BARANGAY:
CITY/MUNICIPALITY:
PROVINCE:
REGION:
2.1.1 Structure:
Organized BDRRMC with its composition compliant to the EO (signed by the PB) or similar issuance
provisions of NDRRMC, DILG, DBM, and CSC JMC No. 2014-01. (resolution/ordinance signed by the PB, Barangay
Secretary and SBMs) organizing the BDRRMC with its
composition compliant to the provisions of JMC No.
2014-01, covering January to October 2023
2.1.2 Plan:
Approved Barangay Disaster Risk Reduction and Management Approved BDRRM Plan adopted by the Sangguniang
(BDRRM) Plan covering CY 2024, adopted by the Sangguniang Barangay ;
Barangay
Resolution adopting the BDRRM Plan signed by the
Sangguniang Barangay with received stamp from the
C/MDRRMO; and
2.1.3 Budget:
Certification on the allocation of at least 5% of the
Allocation of at least 5% of the Estimated Revenue from Regular Estimated Revenue from Regular Sources as BDRRM
Sources as BDRRM Fund Fund, signed by the City/Municipal Budget Officer
(Total number of activities/projects accomplished / Total number of % of programs, project, and activities are completed
activities/projects reflected in the BDRRMP) x 100
OR
2.2.1 Conducted an activity in relation to Risk Assessment in the Post-Activity Report of activities such as Climate and
barangay not earlier than CY 2020 Disaster Risk Assessment, Participatory Disaster Risk
Assessment, BDRRM Planning, etc.
2.2.2 Barangay Risk/Hazard Map which indicates possible risks — Two (2) Photo documentations of Barangay Risk/Hazard
natural or man-made. (e.g. flood-prone and landslide-prone areas, Map
etc.)
2.2.3 An established Early Warning System (EWS) for the top two (2) Two (2) Photo documentations of EWS
hazards present in the barangay
TOP 1 Hazard:
TOP 2 Hazard:
2.3.1 A barangay must have a permanent or temporary evacuation Two (2) Photo documentation of the permanent or
center temporary evacuation center; and
BARANGAY:
CITY/MUNICIPALITY:
PROVINCE:
REGION:
6.1.2 Plan:
Approved Solid Waste Management Program/Plan
Approved Solid Waste Management Program/Plan with covering CY 2023 with corresponding fund allocation
corresponding fund allocation
6.1.3 Trainings:
Attendance of BESWMC to necessary training relative to At least one (1) copy of proof of training such as
promoting environmental protection, preservation and awareness Certificate of Completion and/or Participation
not earlier than 2020
• Established MRF operated by the barangay A. For MRF operated by the barangay:
• MRS Photo documentation of the MRF/MRF Records of the
• Clustered MRF barangay
OR
B. For MRS:
MOA with junkshop;
OR
C. For Clustered MRFs:
MOA with the host barangay (applicable for barangay-
clustered MRFs);
6.3.1 Enacted Barangay Ordinance or similar issuance on segregation of EO (signed by the PB) or similar issuance
wastes at-source (resolution/ordinance signed by the PB, Barangay
Secretary and SBMs) on segregation of wastes at-source