Specn Wedge CONTR-02-MISC-2007Rev-02
Specn Wedge CONTR-02-MISC-2007Rev-02
2486392/2024/O/o ED/SW/RDSO
INDIAN RAILWAYS
CONTR-02-MISC-2007
(Revision- 02)
ISSUED BY
WAGON DIRECTORATE
RESEARCH DESIGNS AND STANDARDS ORGANISATION
MINISTRY OF RAILWAYS
MANAK NAGAR, LUCKNOW-226011
Signature Not
Verified JANUARY – 2024
Digitally signed by
ANIL KUMAR MITRA
Date: 2024.01.25
15:32:16 IST
Reason: IREPS-CRIS
Location: New Delhi
562
Specification No. CONTR-02-MISC-2007(Rev.-02)
2486392/2024/O/o ED/SW/RDSO
Contents
1.0 GENERAL ............................................................................................................................... 3
2.0 SCOPE OF SUPPLY ............................................................................................................... 3
3.0 MATERIAL AND PROCESS................................................................................................ 3
4.0 QUALIFYING CRITERIA..................................................................................................... 4
5.0 TECHNICAL REQUIREMENTS ......................................................................................... 5
6.0 DRAWING, CRITICAL DIMENSIONS AND TOLERANCES ....................................... 7
7.0 REGISTRATION/ APPROVAL PROCEDURE .................................................................. 8
8.0 PURCHASE INSPECTION: (Lot Size, Sampling and Confirmatory Tests) ................ 11
9.0 PERFORMANCE GUARANTEE ...................................................................................... 13
10.0 MARKING ............................................................................................................................ 14
11.0 PAINTING ............................................................................................................................ 14
12.0 PACKING AND STORAGE ............................................................................................... 14
13.0 SPACE ENVELOPE DRAWING (WX-10046).................................................................. 15
Page 2 of 15
563
Specification No. CONTR-02-MISC-2007(Rev.-02)
2486392/2024/O/o ED/SW/RDSO
1.0 GENERAL
1.1 This specification is for Friction Wedges with specified range of coefficient of
friction (COF) used in broad gauge freight bogies. It refers to either metallic wedge
moulded with Non-metallic composite liner with specified range of COF on its
vertical face/slope face/both vertical & slope faces or Complete metallic wedge with
specified range of COF. The acceptance is subject to fulfilments of all applicable
criteria given in this specification.
1.3 Wear in matching faces of Friction Wedge, bolster slope liners and bogie side frame
column liners result in reduction of damping force, which adversely affects riding
parameters of bogies. As liners on vertical and slope surface are made to IS: 3885
Part-I Gr. IV (with proper heat treatment to obtained hardness up to 380 to 420
BHN), wedge material should be designed so as to work optimally with the liner.
1.5 This specification draws reference to some of the relevant IS specifications. Latest
versions of these specifications shall be taken as reference unless mentioned
otherwise.
2.1 Friction wedges shall be used in broad gauge wagons fitted with
CASNUB/LCCF/LWLH/RAFTAAR bogies as per the Bogie General arrangement of
the respective wagons.
2.2 Space envelop drawing no. WX-10046 (latest) is to be followed for the development
of this item. For detailed drawing the RDSO drawing No. WD-22055-S/5 (latest) of
Friction Wedge with specified range of COF shall be referred.
3.1 Generally, Friction Wedge with Composite Liner shall consist of two parts, metallic
and non-metallic composite liner (without asbestos) combined with hot moulding
process. Joining metallic and non-metallic parts by pasting/fastening or by any
other means shall not be acceptable.
Page 3 of 15
564
Specification No. CONTR-02-MISC-2007(Rev.-02)
2486392/2024/O/o ED/SW/RDSO
3.2 For Friction Wedge with Composite Liner, the metallic part shall be cast manganese
steel to IS: 276 Grade-I. Firm may offer alternate material with consent of DG
(Wagon) RDSO such that it meets the technical and functional requirements of the
metallic part of the Friction Wedge as stipulated in this specification.
3.3 For Complete Metallic Wedge, the material shall be Austempered Ductile Iron
(ADI) to ASTM A897/A897M and shall meet all technical and functional
requirements of the Friction Wedge stipulated in this specification. These
properties shall be established in laboratory testing as well as during field
monitoring.
3.4 Firm shall submit the detailed test report, documentary evidences, and
chemical/metallurgical properties of the material to Wagon Directorate/RDSO,
Lucknow for obtaining approval. The material specification shall be submitted by
the firm in the drawings/QAP at the time of registration.
4.1 Firms willing to register for manufacture and supply of friction wedges to Indian
Railways shall have to fulfil any one of the following Criteria. They shall install
adequate infrastructure for manufacturing of friction wedge/composite liner,
testing of properties, coefficient of friction measurements and wear parameters as
per this specification in India. However, necessary machinery and equipment for
measurement of Coefficient of Friction (COF) and Wear Rate as stipulated in this
specification may be installed latest before offering Prototype Inspection to RDSO.
4.1.1 Indian firms engaged-in the field of friction damping for Railway
applications or in the field of friction lining in Automotive sector or in the
field of any other Railway Rolling Stock applications.
4.1.2 Indian firms having collaboration with foreign firms supplying Friction
wedges/composite liner to any Rail Road globally. They have to produce
technical collaboration tie-up in the field of production and quality control in
the form of a written Memorandum of Understanding (MOU). Such MOU
must bear the guarantee from the collaborator for quality control and regular
production for a minimum period of five years.
4.1.3 Joint venture of Indian and foreign firm or Indian subsidiary of foreign firm
supplying Friction wedges/composite liner to any Rail Road globally.
4.2 Firms applying for Friction Wedge with Composite liner may purchase metallic
part of the Friction wedge from reputed foundry having in-house manufacturing,
heat treatment, laboratory testing facilities for castings with well-established
quality control system or from existing RDSO approved metallic wedge
manufacturers.
Page 4 of 15
565
Specification No. CONTR-02-MISC-2007(Rev.-02)
2486392/2024/O/o ED/SW/RDSO
5.1 Vertical face of Friction Wedge has to interact with silico-manganese side frame
column liner face made to IS: 3885 Part-I Gr. IV (with proper heat treatment to
obtained hardness up to 380 to 420 BHN). Testing of coefficient of friction (COF)
and wear rate of composite liner/complete metallic Friction Wedge shall be with
this base material. The thickness of composite liner (if applicable) shall be 10 mm.
For design purpose of Friction Wedges, maximum permissible wear thickness of
vertical and slope surface of the Friction Wedge shall be considered as 07 mm and
03 mm respectively.
5.2 Frictional and wear properties of vertical surface of offered Friction Wedge with
matching face of side frame liner are important. Offered design of Friction Wedge
shall have following functional properties with respect to silico-manganese liner to
IS: 3885 Part-I Gr. IV (with proper heat treatment to obtained hardness up to 380 to
420 BHN):
a) Values of average dynamic coefficient of friction shall be in the range of 0.35
– 0.45.
b) Test shall be conducted on a suitable test machine with suitable procedure as
explained in para 5.3.
c) Frictional force versus time graph at each frequency and normal force as
stipulated in this specification for entire test shall also be recorded and
submitted to RDSO.
d) Average values of COF in static (beginning of forward and reverse stroke)
and dynamic state for each frequency and load shall be recorded and
reported.
e) Wear rate should not exceed to 3.0 mm3 measured over span of 5 hours.
Actual value obtained to be laid down in the Firm’s QAP/Drawing approved
by RDSO. Firm has to simulate wear rate in lab test so as to calculate the
maximum permissible wear of liner/vertical face over entire warranty life of
05 years. Generally, the wagons have to run five lac kilometres in 05 years on
IR operations.
5.3 For measuring static/ dynamic COF and wear rate, generally a cylindrical specimen
of diameter 10 mm and length 20 mm of Friction wedge/composite liner and a
matching square flat specimen of size 40x40x5 mm of side frame liner as per IS:
3885 Part-I Gr. IV (with proper heat treatment to obtained hardness up to 380 to 420
BHN) shall be prepared. Proper matching of mating surfaces (more than 80%) of
specimens should be ensured before test for recording of data. Test to be done at
room temperature. Different shape and size of the specimen of Friction Wedge/
composite liner can also be used with different normal forces accordingly for the
testing of coefficient of friction and wear rate only with the prior approval of
Wagon Directorate/RDSO, Lucknow.
