The document outlines the punch points for the stringing process of the 400 KV D/C Diding Dhalkebar Bathnaha TL project by KEC International Ltd. It includes a detailed checklist for various components such as insulators, grading rings, and bolts, highlighting the required and missing items. The document serves as a guide for ensuring all necessary components are accounted for during the stringing process.
The document outlines the punch points for the stringing process of the 400 KV D/C Diding Dhalkebar Bathnaha TL project by KEC International Ltd. It includes a detailed checklist for various components such as insulators, grading rings, and bolts, highlighting the required and missing items. The document serves as a guide for ensuring all necessary components are accounted for during the stringing process.
Project Name: 400 KV D/C (Quad) Diding Dhalkebar Bathnaha TL (TW-02) STRINGING EARTHWIRE Grading Check Nut Arcing Horns CC Ring CC Ring Nut Split Pin Split Pin Jumper Check Nut Sr. Insulator Loc No Ring Bolt Missing of Tightening Tightening & Bolt (Big) (Small) Bolt Missing of Armour Rod Al No Phase Name Damaged Tightening Tightning Twin Spacer CU Bond VD Remarks Grading Ring Required Required Missing Missing Missing Jumper of Spacer (Nos) Required required (Nos) (Nos) (Nos) (Nos) (Nos) (Nos) (Nos) (Nos) (Nos)