0% found this document useful (0 votes)
3 views

Water Source Validation Report_Final 1

The Water Source Validation Report confirms that a water source in the Philippines has been validated for the FY 2023 Local Government Support Fund, showing a discharge flow of 7.5 lps, which meets the project's requirements. The source is deemed free from contamination and meets the Philippine National Standard for Drinking Water. The design of the water system will comply with relevant sanitation codes, and DILG representatives are allowed to verify the data.

Uploaded by

Danilo
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
3 views

Water Source Validation Report_Final 1

The Water Source Validation Report confirms that a water source in the Philippines has been validated for the FY 2023 Local Government Support Fund, showing a discharge flow of 7.5 lps, which meets the project's requirements. The source is deemed free from contamination and meets the Philippine National Standard for Drinking Water. The design of the water system will comply with relevant sanitation codes, and DILG representatives are allowed to verify the data.

Uploaded by

Danilo
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Republic of the Philippines

Province of
Municipality of

WATER SOURCE VALIDATION REPORT

In the implementation of the FY 2023 Local Government Support Fund – Growth Equity Fund (LGSF-GEF) located in), the following
has been validated:

Location Date of Measured With attach Target


Source Date of Date of
(Exact conduct of Discharge Water Beneficiari
(e.g Well conduct of Measureme Longitude Latitude
Sitio/ Geo- Flow (Q) Quality Test es to be
or Pumping Test nt (spring)
Baranga Resistivity (well or Result (Yes Served
Spring) (well)
y) (for new Spring) or No) (HHs)
well)
Well 7.5 lps N/A 122.298176 11.481440 Yes 1000

Note: Measurement of discharge flow (Row 5) of spring source should be done during the Peak-dry season to determine the minimum capacity.

A. The measured discharge flow of the water source/s was/were feasible for supplying water to the intended beneficiaries, with the discharge/flow
design requirement of 7 . 5 (lps) based on the project’s feasibility study.
B. The water source is free from contamination and pollutants.
C. Potable for drinking and passed the minimum requirements set by the Philippine National Standard for Drinking Water (PNSDW);
D. The design of the Water System will be compliant with Chapter II, Section 13 of PD 856 (Sanitation Code of the Philippines).

We are allowing the DILG representatives to verify the above data as needed to check the feasibility of the proposed project.

Prepared by: Date prepared:

Resident Engineer (COS)

Reviewed by:

Municipal Engineer