The RFI report lists multiple requests for information (RFI) related to various activities, primarily concerning sampling, testing, and clearing for highway construction. All RFIs are currently marked as 'Pending' and are scheduled for inspection between November 11 and December 12, 2024. The report includes details such as RFI IDs, categories, chainages, and inspectors for each activity.

Uploaded by

mtm manglam
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
21 views2 pages

RFI Report

The RFI report lists multiple requests for information (RFI) related to various activities, primarily concerning sampling, testing, and clearing for highway construction. All RFIs are currently marked as 'Pending' and are scheduled for inspection between November 11 and December 12, 2024. The report includes details such as RFI IDs, categories, chainages, and inspectors for each activity.

Uploaded by

mtm manglam
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

RFI Report

Activity Status RFI RFI ID Category Sub-Category Item Layer Side Chainage Chainage To Activity Requested Date & Scheduled Date & Inspector Result Nature Inspected
Status From Time Time of RFI Date &
Time

RFI Raised RFI N/05022/01003/ Other Others NA NA LHS 31.000 31.001 Sampling 11-11-2024 12-11-2024 Mr Pending
By Open RJ/RFI/ Works & Testing 07:09 PM 11:15 AM Bishan
Contractor OTHERWORKS/ of Borrow Sharma
N/16 Area No-4
RFI Raised RFI N/05022/01003/ Other Others NA NA NA 20.000 21.000 Sampling 11-11-2024 12-11-2024 Mr Pending
By Open RJ/RFI/ Works and 07:09 PM 01:15 PM Bishan
Contractor OTHERWORKS/ Testing of Sharma
N/15 OGL BHS
RFI Raised RFI N/05022/01003/ Other Others NA NA NA 29.000 31.000 Sampling 11-11-2024 12-11-2024 Mr Pending
By Open RJ/RFI/ Works and 07:09 PM 10:20 AM Bishan
Contractor OTHERWORKS/ Testing of Sharma
N/14 OGL BHS
RFI Raised RFI N/05022/01003/ Other Others NA NA NA 2.000 10.000 Checking 11-11-2024 12-11-2024 Mr Pending
By Open RJ/RFI/ Works of NGL 07:09 PM 10:00 AM Bishan
Contractor OTHERWORKS/ BHS Sharma
N/13
RFI Raised RFI N/05022/01003/ Highway Main Survey Temporary RHS 0.000 10.000 Checking 11-11-2024 12-11-2024 Mr Pending
By Open RJ/RFI/ Carriageway Benchmark of TBM 07:09 PM 09:57 AM Bishan
Contractor HIGHWAY/N/12 (Flexible Traversing Sharma
Pavement)
RFI Raised RFI N/05022/01003/ Highway Main Survey Temporary LHS 0.000 10.000 Checking 11-11-2024 12-11-2024 Mr Pending
By Open RJ/RFI/ Carriageway Benchmark of TBM 07:09 PM 09:55 AM Bishan
Contractor HIGHWAY/N/11 (Flexible Traversing Sharma
Pavement)
RFI Raised RFI N/05022/01003/ Highway Main Clearing NGL RHS 20.000 22.000 Clearing & 08-11-2024 12-11-2024 Mr Pending
By Open RJ/RFI/ Carriageway and Grubbing 04:42 PM 10:10 AM Bishan
Contractor HIGHWAY/N/10 (Flexible Grubbing Sharma
Pavement)
RFI Raised RFI N/05022/01003/ Highway Main Clearing NGL LHS 20.000 22.000 Clearing & 08-11-2024 12-11-2024 Mr Pending
By Open RJ/RFI/ Carriageway and Grubbing 04:42 PM 10:30 AM PARDEEP
Contractor HIGHWAY/N/9 (Flexible Grubbing KUMAR
Pavement)
RFI Raised RFI N/05022/01003/ Highway Main Clearing NGL RHS 15.500 16.000 Clearing & 08-11-2024 12-11-2024 Mr Pending
By Open RJ/RFI/ Carriageway and Grubbing 04:42 PM 11:30 AM Bishan
Contractor HIGHWAY/N/8 (Flexible Grubbing Sharma
Pavement)
Activity Status RFI RFI ID Category Sub-Category Item Layer Side Chainage Chainage To Activity Requested Date & Scheduled Date & Inspector Result Nature Inspected
Status From Time Time of RFI Date &
Time

RFI Raised RFI N/05022/01003/ Highway Main Clearing NGL LHS 15.500 16.000 Clearing & 08-11-2024 12-11-2024 Mr Pending
By Open RJ/RFI/ Carriageway and Grubbing 04:42 PM 10:30 AM Bishan
Contractor HIGHWAY/N/7 (Flexible Grubbing Sharma
Pavement)
RFI Raised RFI N/05022/01003/ Highway Main Clearing NGL RHS 10.000 11.600 Clearing & 08-11-2024 12-11-2024 Mr Pending
By Open RJ/RFI/ Carriageway and Grubbing 04:42 PM 06:18 PM PARDEEP
Contractor HIGHWAY/N/6 (Flexible Grubbing KUMAR
Pavement)
RFI Raised RFI N/05022/01003/ Highway Main Clearing NGL LHS 10.000 11.600 Clearing & 08-11-2024 12-11-2024 Mr Pending
By Open RJ/RFI/ Carriageway and Grubbing 04:42 PM 11:12 AM Bishan
Contractor HIGHWAY/N/5 (Flexible Grubbing Sharma
Pavement)
RFI Raised RFI N/05022/01003/ Highway Main Clearing NGL RHS 3.700 4.150 Clearing & 08-11-2024 12-11-2024 Mr Pending
By Open RJ/RFI/ Carriageway and Grubbing 04:42 PM 11:17 AM PARDEEP
Contractor HIGHWAY/N/4 (Flexible Grubbing KUMAR
Pavement)
RFI Raised RFI N/05022/01003/ Highway Main Clearing NGL LHS 3.700 4.150 Clearing & 08-11-2024 12-11-2024 Mr Pending
By Open RJ/RFI/ Carriageway and Grubbing 04:42 PM 09:20 AM Bishan
Contractor HIGHWAY/N/3 (Flexible Grubbing Sharma
Pavement)
RFI Raised RFI N/05022/01003/ Highway Main Clearing NGL RHS 4.400 4.600 Clearing & 08-11-2024 12-11-2024 Mr Pending
By Open RJ/RFI/ Carriageway and Grubbing 04:42 PM 10:20 AM PARDEEP
Contractor HIGHWAY/N/2 (Flexible Grubbing KUMAR
Pavement)
RFI Raised RFI N/05022/01003/ Highway Main Clearing NGL LHS 4.400 4.600 Clearing & 08-11-2024 12-11-2024 Mr Pending
By Open RJ/RFI/ Carriageway and Grubbing 04:42 PM 09:16 AM Bishan
Contractor HIGHWAY/N/1 (Flexible Grubbing Sharma
Pavement)