5.4 For COF and wear rate measurement, above two specimen samples are placed
together and a normal force is applied on sample made by Friction Wedge. One of
Page 5 of 15
566
Specification No. CONTR-02-MISC-2007(Rev.-02)
2486392/2024/O/o ED/SW/RDSO
the samples is held in a fixed position, while a force is applied to the other sample
until they begin to slip against one another. To measure Static and Dynamic
coefficients of friction it is necessary to use an instrument in such a way that the
relative reciprocating motion occurs between two mating surfaces. Specimens
should be connected suitably with the computer to observe value of normal forces,
frictional forces, stroke length and frequency given with live display and recording
facility. For all other detailed processes, ASTM G-133-05 (latest) shall be followed.
Average dynamic COF and Wear rate of Friction Wedge specimen has to be in
stipulated range.
5.6 Maximum permissible wear thickness of wedge/composite liner vertical face shall
be 07 mm. For identification of maximum permissible wear thickness, all corner
slots of 07 mm depth on vertical face are provided, as shown in drawing attached
with this specification. After the slot is wear out, Friction wedge shall be
condemned and replaced with new one.
5.7 Friction wedge experiences a normal load of 1200 Kgf to 2800 Kgf in empty to
loaded condition of wagon with vertical face of Side Frame liner.
5.8 Apart from the above, following parameters regarding Friction Wedge have to be
submitted by the firm to RDSO with their offer:
A. For Composite Liner of Friction Wedge (if applicable):
i) Hardness
ii) Internal Shear Strength
iii) Compressive Strength
iv) Density
v) Water absorption.
Page 6 of 15
567
Specification No. CONTR-02-MISC-2007(Rev.-02)
2486392/2024/O/o ED/SW/RDSO
Shear strength of bond shall be minimum of 20 Kg/cm2 (for this test firm
shall specify test method in QAP)
5.9 Metallic part of Friction Wedge shall be free from all types of casting defects and
non-metallic part of wedge, if applicable shall also be smooth, free from air bubbles,
surface streaks, splash marks, pinholes, voids, blistering etc. All the edges shall be
smooth and neatly finished. Surface finish of metallic surface must be of Class A1
category, as compared with Steel Castings Research and Trade Association
(SCRATA) Comparators as per ASTM A 802.
6.1 Firm has to submit its own drawing for Friction Wedge as per space envelope
drawing no. WX-10046 (latest) attached with this specification.
6.2 Firm’s drawing must include all critical and other necessary parameters required
for manufacturing and inspection of the product.
6.3 Following dimensions as given in above space envelope/drawing are critical hence
must be included in offered drawing:
(a) Dimension 113, 151, 69, 90, 130 and 170.
Page 7 of 15
568
Specification No. CONTR-02-MISC-2007(Rev.-02)
2486392/2024/O/o ED/SW/RDSO
(b) Perpendicularity between springs seat & vertical surface butting against
column liner, Radius 940 & 1500 and angle 35 degree.
(c) Wedge wing profile.
(d) Spigot Outer diameter, Inner diameter & Depth (As per material supplied).
(e) Proper slot of 07 mm depth to indicate maximum permissible wear
thickness of the Friction Wedge/composite liner at all corners of vertical
wear surface. Width of this slot should be minimum 5 mm.
6.4 Proper location for marking for RDSO drawing no. along with variant type and
firm’s initial with month and year of manufacture on metallic non wearing part of
wedge shall be provided. Location should be as shown in attached drawing,
suitable to cast min 6 mm size letters.
6.5 Friction Wedge shall be manufactured and inspected as per firm’s drawing
approved by RDSO. Therefore, firm shall provide dimensions with adequate
tolerances on drawing sufficient for critical as well as quality inspection of
components. Unspecified tolerances on casting dimension shall be as per IS: 4897
class- 1 categories.
