1. ALL DIMENSIONS ARE IN MILLIMETERS, COORDINATES AND ELEVATIONS ARE IN METERS (UNLESS NOTED OTHERWISE).
2. COORDINATES ARE BASED ON ROYAL COMMISSION SYSTEM COORDINATES AND ELEVATIONS ARE BASED ON THE
FOLLOWING POINTS:
RCT-912 RCT H-311
N 40734.266 N 44389.121
E 49545.015 E 51505.664
ELEV. 22.826m ELEV. 13.738m
MONUMENT BRASS DISC IN CONCRETE
3. CONVENTIONAL LEVEL +100.000 M IS REFERRED TO THE HIGH POINT OF PAVING (H.P.P.) AND IT CORRESPONDS TO THE
+15.0 MT REFERRED TO RCD (ROYAL COMMISSION DATUM).
4. FOR ALL UNDERGROUND GENERAL NOTES, LEGENDS AND DETAILS REFER STANDARD DRAWING 4399-AQ-DX-3F00300000001/
SA-AMI-F00-TCMT-001548.
5. FOR UNDERGROUND CONCRETE WORKS DETAILS REFER TO STANDARD DRAWINGS FROM 4399-AQ-DC-3F00300000001/
SA-AMI-F00-TCMT-001518 TO 4399-AQ-DC-3F00300000021/SA-AMI-F00-TCMT-001538.
TRUE NORTH
1/16
F.F.L. EL.100.125
1/16
F.F.L. EL.100.125
710
BATTERY ROOM BATTERY ROOM
FUTURE
F.F.L. EL.100.125
F.F.L. EL.100.125
710
3321410-OSW-MH-001 900 900 12" 12" 12" 98.145 98.145 98.575 450 450 450 TYPE 2 99.600 2B West C4 97.845 2155 100.000 1.54 m³ 2.23 m³ 4399-AQ-DA-3321410000002 SA-AMI-321-TCMT-002251 IFR HOLD 1
STACK
MAKKA
H
HVAC ROOM HVAC ROOM
3321410-OSW-MH-002 900 900 12" 16" 16" 98.160 98.590 98.160 450 450 450 TYPE 2 99.600 2A North C4 97.860 2140 100.000 1.53 m³ 2.22 m³ 4399-AQ-DA-3321410000002 SA-AMI-321-TCMT-002251 IFR HOLD 1
60°0'0"
15/30 15/30
900 900
2/17 2/17
43°0'0"
3321410-OSW-MH-003 900 900 16" 16" 16" 98.515 98.540 98.085 450 450 450 TYPE 2 South C4 97.785 2215 100.000 1.59 m³ 2.27 m³ 4399-AQ-DA-3321410000002 SA-AMI-321-TCMT-002251 IFR HOLD 1
CLEAN AGENT
CLEAN AGENT
PIB-30 PIB-30
PLANT NORTH
3321410-OSW-MH-004 900 900 16" 24" 24" 98.505 98.480 98.050 450 450 450 TYPE 2 North C4 97.750 2250 100.000 1.62 m³ 2.25 m³ 4399-AQ-DA-3321410000002 SA-AMI-321-TCMT-002251 IFR HOLD 1
TRANSFORMER
HVAC
ELECTRICAL ROOM
TH
A-602 A-602
DISCHARGE DIE PLATE DISCHARGE DIE PLATE
F.F.L. EL.100.125 F.F.L. EL.100.125
3/18
R
3/18 A-423
MELT PUMP
A-423
MELT PUMP
O
N
A-650 A-650
610
PROCESS SECTION PROCESS SECTION
610
3321410-OSW-MH-005 900 900 24" 24" 24" 98.440 98.465 98.010 450 450 450 TYPE 2 South C4 97.710 2290 100.000 1.65 m³ 2.24 m³ 4399-AQ-DA-3321410000002 SA-AMI-321-TCMT-002251 IFR HOLD 1
E
43°
U
TR
320-Z-3000
320-Z-3000
ELEVATOR
ELEVATOR
10% 4/19
14/29
510
4/19
14/29
510
3321410-OSW-MH-007 900 900 12" 12" 12" 98.145 98.145 98.575 450 450 450 TYPE 2 South C4 97.845 2155 100.000 1.54 m³ 2.23 m³ 4399-AQ-DA-3321410000002 SA-AMI-321-TCMT-002251 IFR HOLD 1
G
15% 610 610
ROSE WIND
D IN
WIN VAIL
PRE
