NeoDen4 User Manual-180509
NeoDen4 User Manual-180509
Ltd
User Manual
Neoden4
1
Content
1.Structure of Neoden 4.................................................................................................................. 6
1.1.Brief Introduction..................................................................................................................6
1.2.Structure of NeoDen 4.......................................................................................................... 7
2.Operation Flow Chart....................................................................................................................8
3.Procedure for making a programming file..................................................................................9
4.Edit on the Operation Interface..................................................................................................10
4.1Edit on the Interface.............................................................................................................10
4.1.1.PCB Feeding Setting................................................................................................10
(1) Tray fixed...................................................................................................... 10
(2) Rail once....................................................................................................... 10
(3) Rail multi.......................................................................................................11
(4) Eject front......................................................................................................11
4.1.2.Setting Panelized PCB & first chip( manual is the same as automatic download)............. 11
(1) Single PCB....................................................................................................12
(2) Panelized PCB.............................................................................................. 12
(3) PCB angle correction.................................................................................... 13
(4) Bad PCB detection........................................................................................13
4.1.3.PCB mark point setting............................................................................................13
(1) Single PCB....................................................................................................13
(2) Panelized PCB.............................................................................................. 13
(3) Maunal.......................................................................................................... 14
(4) Add or delete mark point.............................................................................. 14
4.1.4.Chip list setting........................................................................................................ 15
(1) Manual program............................................................................................15
(2) Import PCB BOM File..................................................................................16
4.1.5.Feeder configuration................................................................................................ 17
(1) Feed setting................................................................................................... 17
(2) System setting............................................................................................... 17
4.2.File mounting...................................................................................................................... 21
4.3.Manual test.......................................................................................................................... 22
4.3.1.Placement head........................................................................................................ 22
4.3.2.Rails control............................................................................................................. 23
4.3.3.Host control..............................................................................................................23
4.3.4.Feeder test................................................................................................................ 24
4.4.Factory settings................................................................................................................... 24
4.4.1Feeder configuration................................................................................................. 26
4.4.2.Feed setting.......................................................................................................... …29
4.4.3.Peel Configuration ……………………………………………………………… 30
4.4.4.System setting.......................................................................................................... 31
4.5.First trial and testing........................................................................................................... 33
4.6Continuous SMT production................................................................................................34
2
5.Structure and maintenance instruction..................................................................................... 35
5.1.Structure chart..................................................................................................................... 35
5.1.1Peel box.....................................................................................................................36
5.1.2.Tape&Reel holder.................................................................................................... 36
5.1.3.Fixation support....................................................................................................... 37
5.1.4.Feed-box...................................................................................................................37
5.1.5.Vibration feeder........................................................................................................38
5.1.6.Auto-rails................................................................................................................. 39
5.1.7.Nozzle...................................................................................................................... 40
5.2Maintenance......................................................................................................................... 42
5.2.1.Take effective measures to reduce/ avoid malfunction........................................... 42
5.2.2Maintenance of device.............................................................................................. 43
5.2.3Placement failure analysis and troubleshooting....................................................... 44
5.2.4Related issues during Solder paste printing process ...............................................45
1.Stencil Printing Technology...................................................................................45
2.Inspecting of solder paste printing.........................................................................45
3.The defects of solder paste printing, reasons and solutions.................................. 46
3
PLEASE READ THIS USER MANUAL
COMPLETELY BEFORE OPERATING
IMPORTANT THIS UNIT AND RETAIN THIS BOOKLET
FOR FUTURE REFERENCE
Notes
1.The contents include all features of NeoDen4, some of which may not be equipped on your
machine.
2.Basic training and basic SMT knowledge is required for an operator.
3.For routine inspection and repair ,please contact sales for operating instruction.
Usage
1.You agree that you will solely be responsible for your use of any products and services provided
to you and that you will use our products and services legally and only for the purposes that they
are intended to be used for.
2.You agree that you will not misuse the products and/or services supplied and that you will abide
by any laws applicable to this agreement or the operation of it.
