The document outlines a comprehensive checklist for the construction of Pre-Engineered Building (PEB) structures, divided into five phases: Pre-Design, Design, Fabrication, Erection, and Final Inspection. Each phase includes specific tasks such as site surveys, structural design, material procurement, and final inspections to ensure compliance with building codes and quality standards. The checklist serves as a guide to ensure all critical steps are completed for successful project execution.

Uploaded by

sandeepdas176
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
24 views

PEB_Structure_Checklist

The document outlines a comprehensive checklist for the construction of Pre-Engineered Building (PEB) structures, divided into five phases: Pre-Design, Design, Fabrication, Erection, and Final Inspection. Each phase includes specific tasks such as site surveys, structural design, material procurement, and final inspections to ensure compliance with building codes and quality standards. The checklist serves as a guide to ensure all critical steps are completed for successful project execution.

Uploaded by

sandeepdas176
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Checklist for Pre-Engineered Building (PEB) Structure

1. Pre-Design Phase

[ ] Site Survey and Soil Testing Completed

[ ] Load Calculations (Dead, Live, Wind, Seismic)

[ ] Building Usage and Functional Requirements Identified

[ ] Dimensions (Length, Width, Height) Finalized

[ ] Required Clearances and Bays Specified

[ ] Local Building Codes and Standards Reviewed

2. Design Phase

[ ] Structural Design Using Software (STAAD, Tekla, etc.)

[ ] Frame Geometry Finalized (Rigid Frame, Multi-span, etc.)

[ ] Secondary Members Designed (Purlins, Girts, Bracings)

[ ] Roof and Wall Panel Design

[ ] Foundation Design Coordinated

[ ] Connection Details Prepared

[ ] Shop Drawings and GA Drawings Approved

3. Fabrication Phase

[ ] Material Procurement (Steel, Fasteners, Panels)

[ ] CNC Cutting and Drilling Completed

[ ] Welding and Assembly as per Drawings

[ ] Quality Checks: Dimensional, Welding, Material Grades

[ ] Surface Preparation (Shot Blasting, Cleaning)

[ ] Primer and Final Coating Applied

[ ] Pre-Shipment Inspection Done

4. Erection Phase

[ ] Foundation Anchor Bolts Checked

[ ] Main Frame Erection (Columns, Rafters)

[ ] Secondary Member Installation (Purlins, Girts)

[ ] Bracing and Connection Tightening


Checklist for Pre-Engineered Building (PEB) Structure

[ ] Roofing and Cladding Installation

[ ] Gutters, Downspouts, and Flashings Installed

[ ] Final Alignment and Verticality Checks

[ ] Safety Measures in Place Throughout

5. Final Inspection and Handover

[ ] Structural Integrity Verified

[ ] Bolt Tightness and Welds Checked

[ ] Roof Leak and Cladding Inspection

[ ] Painting/Coating Touch-Ups Done

[ ] As-Built Drawings Submitted

[ ] Completion Certificate Issued