PART – B
pe
(50 Marks)
4.a) Explain briefly about Detonating fuse with the help of neat sketches and show the
various joints in the detonating fuse.
23
b) State the purpose and applications of drilling operations in mining activities. [5+5]
OR
5.a) State the choice of Drilling methods in Production drilling.
b) State the Principles of Drilling and explain. [5+5]
6.a) Illustrate the Principle of working of the Hydraulic prop with sketch.
b) Explain the withdrawal of supports by safety prop withdrawer with sketch. [5+5]
OR
7.a) In a mine a heavy roof fall has taken place at a junction of a main road way. Describe
how you would clear it.
b) Illustrate the Principle of working of the Roof bolts with sketch. [5+5]
8.a) What are the factors to be considered in choosing the mine Openings i.e., Shaft or
Incline?
b) State the principle and working of TBM. [5+5]
JN
OR
9.a) Explain about the advantages and disadvantages of shafts and inclines for opening of
mineral deposits.?
b) Describe the drivage of Long headings by Road headers for Long wall panel system.
TU
[5+5]
10.a) Describe a method of shaft sinking through water bearing strata.
b) Write in Detail about of the following:
i) Temporary Lining of shafts
H
ii) Removal of Debris and water in shaft sinking. [5+5]
OR
11.a) Sketch and Explain the Drilling blasting operations in a sinking shaft.
U
b) Explain the method of shaft sinking by Cementation Process. [5+5]
se
---ooOoo---