3.1 General
The installation of the DR-6C RMU guarantees the highest possible degree of protection in
the event of an internal arc, by extinguishing it in less than 50 ms. The rapid arc extinction
limits the internal pressure build-up, which prevents the escape of gas.
DW646112 3-1
3.2.2 Diverting of the gases
Figure 10: Gas escape route when placing the switchgear DR-6+ C with a cable cellar available
(Lateral view of installation)
Figure 11: Gas escape route when placing DR-6+ C switchgear without a cable cellar (Lateral view of
installation)
The height of the socle below the switchgear, needs to correspond with the regulations for
bending radius of the installed cable.
3-2 DW646112
4 SWITCHGEAR ARRANGEMENT
Figure 13: Positioning: Installing fixation clips when assemblming DR-6 on soccle
After installing the fixation clips, the DR-6C medium-voltage cubicle can be positioned in
its definitive place. The rear side of the DR-6C medium voltage cubicle is now fixed into
place.
DW646112 4-3
4.1.3 Anchoring front side of DR-6C medium-voltage switchgear
Consult the installation drawing(s), the electrical schematics, and the floor plans
before starting with the actual positioning of the medium-voltage switchgear.
Leave the indicated free space between the rear side of the cubicle and the wall
of the installation room. This allows the overpressure system to function correctly
in the event of an internal arc. A transformer cubicle can be placed with its rear
side against the wall.
4-4 DW646112
• Position the medium-voltage switchgear perfectly level, after anchoring the fixation
clips, in its definitive place in the installation room. The rear side of the DR-6C medium-
voltage switchgear is now fixed into place.
Figure 15: DR-6C medium-voltage switchgear installed in its definitive installation room
• Anchor each functional unit to the floor using two bolts (A). Use the provided openings
as seen in Figure 18. If required, the anchoring can happen after disassembling the
floor panels (B) and the front panel of the cable compartment (C).
DW646112 4-5
4.2 Assembly of the end panels
A special kit is available for the assembly of both the left and right end panels.
4-6 DW646112
4.2.1.3 Preparations
Ensure that the cubicle, the next one, and the previous one are de-energized
and earthed
Figure 17: End panel sealing profile assembly (left and right)
• Place the sealing profile on the inside of the end panel, in such a way that the end
panel’s pattern of holes and the sealing profile match.
• Secure the sealing profile to the end panel using five provided self-drilling
hexagonal collar-head bolts (F) for every end panel
• The result is a left (sealing profile on the right side) and a right (sealing profile on
the left side) end panel, which can be assembled to the medium voltage cubicle, as
outlined in §Fout! Verwijzingsbron niet gevonden..
DW646112 4-7
4.2.1.5 Assembly Guidelines End Panel
• Place the end panel against the lateral wall of the cubicle, in such a way that the
end panel’s pattern of holes and the lateral wall match.
• Secure the end panel using the provided fixing materials, by using the M8x16 RIPP
self-locking hexagonal flange bolts(D) and the M8 RIPP hexagonal flange nuts (E).
Torque MA equals 42Nm.
4-8 DW646112
4.3 Cable connections, mounting floor panels
During the installation of the medium-voltage switchgear, the assembly of the floor panels
happens simultaneously with the connection of the cables, the descrition of these actions
are combined.
Cable connections can only be carried out by qualified and authorized staff in
service of the power supply company, using only fixing materials provided by
SGC – SwitchGear Company nv. Cables must never cross each other.
4.3.1 Preparations
Ensure that the cubicle, the next one, and the previous one are de-energized
and earthed
DW646112 4-9
After disassembling the front panel of the cable compartment, the firstbottom panel (D) can
be removed from the cable compartment, after disassembling the self-locking hexagonal
flange nuts (E). Now the cable grommets (F) can be removed from the cable compartment.
The rear bottom panel (G) is to be installed according to Figure 21, after disassembling the
two self-securing hexagonal flange nuts (H).
4-10 DW646112
4.3.3 Assembly guidelines for cable connection
DW646112 4-11
• Connect the three earthing cables (Figure
26 G) to the cable support using two self-
securing hexagonal flange bolts (Figure
26 H) and two self-securing hexagonal
flange nuts (Figure 26I).
Torque MA equals 40Nm.
After assembly of the bottom panels (and connection of the cables), the doors can be put
back onto the cubicles.
In functional units where the cable connection has not (yet) occurred, the
earthing switch needs to be locked in the closed position, or the bushings
need to be equipped with a proper socket.
4-12 DW646112
4.3.4 Possible bushings
The DR-6C medium-voltage switchgear is equipped with bushings in compliance with
Cenelec EN50181 and IEC 60137 for cable connections.
Figure 29: Cable transit type Interface C Figure 30: Cable transit type Interface A
DW646112 4-13
4.4 Refitting the door
For refitting the door, the load break switch must be in the OPEN position and
the earthing switch in the CLOSED position.
DW646112 4-15
4.5 Measuring phases sequence
4-16 DW646112
5 INITIAL COMMISSIONING
The actual connection to the MV grid and the initial commissioning of the medium voltage
switchgear can be done by qualified and trained staff employed by the power supply
company only, observing the locally applicable safety regulations.
Notes: