0% found this document useful (0 votes)
0 views

3037-SCOM-FOR-1

The document outlines the foundation plan for a construction project, detailing various structural elements and measurements. It includes specific codes, dimensions, and notes related to different components of the foundation. The layout appears to be complex, with multiple references to towers and structural specifications.

Uploaded by

brayan steven
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
0 views

3037-SCOM-FOR-1

The document outlines the foundation plan for a construction project, detailing various structural elements and measurements. It includes specific codes, dimensions, and notes related to different components of the foundation. The layout appears to be complex, with multiple references to towers and structural specifications.

Uploaded by

brayan steven
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

CÓDIGO PLANO: EST-70 -SCOM-PR-FOR-1 CONTENIDO: PLANTA DE CIMENTACIÓN

T2-22 T2-21 T2-20 T2-19 T2-C08 T2-18 T2-17 T2-C07 T2-16 T2-15 T2-14 T2-C06 T2-13 T2-12 T2-11 T2-C05 T2-10 T2-9 T2-C04 T2-8 T2-7 T2-6 T2-5 T1-C03 T2-4 T2-3 T2-2 T2-C02 T2-1 T2-C01

K J I H G F E D C B A
8.30 7.60 7.60 5.20 5.40 5.48 2.95 5.65 7.13 6.24

MC-1
TORRE 2

90
TORRE 2

0.
90 90 90 90 90
0. 0. 0. 0. 0.
VC-49

1.72
0.
0. 90
90 90
0. 90 90

0.20
90 90

0.

0.20
90

0.

0.
0.
0. 0. 0. 0. 0. 90

0.
0.

90
T2-A T2-A

90

90
90
90

0.

0.
90

0.

0.
90 0.

0.
90 90

0.

0.
0.
90

90
90
0.

90

90
0.

90
90
0.

90

90
90
0.

0.
10 M-5 10

0.20
C-12

0.20
(0.20X0.90)
VTC-13

CA-7
0.95

0.95
CA-7
SOBREANCHO

0)
(0.20X0.90)

(0.20X0.90)
VTC-13

VTC-15

(0.50X0.9
NOTA 3

2.34
1.33 1.27
0.075 0.725
0.57 0.80 0.17 0.20
8° 0.03
5.29

0.20

(0.20X0.90)
13°
VTC-P

(0.20X0.90)
11°

(0.20X0.90)

(0.20X0.90)

(0.20X0.90)

(0.20X0.90)

(0.20X0.90)

(0.30X0.90)
VTC-9

VTC-9

VTC-9

VTC-9

VTC-9
VTC-9
4.99

5.29
COMUNAL 0.50 1.30 0.20
0.20 0.09

1.00

0.20
POZO

VC-14
EYECTOR 3

VTC-9
0.20 0.90 1.85
0.60 VTC-P

89
A

88
0.23 0.86 0.86 0.23 0.23 0.86 0.86 0.23

°
- VER

1.46
0.40 0.40 NOTA 6

87
0.79 0.40

0.79 0.40
1.025

1.025
C-3 C-3

0.30

1.04
1.03

°
VC-27 (0.50X0.90) 0.60 0.25

0.09
0.225 0.575
09 C-14 C-14 (0.50X1.40) 09
C-3 C-3
0.41

0.41
0.40

0.40

0.40
C-3

1.025

1.025
1.03

0.46
0.30
0.11
CA-4

0.41

0.50

1.36
(0.60X0.90) CF-1

0.69

0.69
08 08

0.40
0.40

0.40
°
CA-4 88 C-3 CA-3 CA-3 CA-2
CA-3

0.29
CA-1 CA-1 (0.80X0.80X1.00) 0.20
1.025 1.025 1.025 1.025

CA-8
1.025 1.025 1.025 1.025

CÁRCAMO
4.35
3.85

3.85
3.75

3.80
3.85

3.85
M-1
(0.20X0.90)

1.025 1.025 1.025 1.025 0.40 0.40


SOBREANCHO
VTC-1

0.40

0.40
C-3 C-11

0.05
0.10
0.40 0.40

0.50
VC-25 C-11 VC-26
07 07

0.45
(0.50X0.90) C-16

0.40

0.40

0.40
CA-3 CA-2 (0.50X0.90)
CA-3 CA-5

(0.20X0.90)
VTC-10
CÁRCAMO
4 (0.80X2.05X1.00) (0.80X4.85X1.00) 0.90 1.85
-2
VC 0.06

2.00
0.20

2.95
3.04
59
- -
3.34

3.34
0.60 B B

CA-8
° ) 0.40 0.45 0.35
90
CA-3

2.94
1.025 1.025 1.025 1.025 0.