7.1 The firms having adequate manufacturing and testing infrastructure in-house as
per requirements of this specification and willing for registration/approval of their
product may apply online as per latest ISO document QO-D-8.1-5 to Wagon
Directorate, RDSO, Lucknow along with the documents required as per latest ISO
procedure of RDSO.
7.2 The firm shall submit QAP in latest ISO format of RDSO for the product from
purchase of raw material to finished product determining and controlling each
critical stage in the process. QAP should clearly specify critical stages with their
control parameters and system of their measurements.
7.3 RDSO will scrutinise the documents submitted by the firm and if found in order, a
team shall be nominated for infrastructure verification and capability assessment
(CCA) of the firm. In case of inappropriate/incomplete information during scrutiny,
case shall be taken up as per the latest ISO procedure of RDSO and firm shall be
informed accordingly.
7.4 After successful verification of infrastructure during CCA of the firm, firm may be
registered as ‘RDSO Vendor for Developmental Orders’, with conditional approval
for manufacturing and supply of Friction Wedge as per this specification. However
Page 8 of 15
569
Specification No. CONTR-02-MISC-2007(Rev.-02)
2486392/2024/O/o ED/SW/RDSO
supply (even for field trials) shall commence only after approval of the prototype
by the RDSO.
7.5 After registration of the firm as ‘RDSO Vendor for Developmental Orders’, with
conditional approval, firm has to submit its own drawing of the product for Design
Approval including all critical and other necessary parameters given in ‘Para 6.0’
above for manufacturing and inspection of the product as per space envelope
drawing no. WX-10046 (latest) attached with this specification.
7.6 After successful Design & Drawing Approval Firm shall submit their internal test
results (ITR) of offered Friction Wedge (with composite liner or complete metallic)
for scrutiny, which shall include all required tests mentioned in ‘Para 5.0.’ to this
specification. The firm shall submit functional and physical properties along with
chemical/metallurgical properties of the offered Friction Wedge along with method
of testing.
The firm willing to supply complete metallic Friction Wedge shall also submit the
compliance of the material as per ASTM A897/A897M, duly certifying the ADI
casting from a NABL lab/Govt. Lab along with above reports.
Testing of COF and volumetric wear rate as per ‘Para 5.0’ shall be done by any
Govt. Lab or any other lab approved by DG (Wagon), RDSO and report to be sent
to RDSO for scrutiny before offering Prototype Inspection of at least 50 Nos.
Friction Wedge along with required no. of dumb bells for testing. The wedge shall
be offered for inspection before painting. The testing charges will be borne by the
manufacturer.
7.7 If firm’s ITR and above reports found satisfactory, for Prototype inspection a team
will visit firm premises and testing of samples shall be undertaken as per
requirements to this specification.
7.8 On account of failure of Prototype case shall be taken up as per extant ISO
procedure.
The firm shall submit all copies of the purchase order (issued by the purchaser) to
RDSO. The wagon depots(s) where the Friction Wedges shall be supplied and fitted
Page 9 of 15
570
Specification No. CONTR-02-MISC-2007(Rev.-02)
2486392/2024/O/o ED/SW/RDSO
will be nominated by RDSO (Wagon Directorate) in order to monitor their field
trial.
The vendor shall also ensure that they do not secure total order quantity more than
the limited quantity mentioned in the Vendor Directory.
Supply beyond the field trial quantity shall commence only after successful
completion of the field trail.
7.10 The field trial shall be of 09 months period. Measurement of critical parameters
shall be done in three CC Rakes during fitment and at the end of the field trial.
During field trial period, Friction Wedges shall be examined by nominated depots
staffs and in case of failure, Friction Wedge shall be replaced with proper record.
Failed Friction Wedge should be retained for examination of the firms/RDSO. In
case of abnormal/frequent failure of Friction Wedges during field trial, it should be
informed to Wagon directorate, RDSO, Lucknow immediately.
7.11 At the end of the field trial (after 09 months), Friction Wedges shall be jointly
examined extensively by RDSO and depot staff and a joint report shall be prepared.
Firm representative may also join the inspection, if they wish.
7.12 During field trial period, failure should not be more than 2% of fitted Friction
wedges.
