0% found this document useful (0 votes)
117 views

VSP-D1

The document provides installation instructions, technical specifications, and testing procedures for the MINILEC phase failure relay VSP D1. It outlines the necessary precautions, electrical connections, and mounting options, as well as the relay's operational parameters such as supply voltage, output contact ratings, and trip settings. Additionally, it emphasizes the importance of ensuring the motor starter is functioning correctly before installation and includes diagrams for reference.

Uploaded by

energy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
117 views

VSP-D1

The document provides installation instructions, technical specifications, and testing procedures for the MINILEC phase failure relay VSP D1. It outlines the necessary precautions, electrical connections, and mounting options, as well as the relay's operational parameters such as supply voltage, output contact ratings, and trip settings. Additionally, it emphasizes the importance of ensuring the motor starter is functioning correctly before installation and includes diagrams for reference.

Uploaded by

energy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

VER 06 - B - dt.

25/8/04

INSTALLATION INSTRUCTIONS TECHNICAL SPECIFICATIONS


TESTING PROCEDURE
FOR VSP D1 OF VSP D1

INTRODUCTION : CAUTION : 1. SYSTEM SUPPLY VOLTAGE :


220 / 230 / 240 / 380 / 415 VAC K 20 %
1) Ensure that your VSP D1 is -
Thank you for selecting & purchasing MINILEC
* Not installed near any heat sources like 2. AUX. SUPPLY VOLTAGE :
make phase failure relay VSP D1.The following
burner, sunlight, electric arc etc. 110 / 220 / 230 / 240 / 380 / 415 VAC K 20%
installation instructions would guide you in
* Not subjected to abnormal vibrations.
installing your VSP D1 and making best use of it. 3. FREQUENCY :
* Installed as near to the starter as possible. 50 / (60) Hz, K 3%
VSP D1 is a phase failure relay operating on Start
2 ) 3 E sensing (L1,L2,L3) is normaly taken from
negative sequence voltage sensing principle. It 4. POWER CONSUMPTION :
outgoing terminals of motor starter. But in
offers protection against 3 VA ( max.) Is it
. following conditions, sensing should be Is Check Aux. within the Wait till
* Unbalanced voltage condition. L1 NO supply voltage specified NO supply
taken from incoming side of motor starter, . 5. OUTPUT RELAY CONTACT : See Indication
at 7 & 8 of
ON ? voltage
.

tolerance
* Phase failure condition. * Fully automatic reset starter. 1 Changeover VSP D1 limits? normalizes
* Phase sequence reversal condition. * Multi speed motor starter. YES
6. OUTPUT CONTACT RATING ( RESISTIVE ) : Start motor
Your VSP D1 is an auxiliary relay and it should be * Reversible starters. YES
5Amp., 240 VAC
used along with the motor starter only. The effective * When any other auto resetting type control
working of the electromagnetic motor starter. . switch is used in series with no volt coil of the 7. LIFE EXPECTANCY : R,Y,B phase
6
Does NO
Before installing your VSP D1 Check whether the starter. starter sequence is incorrect CONSULT
.

0.5 x 10 operations at 100% rating interchange wires


hold MINILEC
motor starter is operating perfectly by starting the of 1 & 3 of VSP D1 .
motor with the “START” push button and switching 8. UNBALANCE TRIP SETTING :
40V K 6V YES
it off by “OFF” push button. If the motor does not
“START” or “STOP” on respective operations, the R,Y,B phase sequence
9. TRIP TIME DELAY : connected to VSP D1
Tighten all terminals
in power & control
starter needs to be serviced. Do not install your ELECTRICAL CONNECTIONS 3.5 Sec. K 1.5 Sec. is correct.
wiring & at 1 & 3
VSP D1 with faulty motor starter. OF VSP D1: of VSP D1
10. RESETTING :
TRIP SETTING, TRIP DELAY AND See Fig.1 for Electrical connection Auto Reset Now remove any one
details of VSP D1. fuse link in power
. RESETTING : 11. RESET GAP : circuit for all the 3
See Fig.3 for installation of VSP D1 in the 10 - 18V phases one at a time
Is
The VSP D1 is factory set to trip the starter for phase to phase
power and control wiring diagram. 12. INDICATIONS : Check phase to phase voltage
unbalance voltage between any two phases of unbalance voltage NO
L1 : Green - Power ON across 1, 2 & 3 of VSP D1 after
Auxiliary supply voltage should be as marked removing fuse link.
less than unbalanced
40V K 6V (fixed). L2 : Red - Trip Does setting of
on the front cover plate of VSP D1. VSP D1 trip VSP D1
NO
The trip time delay is between 2 to 5 secs. The Connect the auxiliary supply wires at 7 & 8. 13. ENCLOSURE : within 2-5 secs
& L2 get
VSP D1 relay resets automaticaly when the Connect R,Y,B phases at 1,2 and 3 respectively. ABS. ON ? YES
unbalance voltage is reduced to less than 20V The R,Y,B sensing should be taken from outgoing 14. DIMENSIONS (mm) : YES
between all phases. points of motor starter in case of Direct Online Overall : 76 X 30.5 X 117.5
Mounting : 68 center to center VSP D1 will not trip Load
Starter. In case of star delta starters, it should be the motor & retest as per
MOUNTING : 15. MOUNTING : Reset the relay and restart
above procedure.
taken from outgoing terminals of main contactor.
Your VSP D1 can be Rail Mounted or Panel 35 mm Rail Mounting & Panel Mounting
The output relay contacts 13 and 14 are to be
Mounted.(See fig. 4A & 4B for mounting it on RAIL connected in series with no-volt coil of the 16. WEIGHT (gms) :
VSP D1 operation is perfect.
and releasing it from RAIL respectively). It is 320 (approx.) Install it for permanent use END
contactor.
suitable for 35mm RAIL ( for panel mounting and 17. OPERATING CONDITIONS :
0 0
drilling details see fig.2 ). TEMPERETURE : -5 C to + 60 C
HUMIDITY : Upto 95% Rh
VER 06 - B - dt.25/8/04
CORRECTION Check proof
MOUNTING DIMENSIONS 1
Fig. 2 30.5 D1 TYPE BOX
Fig. 3 INSTALLATION
4.5 x 6
DRILLING DETAILS
SLOT
x x x INSTRUCTION MANUAL
MOUNTING FOR
R DIMENSIONS.
PHASE FAILURE RELAY
Y 76

VSP D1
68
B
x x x
x x x

15.25

VSP
D1
OPEN

76

35
76
27
.5
117

30 .
117.5 5
NOTE : RELAY CONTACT SHOWN FOR UNIT IN HEALTHY CONDITION

CONNECTION DIAGRAM MOUNTING ON DIN RAIL RELEASING FROM DIN RAIL


Fig. 1

1 2 3
INDICATIONS :
1 R 7 L1 : POWER ON
13
L2 : TRIP

3 B Y
TERMINAL DETAILS :
8 14 15 1-2-3 : R-Y- B PHASE VOLTAGE
2 SENSING POINTS
7 8 9
7-8 : AUXILIARY SUPPLY VOLTAGE
AS MARKED ON THE UNIT
13 14 15 9 : DUMMY CONTACTS
14-13-15 : 1 CHANGEOVER OUTPUT
RELAY CONTACTS ( NO - C - NC )

VERSION 03
NOTES : RELAY CONTACT SHOWN IN HEALTHY CONDITION. (12/04/99 )