VTC-P
0 X 0.25

1.84
.5 CA-2
CA-4 (0 VC-28

0.77 0.40
0.20
C-17 VER

0.80
0.30
1.025

1.025

0.40 0.38 1.10

0.40 0.38 1.10


1.03

NOTA 6
VC-23 CA-4 (0.50X0.90) CA-6

0.39
C-3 C-3 (0.50X0.90) CF-1

0.50
(0.80X7.30X1.00)
06 06

(0.20X0.90)
VTC-17

0.56
0.24
C-3

1.025

1.025
1.03

(0.60X0.90)
0.30

C-3 C-3

(0.50X0.90)
(0.20X0.90)

(0.50X0.90)

(0.20X0.90)

(0.20X0.90)

(0.20X0.90)

(0.50X0.90)

(0.20X0.90)
SOBREANCHO
1.18

VC-10

CÁRCAMO
VTC-5

VTC-5

VTC-5

VTC-6

VTC-5
3 3

VC-8
VC-7
VTC-P CA-1 CA-1 0.23 0.86 0.86 0.23 0.23 0.86 0.86 0.23 VTC-P TANQUE DE
2.26

2.91
(0.40X0.90)

0.20 0.37 1.00 0.20


0.20 NACE RAMPA ALMACENAMIENTO
DE AGUA POTABLE
0.20

1.20 0.20 CÁRCAMO


0.70

0.30
0.20
0.20 1.45 0.80 LOSA e=0.20m

(0.30X1.40)
2.675 0.80
0.20

POZO POZO CÁRCAMO


VTC-P

VC-15
4.96

4.96
4.86
VTC-P
MC-1

EYECTOR 1 EYECTOR 2

0.50
CA-2 CA-2 NE -6.90
VTC-P
0.20 0.20

(0.20X0.90)

VC-30
VTC-2
(0.20X0.90)

(0.20X0.90)

(0.20X0.90)

(0.20X0.90)

(0.20X0.90)

(0.20X0.90)

(0.20X0.90)

(0.50X0.90)

(0.20X0.90)

(0.20X0.90)

(0.20X0.90)

0.38 0.40 (0.20X0.90)


(0.20X0.90)

(0.50X0.90)

(0.20X0.90)

(0.50X0.90)
1.40 1.76

(0.50X0.90)

0.80

0.50

0.80
1.20

VC-2
VTC-1

VTC-1

VTC-1

VTC-2

VTC-2

VTC-2

VTC-2

VTC-2

VTC-2

VTC-2

VTC-3

VTC-4
VTC-1

4 4
1.00

VC-3

VC-4

VC-5
0.20
0.38 0.42 0.90 1.85
? (0.50X0.90)
0.23 0.66 1.06 0.23 1.20 1.40 0.64 1.35

0.95
VC-1

CA-3 0.20 0.20 0.25

1.23
1.075

0.28
0.40 0.40
CA-4 0.25
0.20

VTC-P VTC-P

0.325

1.40
CÁRCAMO VER

1.05
1.00
0.99

0.825
0.90
NOTA 6

0.10

0.33
0.20 1.025 1.025 1.025 1.025 VC-21 C-9 C-10 VC-22

0.25
75
0.60 °
05 0 05
VC-2 CF-1

0.40 0.58
0.23 0.86 0.86 0.23

MP-1
0.23 0.86 0.86 0.23
C-3 (0.50X0.90)

1.10

1.225
1.14

1.14
1.44

1.44
(0.50X0.90)

(0.20X0.90) 0.09 1.35


0.40

0.475

0.48
CA-5

0.55
0.30

1.10 0.38 0.40

1.10 0.38 0.40


CA-2
1.025

1.025

1.04
1.03

VC-19 C-3 (0.50X0.90) C-3 0X 0.90


) CA-4 ° 4.44
C-3 (0.5 88 C-8
C-3 NACE E- 0.41
04 04

(0.50X0.90)

(0.20X0.90)
(0.50X0.90)
(0.20X0.90)

(0.20X0.90)

VTC-11

VTC-11
(0.50X1.40)
0.23 0.86 0.86 0.23

CA-8
VC-13

VC-29
C-3

VTC-7

VTC-7
VC-11
1.025

1.025
1.03

(0.60X0.90)
0.30

MT

1.71
1.98

1.98
CA-4 CA-4

2.57
CA-3

CA-1

VTC-16
(0.50X0.90)

