RGP_TOOLS_AND_EQUIPMENT_Check_List
RGP_TOOLS_AND_EQUIPMENT_Check_List
SL NO CHECK ITEMS Y N
4
Check the wire sling connections on the Kelly Bar for loose or damaged
U bolts and broken wires.
5
No oil leak in hydraulic parts.
6
Kelly Movement and working condition (damage, crack and jamming
while extending).
7 Working condition of the Emergency Lever in the Operator Cabin.
8 Wire ropes shall be free from Damages (No Kinks and broken wires).
13
Operator should pose a valid license.
Comments If any:
SL NO CHECK ITEMS Y N
4 D.B box connected with the machine is equipped with MGB and ELGB.
Emergency switch is available in working condition ( Front side and back side of the
5
m/c)
6 Power on & off switch with indicator light are available in working condition.
8 No oil leakage
10
Limit switch (Both Side,below the job plate) are in working condition
Comments If any:
SL NO CHECK ITEMS Y N
7 Condition of radiator
8 Wire rope/sling of the hopper fixed with the guide only by 'D' clamp.
9 Condition of belt
11 Condition of chain
13 Ensure barricading on both sides of the hopper when the machine in operation
Comments If any:
SL NO CHECK ITEMS Y N
4 Oil leakage from the hydraulic cylinder and from the diesel tank.
10 Operator license.
Comments If any:
SL NO CHECK ITEMS Y N
5 Safe means of access (steps, grab bars, non-slip surfaces) to the cab is provided
15 Visualization of Check sheet and Operator details with photo in the vehicle itself.
Comments If any:
SL NO CHECK ITEMS Y N
Comments If any:
7
1
10
4
5
6 3
SL NO CHECK ITEMS Y N
3 10
8
6
5 7
SL NO CHECK ITEMS Y N
10 No cracks in windscreen
12 Signal man
Comments If any:
2
1
8 10
11
3
9
6
SL NO CHECK ITEMS Y N
5 Wire rope and slings free from tolerable damage( No kinks, broken wires more than 10% is N.G).
11
SL NO CHECK ITEMS Y N
4 Wire rope and slings free from tolerable damage( No kinks, broken wires more than 10% is N.G).
9 Boom structure condition while full expansion (damage, crack and jamming while extending).
10 3
4
5
9
7
1
10
6
2
SL NO CHECK ITEMS Y N
The cherry picker movement/ work area is leveled ,compacted and free from all
9
obstructions
Comments If any:
Level adjustment is
4 in good working
condition
Availability of limit
6 switch for the
platform extension
Mechanical stoper
7 for the platform
lifter is in
Operator and
Scissor lifter working
scissor lifter
platform is provided
1 8 capacity details
with hand rail and
displayed in the
midrail
liftefr.
3
All wheels are in
good
Comments If any:
SL NO CHECK ITEMS Y N
6 Tyre condition
SL NO CHECK ITEMS Y N
4 No oil leakage from the oil tank & other parts of the m/c.
In case of mobile gen set, confirmation of inbuilt acoustic system. (If sound is
14
more than 85 dB)
Comments If any:
2 4
3 8
9 14
5 7
1
6
15
13
Y N
SL NO CHECK ITEMS
1 Firm Base with grouting & Easily accessable panel (height of the leg is equal to 1m)
4 Visualization of voltage, current and type of tools to be used in the socket & Panel.
9
2
1
3 4 0
16
6
4
4
1
15 0
20 21 22
Extension 1
Ladder 14
10 8
SL NO CHECK ITEMS Y N
1 All the rungs, cleats, or steps are in good condition (Broken,missing,bend rungs)
2 Side rails is intact without any cracks, bends, or breaks.
3 The rungs, cleats, or steps is fit into the side rails without damage.
4 Ladder is free from corrosion.
5 Side rails and steps are free of oil or grease.
6 Rungs are placed at regular intervals (30 cm gap between two rungs)
7 Projection of loose nails, screws, bolts, or other metal parts
8 At the time of using, the ladder should be placed at 65-75 degree angle (1:4 ratio)
9 Ladder is extended at least 1 m above the landing platform (3 Rungs)
10 Ladder is secured either at top or at the bottom
11 Ladder rungs should not be painted.
12 Reinforcement rod should not be used as ladder rungs
13 The surface of the rungs should not be smooth
14 Rubber feet for firm grip (in case of Aluminum ladder)
Comments If any:
Comments If any:
SL NO CHECK ITEMS Y N
6
Weight of the extinguisher (Should be match with actual weight written
in the body)
7 Availability of visual board.
8 All the indicator gages (where fitted) in green segment (not to be red)
4
3
6
7 4
Y N
SL NO CHECK ITEMS
2
5
1 7 4 3
SL NO CHECK ITEMS Y N
2 1
1
4
4
5 5
6
7 8 7
2
3 8 6
3
SL NO CHECK ITEMS Y N
SL NO CHECK ITEMS Y N
SL NO CHECK ITEMS Y N
3 Welding cables connected to the welding machine with lugs at the joints
3
5
2
Y N
SL NO CHECK ITEMS
5 Connection between air blower body & air horn is in good condition?
Comments If any:
SL NO CHECK ITEMS
2 Whether necessary precaution is taken for underground pipes, sewer, and cable?
3 In case of loose soil whether proper shoring for the excavation is provided to prevent cave in?
4 Whether proper slope usually 450 & suitable benches of 0.5 m width at each 1.5 m depth are provided?
5 Whether proper foot step, slope or ladder provided for safe access / egress of man and equipment?
Whether barrication of 1m height with caution tape provided for excavation having depth < 1 m and
6
hard barrication for depth > 1 m?
7 Whether excavated earth is placed beyond 1.5 m of the edge of the trench?
8 Whether separate area is identified for storage of excavated earth or debris if required for back filling?
9 Whether heavy vehicle movement is restricted to come 2m of the edge of the excavation?
11 During rains whether the excavation is done with extra precaution to prevent cave in?
Whether caution board is provided for do’s and don’ts like ‘Caution – Deep Excavation’ & ‘Nobody to
12
enter within one meter of extreme reach’ etc.
13 Others if any
Comments If any:
DATE:
Y N
ble?
e excavation?
t cave in?
Excavation’ & ‘Nobody to
4 6
5
3
2
8
1
9
SL NO CHECK ITEMS
5 Electric connector and wire good condition and without cuts and joints.
DATE:
Y N
ure of site engineer/incharge
SW/HSE/CL028 REV:00
10
4
11 Y N
SL NO CHECK ITEMS
5 Check the Pressure gauges are at zero position and correct reading (Calibrated)
10 Check operating/ Selector knob is in good condition and correct position for type of refrigerant
3
2
SL NO CHECK ITEMS
5 Water Pipe without cuts and joints, connecting part in good condition
9 Check Discharge Water Port must be clean and good condition of thread
10 Check Power supply cable is uncut / without joint & good Condition
Comments If any:
Signature of site safety incharge Signature of site engineer/i
SW/HSE/CL029 REV:00
MP
DATE:
17
Y N
Signature of site engineer/incharge
RGP ELECTRONICS INDIA PVT. LTD
Y N
SL NO CHECK ITEMS
6 Toe board of height 150mm to prevent fall of any material from platform
3
7
1
CHECK ITEMS Y N
SL NO
SL NO CHECK ITEMS OK NA
4
3
CHECK ITEMS Y N
SL NO
6. Is area around bathrooms cleaned & kept dry and non slippery?
DATE:
REMARKS
er/incharge
RGP ELECTRONICS INDIA PVT.LTD
CHECKLIST FOR HOUSEKEEPING
PROJECT: LOCATION: DATE: