The document is an activity checklist for AVON CYCLES LTD, detailing various tasks assigned to different departments with target and completion dates. It includes tasks related to employee profiles, quality assurance, production targets, and compliance with ISO standards. The status of each task is noted, with some completed, some received, and others awaiting action or clarification.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
9 views
Avon Checklist 09-12-2024
The document is an activity checklist for AVON CYCLES LTD, detailing various tasks assigned to different departments with target and completion dates. It includes tasks related to employee profiles, quality assurance, production targets, and compliance with ISO standards. The status of each task is noted, with some completed, some received, and others awaiting action or clarification.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3
Activity Checklist - AVON CYCLES LTD
S No Activity Task Allocation TARGET COMPDESIGNATION/ DEPARTMENT Concerned PeSTATUS REMARKS
1 FILLING GETTINGOF THESELF EPS'EMPLOYEE FILLED FROM PROFILE SHEET-[EPS]' ALL SUBORDINATES 23-10-2024 26-10-2024 ALL HOD PARTICIPANTS Completed 2 (2 SHEETSTHE GETTING EXPECTED) EPS FILLED FROM ALL SUBORDINATES 23-10-2024 26-10-2024 PLANT HEAD R N SINGH JI RECEIVED 3 (4 SHEETSTHE GETTING EXPECTED) EPS FILLED FROM ALL SUBORDINATES 23-10-2024 26-10-2024 PRODUCTION HEAD DINESH JI RECEIVED 4 (5 SHEETSTHE GETTING EXPECTED) EPS FILLED FROM ALL SUBORDINATES 23-10-2024 26-10-2024 QA AMANDEEP RECEIVED 5 (10 SHEETS GETTING THEEXPECTED) EPS FILLED FROM ALL SUBORDINATES 23-10-2024 26-10-2024 DY. DY. MANAGER MANAGER (CYCLE(PRODUCTION) ASSEMBLY & NISHCHAY RECEIVED 6 (5 SHEETS EXPECTED) SHARING THE ISO 9001:2015 - QMS MANUAL 23-10-2024 26-10-2024 STORE) HARPREET RECEIVED 7 (EXISTING) DOCUMENTS CONTROL SHEET AS PER ISO 23-10-2024 24-10-2024 QA AMANDEEP RECEIVED 8 9001 EXISTING JOB ROLE SHEETS & KRA FOR 23-10-2024 24-10-2024 QA AMANDEEP RECEIVED 9 REVIEW 23-10-2024 24-10-2024 LEAN IMPLEMENTATION INCHARGE KHAYATI MA RECEIVED 10 Email to NITJalandhar for freshers recruitment 23-10-2024 23-10-2024 HR KHAYATI MA AWAITED 11 Defects Categorisation 28-10-2024 11-6-2024 QA AMANDEEP RECEIVED 12 QA Job Description Department wise Plant Defined by Anatech production targets to be 28-10-2024 11-6-2024 QA AMANDEEP Google link shared + JD doc 13 defined as per Machines Output 28-10-2024 11-6-2024 DEPUTY MANAGER - PRODUCTION NISHCHAY RECEIVED 14 Quality 5s formats to be Communication shared board location to be nominated 28-10-2024 11-6-2024 QA AMANDEEP RECEIVED 15 by each Red TagZone Explained with Google form, need its 4/11/2024 6-11-2024 5S ZONE INCHARGE R N SINGH JI AWAITED 16 initiation from each Zone Incharge 4/11/2024 7-11-2024 5S ZONE INCHARGE R N SINGH JI AWAITED 17 5s Training date to be scheduled 4/11/2024 07-11-2024 Staff Allocation pending R N SINGH JI Completed 18 Redof List Tagged machinesitems to be with shared maintenance preventive 4/11/2024 06-11-2024 Staff Allocation pending R N SINGH JI AWAITED 19 schedule 4/11/2024 11-6-2024 Maintenance Head Sunil Srivastav PREVENTIVE M. SCHEDULE AWAITED 20 List of tools with Calibration schedule 4/11/2024 11-6-2024 Maintenance Head Sunil Srivastav RECEIVED 21 Machine Health Card 4/11/2024 11-6-2024 Maintenance Head Sunil Srivastav Shown physical copies, photo copy of few taken 22 Machine repair record 4/11/2024 11-6-2024 Maintenance Head Sunil Srivastav Manual slips 23 TOOL ROOM Material issue LAYOUT through SAP FORasYELLOW LINES per Batch/BOM 4/11/2024 06-11-2024 Maintenance Head Sunil Srivastav AWAITED 24 along with reconcillation on every Batch/BOM 4/11/2024 Pending Staff Allocation pending R N SINGH JI AWAITED 25 Waste Generation entry through SAP 4/11/2024 13-11-2024 Staff Allocation pending R N SINGH JI Initiated on 30/11, to be verified from IT 26 Bins/Racks Labelling Bins/Racks Before 5snoticed during visit Implementation to be 4/11/2024 Pending Maintenance Head Sunil Srivastav AWAITED 27 displayed on notice board 4/11/2024 07-11-2024 Maintenance Head Sunil Srivastav RECEIVED 28 Each Ensure department free access individual Layout of fire Extinguisher /Zebra 4/11/2024 07-11-2024 Staff Allocation pending R N SINGH JI RECEIVED 29 crossing at its bottom 4/11/2024 07-11-2024 Staff Allocation pending R N SINGH JI AWAITED 30 Re work %age Feasibility and rejection of production %ageand entry required Target for 6/11/2024 Pending Quality WITH SAP TEAM - CONFIRMED CONTACT AMANDEEP AWAITED 31 Production in SAP 6/11/2024 Pending FROM RAM SWAROOP JI Maninder Confirmed by Ram Swaroop ji, action reqd from Production 32 Combining Process Master data availability of Model Wise daily Model for each production and its 6/11/2024 09-11-2024 PPC Maninder UPDATED EXCEL AWAITED 33 Validation route 6/11/2024 Pending CONTACT WITH SAP TEAM Maninder AWAITED 34 MRP Trial by Auto Email of Maninder Process wise Daily Production 6/11/2024 Pending CONTACT WITH SAP TEAM Maninder Feasibility check awaited from Ram Swaroop 36 Report 6/11/2024 Pending CONTACT WITH SAP TEAM Maninder Trial done, format need to be revised, further discussions to be done with Management 37 Quality related Process list of reports Wise material WIP inavailability the factory in the Pie 6/11/2024 Pending CONTACT WITH SAP TEAM AMANDEEP RECEIVED 38 Chart form 6/11/2024 Pending CONTACT WITH SAP TEAM Maninder Puneet Will share Process master 39 Re work %age and rejection %age required in SAP 6/11/2024 Quality AMANDEEP Defects wise entry available and it will be activated with the help of Amandeep Sharma 40 Defect Master FROM SAP - Ram Swaroop 6/11/2024 SAP AMANDEEP AWAITED 41 Master list of documents Department wise 6/11/2024 DOCUMENTS STANDARDIZED AMANDEEP RECEIVED 42 CUSTOMER COMPLAINTS REPROT 8/11/2024 12-11-2024 SHARE THE REPORT NISHCHAY RECEIVED 43 ANNUAL 80:20 ANALYSIS OF 23-24 8/11/2024 12-11-2024 SHARE THE REPORT NISHCHAY AWAITED 44 LASTMONTH NOV MONTHSALES SALESPROJECTION TRENDS 80:20 ANALYSIS 80:20 8/11/2024 12-11-2024 SHARE THE REPORT NISHCHAY AWAITED 45 ANALYSIS MONTHLY PLANNING PRODUCTION TARGET 8/11/2024 12-11-2024 SHARE THE REPORT NISHCHAY AWAITED 46 FOR COMPARISON MONTHLY PLANNING MATERIAL PLANNING 8/11/2024 14-11-2024 SHARE THE REPORT NISHCHAY AWAITED 47 GIVEN TO STORE 8/11/2024 12-11-2024 SHARE THE REPORT NISHCHAY DENIED 48 DAILY PLANNING VS ACTUAL PRODUCTION 8/11/2024 12-11-2024 SHARE SHARE THE THE REPORTS REPORTS FOR FOR LAST 1 WEEK NOV 2024 & OCT NISHCHAY AWAITED 49 MIS SHEET WIP OF EACH DEPARTMENT ( EXISTING 8/11/2024 12-11-2024 2024 NISHCHAY RECEIVED 50 SHEET) ALL PROCESS VALIDATIONS AVAILABLE FOR 8/11/2024 12-11-2024 SHARE THE REPORT NISHCHAY RECEIVED 51 CRITICAL DEPARTMENT PROCESSES WISE OEE REPORT 8/11/2024 12-11-2024 SHARE THE VALIDATION RECORDS NISHCHAY KHAYATI MAM 52 (AVAILABLE) EFFICIENCY AT PRESENT (FOR ALL 8/11/2024 12-11-2024 SHARE THE REPORT NISHCHAY DENIED 53 PROCESSES AS AVAILABLE) 8/11/2024 12-11-2024 SHARE THE REPORT (3 PROCESSES) NISHCHAY DENIED Software recommended, Example will be shared for reference 54 ALL EXISTING SKILL MATRIX SOP OF EACHAND DEPARTMENT FLOW CHARTSAND 8/11/2024 12-11-2024 SHARE THE EXISTING NISHCHAY AWAITED 55 OPERATORS 8/11/2024 12-11-2024 SHARE THE REPORT NISHCHAY AWAITED 56 TRAINING PRODUCTION RECORDSREPORT FORFROMLAST SAP1 WEEK FOR LAST 8/11/2024 12-11-2024 SHARE THE RECORDS NISHCHAY AWAITED 57 1 WEEK 8/11/2024 12-11-2024 SHARE THE REPORT NISHCHAY Not available 58 Employee wise / department wise attendance 11/11/2024 14-11-2024 DY. MANAGER (PRODUCTION) NISHCHAY ANA RECEIVED 59 FG store Minimum and maximum 11/11/2024 14-11-2024 DISPATCH STOCK Vinay 09-12-2024 : Point clarification to Vinay ji - DISCUSS WITH RAM SWAROOP JI 60 DEPARTMENT LAYOUT SQA 11/11/2024 11-11-2024 EXISTING FLOOR LAYOUT AMANDEEP RECEIVED 61 DEPARTMENT LAYOUT (8 SECTIONS) 11/11/2024 12-11-2024 EXISTING FLOOR LAYOUT NISHCHAY RECEIVED 62 5s Audit Conducted in DISPATCH 14-11-2024 14-11-2024 DISPATCH SECTION Anatech COMPLETED 63 Visuals taken by Anatech Recommendation and will of Inspection be shared ticket slip/Counting 14-11-2024 20-11-2024 DISPATCH SECTION Anatech COMPLETED 64 to be computerised Housekeeping or have noticed barcode very poor system , need 14-11-2024 23-11-2024 DISPATCH SECTION Vinay 09-12-2024 : Point clarification to Vinay ji - Meeting with SQA by 09-12-2024 65 mechanism Red Tag registerfor ensuring it regularso another audit not maintained 14-11-2024 23-11-2024 DISPATCH SECTION Vinay 09-12-2024 - pictures required + implement house keeping checklist 66 required IT team proposed to use Production Order as a 14-11-2024 23-11-2024 DISPATCH SECTION Vinay 09-12-2024RECD RESPONSE - picture of red tag ON EMAIL - register 67 point for daily targets 14-11-2024 23-11-2024 IT Team Ram Sawrup EXPECTED TO RUN TRIAL BY 3RD DEC 68 Scrap Entry Graphical Point shared presentation of by IT team process wise production 14-11-2024 23-11-2024 IT Team Ram Sawrup AWAITED 69 Daily/Monthly and Yearly 14-11-2024 23-11-2024 IT Team Ram Sawrup IN PROGRESS 72 5s Training Singh from SQAConducted relatedonto 18/11/24 Mixing of rejections and 18-11-2024 Anatech Anatech COMPLETED 73 then againformats Required sortingforbeing carried Junior teamout by SQA team performance 18-11-2024 23-11-2024 SQA Ram Singh Solution Awaited 74 assessment with purchase - required team andbySales Nishchay team for routine 18-11-2024 Anatech Anatech AWAITED 75 activities - Quoted by Nishchay 18-11-2024 23-11-2024 DY. MANAGER (PRODUCTION) Nishchay Solution Awaited 76 Similar follow upDiscussed Job Description required withWithSQA team and Maninder 18-11-2024 23-11-2024 DY. MANAGER (PRODUCTION) Nishchay Solution Awaited 77 accepted Job with remarks Description Discussed With Nischay and need 18-11-2024 Production Maninder COMPLETED 78 consultation of Rishi Sir to accept 18-11-2024 DY. MANAGER (PRODUCTION) Nishchay ACCEPTED 79 Internal Organisational Chart to be prepared 25-11-2024 27-11-2024 Maintenance Head Sunil SriVastav Awaited 80 Predictive Maintenance for critical machines 25-11-2024 27-11-2024 Maintenance Head Sunil SriVastav Awaited 81 Persons lists for the responsibility of preventive ma 25-11-2024 27-11-2024 Maintenance Head Sunil SriVastav Awaited 82 Line Wise Daily Production required 27-11-2024 27-11-2024 Cycle Fitting Harpreet To be provided by 27-11-24 83 All types of Packing List 27-11-2024 27-11-2024 Cycle Fitting Harpreet To be provided by 27-11-24 84 Log book of the Department 27-11-2024 27-11-2024 Cycle Fitting Harpreet To be provided by 27-11-24 85 Production Chart of any one operator 27-11-2024 27-11-2024 Cycle Fitting Harpreet To be provided by 27-11-24 86 Skill development of any one Operator 27-11-2024 27-11-2024 Cycle Fitting Harpreet To be provided by 27-11-24 87 Method of giving target to subordinates 27-11-2024 27-11-2024 Cycle Fitting Harpreet To be provided by 27-11-24 88 Quality Checker production 27-11-2024 27-11-2024 Cycle Fitting Harpreet To be provided by 27-11-24 89 Hourly production board 27-11-2024 27-11-2024 Cycle Fitting Harpreet To be provided by 27-11-24 90 November Attendance of operators to see the effect 27-11-2024 27-11-2024 Cycle Fitting Harpreet To be provided by 27-11-24 91 Duplicacy of material codes 27-11-2024 27-11-2024 Cycle Fitting Harpreet To be provided by 27-11-24 92 WIP of child parts 27-11-2024 27-11-2024 Cycle Fitting Harpreet To be provided by 27-11-24 93 Dead Stock excel 27-11-2024 27-11-2024 Cycle Fitting Harpreet To be provided by 27-11-24 94 Planning approval from management 27-11-2024 27-11-2024 Cycle Fitting Harpreet To be provided by 27-11-24 95 Correction of BOM - Consumption 27-11-2024 27-11-2024 Cycle Fitting Harpreet To be provided by 27-11-24 96 Defect Wise registers to be shared 27-11-2024 27-11-2024 In-Process Quality AMANDEEP Awaited 97 Excel of any material requirement being generated 27-11-2024 28-11-2024 Gaispura Unit Head Dinesh Awaited 98 Communication formats being shared with SQA Main 27-11-2024 28-11-2024 Gaispura Unit Head Dinesh Awaited 99 Production Chart of any one operator 27-11-2024 28-11-2024 Gaispura Unit Head Dinesh Awaited 100 Log book of the Department 27-11-2024 28-11-2024 Gaispura Unit Head Dinesh Awaited 101 Registers being maintained by his department 27-11-2024 28-11-2024 Gaispura Unit Head Dinesh Awaited 102 Production schedule being shared with supervisors 27-11-2024 28-11-2024 MAIN STORE VINAY received 103 Any white board display 27-11-2024 28-11-2024 MAIN STORE VINAY Awaited 104 Record of Material movement from Main plant to G 27-11-2024 28-11-2024 MAIN STORE VINAY Awaited 105 5s Red Tag register 27-11-2024 28-11-2024 MAIN STORE VINAY Awaited 106 Production Report (target vs achieved) 27-11-2024 28-11-2024 MAIN STORE VINAY Received 107 Process Flow Chart of Tool Room 05-12-2024 06-12-2024 TOOL ROOM & MAINTENANCE Sunil SriVasta Denied 108 Log book picture 27-11-2024 09-12-2024 MAIN STORE VINAY Received 109 Packing list 27-11-2024 09-12-2024 MAIN STORE VINAY Received 110 Rackwise loaction in SAP - discuss with team 27-11-2024 09-12-2024 MAIN STORE VINAY Awaited 111 Production Chart of any one operator 27-11-2024 09-12-2024 MAIN STORE VINAY Awaited 112 Slow Moving/ Dead Stock report (any format) 27-11-2024 09-12-2024 MAIN STORE VINAY Awaited 113 List of Machines of Main Store & Dispatch Section 27-11-2024 09-12-2024 MAIN STORE & DISPATCH VINAY Awaited 114 SOP - FLOW CHART 27-11-2024 09-12-2024 MAIN STORE & DISPATCH VINAY Awaited 115 SKILL MATRIX 27-11-2024 09-12-2024 MAIN STORE & DISPATCH VINAY Awaited 116 REPAIR ALLOCATION VEHICLE IN/ OUT REPORT WITH VEHICLE 27-11-2024 09-12-2024 MAIN STORE & DISPATCH VINAY Awaited 117 CAPACITY 09-12-2024 DISPATCH VINAY Awaited