(0.20X0.90)
CA-1 (.VARX.VARX1.00) 0.475 0.325

VTC-5
VC-6
(2.05X2.05X1.00)
C-7 C-7 2.68

0.80
1 1 CA-2

(0.50X0.90)
0.80

0.80

0.80
VC-9
LOSA e=0.06m NE -6.40

0.80
CA-2 CA-2 1.45 0.80
6.91

6.91
6.61

0.35 0.45 0.22 0.58


0.20 CA-2 0.20
1.20 1.44 1.31 1.31 1.41 1.68 1.58 1.57 1.68 1.68 1.58 1.58 1.68 1.47 1.37 1.47 1.51 1.53 1.51 1.54 1.44 1.54 1.12 1.12 1.63 0.70 1.00 0.95 1.13 1.13 1.50 1.40 0.64 1.35 0.30 0.87 1.24 1.14
0.40 0.20 0.20 0.20 0.20 0.20 0.25 0.25 0.20 0.20 0.20 0.25 0.25 0.20 0.20 0.20 0.25 0.25 0.20 0.20 0.25 0.25 0.20 0.20 0.20 0.30 0.20 0.20 0.25 0.25 0.20 0.25 0.25 0.20 0.22 0.28 0.20 0.20 0.20 0.20 0.25 0.25 0.10 0.10 0.20 0.20 0.30 0.20
0.18 0.50

0.80

0.80
CA-2 C-6

(2.70X0.80X1.00)
C-6 VC-16 CA-2
0.80
(0.50X0.90) 0.90 1.85
0.40 0.40

CA-8
2 2

1.97

1.97

1.97
0.20 0.60 1.025 1.025 1.025 1.025 CA-4 2.15 CA-4

0.40
VER

1.10

1.10

1.10
0.25 0.22
85 CA-2 C-13

0.95
° CA-4 0.03 NOTA 6

0.69
CA-4 C-3 C-5
1.025

0.69
CF-1
1.025

0.30
03 03

0.40 0.38
0.40 0.38
0.30

0.40 0.38 1.10

0.40 0.38 1.10


1.03

0.39

0.40
VC-17 CA-4

0.50
0.69

0.69
(0.50X0.90) CA-2

0.69

0.69
(2.70X0.80X1.00)
C-3 C-3 C-3 C-3
02 C-4 02

0.19

1.45
0.11
0.11
CA-2 CA-2
C-3

0.09
1.03

0.20
VC-18
1.025

(0.60X0.90)
0.30

83
1.025

C-3 C-3 0.38 0.42

°
0.23 0.86 0.86 0.23 0.23 0.86 0.86 0.23 0.80 2.38 (0.50X1.40)

2.17

VC-12
0.23 0.86 0.86 0.23
CA-1 CA-1
CA-3

A
-

°
0.23 0.86 0.86 0.23

88
POZO
°
89

0.20
EYECTOR 2
VTC-P

(0.20X0.90)

(0.20X0.90)

(0.20X0.90)

(0.20X0.90)

(0.20X0.90)

(0.20X0.90)

(0.30X0.90)
(0.20X0.90)
VTC-8

VTC-8

VTC-8

VTC-8

VTC-8

VTC-8
VTC-8
5.88

0.50 1.30 0.20

5.88
1.00

5.37
0.20 0.09

(0.20X0.90)
5.58

VTC-14
11°

.90)
(0.20X0.90)


VTC-12


VTC-P

0.20

(0.50X0
(0.20X0.90)
VTC-14
(0.20X0.90)
VTC-12

0.38 0.42 1.34 1.27


0.60 0.80

2.31
0.16 0.20
NOTA 3 CA-7 0.04

0.30
NOTA 3
CA-7

0.20
0.95

0.95
C-1 M-3 SOBREANCHO
0.20

0.20
01 0.
90 01
90 90 90 90 90 90 90
0. 0. 90 90

0.
0. 90 0.
0.20

0.

0.20
90 0. 90 0. 0. 0.
0.

0.
90

90
0.

0.

0.
90

0.
T1-A
0. 0. T1-A
0.
90

90
0.
90

90
0.

90
90
0.

0.
0.

0.
0.

0.
0.
90

0.
0.

90
90

90
90

90
90

90
0.

90
90

0. 0.50
90

TORRE 1
0.

