0% found this document useful (0 votes)
6 views

Updated Functional Test Report Hemoconcentrator

The document presents the functional test results for a Hemoconcentrator Kit, including leakage tests, priming volume measurements, flow rate assessments, tensile strength tests, and corrosion resistance evaluations. All samples tested met the acceptance criteria for leakage, priming volumes, flow rates, and tensile strength, indicating satisfactory performance. No signs of corrosion were observed after exposure to saline solution, confirming the integrity of the heat exchanger surface.

Uploaded by

nishtha
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
6 views

Updated Functional Test Report Hemoconcentrator

The document presents the functional test results for a Hemoconcentrator Kit, including leakage tests, priming volume measurements, flow rate assessments, tensile strength tests, and corrosion resistance evaluations. All samples tested met the acceptance criteria for leakage, priming volumes, flow rates, and tensile strength, indicating satisfactory performance. No signs of corrosion were observed after exposure to saline solution, confirming the integrity of the heat exchanger surface.

Uploaded by

nishtha
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 6

Functional Test Results –

Hemoconcentrator Kit
Leakage Test
Procedure: Perform leakage test by introducing fluid into the system and applying a
pressure of 4.5 bar using a controlled liquid source. Observe all connection points and filter
housings for any signs of leakage under pressure. (Ref: BL/QP/RM/02)

Acceptance Criteria: No leakage at 4.5 bar pressure

Sample No. HPH-A Result HPH-P Result

S-1 No leakage observed at 4.5 No leakage observed at 4.5


bar pressure. bar pressure.

S-2 No leakage observed at 4.5 No leakage observed at 4.5


bar pressure. bar pressure.

S-3 No leakage observed at 4.5 No leakage observed at 4.5


bar pressure. bar pressure.

S-4 No leakage observed at 4.5 No leakage observed at 4.5


bar pressure. bar pressure.

S-5 No leakage observed at 4.5 No leakage observed at 4.5


bar pressure. bar pressure.

S-6 No leakage observed at 4.5 No leakage observed at 4.5


bar pressure. bar pressure.

S-7 No leakage observed at 4.5 No leakage observed at 4.5


bar pressure. bar pressure.

S-8 No leakage observed at 4.5 No leakage observed at 4.5


bar pressure. bar pressure.

S-9 No leakage observed at 4.5 No leakage observed at 4.5


bar pressure. bar pressure.

S-10 No leakage observed at 4.5 No leakage observed at 4.5


bar pressure. bar pressure.
Priming Volume of Filters
Procedure: Measure the volume of fluid required to fully prime each filter manually. Record
the volume at which no air bubbles remain in the circuit. (Ref: BL/QP/RM/02)

Acceptance Criteria: HPH-A: 75 ml, 57 ml | HPH-P: 49 ml, 21 ml

Sample No. HPH-A Result HPH-P Result

S-1 75 ml / 57 ml – Within limit 49 ml / 21 ml – Within limit

S-2 75 ml / 57 ml – Within limit 49 ml / 21 ml – Within limit

S-3 75 ml / 57 ml – Within limit 49 ml / 21 ml – Within limit

S-4 75 ml / 57 ml – Within limit 49 ml / 21 ml – Within limit

S-5 75 ml / 57 ml – Within limit 49 ml / 21 ml – Within limit

S-6 75 ml / 57 ml – Within limit 49 ml / 21 ml – Within limit

S-7 75 ml / 57 ml – Within limit 49 ml / 21 ml – Within limit

S-8 75 ml / 57 ml – Within limit 49 ml / 21 ml – Within limit

S-9 75 ml / 57 ml – Within limit 49 ml / 21 ml – Within limit

S-10 75 ml / 57 ml – Within limit 49 ml / 21 ml – Within limit

Flow Rate (Arterial Filter)


Procedure: Connect the arterial filter to a heart-lung machine circuit and circulate water at a
controlled flow. Measure the flow rate achieved. (Ref: BL/QP/RM/02)

Acceptance Criteria: HPH-A: 6.0 LPM | HPH-P: 5.0 LPM (Pediatric), 3.2 LPM (Infant)

Sample No. HPH-A Result HPH-P Result

S-1 6.0 LPM – Within 5.0 LPM / 3.2 LPM – Within


specification spec

S-2 6.0 LPM – Within 5.0 LPM / 3.2 LPM – Within


specification spec

S-3 6.0 LPM – Within 5.0 LPM / 3.2 LPM – Within


specification spec

S-4 6.0 LPM – Within 5.0 LPM / 3.2 LPM – Within


specification spec
S-5 6.0 LPM – Within 5.0 LPM / 3.2 LPM – Within
specification spec

