0% found this document useful (0 votes)
0 views

Punch Points Stringing Formats

The document outlines the punch points for the stringing process of the 400 KV D/C Diding Dhalkebar Bathnaha TL project by KEC International Ltd. It includes a detailed checklist for various components such as insulators, grading rings, and bolts, highlighting the required and missing items. The document serves as a guide for ensuring all necessary components are accounted for during the stringing process.

Uploaded by

sAuRaBh
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
0 views

Punch Points Stringing Formats

The document outlines the punch points for the stringing process of the 400 KV D/C Diding Dhalkebar Bathnaha TL project by KEC International Ltd. It includes a detailed checklist for various components such as insulators, grading rings, and bolts, highlighting the required and missing items. The document serves as a guide for ensuring all necessary components are accounted for during the stringing process.

Uploaded by

sAuRaBh
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

PUNCH POINTS-STRINGING

KEC INTERNATIONAL LTD.


Project Name: 400 KV D/C (Quad) Diding Dhalkebar Bathnaha TL (TW-02)
STRINGING EARTHWIRE
Grading Check Nut Arcing Horns CC Ring CC Ring Nut Split Pin Split Pin Jumper Check Nut
Sr. Insulator
Loc No Ring Bolt Missing of Tightening Tightening & Bolt (Big) (Small) Bolt Missing of Armour Rod Al
No Phase Name Damaged Tightening Tightning Twin Spacer CU Bond VD Remarks
Grading Ring Required Required Missing Missing Missing Jumper of Spacer
(Nos) Required required
(Nos) (Nos) (Nos) (Nos) (Nos) (Nos) (Nos)
(Nos) (Nos)