3321410-OSW-MH-008 900 900 24" 16" 16" 98.335 98.565 98.360 450 450 450 TYPE 2 East C4 98.035 1965 100.000 1.39 m³ 1.93 m³ 4399-AQ-DA-3321410000002 SA-AMI-321-TCMT-002251 IFR HOLD 1
320-US 321-US
321-US
320-X-5021 321-X-5021
5/20 G/L
5/20 G/L
3321410-OSW-MH-009 900 900 12" 12" 98.170 98.600 450 450 TYPE 2 99.550 4C North C4 97.870 2130 100.000 1.52 m³ 2.26 m³ 4399-AQ-DA-3321410000002 SA-AMI-321-TCMT-002251 IFR HOLD 1
SEPARATION SEPARATION
320-US
SKID SKID
410 9 410
320-US
810 321-US
3321410-OSW-MH-010 1200 1200 16" 12" 12" 98.530 98.555 98.100 350 600 850 TYPE 3 South C4 97.800 2200 100.000 2.81 m³ 4.04 m³ 4399-AQ-DA-3321410000002 SA-AMI-321-TCMT-002251 IFR HOLD 1 9/24
810
3321410-OSW-MH-011 900 900 16" 16" 16" 12" 98.490 98.465 98.035 98.035 450 450 450 450 TYPE 2 North C4 97.735 2265 100.000 1.63 m³ 2.28 m³ 4399-AQ-DA-3321410000001 SA-AMI-321-TCMT-002250 IFR HOLD 1 6/21
310
12/27
6/21
310
12/27
410 410
3321410-OSW-MH-012 900 900 12" 24" 24" 4" 97.990 98.420 97.990 98.445 450 450 450 450 TYPE 2 North C4 97.690 2310 100.000 1.67 m³ 2.30 m³ 4399-AQ-DA-3321410000001 SA-AMI-321-TCMT-002250 IFR HOLD 1
3321410-OSW-MH-013 900 900 12" 12" 12" 98.580 98.150 98.150 450 450 450 TYPE 2 99.600 3D East C4 97.850 2150 100.000 1.54 m³ 2.25 m³ 4399-AQ-DA-3321410000002 SA-AMI-321-TCMT-002251 IFR HOLD 1 7/22
210
11/26
110
7/22
210
11/26
110
3321410-OSW-MH-014 900 900 12" 20" 20" 98.095 98.525 98.550 450 450 450 TYPE 2 East C4 97.795 2205 100.000 1.58 m³ 2.25 m³ 4399-AQ-DA-3321410000002 SA-AMI-321-TCMT-002251 IFR HOLD 1 8/23 10/25 8/23 10/25
3321410-OSW-MH-015 900 900 20" 12" 12" 24" 98.465 98.010 98.365 98.390 450 450 450 450 TYPE 2 North C2 97.710 2290 100.000 1.65 m³ 2.17 m³ 4399-AQ-DA-3321410000001 SA-AMI-321-TCMT-002250 IFR HOLD 1 UP
210 110 210 110
3321410-OSW-MH-016 900 900 12" 8" 8" 98.610 98.640 98.180 450 450 450 TYPE 2 99.600 3D East C4 97.880 2120 100.000 1.51 m³ 2.23 m³ 4399-AQ-DA-3321410000001 SA-AMI-321-TCMT-002250 IFR HOLD 1
3321410-OSW-MH-017 900 900 12" 20" 20" 12" 98.120 98.550 98.120 98.575 450 450 450 450 TYPE 2 North C4 97.820 2180 100.000 1.56 m³ 2.20 m³ 4399-AQ-DA-3321410000001 SA-AMI-321-TCMT-002250 IFR HOLD 1
3321410-OSW-MH-018 900 900 20" 24" 24" 98.530 98.345 98.320 450 450 450 TYPE 2 West C4 98.020 1980 100.000 1.40 m³ 1.92 m³ 4399-AQ-DA-3321410000001 SA-AMI-321-TCMT-002250 IFR HOLD 1 THIS DRAWING
3321510
3321510-OSW-MH-001 900 900 16" 12" 12" 98.575 98.145 98.145 450 450 450 TYPE 2 99.600 2A East C4 97.845 2155 100.000 1.54 m³ 2.23 m³ 4399-AQ-DA-3321510000001 SA-AMI-321-TCMT-001772 IFR HOLD 1
