The inspection report for grounding work at the MEP project A31 outlines various inspection items related to grounding installations. It confirms the compliance of materials and installation practices with the latest construction drawings and specifications. The report includes sections for remarks and signatures from the subcontractor and client representatives.

Uploaded by

raghuveer0609
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
13 views1 page

Grounding List

The inspection report for grounding work at the MEP project A31 outlines various inspection items related to grounding installations. It confirms the compliance of materials and installation practices with the latest construction drawings and specifications. The report includes sections for remarks and signatures from the subcontractor and client representatives.

Uploaded by

raghuveer0609
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

INSPECTION REPORT FOR GROUNDING WORK

CLIENT : JONY
RECORD NO. :
PROJECT : MEP WORKS FOR A31
UNIT :
PROJECT NO. : AO0421JD02
PAGE : ___ OF ___ DATE:_____________

PLANT DRAWING NO.: __________________

LOCATION : ___________________________

ACCEPTABLE
ITEM INSPECTION ITEM REMARKS
YES NO
The construction drawing used in the latest revision.
Earthing layouts are surveyed & confirmed before
1 commencement of installation to avoid re works
/interference/fouling with other services installtions.

Specifications of grounding materials comply with the


2
drawing & Contract specification. IMR is clear.
Weld joints are made by overlapping the strip equivalent
3 to double the width of the strip and four sides continuously
weld.

Earthing materials are installed as per the pre-determined


4
layout & earthing box installed as specified in the drawing.
Proper connection of grounding cable to earthing Lug.
5
correct type and size of terminal Lug is used.
Electrodes have clean surface, free from non-conducting
6
materials like Paint, grease etc.
Top level of the earth pit is matched with the finished grade
7 level at paved area and projected 100mm above FGL at
unpaved area.
Earth pit is backfilled by using alternate layers of charcoal &
8
common salt and individually numbered for identification
Note:

PREPARED BY : __________________ _______________


SUBCONTRACTOR DATE

INSPECTED BY : ______________ _________ WITNESS BY : ______________ __________


CTCI DATE JONY DATE