0% found this document useful (0 votes)
0 views

doc_5

The document outlines the compliance status of various environmental conditions related to air and water quality monitoring, as well as waste management for a project under the Environmental Compliance Certificate (ECC). It details the proponent's adherence to regulations, including the installation of pollution control devices and waste management systems, and highlights the quantities of solid waste generated and collected. Additionally, it includes a brief description of the solid waste management plan aimed at maintaining a waste-free site through proper disposal and recycling practices.

Uploaded by

Ronie Atis Lemin
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
0 views

doc_5

The document outlines the compliance status of various environmental conditions related to air and water quality monitoring, as well as waste management for a project under the Environmental Compliance Certificate (ECC). It details the proponent's adherence to regulations, including the installation of pollution control devices and waste management systems, and highlights the quantities of solid waste generated and collected. Additionally, it includes a brief description of the solid waste management plan aimed at maintaining a waste-free site through proper disposal and recycling practices.

Uploaded by

Ronie Atis Lemin
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

MODULE 5: P.D.

1586

Ambient Air Quality Monitoring (if required as part of ECC conditions)

Station DATE Noise Level CO NOx Particulates (mg/Ncm) (mg/Ncm) (mg/Ncm) (mg/Ncm)
Description (dB) (mg/Ncm) (ng/Ncm) (mg/Ncm)
N/A 2000-01-01

Ambient Water Quality Monitoring (if required as part of ECC conditions)

Station DATE / / / / / / / /
Description
N/A 2000-01-01

Other ECC Conditions

ECC Condition/s Status of Compliance Actions Taken


The proponent shall ensure that Yes
discharges/effluents at all times comply with
the DENR standards and with all the
provisions of RA 9275, the Philippine Clean
Water Act of 2004 and its Implementing
Rules and Regulations;
The proponent shall install and maintain air Yes
pollution control devices to minimize dust
and gas emissions from different sources.
Likewise, the proponent shall ensure that
emissions at all times comply with the DENR
standards and with all the provisions of RA
8749, the Philippine Clean Air Act of 1999
and its Implementing Rules and Regulations;
The proponent shall install, operate, and Yes
maintain collection, handling, treatment,
storage and disposal facilities or any system
serving different sources of hazardous
waste. The system shall be properly
operated to ensure compliance with all the
provisions of RA 6969, the Toxic Substances
and Hazardous and Nuclear Wastes Control
Act of 1990 and its Implementing Rules and
Regulations;
The proponent Install, operate and maintain Yes
collection, handling, treatment, storage and
disposal facilities or any system serving
different sources of solid waste. The system
shall be properly operated to ensure
compliance with all the provisions of RA
9003, the Ecological Solid Waste
Management Act of 2000 and its
Implementing Rules and Regulations;
That the proponent shall strictly manage all Yes
project related traffic problems, excessive
surface runoff, dust, soil erosion, accidental
spillage and health hazards identified in the
Initial Environmental Examination (IEE}
Checklist Report and, in case of emergency
episodes, appropriate response activities
shall be immediately undertaken for the
protection of the workers/ personnel, host
and nearby communities and the receiving
environment;
Planting of appropriate tree species shall be Yes
undertaken in coordination with DENR
CENRO in support to National Greening
Program of the DENR to compensate for the
loss of vegetation. Replacement of trees
shall follow the following ratio: 50 trees for
one (1) planted tree cut and 100 trees for
one (1) naturally growing tree cut.
A rainwater harvesting/ cistern storage tank Yes
shall be installed to maximize recycling,
distribution and utilization of used water and
to store and capture rainwater as additional
measures in water resources management,
respectively;
The proponent shall designate a Pollution Yes
Control Officer (PCO) and secure
accreditation at the EMB within Six (6)
months from the issuance of this ECC who
shall take charge on the environmental
concerns of the project;
The proponent shall submit an Yes
Abandonment Plan to the EMB Regional
Office at least six (6) months prior to project
abandonment. The plan shall include
rehabilitation measures/clean-up,
remediation of areas affected by the project
and proposed alternative projects in the
area;
That a semi-annual Compliance Monitoring Yes
Report (CMR) shall be submitted in July and
January of each year;

Environmental Management Plan/Program

Enhancement/Mitigation Measures/s Status of Compliance Actions Taken


N/A Yes

Solid Waste Characterization/Information

Recyclable Biodegradable Residual


Average Quantity Generated 0.51 0.36 0.09
(tons/ month)
Total Quantity Generated (tons/ 1.53 1.08 0.27
quarter)
Average Quantity Collected (tons/ 0.48 0.3 0.09
month)
Total Quantity Collected 1.44 0.9 0.27
(tons/quarter)
Entity in charge of collection CENRO/JUNKSHOP CENRO CENRO

Brief Description of Solid Waste Management Plan (e.g., waste reduction, segregation, recycling)

To maintain site free from waste by proper disposing and reusing of the waste materials generated
from the site and other allied services.This system is applicable to all working areas like Function
hall,Dining area and Utility workers resting place. MTC office mess hall, stores, sickbay, storag room
firehouse pump rooms and dormitories, bench working area and shoeline areas, etc at site. Metal
scrap/leaves/ wood should be pick-up by LGU garbages collector. metallic and plastic container
should send to the supplier/ pick-up by scrap buyer. Hazardous waste place at the firehouse fire
dumper for training purpose only.

Powered by TCPDF (www.tcpdf.org)

You might also like