90
90

0. 0.25 1.48 1.37 1.38


0.25 0.20 0.20 0.20
8.30 7.60 7.60 5.20 5.40 5.48 2.95 5.65 7.13 6.24

K J I H G F E D C B A
T1-22 T1-21 T1-20 T1-19 T1-C08 T1-18 T1-17 T1-C07 T1-16 T1-15 T1-14 T1-C06 T1-13 T1-12 T1-11 T1-C05 T1-10 T1-9 T1-C04 T1-8 T1-7 T1-6 T1-5 T1-C03 T1-4 T1-3 T1-2 T1-C02 T1-1 CONVENCIONES: T1-C01

C C PLANTA DE CIMENTACIÓN B A F MUROS EN CONCRETO CONTRAFUERTE


K J LOSA e=0.06m
ESC 1 : 75 7.13 6.24
NE -6.40 COLUMNAS EN CONCRETO
0.06

MURO DE CONTENCIÓN
8.30 0.20 LOSA MACIZA
0.10 0.20 0.50 e=0.12m CAMBIO DE NIVEL NE-6.90
LOSA MACIZA 0.25 MURO PANTALLA (ZONA TANQUE)
0.69

LOSA MACIZA CÁRCAMO . 18%


0.90

e=0.06m
LOSA e=0.06m e=0.06m MURO PEND ÁREA DE CIMENTACIÓN
VC- SOBREANCHO DE VC-

0.12
TANQUE 0.60 0.40 2%
PEND. 1 DE TORRE 2 CONSTRUIR
0.05

C- NE -6.40

0.06
MC- NE -6.40 VC-

0.20
NE -6.40
0.60 0.15
0.06

0.06

0.25 LOSA MACIZA EN ETAPA 1


MURO NOTAS:
e=0.20m TANQUE
M- M- LOSA e=0.15m NE -7.25 NE -7.30 1. VER NOTAS GENERALES EN PLANO IND-1.
0.50
0.20

NE -7.90 NE -6.90

0.69
CÁRCAMO

0.06

0.90
0.25 0.25
0.69

2. VER CORTES A-A Y B-B EN PLANO TAN-1.


0.69

0.49
0.90

CÁRCAMO
0.90

0.15
VC- MP- 3. REFUERZO DE VC Y VTC PREVISTO Y ANCLADO EN VC-40 DE TORRE 1 Y 2
0.25

0.40

4. VER REFUERZO DE POZOS EYECTORES EN PLANO LOS-1.4.


0.20
0.20

5. VER REFUERZO DE VTC-P EN PLANO VIG-1.3


0.05

0.55

0.15
LOSA e=25cm

0.05
0.15

0.15

0.15

6. CONTRAFUERTE A DEMOLER UNA VEZ CONTRUIDA LA TOTALIDAD DE LAS

0.05
0.05

VTC-
0.05

CA- VTC- VTC- VTC- VC- VC- VTC- VTC- VTC- PLACAS DE SÓTANO 1 Y PISO 1
CONCRETO CONCRETO
LOSA e=0.15m DE LIMPIEZA VC- LOSA MACIZA 7. ESTE PLANO NO ES VÁLIDO SIN LA APROBACIÓN DEL ING. GEOTECNISTA.
CONCRETO DE P- P- DELIMPIEZA
LOSA MACIZA e=0.15m
0.15
0.15

P- LIMPIEZA VC-
0.05

0.20

CORTE 2-2 e=0.15m


CORTE 1-1
VTC- VTC- VC- VTC- VTC- VTC- CORTE 4-4
ESC 1 : 50 CORTE 3-3 SOBREANCHO
LOSA MACIZA CONCRETO ESC 1 : 50
ESC 1 : 50 ESC 1 : 50 e=0.15m DELIMPIEZA Vo. Bo. Ing. Geotecnista
Archivo
VER. FECHA NOTAS
DIRECTOR DE PROYECTO CALCULÓ JBL REVISOR ESTRUCTURAL
LOS SAUCES VI2123-EST-SCOM-PR-FOR-1-2 Código Unidad Estructural
1 13-DIC-2023 SE INCLUYEN POZOS EYECTORES
Fecha Inicial 3037 SCOM
DIBUJÓ ESL SALÓN COMUNAL 2 14-FEB-2024 SE INCLUYE NOTA 6
13-OCT-2023

Última actualización
Plano
CANTIDADES JEB
Calle 17 # 72-82, Bogotá D.C. PLANTA DE CIMENTACIÓN 14-FEB-2024

[email protected] MAURICIO RINCON BOTERO REVISÓ JSB JORGE SANTANDER Escala INDICADA
FOR-1
Mat. N° 17202-77730 CLD Mat. N° 25202-82554 CND