4
CAUTION
Power off: After cut off main power supply,pull the plug or disconnect the power cable from the
power supply.
1.When an exception or failure happens,or power failure,please terminate the operation of
Windows,and power it off.
2.Power off prior to cleaning and repairing in case of any accidents.
3.When pull the plug,please hold the head instead of wire.
Transport
1.Take necessary security measures,to prevent upside down or fall when lifting or moving.
Open
1.Please read all instruction in the wooden box
2.Do not cut the packing tape by knife,to avoid scratch the machine
3.Keep all packing material.
Installation
1.Please put the machine in a horizontal place.
2.Please keep the floor clean and dry,and the machine should be grounded, to prevent electric
shock or leakage.
Prepare work
1.Make sure the power cable no damage,no shedding and no loose.
2.Do not put hand in the working area.
Maintenance
1.Repair and calibration should be operated by skilled mechanical technician.When replacing
parts,please use the part which are supplied by NeoDen.We are not responsible for any accident
result from using nonstandard part.
2.In order to prevent electric shock caused by unskilled operation,the electrical repairs,
maintenance(including wiring),should be operated by professional electrician or the technical staff
from NeoDen or our distributors.
3.Make sure Bolts - Nuts are tighten after repair,calibration or replacing any part.
Working Environment
1.Do not use machine in a noisy environment,such as high frequency welding machine.
2.Do not use machine if the power supply voltage exceed the rated voltage ± 10%.
3.Do not use machine and pull the plug when thunder to avoid any accident caused by damaged
electrical component.
5
1. Brief Introduction
NeoDen4,the 4th generation pick and place machine of NeoDen Tech., was
independently designed and developed with patents and CE certificate.
This machine equipped with dual cameras, four heads, auto rails,electronic
feeder,two conveyor ports, which achieves high accuracy,simple structure,stable
performance and easy operation.
It adopts our newly developed feeding system which can help to replace the tape
easily and install smoothly, together with its vision system and rails feeding system,
committed to create the great value for customers in actual PCB production.
6
1.2. Structure of NeoDen 4
Each part mentioned above can be disassembled and tested. Please find more details on P20.
①:Placement head
②: Nozzle
③:Rails
④:Vibration feeder
⑤:On/Off button
⑥:Conveyor port
⑦:Multi-hole positioning board
⑧:Feed box
⑨:Peel box
⑩:Emergency button
⑪:Power switch
⑫:Rack shelf
⑬:Acrylic cover
⑭:Foot Mounts
⑮:Fixed support
7
2. Operation Flow Chart
NO. Flow chart Note
Check the working environment
1 Preparation whether it is safe or not
2 Turn on
4 Operation page
8
Exit
8
3. Procedure for making a programming
file
See P11
2、Chip list Save Select
and file and
3.Feeder setting See P 17 start
return
Add a new file working
4.Panelized PCB first See P11
chip setting
See P13
Start 5.Mark point setting
Note: The basic procedure of making a programming file for manual programming or direct PCB
file is similar, but there are two different parts: chip list and mark point setting. Please find the
detailed operation steps of the differences on relative page.
9
4. Edit on the Operation Interface
10
to finish the setting.
Fig.2 Fig.3
(3) Multiple rail feed: This is only available for long board that can’t be handled once, such as
LED strip. After finished one part of PCB, the rails will advance the board and handle the left part
automatically.
(4) Eject PCB front-side:Once selected this item,the PCB will eject at front side when finish
mounting.If don’t select,the PCB will eject at back side.
4.1.2. Setting Panelized PCB & first chip( manual is the same as
automatic import)
Function: This is mainly to determine the first component on single or panelized PCB of manual
programmed or imported file. The principle is to collect and calculate the data of each board’s
11
relative spacing, in order to achieve the effect of the actual placing.
Operation introduction
(1) Single PCB: Only need to enter “1” in the row and column, some other useless function will
turn grey. The “left bottom” is functional, which means the first PCB.Then you can press “align”
to go to the screen of vision and get the coordinate of first component, see image 2-2.
Fig.2-2
After saving the coordinate, the screen will automatically turn back to “PCB information” . Click
“Create panelized list” to get the information of “Panel 1”. Now we’ve finished setting of first
component of PCB.
(2) Panelized PCB: the sequence is same to single PCB, but please pay some attention to several
points below.
The row and column is determined by the positioning of PCB on working area. The
direction along the rails is the column. Enter data in the row and column.
About the data collection of “left bottom” , “left top” and “right top”, we should take the
“left bottom” as the basic, and then go to set “left top” and “right top”. Once all the data is
collected, the machine can calculate and process the information of panelized PCB. Please
refer to the data collecting method of each position information as following:
The data of “left bottom” is collected according to first component in programming file.
Press “align” find the left bottom panel which is nearest to the feeding position, after saving
the data, it will return to the “PCB information” automatically.
The data of “left top” is collected according to component (its position is same to that on “left
bottom”). Press “align” find the left top panel which is furthest to the feeding position, after
saving the data, it will return to the “PCB information” automatically.
The data of “right top” is collected according to component (its position is same to that on
“left bottom”). Press “align” find the right top panel which is furthest to the feeding position,
after saving the data, it will return to the “PCB information” automatically.
12
After setup, click “create panelized list”, the data will be generated accordingly in the blank.
Fig.3-1
Function: After completing setup of the mark points, with which the machine can locate the
position of PCB and identify the set up mark points, so that the next step can be followed
Operation method:
(1) Mark point on single PCB: this mainly applies on single PCB or a whole board that consists of
a few boards (take them as a single board ).General we need to set 2-3 mark points.
(2) Panelized PCB: this mainly applies on multiple PCB(we need to set mark points on each
PCB )
13
Fig.3-2
Import coordinate: according to the PCB schematic, we get the coordinate of mark and write
down manually.
Mark point information;
Min-Max: Based on different size of mark point to find the correct position in case of any
confusion.
Light source: inner ring and outer ring. Use inner ring if the board holes work as fiducials , use
outer ring if light-spots work as fiducials.
Brightness:Default value
Manual programming: when it’s in Manual Programming status, the function “Alignment” of
Mark will be effective. Click on it, the camera will go and collect the coordinate of mark (see
image 3-2), save it and go back. (Note: if the mark point is far away, please use Overall
movement to find it)
No mark exists: Generally we will choose a component that is far away from the first
component as a mark, which will make placement effect better.
(4) Add mark point: the function of adding mark point
Delete mark point: the function of deleting mark point can be used when there is needless mark
point or error point.
14
4.1.4.Chip list settings
Function: to display the sequence, footprint and other information of components. There are two
ways to add these information: manual programming and import mounting file.
Operation:
(1) Manual programming: firstly, check the box of manual programming. There is a sample line
of the first component, please modify this line firstly.
Fig. 4-1,
one component has been found
Find and confirm one component’s coordinate by using the function of “Movement Mode”-Click
15
to move (Visual field/Overall Workbench).Once clicked the “Save” item,the interface will
automatic back to main page,then input the corresponding values(Designator refer to the
location,Specification refer to the value of resistance,Footprint refer to the normal package
info,I.e.0603,0805,1206,Etc.Angle value should be set according to the required direction on the
PCB and polarity ,horizontal direction(0 or 180 degree),vertical direction(90 or -90 degree).The
first component have been completely created after set all above values.The next step is click
“New”item and will pop up one line(completely copy the previous line),then click “Align” to find
and confirm second component(same operation as before)
Fig.4-2
16
4.1.5.Feeder configuration
17
Feed-box information setting
Function:Use to set the components’ information from tray and tube packages,complete picking
up operation for special feeders by changing the values
1 Column: Quantity of components on each column
2 Row: Quantity of components on each row
3 Right top X/Y: Find the position of right top component, this component is usually the
last component in IC tray, and left bottom side is the first component in IC tray.
