0% found this document useful (0 votes)
3 views

Details A2

The document outlines the specifications and materials for the construction of a roof at Lorentzville Park, including details on timber rafters, insulation, drainage, and electrical installations. It includes general notes for compliance with building standards and responsibilities of the contractor. Additionally, it specifies the need for proper waterproofing, ventilation, and drainage systems in accordance with relevant regulations.

Uploaded by

1746213
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
3 views

Details A2

The document outlines the specifications and materials for the construction of a roof at Lorentzville Park, including details on timber rafters, insulation, drainage, and electrical installations. It includes general notes for compliance with building standards and responsibilities of the contractor. Additionally, it specifies the need for proper waterproofing, ventilation, and drainage systems in accordance with relevant regulations.

Uploaded by

1746213
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Project:

6.0mm IBR iron roof sheet LORENTZVILLE PARK


Manufacterer: GRS
UPC: 12764

0
228X38mm Timber rafter @ 120 General notes:
1400mm c.c. spacing
Manufacterer: P & S Timber 1.1 All cavity walls to have brick wall ties in accordance with MPW-100.
UPC: TM5889 1.2 All open paved areas to be graded to falls, as determined on site.
1.3 Contractor to provide flashing to changes in roof levels and to parapet
walls.
76x50mm Timber battens
76.2x2.5mm Steel 1.4 Glazing to comply with SANS 10400-N.
Manufacterer: P & S Timber 1.5 Min. ffl to ngl to be 230mm.
UPC: TM5433 circular hollow section 1.6 All concrete slabs, columns, retaining walls, to engineer's specifications.
1.7 Contractor to make good all damaged and defective work caused as a
result of the works.
1.8 Drawings are not to be scaled with only figure dimensions to be taken.
100mm Mineral wool insulation 1.9 The contractor is to verify all levels, heights and dimensions on site and
Manufacterer: Isover 575 Stainless steel net hooks is required to check these dimensions against the drawings before
carrying out any work.
UPC: 12553
1.10 The contractor is responsible for the correct setting out of the buildings.
Any discrepancies are to be reported to the architect before carrying
polypropylene net out any work.
25.0° 1.11 Quality of all materials and workmanship to comply with the relevant
100x75mm Steel gutter SABS specifications and shall conform to the minimum standards
Manufacterer: SA gutter specified in the standard preambles.
1.12 Contractor to make good all damaged and defective work caused as a
UPC: FG87KL result of the works.

Gutter hanger 230x230mm 2.0 ROOF CONSTRUCTION


Manufacterer: SA gutter Steel base plate 2.1 All roofs to have waterproofing and insulation as per specifications.
UPC: FG677S
3.0 DRAINAGE
Timber wall plate 400 3.1 All WP's to be fully accessible along their entire length. WP's to be
50mmØ unless otherwise noted.
3.2 No bends or junctions under the buildings.
38x38mm Timber battens @ 3.3 IE's to have marked covers at ground level.
400mm c.c. spacing 3.4 All waste fittings to have reseal traps.
3.5 All bends, junctions and level changes to have IE's.
3.6 All pipes passing under buildings to be encased in 100 thick concrete.
3.7 All drainage to comply with SANS 10400-P
PVC white Cornice
3.8 All waste pipes and soil pipes from urinals to be 40mm Ø.
Manufacterer: Pelican 3.9 All waste fittingd to have deep seal traps.
UPC: PVCZC540 Stainless steel net hooks 3.10 Provide access eyes at every 25m of soil pipes.
3.11 RWDP's to be min. 2450mm from gulleys.
3.12 100mm PVC OVP to the head of each drain run
100x75mm Steel 3.13 Any existing drainage to be sealed off and disconnected where shown
square crimped shoe 230mm Reinforced and work made good to match existing.
UPC: 20415 3.14 All WC's with soil pipes greater than 1200mm to be adequately
concrete parapet wall anti-siphoned.
6mm PVC ceiling panel
4.0 LIGHT AND VENTILATION
Manufacterer: 4.1 All light and ventilation to be in accordance with SANS 10400-0
UPC: 4.2 Ventilation to habitable rooms to be specified by the mechanical
110 10 110 230 engineer in accordance with the NBR.
4.3 Area of natural light to all habitable rooms to be a minimum of 10% of the
floor area.

Roof Detail 250 Parapet & Circular Hollow Section 5.0 ELECTRICAL

1 2 1 : 10
5.1 Light fittings, switches and plug points to be determined by owner on site.

1 : 10

240 Architect's signature:

110 10 110 10 Client's signature:


Full-bore outlet
Manufacterer: Saint-Gobain Structural eng. signature:
UPC: 3500
Mechanical eng. signature:
Pebbles for filtering unwanted products

55mm Artificial turf Key / Legend:


Polypropylene cavity drainage (Easi-Chelsea Grass)
membrane (Oldroyd Xv) Manufacterer: Easigrass

Epdm rubber roof water stop waterproofing


membrane
300x00mm Reinforced
concrete column
Concrete screed @ 1:90 fall

255
240mm Brick wall with 10mm 255 mm Reinforced concrete
exterior plaster roof slab to engineers spec. Rev Description Date

245
25x35mm T-section (forming grid)
40mm Power floated concrete
screed

Polypropylene cavity drainage


membrane (Oldroyd Xv)
Company :
40

1200x900x6mm Gypsum ceiling board

600Ø Concrete pile wall 110Ø 90° Elbow pvc prainage pipe
150

according to engineer's spec.

100x90mm Drainage channel


150

Client:
LORENTZVILLE
150mm Concrete surface bed
Drawing title:
DETAILS

Drawn by: Student no:


DN MALULEKE 217062331

Checked by: Date issued:


Basement Waterproofing Drainage Detail DN MALULEKE 15/10/2019
3 1 : 10 4 1 : 10 Project no: Rev no: Scale: Drawing no:
001 1:10 95