DR-6 Installation Manual (en) - Copy (7)

The document is an installation manual for the DR-6C medium voltage switchgear, detailing procedures for refitting the door and measuring phase sequences. It emphasizes the importance of qualified personnel for initial commissioning and adherence to safety regulations. Additionally, it includes disclaimers regarding liability for information accuracy and changes to specifications.

Uploaded by

hoomanir1980
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
4 views

DR-6 Installation Manual (en) - Copy (7)

The document is an installation manual for the DR-6C medium voltage switchgear, detailing procedures for refitting the door and measuring phase sequences. It emphasizes the importance of qualified personnel for initial commissioning and adherence to safety regulations. Additionally, it includes disclaimers regarding liability for information accuracy and changes to specifications.

Uploaded by

hoomanir1980
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 7

DR-6C

MEDIUM VOLTAGE SWITCHGEAR


COMPACT RING MAIN UNIT

Installation Manual:
DR-6C / DR-6+ C

SGC - SwitchGear Company nv - Moorstraat 24 - B-9850 Nevele - Belgium


 +32 (0)9/321.91.12 - Fax +32 (0)9/321.91.13 - e-mail: [email protected] -
Website: www.switchgearcompany.eu
© 2013 SGC – SwitchGear Company nv

All rights reserved.

The information provided herein may not be reproduced and/or (re)published in any way and by any means (electronic or
mechanical), without the prior, explicit written authorization of SGC - SwitchGear Company nv.

The information provided herein is based on general data concerning the construction, known at the time of publication,
and concerning the qualities of the material and working methods. Consequently, the right to make changes is reserved.

The information contained within is applicable to the standard version of the DR-6 medium-voltage switchgear.
Therefore, SGC - SwitchGear Company nv cannot be held liable for any damage resulting from specifications that differ
from the standard version of the DR-6 medium-voltage switchgear.

The available information has been assembled with the greatest possible care, but SGC - SwitchGear Company nv
cannot be held liable for any mistakes in the information, or the consequences thereof.

The user names, trade names, trademarks, etc., used by SGC - SwitchGear Company nv cannot, in accordance with the
legislation concerning the protection of trademarks, considered to be free.

ii Installation Manual – DR-6C/ DR-6+ C DW646112


4.4 Refitting the door

For refitting the door, the load break switch must be in the OPEN position and
the earthing switch in the CLOSED position.

• Carefully check whether there are any


tools or fixing materials left in the cable
compartment.
• Check all connections.
• Attach the door (B) to the cable
compartment:
o Grasp the door with both hands
using the handle(D).
o Carefully position the door in the
supports.
o Push the door downward.
• Lock the door with a reliable padlock (C)
on the locking latch (A).

Figure 31: Placing the door back

A specially appointed, qualified operator must retain the keys.

DW646112 4-15
4.5 Measuring phases sequence

The phase sequence is usually


measured between K functions.
The phase sequence can be
measured easily using the
voltage indicators (A) on the
front panel,

• Measure using a voltage meter/phase


sequence indicator (B) between the
corresponding phases. A phase
sequence indicator (RM086000) is
optionally available.

If no voltage can be measured,


the phase sequence is correct.
Measuring the voltage between
two different phases allows you
to check the measurement.
Obviously a voltage should be
measured in this case. Figure 32: Measuring phase sequence

4-16 DW646112
5 INITIAL COMMISSIONING

The actual connection to the MV grid and the initial commissioning of the medium voltage
switchgear can be done by qualified and trained staff employed by the power supply
company only, observing the locally applicable safety regulations.

Notes:

DW646112 5-1
DW646112 ©2013 SGC – SwitchGear Company nv