4 Start X/Y: This setting is used to define the position of 1st component, its default setting
is X1,Y1( in 1st column, 1st row). If the 1st component is on 2nd column, 1st row, you can enter
X2,Y1.
18
Feeder basic information
Fig.5-1 Fig.5-2
1 Pick position X/Y:First have to lock the position of component on the feeder(See
fig.5-2),once saved the modification, the XY data will automatically change to the ones after
alignment.
2 Pickup Angle:The initial default angle is 90 degrees, support to do modifying the value
in order to change the mounting angels for wholly feeder if needed.
3 Footprint:Select corresponding footprint,when use the function”Vision Alignment”, will
refer to the values in date base.
4 Placement speed:Control the placement speed for the feeder by adjust the speed values.
5 Vision Alignment:Choose corresponding alignment method under this item.
6 Pick height:Control the pick height by dragging the sideward slider.
Placement height:Set the value according to the component’s actual thickness.
7 Placement/Pick delay:set a little value or 0 both ok.
8 There are two detection methods,Vacuum Detection and Vision Detection.
Vacuum Detection:Once the “Vacuum dete.” is ticked, the sensor of air pressure will be turned on.
If the actual vacuum hasn’t reached the default value during pick and place, the machine will
throw it and re-pick a component.
9 Skip:Once select this item,will skip all placement for this feeder.
19
Nozzle Information
Align:The nozzle will align to the component’s upside on corresponding feeders when click this
item
Height Test:After clicking this item,the nozzle will go down and check whether the pick height is
ok. Support do adjustment of pick height on feeder information item if needed.
Pick test:After clicking this item,the corresponding nozzle will pick one component and check
whether pick position is ok. Support do adjustment of pick position on feeder information item if
needed.
After finish setting of all above feeders information,then click “assign feeder and nozzle to Chip
list”,then chip list will automatic to be changed correspondingly.
20
4.2. File Mounting
21
4.3. Manual Test
Function: Used for testing the basic functions, connection between software and hardware is the
mainly function, details about testing as below:
4.3.1.Placement head
22
nozzle.
Head move, after click this option, you will enter into”head move”page, click to move
(Overall Workbench) you can test to move in a wide range.
4.3.2.Rail control
Function, test rail PCB feeding,forward PCB feeding, backward PCB feeding and feeding speed
4.3.3.Hose control
23
Up Looking Camera Photograph, after click this option will take a picture
Send PCB feeding command, after click this option, PCB will feed forward
Buzzer,after click this option some sound will appear
X Y step out recover&X Y Initialize, after click this, machine will recover to its original
position and coordinates in system will initialize.
4.3.4.Feeder test
Function, test each feeder’s matching and feed box & peel box’s function. First, select” Feed-box
and peel-box linkage”, then test function of feed box and peel box.
(1) click any feeder randomly, feed box and peel box will appear corresponding actions
Function, this part arm at machine’ global parameter settings, any modified parameter will
influence all mounting files, when modify this part please consider seriously. Especially the last
page system settings, we suggest after using a period of time or under the guidance of our
engineers then change its parameter.(Notice, before our machines leave factory, all parameter
already be set and no need to change). This user manual just introduce all setting functions briefly,
more details about parameter modification please refer to comments from our engineers.
24
As pic show, function description of button on right side
Save configuration: click it for saving after modify the parameters
Modify password: click it, put into the password, then finish change the fourth page which is
also the System interface.
Set up feeder ID: click and show as pic above. This is for modifying of feed-box ID.
Feed-box is different from peel-box, feed-box ID is saved in feed-box itself . E.g.: Feeder of
feed-box 1, it will be identified feed-box 1 no matter which port matched. So we will mark it.
New feed-box default ID are all No.50, it need you to change them here by yourselves.
25
Version upgrade: After receiving our new version file, you can upload it with clicking
“version upgrade” to finish.
ENGLISH:Change to the English version.
4.4.1.Feeder configuration
26
Save after setting well the pick position of the feeder. Same way as in the file.
“Feed-box” setting
It is used to set the feed-box ID. E.g., if you insert the feed-box 2 in the port 1, then it need to set
the feed-box ID to be 2
“Peel Box”setting
“Peel box” is different from “Feed box”,the ID for peel box is corresponding to the port.For
example,no matter which “Peel box” you connect,the ID always be No.1.
Above setting can help set the serial number of the stack in power supply port on the machine,
See below fig.
27
For example,the default port ID for Stack 33 is 33,if the port 33 is broken and want to change to
port 34,can set in this item
“Feed test”
Once clicked this item,then the machine will start Feed test,feed one component and help check
whether the feed is normal
28
4.4.2. Feed setting
Used if there are problems during peel operation,then can click this item to repair. Normally no
need to click.
29
4.4.3.Peel Configuration
Function:Peel configuration as above figure show,used to set the values for all peel boxes
Feed rate:Similar meaning in Feed box part,mean length of rotation each time
Strength:Torque setting of Peel motor(Plastic tape will be difficult strip away in the case of being
affected with damp, can adjust bigger values of motor torque here)
Test:The machine will do peel test separate after clicking this item,feed box won’t work during
above test
30
4.4.4. System setting
Function: it is mainly for correction the position of suction nozzle.(Notice: In case change by
mistake,we ‘ve locked it by password. It can be changed by clicking the button of Password
change and then insert password. Strongly recommend operating it under our engineer’s
guidance).
(1) Default parameters 1 setting:
Default speed: placement head movement speed under overall situation, priority is not as fast
as speed set in stacks.
Vibration feeder frequency: setting the frequency of vibration feeder. Discharge state will be
more stable if frequency high.
Vibration feeder strength: it depends on the component, if component too small and strength
set high it will shake out the component easily, of course if strength small, the discharging
speed will be slower.
(2) Nozzle Jointly Alignment setting:
Click test button and go into interface below:
31
Click the central point among four nozzles under the shot can set the central point.
Another way is press CTRL button then click the mouse to make each nozzle to identify their
own central point in the four quadrants.
(Notice: Please click the LENS ROTATION before setting the suction nozzle, then PnP machine
will collect nozzle’s 360 degree rotation photos to synthesize. After that, press CTRL button to set
each nozzle’s identification of central point.
Save it after finishing the setting.
Operation steps: 1.click the button of LENS ROTATION to let machine take photos of nozzle’s
360 degree rotation . 2.click the central point of nozzle 3. Click the save button.
Relative position of nozzle 1 and camera: it is for the synchronism of nozzle and camera,
setting it when placement position do not matched with the camera position.
Click setting then go into interface below:
32
Move the nozzle to any place of PCB board, put one piece of carbon paper, then click
REMAINS(MARK), placement head will rotate and leave a dot, after that click the button of
Focus that dot and save,it will be done (show as photo above ).
Trash box position: setting the position of dropping component, it depends.
(2)Production test
1 Make a programming file
2 Test the file to pick and place components.
(3)Inspection
1 Inspection Items
Check if the specification,direction,polarity of components are aligned with what they should be.
— Whether the components are damaged or the pins are distorted.
— Whether the component is off beyond allowance.
2 Inspection Methods
The inspection methods vary from the equipment that you have.
Except visual inspection, all of amplifier, microscope, online or offline AOI equipment can be
applied if the pitch of IC is quite small to check.
3 Inspection Standard
Please follow SOP to do inspection or any other general standards (IPC Standard and SJ /
T10670-1995 SMT General Technical Requirements)
Adjust the programming file according to the placement effect after the first production test
If there is any issue of specification, direction and polarity, please follow process file to amend.
If the components are off, please adjust the file by following two methods
a. If the placement effects of all components are off in the same direction, it would be the
fiducial issues. Please resolve this issue by adjusting the coordinate of fiducials according to
its value of deviation.
b. If there are several components off beyond allowance, you’d better adjust their coordinates
on working file with down-looking camera.
