PPE-sample-problems
PPE-sample-problems
1
Machinery at book value 1,500,000.00
Land used as plant site 1,000,000.00
Construction in progress 600,000.00
Motor vehicles 400,000.00
Total 3,500,000.00
2
Supplies 100,000.00
Merchandise Inventory 1,200,000.00
Investment Property 800,000.00
Machinery 100,000.00
Land 2,000,000.00
The following are related to the cost for the newly constructed office building:
Direct materials purchased 500,000.00
Direct labor 300,000.00
Variable overhead 47.3625% of direct materials used
Fixed overhead excluding interest 200,000.00
Additional information:
1. Unused materials for the construction of the building amounting 100,000
2. Direct labor includes the salary of the office supervisor overseeing the construction amounting to 50,000
3. 40% of the fixed overhead is applicable to the cost of construction.
4. A loan was made intended for the construction of the building. Total interest for the loan is 20,000 in which 5,000 was incur
5. A freight in of 40,000 was not included in the cost of the direct materials.
Overhead:
Variable 204,606.00
Fixed 80,000.00
Interest 5,000.00 289,606.00
971,606.00
ng to 50,000
20,000 in which 5,000 was incurred for the duration of the construction.
The following are the properties acquired by Si Company in 2024
Machine 350,000.00
Equipment 220,000.00
Motor Vehicle 800,000.00
Warehouse 600,000.00
Land 400,000.00
Total 2,370,000.00
lue of the land is 400,000.