contract_25di0084 (1)
contract_25di0084 (1)
Contract ID : 25DI0084
JAIME C. LACTANIN
Location of the Contract : Barangay San Roque, San Pedro City, Laguna
--------------------------------------------------------------------------------------------------------
FORM OF CONTRACT AGREEMENT
This CONTRACT AGREEMENT, made this 24th day of March, 2025 by and
between:
MAR-VEL CONSTRUCTION & SUPPLY
for this purpose, with main office address at DPWH Laguna 2ND District Engineering
Office, Los Baños, Laguna, hereinafter referred to as the “PROCURING ENTITY”;
- and –
WITNESSETH:
Accountant III
WHEREAS, the PROCURING ENTITY is desirous that the CONTRACTOR executes the
Works under 25DI0084 – Construction of Multi-Purpose Building, Barangay San
Roque, San Pedro City, Laguna, hereinafter called “the Works,” and the PROCURING
ENTITY has accepted the Calculated Bid of the CONTRACTOR for the execution and
completion of the Works at the calculated unit bid prices shown in the attached Bill of
Quantities, or a total Contract price of Forty Six Million Two Hundred Six Thousand
(DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS)
WHEREAS, the whole WORKS in this PROJECT as covered by this CONTRACT shall be
completed within 315 calendar days in accordance with the provisions of the bid
documents.
NAPOLEON T. ABRIL
District Engineer
DPWH-INFR-51-2016 Page 1 of 6
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
LAGUNA 2ND DISTRICT ENGINEERING OFFICE
Los Baños, Laguna, Region IV-A
Contract ID : 25DI0084
JAIME C. LACTANIN
Location of the Contract : Barangay San Roque, San Pedro City, Laguna
--------------------------------------------------------------------------------------------------------
The items of work covered under this contract are enumerated hereunder, viz:
Furniture/Fixtures,
Lump
A.1.1 (11) Equipment & Appliances 1.00 22,210.52 22,210.52
Sum
for the Field Office for
EVELYN C. TING
the Engineer
Provision of Progress
Contractor
DIVISION
GENERAL
I
PART C EARTHWORK
Accountant III
Individual Removal of
800 (3) a1 Each 1.00 1,177.95 1,177.95
Trees (150-300 mm dia)
Individual Removal of
800 (3) a2 Each 2.00 2,326.28 4,652.56
Trees (301-500 mm dia)
Individual Removal of
800 (3) a3 Each 2.00 11,831.89 23,663.78
Trees (501-750 mm dia)
Removal of Structures Lump
(DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS)
DPWH-INFR-51-2016 Page 2 of 6
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
LAGUNA 2ND DISTRICT ENGINEERING OFFICE
Los Baños, Laguna, Region IV-A
Contract ID : 25DI0084
JAIME C. LACTANIN
Location of the Contract : Barangay San Roque, San Pedro City, Laguna
--------------------------------------------------------------------------------------------------------
PART G DRAINAGE AND SLOPE PROTECTION STRUCTURES
Structural Concetre
Cu.
900 (1) c Class A, 3000psi, 28 1,629.60 14,890.00 24,264,744.00
Days M.
Reinforcing Steel
902 (1) a1 kg 35,029.00 77.93 2,729,809.97
(Deformed), Grade 40
Reinforcing Steel
902 (1) a2 kg 183,699.00 79.22 14,552,634.78
(Deformed), Grade 60
MAR-VEL CONSTRUCTION & SUPPLY
NOW, THEREFORE, for and consideration of the foregoing premises, the parties hereto
agree as follows:
1. In this CONTRACT AGREEMENT, words and expressions shall have the same meanings
as are respectively assigned to them in the Conditions of Contract hereinafter referred
to.
2. The following documents as required by the 2016 revised Implementing Rules and
Regulations of Republic Act No. 9184 shall be deemed to form and be read and
construed as part of this Agreement, viz.:
i. Drawings/Plans;
ii. Specifications;
iii. Bill of Quantities;
Accountant III
(2) Winning bidder’s bid, including the Eligibility requirements, Technical and Financial
Proposals, and all other documents or statements submitted;
(4) Notice of Award of Contract and the Bidder’s conforme thereto; and
NAPOLEON T. ABRIL
(5) Other contract documents that may be required by existing laws and/or the
District Engineer
DPWH-INFR-51-2016 Page 3 of 6
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
LAGUNA 2ND DISTRICT ENGINEERING OFFICE
Los Baños, Laguna, Region IV-A
Contract ID : 25DI0084
JAIME C. LACTANIN
Location of the Contract : Barangay San Roque, San Pedro City, Laguna
--------------------------------------------------------------------------------------------------------
that are subsequently required for submission after the contract
execution, such as the Notice to Proceed, Variation Orders, and
Warranty Security, shall likewise form part of the Contract.
respects.
4. In consideration of the execution and completion of the Works by the CONTRACTOR,
the PROCURING ENTITY hereby covenants to pay the CONTRACTOR the unit prices
EVELYN C. TING
NAPOLEON T. ABRIL
District Engineer
DPWH-INFR-51-2016 Page 4 of 6
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
LAGUNA 2ND DISTRICT ENGINEERING OFFICE
Los Baños, Laguna, Region IV-A
Contract ID : 25DI0084
Contract Name : Construction of Multi-Purpose Building, Barangay
San Roque, San Pedro City, Laguna
Location of the Contract : Barangay San Roque, San Pedro City, Laguna
--------------------------------------------------------------------------------------------------------
IN WITNESS WHEREOF, the parties hereto set their respective hands on the day,
month and year first above written.
Witnessed by:
APRILINE E. VALENCIANO
Accountant III
Finance Section
APPROVED:
NAPOLEON T. ABRIL
District Engineer
Date of Approval: _
DPWH-INFR-51-2016 Page 5 of 6
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
LAGUNA 2ND DISTRICT ENGINEERING OFFICE
Los Baños, Laguna, Region IV-A
Contract ID : 25DI0084
JAIME C. LACTANIN
Location of the Contract : Barangay San Roque, San Pedro City, Laguna
--------------------------------------------------------------------------------------------------------
REPUBLIC OF THE PHILIPPINES)
PROVINCE OF LAGUNA ) S.S.
Municipality of Los Baños )
ACKNOWLEDGEMENT
BEFORE ME, as the Notary Public for and within the Municipality of Los Baños,
MAR-VEL CONSTRUCTION & SUPPLY
who executed the foregoing CONTRACT AGREEMENT and they acknowledge to me that
the same is their true act and deed for in behalf of the parties they represented.
This statement consists of Six (6) pages, including this page, on which this
acknowledgement is written duly signed by the contracting parties and their witnesses on
the left margin of the other pages.
(Notary Public)
(DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS)
Government of the Republic of the Philippines
NAPOLEON T. ABRIL
District Engineer
DPWH-INFR-51-2016 Page 6 of 6