STR Adapters
STR Adapters
Ministry of Railways
QMS-26:2017
(Revision 0)
Schedule of Technical Requirements
For Infrastructural, Manufacturing & Testing facilities
and Quality Control
For
Class ‘E’ & Class ‘K’ Adapters
*Note: - New Vendors shall be approved for all the above four items at a time. No approval would be
given for individual type of adapters
Oct ’2017
QMS-26:2017(Rev.0) Page 1 of 4
1.0 SCOPE
1.1 This schedule covers technical requirement for manufacture, testing and supply of Narrow
Jaw, wide jaw, modified adapters to be fitted in BG wagon
2.0 REQUIREMENT
The vendor seeking approval shall have the required facilities as mentioned below:
2.2 Manufacturer should have adequate covered accommodation for storing raw material &
other activities such as testing & inspection, storage of finished items awaiting dispatch
2.3 M&P
The following machinery and plants with adequate capacity should be available.
2.3.1 Ensure that covered shed with sufficient height and space provided with EOT Crane / Tram
Beam Crane / Jib Crane facilities for the following is available:
2.3.3 Atleast one no. each Immersion and optical pyrometer / Infrared Pyrometer with digital
display for measuring liquid metal temp shall be available.
2.3.5 Ladle with bottom pouring / Kettle ladle pouring arrangement should be available
3.1 All incoming sand must be tested before acceptance as per frequency set by quality control
department.
_________________________
QMS-26:2017(Rev.0) Page 2 of 4
3.3 For testing incoming virgin sand, moulding, sand, the following equipment should be
available.
The calibration of such equipment must be done once in a year.
(i) Permeability tester
(ii) Quick moisture teller
(iii) Dry compression strength tester
(iv) Chemical balance
(v) Sand sieve shaker
4.1 Sand drier with cooling arrangement provided with intermediate hopper must be available.
4.2 Automatic sand continuous mixture machine for making mould shall be available
4.4 Whenever the sand is tested the following properties of prepared sands checked:-
Moisture, permeability, GCS, GSS. Ensure that a system exists specifying the acceptance
values for each test and any sand not meeting the above parameters is not used for mould
making.
4.5 Jolting machine with squeezing facilities for Mould preparation should be available
6.1 Universal testing machine of 40t capacity with graphical /computerised recording for tensile
test sample from each heat should be available. The machine is to be calibrated once in a
year
6.2 One number fixed bench type heavy duty hardness testing equipment of 500 BHN capacity
with optical / digital display arrangement for giving direct reading should be available.
_________________________
QMS-26:2017(Rev.0) Page 3 of 4
7.0 MACHINING FACILITIES
7.1 There should be a machine shop equipped with the following machines
(i) CNC Machine with facility for precision machining of adapters is required for proper
matching of adapter with bearing.
(ii) Heavy duty swing frame grinder
(iii) Pedestal grinder
8.1 Suitable shot blasting machine conveyer or monorail type or twin table type should be
available
9.1 One number Hardness testing machine of 500 BHN capacity shall be available on shop floor
in addition to facility as per clause 6.2 of this STR.
9.2 All gauges for checking dimensional accuracy of the product shall be available
10.1 Quality manual of the firm for ISO 9000 should clearly indicate at any stage the control,
over the manufacturing and testing of the said railway product.
10.2 There exists system of easy traceability of the product from casting stage to finished product.
10.3 Quality assurance plan for the product detailing various aspects like
(a) Organisation chart
(b) Flow process chart
(c) Stage inspection details
(d) Various parameters to be maintained to ensure control
(e) Policy of disposal of rejected casting should be implemented and record is maintained for
documentary evidence. The QAP shall be available as per the requirements detailed in
“Vendor approval guidelines & application form” issued by QA(Mech) Directorate,
RDSO
10.4 Diploma holder must be head of the inspection/final control section having 5 years
experience in the relevant field.
10.5 Ensure that there exists a quality manual of the firm indicating the extent of control over
production and testing
10.6 Ensure that there exists a system of documentation in respect of rejection at customer end,
warranty replacement.
10.7 System should exists for documentation of the following:
(i) Incoming raw material with TC ref. of supplier as well as internal test result.
(ii) Stage inspection and test results.
(iii) Calibration records.
_________________________
QMS-26:2017(Rev.0) Page 4 of 4