3321510-OSW-MH-002 900 900 20" 12" 12" 98.490 98.060 98.515 450 450 450 TYPE 2 East C4 97.760 2240 100.000 1.61 m³ 2.27 m³ 4399-AQ-DA-3321510000001 SA-AMI-321-TCMT-001772 IFR HOLD 1
3321510-OSW-MH-003 900 900 24" 12" 12" 98.425 97.995 98.450 450 450 450 TYPE 2 East C4 97.695 2305 100.000 1.66 m³ 2.28 m³ 4399-AQ-DA-3321510000001 SA-AMI-321-TCMT-001772 IFR HOLD 1
3321510-OSW-MH-004 900 900 24" 16" 16" 98.370 97.940 98.395 450 450 450 TYPE 2 East C4 97.640 2360 100.000 1.71 m³ 2.28 m³ 4399-AQ-DA-3321510000001 SA-AMI-321-TCMT-001772 IFR HOLD 1
3321510-OSW-MH-005 900 900 12" 16" 16" 98.145 98.575 98.145 450 450 450 TYPE 2 99.600 4C North C4 97.845 2155 100.000 1.54 m³ 2.23 m³ 4399-AQ-DA-3321510000001 SA-AMI-321-TCMT-001772 IFR HOLD 1
3321510-OSW-MH-006 900 900 12" 24" 24" 12" 98.065 98.495 98.065 98.520 450 450 450 450 TYPE 2 North C3 97.765 2235 100.000 1.61 m³ 2.21 m³ 4399-AQ-DA-3321510000001 SA-AMI-321-TCMT-001772 IFR HOLD 1
3321510-OSW-MH-007 900 900 12" 24" 24" 12" 98.025 98.455 98.025 98.480 450 450 450 450 TYPE 2 North C3 97.725 2275 100.000 1.64 m³ 2.19 m³ 4399-AQ-DA-3321510000001 SA-AMI-321-TCMT-001772 IFR HOLD 1
3321510-OSW-MH-008 900 900 12" 24" 24" 12" 97.980 98.410 97.980 98.435 450 450 450 450 TYPE 2 North C3 97.680 2320 100.000 1.68 m³ 2.23 m³ 4399-AQ-DA-3321510000001 SA-AMI-321-TCMT-001772 IFR HOLD 1
3321510-OSW-MH-009 900 900 12" 24" 24" 12" 97.930 98.360 97.930 98.385 450 450 450 450 TYPE 2 North C3 97.630 2370 100.000 1.72 m³ 2.28 m³ 4399-AQ-DA-3321510000001 SA-AMI-321-TCMT-001772 IFR HOLD 1
3321610
3321610-OSW-MH-001 900 900 24" 12" 12" 24" 97.770 97.315 97.745 97.315 450 450 450 450 TYPE 2 North C4 97.015 2985 100.000 2.22 m³ 2.82 m³ 4399-AQ-DA-3321610000001 SA-AMI-321-TCMT-001776 IFR HOLD 1
3321610-OSW-MH-002 900 900 12" 8" 98.650 98.585 450 450 TYPE 2 West C4 98.285 1715 100.000 1.19 m³ 1.91 m³ 4399-AQ-DA-3321610000001 SA-AMI-321-TCMT-001776 IFR HOLD 1
3321610-OSW-MH-003 900 900 24" 12" 12" 97.730 98.630 97.705 450 450 450 TYPE 2 North C4 97.405 2595 100.000 1.90 m³ 2.51 m³ 4399-AQ-DA-3321610000001 SA-AMI-321-TCMT-001776 IFR HOLD 1
3321610-OSW-MH-004 900 900 8" 12" 12" 98.640 98.180 98.610 450 450 450 TYPE 2 99.600 2A North C4 97.880 2120 100.000 1.51 m³ 2.23 m³ 4399-AQ-DA-3321610000001 SA-AMI-321-TCMT-001776 IFR HOLD 1
3321610-OSW-MH-005 900 900 12" 12" 12" 98.090 98.090 98.520 450 450 450 TYPE 2 North C4 97.790 2210 100.000 1.59 m³ 2.28 m³ 4399-AQ-DA-3321610000002 SA-AMI-321-TCMT-001777 IFR HOLD 1