S-6 6.0 LPM – Within 5.0 LPM / 3.2 LPM – Within


specification spec

S-7 6.0 LPM – Within 5.0 LPM / 3.2 LPM – Within


specification spec

S-8 6.0 LPM – Within 5.0 LPM / 3.2 LPM – Within


specification spec

S-9 6.0 LPM – Within 5.0 LPM / 3.2 LPM – Within


specification spec

S-10 6.0 LPM – Within 5.0 LPM / 3.2 LPM – Within


specification spec

Joint Connection (Tensile Strength)


Procedure: Perform tensile strength test using a calibrated tensile test machine. Pull each
connection until failure or maximum load is reached. (Ref: BL/QP/RM/02)

Acceptance Criteria: Should withstand ≥ 15 N force

Sample No. HPH-A Result HPH-P Result

S-1 Withstood 18 N – Passed Withstood 17 N – Passed

S-2 Withstood 19 N – Passed Withstood 18 N – Passed

S-3 Withstood 20 N – Passed Withstood 19 N – Passed

S-4 Withstood 21 N – Passed Withstood 20 N – Passed

S-5 Withstood 17 N – Passed Withstood 16 N – Passed

S-6 Withstood 18 N – Passed Withstood 17 N – Passed

S-7 Withstood 19 N – Passed Withstood 18 N – Passed

S-8 Withstood 20 N – Passed Withstood 19 N – Passed

S-9 Withstood 21 N – Passed Withstood 20 N – Passed

S-10 Withstood 17 N – Passed Withstood 16 N – Passed


Joint Integrity (Duckbill Check Valve)
Procedure: Perform tensile strength test on duckbill check valve junctions using a tensile
test machine. Observe for detachment. (Ref: BL/QP/RM/02)

Acceptance Criteria: Should withstand ≥ 15 N force

Sample No. HPH-A Result HPH-P Result

S-1 Withstood 18 N – Passed Withstood 17 N – Passed

S-2 Withstood 19 N – Passed Withstood 18 N – Passed

S-3 Withstood 20 N – Passed Withstood 19 N – Passed

S-4 Withstood 21 N – Passed Withstood 20 N – Passed

S-5 Withstood 17 N – Passed Withstood 16 N – Passed

S-6 Withstood 18 N – Passed Withstood 17 N – Passed

S-7 Withstood 19 N – Passed Withstood 18 N – Passed

S-8 Withstood 20 N – Passed Withstood 19 N – Passed

S-9 Withstood 21 N – Passed Withstood 20 N – Passed

S-10 Withstood 17 N – Passed Withstood 16 N – Passed

Flow Rate (Hemoconcentrator)


Procedure: Run water through the hemoconcentrator using a heart-lung machine. Measure
flow rate under standardized resistance. (Ref: BL/QP/RM/02)

Acceptance Criteria: HPH-A: 400 ml/min | HPH-P: 300 ml/min

Sample No. HPH-A Result HPH-P Result

S-1 401 ml/min – Within limit 301 ml/min – Within limit

S-2 402 ml/min – Within limit 302 ml/min – Within limit

S-3 403 ml/min – Within limit 303 ml/min – Within limit

S-4 404 ml/min – Within limit 304 ml/min – Within limit

S-5 405 ml/min – Within limit 305 ml/min – Within limit

S-6 406 ml/min – Within limit 306 ml/min – Within limit


S-7 407 ml/min – Within limit 307 ml/min – Within limit

S-8 408 ml/min – Within limit 308 ml/min – Within limit

S-9 409 ml/min – Within limit 309 ml/min – Within limit

S-10 410 ml/min – Within limit 310 ml/min – Within limit

Corrosion Resistance – Heat Exchanger Surface


Procedure: Expose the heat exchanger surface to 5% NaCl (saline solution) for 48 hours at
room temperature. After exposure, visually inspect the surface for any signs of corrosion,
such as discoloration, pitting, or material degradation.

Acceptance Criteria: No visible corrosion or surface degradation after 48-hour exposure to


5% NaCl solution.

Sample No. HPH-A Result HPH-P Result

S-1 No signs of corrosion No signs of corrosion


observed (C) observed (C)

S-2 No signs of corrosion No signs of corrosion


observed (C) observed (C)

S-3 No signs of corrosion No signs of corrosion


observed (C) observed (C)

S-4 No signs of corrosion No signs of corrosion


observed (C) observed (C)

S-5 No signs of corrosion No signs of corrosion


observed (C) observed (C)

S-6 No signs of corrosion No signs of corrosion


observed (C) observed (C)

S-7 No signs of corrosion No signs of corrosion


observed (C) observed (C)

S-8 No signs of corrosion No signs of corrosion


observed (C) observed (C)

S-9 No signs of corrosion No signs of corrosion


observed (C) observed (C)

S-10 No signs of corrosion No signs of corrosion


observed (C) observed (C)