EM Bundle Mechanical List
EM Bundle Mechanical List
1 ACD 40 Drum √ For 100% clean, crew had to go into the drum. As there are plates in the drum na
4 ATTK 30 Tank √ Propose 3D tank internal system with telescopic arm, Need to map out the covererd areas. Crew had to go in for final pick up on the base na
9 ACE 40 A/B Cooler √ Scape item, Washing at TRIDENT W/S, * Cobalt, may need UHP to Jet*** na
11 ACE 51 reboiler X Washing at TRIDENT W/S, Tricky on Bundle Extraction (Need 45 Ton, length at least 9 m long to pull due to the overhead structure) bundle puller
14 ACD 20 Drum X Propose to use 3D tank internal cleaning system with telescopic arm; For 100% cleaning, Crew will need ro go in na
17 ADE 51 Pre heater X Washing at TRIDENT W/S (Used chain block, due to space constain) mechanical
18 ADE 73 condenser X Washing at TRIDENT W/S (Used chain block, due to space constain) mechanical
19 ADE 01A exchanger X Washing at TRIDENT W/S; shell at site bundle puller
20 ADE 01B exchanger X Washing at TRIDENT W/S; shell at site bundle puller
23 AHE 07/A/B preheater √ Whole bundle send to wash at TRIDENT W/S; Arsenic Chemical; tight back the bolt before sen back to EM for Scape na
25 AUE 01 Air cooler X Site, Aor fin cooler tube internal only na