0% found this document useful (0 votes)
2 views

dp-additional ceiling-0108

This document is a billing invoice from Huayou Construction Development Philippines Corporation to Loyalty Homes (M) SDN BHD for renovation and expansion works at the Alogis Warehouse, totaling PHP 2,158,986.58. The invoice outlines the project details, payment terms, and a breakdown of costs related to additional ceiling works. It also includes bank details for payment transfer and signatures from the involved parties.

Uploaded by

qimengge6
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
2 views

dp-additional ceiling-0108

This document is a billing invoice from Huayou Construction Development Philippines Corporation to Loyalty Homes (M) SDN BHD for renovation and expansion works at the Alogis Warehouse, totaling PHP 2,158,986.58. The invoice outlines the project details, payment terms, and a breakdown of costs related to additional ceiling works. It also includes bank details for payment transfer and signatures from the involved parties.

Uploaded by

qimengge6
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

华友建设发展菲律宾有限公司

HUAYOU CONSTRUCTION DEVELOPMENT PHILIPPINES CORPORATION


U102 Cedar Mansion II, Escriva Drive, Ortigas Center, Pasig City, Metro Manila 1605
Telephone Nos. 632 8638-1108/632 8638-1109

BILLING INVOICE
No. 0108

BILL TO: DATE : 08-May-25


LOYALTY HOMES (M) SDN BHD
No. 13 Jalan Pelepas 4/8 Taman Perindustrian Tanjung, Pelepas
81550 Gelang Patah, Johor, Malaysia

PROJECT:
RENOVATION & EXPANSION OF ALOGIS WAREHOUSE
Owner: V.S. INDUSTRY PHILIPPINES, INCORPORATED
Location: Light Industry & Science Park III, Santo Toams, Batangas

PARTICULARS AMOUNT

This is to bill you for the Works Done for additional ceiling
under P.O. No. 2504-069

P 2,158,986.58

Contract Amount 5,397,466.46


Down payment 2,158,986.58

TOTAL P 2,158,986.58
Amount in Words:
TWO MILLION ONE HUNDRED FIFTY EIGHT THOUSAND NINE HUNDRED EIGHTY SIX & 58/100.

Please issue payment in favor of: Prepared by : ARCHELLE ARGOSINO


HUAYOU CONSTRUCTION DEVELPOMENT PHILIPPINES CORPORATION
Bank Details for Telegraphic Transfer Payment Checked by: ZHI QIANZHU
Bank Name : BDO Unibank, Inc.
Account No.: 007070065350 Approved by: ZHANG ZONGMIN
Swift Code: BNORPHMM
Bank Address: 106 Shaw Bldg. 106 Shaw Blvd> Received by:
Brgy Kapitolyo, Pasig City, Philippines Signature over Printed Name/ Date
Project : Renovation and Expansion of Alogis WareHouse
Location : Light Industry & Science Park III, Santo Tomas, Batangas, Philippines
Owner : VS Industry Philippines, Inc.
Subject : Additional Ceiling
As of November 20,2024
PERIODIC ACCOMPLISHMENT
ITEM DESCRIPTION QTY UNIT UNIT COST AMOUNT PREVIOUS THIS PERIOD TO-DATE
QTY % Amount QTY % Amount QTY % Amount

1 additional ceiling 3,763.62 M2 780.00 2,935,623.60


supply of labour and tools -
pvc coated gpysum ceiling board, 600mm x 1200mm x 9mm thk -
galvanized main c-furring -
powder coated double furring 1'' x 1'' -
gi tie wire # 16 as hanging support -
-
2 ceiling works at product area 1,725.46 M2 780.00 1,345,858.80
supply of labour and tools -
pvc coated gpysum ceiling board, 600mm x 1200mm x 9mm thk -
galvanized main c-furring -
powder coated double furring 1'' x 1'' -
gi tie wire # 16 as hanging support -
-
3 ceiling works at ground floor area (labour only) 882.00 M2 650.00 573,300.00
existing galvanzed main c-furring -
existing hanging support -
existing ceiling board -
-
4 ceiling works at ground floor area (labour only) 12.00 M2 650.00 7,800.00
existing galvanzed main c-furring
existing hanging support
existing ceiling board

5 Preliminaries 1.00 LOT 534,884.06 -

PROGRESS AMOUNT 5,397,466.46 0.00% - 0.00% - 0.00% -

DEDUCTIONS:
Discount - -
Down Payment - -
5% Retention - -

AMOUNT DUE 5,397,466.46 0.00% - 0.00% - 0.00% -

Prepared By : Noted By : Verified By : Conforme :

Engr. Raymond Pauler Mr. Luo Rengui


Construction Manager - HCDPC Project Manager - HCDPC VS Industry Philippines, Inc.