If there are couple of issues occur during test, some other points need to be considered.
a. Frequent pickup failure. Some suggestions are listed below,
— The pick height is inappropriate, please revise the value after an inspection or a pick-test;
— The pick offset needs an adjustment, it should be aligned with the center of component reel
slot rather than that of component.
— Due to peel strength or installation issue of wasted film, the film on tape won’t be peeled
33
completely
— The nozzle was blocked
— The nozzle is damaged or has a crack
— The size issue of nozzle would cause air leakage or insufficient suction.
— The air hose is blocked or has a leakage problem, and even the pump has an issue.
b. Frequently throwing components. Some suggestions are listed below,
— Up-looking camera can’t take a clear picture of component due to brightness issue for
example.
— The size or shape isn’t aligned with that in “Footprint library”
— The size of nozzle is inappropriate or insufficient suction.
— The nozzle is damaged or blocked, and even has a crack
34
5. Structure and maintenance instruction
⑴ ⑻
⑺
⑵ ⑼
⑹
⑶ ⑽
⑸
⑷
⑾
⑻ ⑿ Up-looking camera
⒀ Auto-rails
⒀ ⑿
⒁ PCB support board
⑹
⒂ Nozzles
⒁ ⑼
35
5.1.1.Peel-box
Installation of peel-box
36
5.1.2.Tape&Reel holder
5.1.3.Fixation support
37
5.1.4.Feed-box
5.1.5.Vibration feeder
38
5.1.6.Auto-rails
Adjustment of auto-rails
A
Fig.2 Fig.3
Fig.1
See(Fig.1):Loosen screws on A and B,then the left rail can be moved arbitrarily.
See(Fig.2):Put PCB on the groove of rails and tighten and screws A and B once confirmed
the width.
See(Fig.3):Once finished width adjustment, put the board into rails. Check the effect picture
as below
39
5.1.7.Nozzle
Illustration
Inner
0.3mm 0.7mm 1.4mm 2.2mm 4mm 7.5mm
diameter
40
size size
TO252 6.5*6.3
41
5.2. Maintenance
42
5.2.2.Maintenance of device
43
5.2.3.Placement failure analysis and troubleshooting
Whether Pick and Place machine can run normally or not, which will directly impact on
production quality and volume. To make the machine run properly, we must fully understand the
structure and characteristics of the machine, master every kinds of failure
patterns of manifestation,reason and troubleshooting methods. Finding problems and reasons in
time and timely troubleshooting can help ensure efficiency of the machine during working.
(1)Common failures
boot failure
head doesn’t move
fail to feed forward a board
Pick failure
Place failure
(2) Main reasons of failure
transmission systems-driven PCB and head movement transmission system and the
corresponding sensors.
Air Route-Air pipe,nozzle
Nozzle size not suit to the component
No info in Footprint library
Irregular component
Incorrect values setting of component’s height or pick height
(3)placement troubleshooting
failure patterns of manifestation,Reasons,troubleshooting methods
head doesn’t move
Solutions:
1. Sensor is poor connected or short-circuited. Please wipe off the dust or lubrication on
sensor or even exchange a sensor
2. Longitudinal sensor or sensor poor connect or short circuit, check and repair the transmitter
or add too much lubricating oil on sensor-clean the sensor
Rails fail to advance the board feed forward after uploading the PCB
Solutions:
3. The rails belt get loose or broken, need to be adjusted or exchanged.
4. The rails drive motor doesn’t work.
Nozzle can’t pick up component
Pick up position offset
Components fall down during moving
Solutions:
1. Nozzle had been wearing or become aging,the crack causes leakage,replace with a new
nozzle
2. The nozzle’s bottom surface is uneven or get suck by solder paste or other dirt.Please wipe it
44
off and use cleaning needle to clean the nozzle
3. Current nozzle size is not suit to component , change another one
4. Surface uneven on the component, replace with a qualified one
5. Component is sticking to the bottom tape;
6. Burrs on tape hole stuck component;
7. Component’s pin get stuck in the corner of the den;
8. Gap between components and tape package hole is not big enough , uncover the plastic tape
and upside down to check if the components can fall down or not.
9. Plastic adhesive tape is too sticky or flimsy and then can not be unfolded. Or plastic adhesive
tape has been tore down from edge side.
10. Pick up position offset. Actual Feed box is offset from Feeding center,check X, Y, Z data and
do reprogram.
Placement offset
Solutions:
1. Programming issue(some components’ positions are inaccurate),amend the coordinates;
2. If all components are offset, please modify fiducials.
3. The components’ thickness setting errors,modify components information on Footprint
Library
4. Pick height is too high that causes components being dropped. Please reset the Pick Height
value
5. Pick height is too low that causes slide problem during placement
6. High speed issue. Lower the speed to achieve a more accurate rotation and placement effect.
Screen printing technology refer to using ready-made stencil, directly contact to the printer in a
certain way, make the solder paste evenly flow on the stencil and then leak into the mesh through
the holes. When getting the stencil away, solder paste had been covered to the printed circuit board
solder graphics
corresponding, thus complete the solder paste printing on the PCB.
Printing process is one of the key working procedure to ensure the quality of surface mounting.
According to the statistics,under the premise of guaranteed quality about components and
PCB,correctly PCB design, 70% of the surface quality problem caused during printing process. In
order to ensure the quality of SMT assembly, it is necessary to strictly control the quality of the
solder paste printing.
The amount of solder paste printing requirements are as follows:
45
1.The using amount of solder paste should be uniform, good consistency. Solder paste graphics
should be clear, try to avoid adhesion between adjacent graphics. Solder paste graphics and solder
graphics should be consistent.
2.In general,keep unit area amount of solder paste about 0.8 mg/mm². For fine pitch components,
should be 0.5 mg/mm² (using stencil thickness and hole size to control in the actual operation).
3.Printed on the substrate of solder paste compared with required value, a certain deviation is
permissible, the covering area of the solder paste on each solder pad should be more than 75%.
4.Should be no seriously collapsing problem and edges neatly after solder paste had been printed,
the dislocation shouldn’t be larger than 0.2 mm, for solder pad of fine pitch
components,dislocation shouldn’t be larger than 0.1MM,pollution by solder paste is not permitted
to the PCB.
Excellent printing graphics should be uniform in both vertical and horizontal direction,full,clean
all round, solder paste fill solder pad. Using above such printing graphics device, after reflow
soldering,will get good welding effect then.
Solder Paste graphics dislocation
Reasons: Holes on the stencil not good match with solder pad; No enough precision of the Printing
machine
Issues: easily cause bridge connection
Solutions:Adjust the stencil position; Adjust the printing machine.
Solder paste graphics have icicles and dents
Reasons:Scraper’s pressure is too large; Rubber scraper’s hardness is not enough; Holes are too
big in the stencil
Issues: Solder paste’s required volume is not enough, easy to appear faulty soldering;solder joint
strength is not enough.
Solutions:Adjust the printing pressure; Use metal scraper; Improved holes designing in the stencil.
Too much solder paste
Reasons:Holes are too big in the stencil; The gap is too big between stencil and PCB.
Issues: easily cause bridge connection
Solutions:Check the holes size in stencil; Adjust the parameters of printing, especially the gap
between PCB and stencil
Graphic uneven(have breakpoints)
Reasons:Holes’ wall are not smoothness enough; not wipe residual solder paste in using for many
times; Solder paste’s thixotropy is bad.
Issues: Easy cause no enough solder paste, lead to the problem such as faulty soldering.
Solutions:Wipe the stencil
Contamination of the graphics
Reasons:Not wipe residual solder paste in stencil after using for many times;Poor quality of solder
paste; Shake problem when getting the stencil way
Issues: easily cause bridge connection
Solutions:Wipe and clean stencil; replace solder paste;adjust the machine.