7.13 Following shall be the failure criteria after 09 months of trial period for assessment:
7.14 After successful field trial performance of the offered design, firm may be
upgraded from ‘RDSO Vendor for Developmental Orders’, with conditional
approval to ‘RDSO Vendor for Developmental Orders’, for manufacturing and
supply of Friction Wedge as per this specification.
7.15 If firm’s Friction Wedges under field trial performance monitoring do not qualify
Para 7.10. 7.12 and 7.13, further inspection and supply shall not be recommended.
Firm will have to investigate the cause/s and a fresh application shall be made for.
7.16 Supply of minimum quantity of Friction Wedge as per RDSO Vendor Directory &
satisfactory field performance are required for upgradation of vendors from ‘RDSO
Vendor for Developmental Orders’, to ‚Approved Vendor‛. The provisions of ISO
Page 10 of 15
571
Specification No. CONTR-02-MISC-2007(Rev.-02)
2486392/2024/O/o ED/SW/RDSO
document no. QO-D-8.1-11 (titled ‚Vendor-Changes in approved status‛) for
upgradation of vendors as ‘Approved vendor’ shall be applicable.
7.17 All the provisions contained in RDSO’s ISO procedures laid down in document No
QO-D-8.1-11 (titled ‚Vendor-Changes in approved status‛) and subsequent
versions/amendments thereof, shall be binding and applicable on the successful
vendor/vendors in the contracts floated by Railways to maintain quality of
products supplied to Railways.
7.18 To ensure and maintain the quality of Friction wedge supplied by Approved
Vendor, two samples shall be picked up randomly from field for Sample/ Type test
out of which one shall be sent to RDSO/Govt. Lab for testing of COF, wear rate and
second shall be kept reserved in custody with RDSO. In case of complete metallic
Wedge (ADI), two more samples to be picked up from the field and one sample
shall be sent to RDSO or any government lab for Chemical and Micro Analysis as
per ASTM A897/A897M also and second shall be kept with RDSO as reserved
sample. RDSO at its discretion may send the samples to another laboratory as well.
This process shall be part of Quality Audit and conducted during Quality Audit.
Testing charges will be borne by the manufacturer.
If any above sample of Friction Wedge fail during type test, the approved
manufacturer will be required to submit an explanation for the same. Based on the
rationality of the explanation, the reserved second sample will be sent to retest. In
case the second sample also fails during retesting, the Quality audit of the firm will
be treated as failed and accordingly action will be taken against the firm as per
extent policy.
8.1 Regular inspection of the Friction Wedge shall be carried out by the inspecting
agency at the vendor’s premises as per provision of latest ISO documents. The
vendor shall provide material, equipment, tools and any other assistance, which the
inspecting agency may consider necessary for tests and examination without any
charges. The vendor shall make available manufacturing drawings and material
specifications of the components to the inspecting agency at the time of inspection.
8.2 The lot size of Friction Wedge to be offered in one inspection shall be maximum
2000 nos. or part thereof. The vendor shall offer the lot for inspection after complete
checking by them. The internal test results (ITR) shall be submitted to the
inspecting agency.
8.3 Physical and chemical/metallurgical tests of the metallic part of the Friction Wedge
shall meet all requirements of the specification given in the firm’s drawings/QAP
approved by RDSO.
8.4 Testing of COF and wear rate of the Friction Wedge shall be done in house and
reports shall be submitted to the inspecting agency. However, Random samples
Page 11 of 15
572
Specification No. CONTR-02-MISC-2007(Rev.-02)
2486392/2024/O/o ED/SW/RDSO
may be picked up during purchase inspection by RDSO inspecting agency for
testing of COF, wear rate in addition to ADI microstructure (in case of Complete
Metallic Wedge) of the Friction Wedge from any NABL accredited lab/ Govt. Lab, if
required so. Expenses of these tests shall be borne by the firm.
8.5 From the lot offered for purchase inspection, the following samples shall be
randomly drawn by the Inspecting agency for various tests of Friction Wedges:
NOTE: Samples for 5-6 above if applicable may be taken from composite
liner slab of same lot of Friction Wedge
8.6 Material shall be offered for inspection within three months of manufacturing as
marked on Friction Wedge.