2/ 4
华 友 建 设 发 展 菲 律 宾 有 限 公 司
HUAYOU CONSTRUCTION DEVELOPMENT PHILS. CORPORATION
Unit 101,Cedar Mansion II, No. 7 JM Escriva Drive, Ortigas Center, San Antonio, Pasig City, Metro Manila 1605, Philippines
Telephone no.: +632 8638-1108; Telefax no.: +632 8638-1109; Email ad.: [email protected]

Delivery Order
Billing Address Delivery Address
LOYALTY HOMES (M) SDN BHD (1311819-V) V.S. INDUSTRY PHILIPPINES, INC.
13, JALAN PELEPAS 4/8, TAMAN PERINDUSTRIAN TENJUNG ALOGIS WAREHOUSE, LIGHT INDUSTRY & SCIENCE PARK III,
PELEPAS, 81550 GELANG PATAH, JOHOR, MALAYSIA SAN RAFAEL, SANTO TOMAS, BATANGAS, PHILIPPINES
JOB : SEVER ROOM (PROGRESS BILLING NO. 1)
PERSON IN CHARGE : MR. HUANG

Attn MR HUANG Attn. : V.S. IND. PHILS.


Tel 07-5099299 Tel
Fax 07-5099299 Fax PO No : 2504-069
Customer Account Sales Executive From Doc Date From Doc No Name Page No Invoice No Date
26/4/2025 1 of 1 0108 03-MAY-25
No Description Qty Qty Finished % Finished
1 additional ceiling
supply of labour and tools 3,763.620 M2 - M2
pvc coated gpysum ceiling board, 600mm x 1200mm x 9mm thk
galvanized main c-furring
powder coated double furring 1'' x 1''
gi tie wire # 16 as hanging support

2 ceiling works at product area 1725.46 M2 - M2 -


supply of labour and tools
pvc coated gpysum ceiling board, 600mm x 1200mm x 9mm thk
galvanized main c-furring
powder coated double furring 1'' x 1''
gi tie wire # 16 as hanging support

3 ceiling works at ground floor area (labour only) 882 M2 - M2


existing galvanzed main c-furring
existing hanging support
existing ceiling board

4 ceiling works at ground floor area (labour only) 12 M2 - M2


existing galvanzed main c-furring
existing hanging support
existing ceiling board

5 Preliminaries 1 LOT - LOT

Total 6384.080 0.000


Payment Terms Ref 1
DAYS:
I/We hereby confirmed and received to the above mentioned Authorized Signature
goods in a good order & condition. HUAYOU CONSTRUCTION DEVELOPMENT PHILS.CORP.

Customer Company Stamp & Signature


华 友 建 设 发 展 菲 律 宾 有 限 公 司
HUAYOU CONSTRUCTION DEVELOPMENT PHILS. CORPORATION
Unit 101,Cedar Mansion II, No. 7 JM Escriva Drive, Ortigas Center, San Antonio, Pasig City, Metro Manila 1605, Philippines
Telephone no.: +632 8638-1108; Telefax no.: +632 8638-1109; Email ad.: [email protected]

Accomplishment
Billing Address Delivery Address
LOYALTY HOMES (M) SDN BHD (1311819-V) V.S. INDUSTRY PHILIPPINES, INC.
13, JALAN PELEPAS 4/8, TAMAN PERINDUSTRIAN TENJUNG ALOGIS WAREHOUSE, LIGHT INDUSTRY & SCIENCE PARK III,
PELEPAS, 81550 GELANG PATAH, JOHOR, MALAYSIA SAN RAFAEL, SANTO TOMAS, BATANGAS, PHILIPPINES
JOB : SEVER ROOM (PROGRESS BILLING NO. 1)
PERSON IN CHARGE : MR. HUANG

Attn MR HUANG Attn. : V.S. IND. PHILS. QTT No:


Tel 07-5099299 Tel PO No : 2504-069
Fax 07-5099299 Fax DO No :
Customer Account Sales Executive Currency Name Page No Invoice No Date
PHP 1 of 1 0108 03-MAY-25
No Item Code Description Qty Finished Unit Price Discount Total Price
1 additional ceiling
supply of labour and tools 3,763.620 M2 780.000 2935623.6
pvc coated gpysum ceiling board, 600mm x 1200mm x 9mm thk
galvanized main c-furring
powder coated double furring 1'' x 1''
gi tie wire # 16 as hanging support
1725.46 M2 780.00 1,345,858.80
2 ceiling works at product area
supply of labour and tools
pvc coated gpysum ceiling board, 600mm x 1200mm x 9mm thk
galvanized main c-furring
powder coated double furring 1'' x 1''
gi tie wire # 16 as hanging support

3 ceiling works at ground floor area (labour only) 882 M2 650.00 573,300.00
existing galvanzed main c-furring
existing hanging support
existing ceiling board

4 ceiling works at ground floor area (labour only) 12 M2 650.00 7,800.00


existing galvanzed main c-furring
existing hanging support
existing ceiling board

5 Preliminaries 1 LOT 534,884.06 534,884.06

Contract Amount 5,397,466.46


Forty(40%) percent downpayment 2,158,986.58

PESO PHILIPPINES:TWO MILLION ONE HUNDRED FIFTY EIGHT THOUSAND NINE HUNDRED EIGHTY SIX & 58/100.

Payment Terms Ref 1 : Ref 2 : Total Payable


DAYS: 2,158,986.58
Ref 3 : Ref 4 :

Authorized Signature
PAYMENT TO : HUAYOU CONSTRUCTION DEVELOPMENT PHILS.CORP.
BDO Unibank Inc. Bank A/C No : 007070065350
Name : Huayou Construction Development Philippines Corporation

You might also like