The document outlines a four-day training course on instrument transformer diagnostics using the CPC 100, focusing on testing current transformers (CTs) and voltage transformers (VTs). Participants will learn to perform commissioning, troubleshooting, and periodic tests, create asset-specific test plans, and generate comprehensive reports using Primary Test Manager (PTM). The course is aimed at technical staff in various sectors, requiring a background in electrical engineering.

Uploaded by

levanthanhbka
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
4 views1 page

Citr01en-Course-Details-MEA

The document outlines a four-day training course on instrument transformer diagnostics using the CPC 100, focusing on testing current transformers (CTs) and voltage transformers (VTs). Participants will learn to perform commissioning, troubleshooting, and periodic tests, create asset-specific test plans, and generate comprehensive reports using Primary Test Manager (PTM). The course is aimed at technical staff in various sectors, requiring a background in electrical engineering.

Uploaded by

levanthanhbka
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Instrument transformer diagnostics with CPC 100

4 days English Citr01en

Get to know the wide scope of applications and operation of the CPC 100. Learn how to efficiently test CTs and
VTs in hands-on and theoretical sessions using Primary Test Manager (PTM). Work with CTs and VTs to gain
experience with this application.

Objectives

 Perform commissioning, troubleshooting and periodic tests of CTs and VTs


 Create asset specific test plan including wiring diagram
 Automatic assessment according to industry standards
 Comprehensive reporting, including templates for all standard and advanced tests

Content

 Measure the CT and VTs ratio or ratio error as functional test of the ITs' performance as part of
commissioning tests
 Evaluate the excitation current and the CT’s knee-point to define its error and performance
 Background about winding resistance measurement to find possible electrical damage in windings or
contact problem
 Perform burden measurement to determine the influence of cables and connections on the burden
impedance
 Check the polarity check between the primary and secondary windings of an IT to prevent maloperation of
connected protection devices
 How to efficiently perform all relevant commissioning test using Primary Test Manager (PTM)
 Automated generation of test reports with Primary Test Manager (PTM)

Solutions Audience Prerequisites

CPC 100, CP SB2, CPOL2 Technical staff involved in Knowledge of electrical


Primary Test Manager (PTM) transformer testing in utilities, engineering
transmission, distribution and
generation networks, railway grids,
service companies and
manufacturers.

Join our training courses and get registered on www.omicron.academy