Page 12 of 15
573
Specification No. CONTR-02-MISC-2007(Rev.-02)
2486392/2024/O/o ED/SW/RDSO
8.7 Material offered for inspection shall not be withdrawn during the course of
inspection. Any move to withdraw the material or interfere with the inspection in
any way shall render the entire lot being rejected.
8.8 If any of the samples fails in any one or more criteria, double sample method
prevailing as per ISO procedure in RDSO shall be applied for accepting or rejecting
the entire lot offered. If double sample fails, entire lot shall be rejected. Inspection
shall not be recommenced till further advice from RDSO. The firm shall investigate
the cause of the failure, take remedial action to improve the quality of material &
process control and also implement the same.
8.9 In the event of rejection, the entire lot offered for inspection shall be made unusable
in the presence of the inspecting/purchasing authority. Record keeping format for
disposal of failed/rejected lot shall be part of QAP.
8.10 Any failure in attribute checked on 100% of Friction Wedge internally as per the
firm’s own Quality Assurance Plan (QAP) will be considered very serious as it will
indicate the failure of the firm’s own QAP. In that case manufacturer will have to
review their internal QAP and take corrective action accordingly advising details of
action taken to RDSO.
8.11 The Friction Wedge, which has been inspected and passed, shall be double stamped
by the Inspecting Agency. The entire quantity of Friction Wedges from which the
sampling has been taken shall be stamped (single stamp mark) by the Inspecting
Agency. Double stamping mark is to identify the samples, which were drawn for
inspection for future reference in the event of any dispute.
8.12 The responsibility of lot offered for inspection shall be of manufacturer and the
manufacturer shall submit a certificate that the entire lot offered for inspection was
internally checked and it conforms to the technical requirements of RDSO
approved drawings, QAP and this specification.
9.1 The offered design of Friction Wedge shall be guaranteed for a period of 5 years
(sixty months) from the month and year of manufacture. The guarantee shall cover
design, material and workmanship. The vendor shall replace complete Friction
Wedge failed during guarantee period to the depot raised claim at his own expense
and within reasonable time with intimation to Wagon Directorate, RDSO Lucknow.
9.2 The Zonal Railways shall log the warranty failure on the Online Portal decided by
the Railway Board or as per the extant procedure of warranty logging. Whenever
repeated/frequent failures are reported, firm shall investigate and come up with
satisfactory reasons of failure and take remedial action to improve the quality.
9.3 Linking performance of the Friction Wedges with maintenance condition of bogie
and Indian Railways operating conditions etc. for warranty compliance shall not be
accepted.
Page 13 of 15
574
Specification No. CONTR-02-MISC-2007(Rev.-02)
2486392/2024/O/o ED/SW/RDSO
10.0 MARKING
10.1 Marking on each Friction Wedge as given below, shall be done by cast depressed
embossing or engraving with letters size of at least 6 mm on non-wearing metallic
surfaces at location as shown in attached drawing (side surfaces between vertical
and slope wear surfaces) during manufacturing process itself. Stamping/punching
and marking these information by any other method after manufacturing shall not
be permitted. Non-compliance of marking particular shall be adequate reason for
rejection of material.
a) RDSO Drawing number along with Variant Type.
b) Manufacturer’s Initial/trade mark with Month and year of manufacture &
Heat Number.
10.2 The embossed/ engraved letter shall be of the size and at the location shown in the
drawing approved by RDSO.
11.0 PAINTING
11.1 Metallic part of Friction Wedge shall be spray painted with rust-resistance coating
of dove grey colour as per specification no. IS: 2074 to prevent rusting.
12.1 Friction Wedges shall be packed in pairs, with diagonals face each other and in a
suitable card board/wooden packing to protect against damage during transit and
storage. The component shall be stored under cover and dry places.
12.2 In the event of sublet orders placed by bogie manufacturers, packing shall be as
agreed to between the purchaser and the supplier.
Page 14 of 15
575
Specification No. CONTR-02-MISC-2007(Rev.-02)
2486392/2024/O/o ED/SW/RDSO
Page 15 of 15