3321610-OSW-MH-006 900 900 16" 12" 12" 98.460 98.010 98.440 450 450 450 TYPE 2 North C4 97.710 2290 100.000 1.65 m³ 2.31 m³ 4399-AQ-DA-3321610000002 SA-AMI-321-TCMT-001777 IFR HOLD 1
3321610-OSW-MH-007 900 900 16" 20" 20" 98.550 98.525 98.095 450 450 450 TYPE 1 99.600 3C South C4 97.795 2205 100.000 1.58 m³ 1.60 m³ 4399-AQ-DA-3321610000002 SA-AMI-321-TCMT-001777 IFR HOLD 1
3321610-OSW-MH-008 900 900 12" 24" 24" 12" 97.885 98.340 97.885 98.315 450 450 450 450 TYPE 2 North C4 97.585 2415 100.000 1.75 m³ 2.32 m³ 4399-AQ-DA-3321610000002 SA-AMI-321-TCMT-001777 IFR HOLD 1
3321610-OSW-MH-009 900 900 12" 24" 24" 12" 97.840 98.295 97.840 98.270 450 450 450 450 TYPE 2 North C4 97.540 2460 100.000 1.79 m³ 2.36 m³ 4399-AQ-DA-3321610000002 SA-AMI-321-TCMT-001777 IFR HOLD 1
3321610-OSW-MH-010 900 900 12" 24" 24" 12" 97.790 98.245 97.790 98.220 450 450 450 450 TYPE 2 North C4 97.490 2510 100.000 1.83 m³ 2.40 m³ 4399-AQ-DA-3321610000002 SA-AMI-321-TCMT-001777 IFR HOLD 1
UNDERGROUND NETWORKS LAYOUTS - CONCEPTUAL LAYOUT -
3321610-OSW-MH-011 900 900 16" 12" 12" 98.565 98.135 98.135 450 450 450 TYPE 2 99.650 3C North C4 97.835 2165 100.000 1.55 m³ 2.24 m³ 4399-AQ-DA-3321610000002 SA-AMI-321-TCMT-001777 IFR HOLD 1 SA-AMI-321-TCMT-001799 4399-AQ-DG-3321000000003 U321 HDPE TRAIN 2
3321710 SA-AMI-321-TCMT-001812 4399-AR-DG-3321000000001 ROAD AND PAVING PLANS - ROADS AND YARDS - KEY PLAN - U321 HDPE
3321710-OSW-MH-001 900 900 12" 16" 16" 98.135 98.565 98.135 450 450 450 TYPE 2 99.400 1D East C4 97.835 2165 100.000 1.55 m³ 2.24 m³ 4399-AQ-DA-3321710000001 SA-AMI-321-TCMT-001780 IFR HOLD 1 TRAIN 2
3321710-OSW-MH-002 900 900 16" 12" 12" 24" 98.500 98.585 98.475 98.045 450 450 450 450 TYPE 2 North C3 97.745 2255 100.000 1.62 m³ 2.22 m³ 4399-AQ-DA-3321710000001 SA-AMI-321-TCMT-001780 IFR HOLD 1 SA-AMI-321-TCMT-001755 4399-AP-DG-3321000000001 ROAD AND PAVING PLANS - PAVING WORKS - KEY PLAN - U321 HDPE TRAIN 2
3321710-OSW-MH-002 900 900 12" 12" 12" 98.175 98.605 98.175 450 450 450 TYPE 2 99.600 3C South C4 97.875 2125 100.000 1.52 m³ 2.22 m³ 4399-AQ-DA-3321710000001 SA-AMI-321-TCMT-001780 IFR HOLD 1 SA-AMI-321-TCMT-001797 4399-AQ-DG-3321000000001 UNDERGROUND NETWORKS LAYOUTS - KEY PLAN - U321 HDPE TRAIN 2
UNDERGROUND CONCRETE WORKS DETAILS - OILY WATER SYSTEM
3321710-OSW-MH-004 900 900 24" 12" 12" 24" 98.450 98.000 98.430 98.000 450 450 450 450 TYPE 2 North C3 97.700 2300 100.000 1.66 m³ 2.21 m³ 4399-AQ-DA-3321710000002 SA-AMI-321-TCMT-001781 IFR HOLD 1 SA-AMI-F00-TCMT-001522 4399-AQ-DC-3F00300000005
MANHOLE (OSW)
