0% found this document useful (0 votes)
2 views

1W+1S Auto:Manual Shift with Timer

The document is a technical drawing related to the ERAM project, detailing electrical components and configurations. It includes specifications such as voltages, auto/manual shift mechanisms, and project information. The drawing is dated October 12, 2024, and is marked for approval.

Uploaded by

Sathya The Gamer
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
2 views

1W+1S Auto:Manual Shift with Timer

The document is a technical drawing related to the ERAM project, detailing electrical components and configurations. It includes specifications such as voltages, auto/manual shift mechanisms, and project information. The drawing is dated October 12, 2024, and is marked for approval.

Uploaded by

Sathya The Gamer
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

MCB R-Ph.

R
R-PH

F.S 2 R01

F.S 1 S.S 1 A S.S 2 A S.S 1 M R 02 S.S 2 M R 03 R 02

R 02 R 03

S.S02 A

K 02 K 01 R 03

MPCB 1 MPCB2

R01 R02 R03 K01 K02 T01

N
415VAC-NE N

1W + 1S Auto/Manual Auto Shift with Timer

TITLE: DATE : 10/12/2024 SCALE :NTS SHEET NO: 01/01

ERAM PROJECTS ISSUE : FOR APPROVAL DWG NO : REV

PROJECT : EAC-005-SC-00 0

You might also like