3321710-OSW-MH-005 900 900 24" 12" 12" 98.370 97.520 97.950 450 450 450 TYPE 1 East 97.220 2780 100.000 2.05 m³ 1.91 m³ 4399-AQ-DA-3321710000002 SA-AMI-321-TCMT-001781 IFR HOLD 1 STORM WATER DRAINAGE / OILY WATER NETWORKS CALCULATION -
SA-AMI-F00-TCMT-001484 4399-AQ-CS-3F00300000001
3321710-OSW-MH-006 900 900 24" 12" 12" 97.925 97.470 97.900 450 450 450 TYPE 2 East C4 97.170 2830 100.000 2.09 m³ 2.71 m³ 4399-AQ-DA-3321710000002 SA-AMI-321-TCMT-001781 IFR HOLD 1 HYDRAULIC CALCULATION REPORT
3321710-OSW-MH-007 900 900 24" 12" 12" 97.870 97.415 97.845 450 450 450 TYPE 2 East C4 97.115 2885 100.000 2.13 m³ 2.76 m³ 4399-AQ-DA-3321710000002 SA-AMI-321-TCMT-001781 IFR HOLD 1 SA-AMI-F00-TCMT-001334 4399-AA-DX-3F00300000002 STANDARD DRAWING FOR CONCRETE STRUCTURE GENERAL NOTES - 2
SA-AMI-F00-TCMT-001333 4399-AA-DX-3F00300000001 STANDARD DRAWING FOR CONCRETE STRUCTURE GENERAL NOTES - 1
SA-AMI-F00-TCMT-001550 4399-AQ-SG-3F00300000001 CIVIL DESIGN BASIS - DESIGN SPECIFICATION FOR UNDERGROUND SYSTEMS
REFERENCE DOCUMENTS
PF_Ecc_A
PI_TOC
A A
PF_Ecc_V
VENT POSITION
LEGEND COVER POSITION VENT PIPE
PI_TOC TOP OF PIT
PI_H HEIGHT OF PIT
PF_Ecc_D2
PI_OwA/B/... DIAMETER OF PIPE 00 IFR 27-Jun-2024 ISSUED FOR REVIEW J.Chavan M. Mainardi / B.Shah A.Biasutti
PF_Ecc_B
PF_Ecc_D1
C C
PF_Ecc_C
ORIENTATION SIDE A: Pit orientation side refers to the position of "A" ORIENTATION SIDE A: Other examples of pit orientation AMIRAL
PROJECT
A A C B
This document has been generated by an Electronic Document Management System. When printed it is considered as a“for information only” copy. The controlled
copy is the screen version and it is the holder’s responsibility that he/she holds the latest valid version
”.
A A D B A B A C This document is the property of AMIRAL and shall not be disclosed to third parties or reproduced without permission of the owner.
CONFIDENTIAL: This document is proprietary and confidential and must not be copied, reproduced or disclosed to others except with the express
permission of the Client (Aramco Overseas Company B.V and/or Saudi Arabian Oil Company) and/or its assignee, as the case may
be, or express permission from Tecnimont S.p.A and/or Tecnimont Arabia Company Limited, as the case may be.
A C B A
North East South West UNDERGROUND CONCRETE WORKS DETAILS -
4399-AQ-DC-3321000000001
North East South West
PIT SCHEDULE U321 - OSW MANHOLES
Doc Type: STD Discipline: CIV Phase: DE Class: 2 System / Subsystem: NA Equipment Type: NA
Contractor VENDOR
Document 4399-AQ-DC-3321000000001 DOCUMENT
Number: NUMBER:
Company
SIZE:A0
Document SA-AMI-321-TCMT-001794 Rev: 00 Scale: 1:100 Format: A0 Sheet 1 OF 1
ID: