0% found this document useful (0 votes)
14 views

Form Summary Welding Treacibility

The document outlines the welding monitoring progress for the replacement of a trunkline spanning 7.6 km in Jambi, Indonesia. It includes details on various welding inspections such as visual, radiography, and holiday tests, as well as the materials and processes used. The report lists multiple welding joints, their statuses, and associated inspection results for compliance with project specifications.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
14 views

Form Summary Welding Treacibility

The document outlines the welding monitoring progress for the replacement of a trunkline spanning 7.6 km in Jambi, Indonesia. It includes details on various welding inspections such as visual, radiography, and holiday tests, as well as the materials and processes used. The report lists multiple welding joints, their statuses, and associated inspection results for compliance with project specifications.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 9

Document No. 001/RJA.QA.

QC/TRL/SG/XI/2024 WELDING VISUAL RADIOGRAPHY WRAPPING HOLIDAY TEST


PT. RAMAI JAYA ABADI
MONITORING PROGRESS WELDING Revision No. 0 WELDING
REP ACC ACC REP RSC DONE ACC REP ACC REPAIR
DONE
PENGGANTIAN TRUNKLINE 4 IN SEPANJANG 7.6 KM GS1 - GS2 DI FIELD JAMBI Page OF

PT. PERTAMINA EP ZONA 1 FIELD JAMBI Issue Date


528 0 644 523 34 5 0 0
CONTRACT NO 4710000889

CONNECTION MATERIAL 1 MATERIAL 2 FIT-UP INSP. VISUAL INSP. RADIOGRAPHY FIELD JOINT COATING HOLIDAYTEST LOWERING & BACKFILING

DRAWING
NO DRAWING NO SHEET OF REV. STA PROCESS WELDING ELECTRODE JOINT NO. J. TYPE SW/FW DIA-INCH THK(mm) REPORT NO. REMARKS
STATUS
REPORT
MATERIAL TO MATERIAL MATERIAL HEA .NO. PIPE NO. MATERIAL HEA .NO. PIPE NO. DATE ACC REP WELDING DATE WELDER STAMP ACC REP REPORT NO. DATE ACC REJ RSC REPORT NO. DATE ACC REP DATE ACC REP LOWERING BACKFILLING
NO.

1 PEP-RJA-WM-JBI-TRL-001 1 OF 41 0 AFC SMAW E6010 + E7010 1 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

2 PEP-RJA-WM-JBI-TRL-001 1 OF 41 0 AFC SMAW E6010 + E7010 2 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

3 PEP-RJA-WM-JBI-TRL-001 1 OF 41 0 AFC SMAW E6010 + E7010 3 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

4 PEP-RJA-WM-JBI-TRL-001 1 OF 41 0 AFC SMAW E6010 + E7010 4 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

5 PEP-RJA-WM-JBI-TRL-001 1 OF 41 0 AFC SMAW E6010 + E7010 5 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

6 PEP-RJA-WM-JBI-TRL-001 1 OF 41 0 AFC SMAW E6010 + E7010 6 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

7 PEP-RJA-WM-JBI-TRL-001 1 OF 41 0 AFC SMAW E6010 + E7010 7 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

8 PEP-RJA-WM-JBI-TRL-001 1 OF 41 0 AFC SMAW E6010 + E7010 8 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

9 PEP-RJA-WM-JBI-TRL-001 1 OF 41 0 AFC SMAW E6010 + E7010 9 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

10 PEP-RJA-WM-JBI-TRL-001 1 OF 41 0 AFC SMAW E6010 + E7010 10 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

11 PEP-RJA-WM-JBI-TRL-001 1 OF 41 0 AFC SMAW E6010 + E7010 11 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

12 PEP-RJA-WM-JBI-TRL-001 1 OF 41 0 AFC SMAW E6010 + E7010 12 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

13 PEP-RJA-WM-JBI-TRL-001 1 OF 41 0 AFC SMAW E6010 + E7010 13 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

14 PEP-RJA-WM-JBI-TRL-001 1 OF 41 0 AFC SMAW E6010 + E7010 14 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

15 PEP-RJA-WM-JBI-TRL-001 1 OF 41 0 AFC SMAW E6010 + E7010 15 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

16 PEP-RJA-WM-JBI-TRL-001 1 OF 41 0 AFC SMAW E6010 + E7010 16 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

17 PEP-RJA-WM-JBI-TRL-001 1 OF 41 0 AFC SMAW E6010 + E7010 17 API 5L SCH.40 API 5L SCH.40 BW FW 4 6,02 ACC ACC

18 PEP-RJA-WM-JBI-TRL-001 1 OF 41 0 AFC SMAW E6010 + E7010 18 API 5L SCH.40 API 5L SCH.40 BW FW 4 6,02 ACC ACC

19 PEP-RJA-WM-JBI-TRL-001 1 OF 41 0 AFC SMAW E6010 + E7010 19 API 5L SCH.40 API 5L SCH.40 BW FW 4 6,02 ACC ACC

20 PEP-RJA-WM-JBI-TRL-001 1 OF 41 0 AFC SMAW E6010 + E7010 20 API 5L SCH.40 API 5L SCH.40 BW FW 4 6,02 ACC ACC

21 PEP-RJA-WM-JBI-TRL-001 2 OF 41 0 AFC SMAW E6010 + E7010 21 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

22 PEP-RJA-WM-JBI-TRL-001 2 OF 41 0 AFC SMAW E6010 + E7010 22 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

001
23 PEP-RJA-WM-JBI-TRL-001 2 OF 41 0 AFC 0+040 0+060 SMAW E6010 + E7010 PIPE PIPE 23 API 5L SCH.40 54349994 022-0788 API 5L SCH.40 54349994 022-0788 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 11/11/24 ACC 11/11/24 W-01 ACC 001 27-Nov-24 ACC
XI/2024

001
24 PEP-RJA-WM-JBI-TRL-001 2 OF 41 0 AFC 0+040 0+060 SMAW E6010 + E7010 PIPE PIPE 24 API 5L SCH.40 54349994 022-0788 API 5L SCH.40 54349994 022-0791 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 11/11/24 ACC 11/11/24 W-01 ACC 001 27-Nov-24 ACC
XI/2024

001
25 PEP-RJA-WM-JBI-TRL-001 2 OF 41 0 AFC 0+060 0+080 SMAW E6010 + E7010 PIPE PIPE 25 API 5L SCH.40 54349994 022-0791 API 5L SCH.40 54349994 022-0793 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 11/11/24 ACC 11/11/24 W-01 ACC 001 27-Nov-24 ACC
XI/2024

001
26 PEP-RJA-WM-JBI-TRL-001 2 OF 41 0 AFC 0+080 0+100 SMAW E6010 + E7010 PIPE PIPE 26 API 5L SCH.40 54349994 022-0793 API 5L SCH.40 54349994 022-0794 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 11/11/24 ACC 11/11/24 W-01 ACC 001 27-Nov-24 ACC
XI/2024

001
27 PEP-RJA-WM-JBI-TRL-001 2 OF 41 0 AFC 0+080 0+100 SMAW E6010 + E7010 PIPE PIPE 27 API 5L SCH.40 54349994 022-0794 API 5L SCH.40 54349994 022-0790 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 11/11/24 ACC 11/11/24 W-01 ACC 017 30-Nov-24 ACC
XI/2024

002
28 PEP-RJA-WM-JBI-TRL-001 2 OF 41 0 AFC 0+100 0+120 SMAW E6010 + E7010 PIPE PIPE 28 API 5L SCH.40 54349994 022-0790 API 5L SCH.40 54349510 022-0797 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 12/11/24 ACC 12/11/24 W-01 ACC 002 27-Nov-24 ACC
XI/2024

002
29 PEP-RJA-WM-JBI-TRL-001 2 OF 41 0 AFC 0+100 0+120 SMAW E6010 + E7010 PIPE PIPE 29 API 5L SCH.40 54349510 022-0797 API 5L SCH.40 54349510 019-0681 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 12/11/24 ACC 12/11/24 W-01 ACC 002 27-Nov-24 ACC
XI/2024

002
30 PEP-RJA-WM-JBI-TRL-001 2 OF 41 0 AFC 0+120 0+140 SMAW E6010 + E7010 PIPE PIPE 30 API 5L SCH.40 54349510 019-0681 API 5L SCH.40 54349510 019-0687 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 12/11/24 ACC 12/11/24 W-01 ACC 017 30-Nov ACC
XI/2024

002
31 PEP-RJA-WM-JBI-TRL-001 2 OF 41 0 AFC 0+140 0+160 SMAW E6010 + E7010 PIPE PIPE 31 API 5L SCH.40 54349510 019-0687 API 5L SCH.40 54349510 019-0686 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 12/11/24 ACC 12/11/24 W-01 ACC 002 27-Nov-24 ACC
XI/2024

002
32 PEP-RJA-WM-JBI-TRL-001 2 OF 41 0 AFC 0+140 0+160 SMAW E6010 + E7010 PIPE PIPE 32 API 5L SCH.40 54349510 019-0686 API 5L SCH.40 54349510 019-0679 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 12/11/24 ACC 12/11/24 W-01 ACC 002 27-Nov-24 ACC
XI/2024

002
33 PEP-RJA-WM-JBI-TRL-001 2 OF 41 0 AFC 0+160 0+180 SMAW E6010 + E7010 PIPE PIPE 33 API 5L SCH.40 54349510 019-0679 API 5L SCH.40 54349510 019-0682 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 12/11/24 ACC 12/11/24 W-01 ACC 017 30-Nov ACC
XI/2024

34 PEP-RJA-WM-JBI-TRL-001 2 OF 41 0 AFC SMAW E6010 + E7010 34 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

001
35 PEP-RJA-WM-JBI-TRL-001 2 OF 41 0 AFC 0+180 0+200 SMAW E6010 + E7010 PIPE PIPE 35 API 5L SCH.40 54349510 019-0682 API 5L SCH.40 54349510 019-0688 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 11/11/24 ACC 11/11/24 W-02 ACC
XI/2024

001
36 PEP-RJA-WM-JBI-TRL-001 2 OF 41 0 AFC 0+200 0+220 SMAW E6010 + E7010 PIPE PIPE 36 API 5L SCH.40 54349510 019-0688 API 5L SCH.40 54349510 019-0683 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 11/11/24 ACC 11/11/24 W-02 ACC 017 30-Nov-24 ACC
XI/2024

001
37 PEP-RJA-WM-JBI-TRL-001 2 OF 41 0 AFC 0+200 0+220 SMAW E6010 + E7010 PIPE PIPE 37 API 5L SCH.40 54349510 019-0683 API 5L SCH.40 54349510 019-0684 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 11/11/24 ACC 11/11/24 W-02 ACC 003 27-Nov-24 ACC
XI/2024

002
38 PEP-RJA-WM-JBI-TRL-001 3 OF 41 0 AFC 0+220 0+240 SMAW E6010 + E7010 PIPE PIPE 38 API 5L SCH.40 54349510 019-0684 API 5L SCH.40 54349510 020-0724 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 12/11/24 ACC 12/11/24 W-02 ACC 003 27-Nov-24 ACC
XI/2024

002
39 PEP-RJA-WM-JBI-TRL-001 3 OF 41 0 AFC 0+220 0+240 SMAW E6010 + E7010 PIPE PIPE 39 API 5L SCH.40 54349510 020-0724 API 5L SCH.40 54349510 020-0723 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 12/11/24 ACC 12/11/24 W-02 ACC 003 27-Nov-24 ACC
XI/2024

002
40 PEP-RJA-WM-JBI-TRL-001 3 OF 41 0 AFC 0+240 0+260 SMAW E6010 + E7010 PIPE PIPE 40 API 5L SCH.40 54349510 020-0723 API 5L SCH.40 54349510 020-0725 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 12/11/24 ACC 12/11/24 W-02 ACC 003 27-Nov-24 ACC
XI/2024

002
41 PEP-RJA-WM-JBI-TRL-001 3 OF 41 0 AFC 0+260 0+280 SMAW E6010 + E7010 PIPE PIPE 41 API 5L SCH.40 54349510 022-0723 API 5L SCH.40 54349510 022-0725 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 12/11/24 ACC 12/11/24 W-02 ACC 004 27-Nov-24 ACC
XI/2024

002
42 PEP-RJA-WM-JBI-TRL-001 3 OF 41 0 AFC 0+260 0+280 SMAW E6010 + E7010 PIPE PIPE 42 API 5L SCH.40 54349510 022-0725 API 5L SCH.40 54349510 022-0730 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 12/11/24 ACC 12/11/24 W-02 ACC 004 27-Nov-24 ACC
XI/2024

003
43 PEP-RJA-WM-JBI-TRL-001 3 OF 41 0 AFC 0+280 0+300 SMAW E6010 + E7010 PIPE PIPE 43 API 5L SCH.40 54349510 020-0730 API 5L SCH.40 54349510 020-0726 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 13/11/24 ACC 13/11/24 W-02 ACC 004 27-Nov-24 ACC
XI/2024

003
44 PEP-RJA-WM-JBI-TRL-001 3 OF 41 0 AFC 0+280 0+300 SMAW E6010 + E7010 PIPE PIPE 44 API 5L SCH.40 54349510 020-0726 API 5L SCH.40 54349510 020-0731 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 13/11/24 ACC 13/11/24 W-02 ACC 018 30-Nov-24 ACC
XI/2024

003
45 PEP-RJA-WM-JBI-TRL-001 3 OF 41 0 AFC 0+300 0+320 SMAW E6010 + E7010 PIPE PIPE 45 API 5L SCH.40 54349510 020-0731 API 5L SCH.40 54349510 020-0722 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 13/11/24 ACC 13/11/24 W-02 ACC 018 30-Nov-24 ACC
XI/2024

003
46 PEP-RJA-WM-JBI-TRL-001 3 OF 41 0 AFC 0+320 0+340 SMAW E6010 + E7010 PIPE PIPE 46 API 5L SCH.40 54349510 020-0722 API 5L SCH.40 54349510 020-0728 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 13/11/24 ACC 13/11/24 W-02 ACC 005 28-Nov-24 ACC
XI/2024

003
47 PEP-RJA-WM-JBI-TRL-001 3 OF 41 0 AFC 0+320 0+340 SMAW E6010 + E7010 PIPE PIPE 47 API 5L SCH.40 54349510 020-0728 API 5L SCH.40 54349510 020-0727 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 13/11/24 ACC 13/11/24 W-02 ACC 005 28-Nov-24 ACC
XI/2024

004
48 PEP-RJA-WM-JBI-TRL-001 3 OF 41 0 AFC 0+340 0+360 SMAW E6010 + E7010 PIPE PIPE 48 API 5L SCH.40 54349510 020-0727 API 5L SCH.40 54349510 020-0729 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 14/11/24 ACC 14/11/24 W-02 ACC 018 30-Nov-24 ACC
XI/2024

004
49 PEP-RJA-WM-JBI-TRL-001 3 OF 41 0 AFC 0+340 0+360 SMAW E6010 + E7010 PIPE PIPE 49 API 5L SCH.40 54349510 020-0729 API 5L SCH.40 54349994 023-0834 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 14/11/24 ACC 14/11/24 W-02 ACC 005 28-Nov-24 ACC
XI/2024

004
50 PEP-RJA-WM-JBI-TRL-001 3 OF 41 0 AFC 0+360 0+380 SMAW E6010 + E7010 PIPE PIPE 50 API 5L SCH.40 54349994 023-0834 API 5L SCH.40 54349994 023-0835 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 14/11/24 ACC 14/11/24 W-02 ACC 005 28-Nov-24 ACC
XI/2024

005
51 PEP-RJA-WM-JBI-TRL-001 3 OF 41 0 AFC 0+380 0+400 SMAW E6010 + E7010 PIPE PIPE 51 API 5L SCH.40 54349994 023-0835 API 5L SCH.40 54349994 023-0833 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 15/11/24 ACC 15/11/24 W-02 ACC 011 29-Nov-24 ACC
XI/2024

004
52 PEP-RJA-WM-JBI-TRL-001 3 OF 41 0 AFC 0+400 0+420 SMAW E6010 + E7010 PIPE PIPE 52 API 5L SCH.40 54349994 023-0840 API 5L SCH.40 54349994 019-0674 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 14/11/24 ACC 14/11/24 W-02 ACC 011 29-Nov-24 ACC
XI/2024

001
53 PEP-RJA-WM-JBI-TRL-001 3 OF 41 0 AFC 0+400 0+420 SMAW E6010 + E7010 PIPE PIPE 53 API 5L SCH.40 54349994 023-0840 API 5L SCH.40 54349994 023-0839 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 11/11/24 ACC 11/11/24 W-03 ACC 006 28-Nov-24 ACC
XI/2024

002
54 PEP-RJA-WM-JBI-TRL-001 4 OF 41 0 AFC 0+400 0+420 SMAW E6010 + E7010 PIPE PIPE 54 API 5L SCH.40 54349994 023-0839 API 5L SCH.40 54349994 023-0837 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 12/11/24 ACC 12/11/24 W-03 ACC 006 28-Nov-24 ACC
XI/2024

002
55 PEP-RJA-WM-JBI-TRL-001 4 OF 41 0 AFC 0+420 0+420 SMAW E6010 + E7010 PIPE PIPE 55 API 5L SCH.40 54349994 023-0837 API 5L SCH.40 54349994 023-0831 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 12/11/24 ACC 12/11/24 W-03 ACC 018 30-Nov-24 ACC
XI/2024

002
56 PEP-RJA-WM-JBI-TRL-001 4 OF 41 0 AFC 0+440 0+460 SMAW E6010 + E7010 PIPE PIPE 56 API 5L SCH.40 54349994 023-0831 API 5L SCH.40 54349994 023-0838 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 12/11/24 ACC 12/11/24 W-03 ACC 019 30-Nov-24 ACC
XI/2024

002
57 PEP-RJA-WM-JBI-TRL-001 4 OF 41 0 AFC 0+440 0+460 SMAW E6010 + E7010 PIPE PIPE 57 API 5L SCH.40 54349994 023-0838 API 5L SCH.40 54349994 023-08XX BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 12/11/24 ACC 12/11/24 W-03 ACC 006 28-Nov-24 ACC
XI/2024

002
58 PEP-RJA-WM-JBI-TRL-001 4 OF 41 0 AFC 0+460 0+480 SMAW E6010 + E7010 PIPE PIPE 58 API 5L SCH.40 54349994 023-08XX API 5L SCH.40 54349994 024-0855 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 12/11/24 ACC 12/11/24 W-03 ACC 006 28-Nov-24 REP
XI/2024

002
59 PEP-RJA-WM-JBI-TRL-001 4 OF 41 0 AFC 0+460 0+480 SMAW E6010 + E7010 PIPE PIPE 59 API 5L SCH.40 54349994 024-0855 API 5L SCH.40 54349994 024-08-- BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 12/11/24 ACC 12/11/24 W-03 ACC 007 28-Nov-24 ACC
XI/2024

60 PEP-RJA-WM-JBI-TRL-001 0 AFC SMAW E6010 + E7010 60 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

003
61 PEP-RJA-WM-JBI-TRL-001 4 OF 41 0 AFC 0+500 0+520 SMAW E6010 + E7010 PIPE PIPE 61 API 5L SCH.40 54349994 024-0854 API 5L SCH.40 54349994 024-0857 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 13/11/24 ACC 13/11/24 W-03 ACC 007 28-Nov-24 ACC
XI/2024

005
62 PEP-RJA-WM-JBI-TRL-001 4 OF 41 0 AFC 0+500 0+520 SMAW E6010 + E7010 PIPE PIPE 62 API 5L SCH.40 54349994 024-0857 API 5L SCH.40 54349509 001-0008 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 15/11/24 ACC 15/11/24 W-02 ACC 019 30-Nov-24 ACC
XI/2024

003
63 PEP-RJA-WM-JBI-TRL-001 4 OF 41 0 AFC 0+520 0+540 SMAW E6010 + E7010 PIPE PIPE 63 API 5L SCH.40 54349994 024-0856 API 5L SCH.40 54349994 024-0853 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 13/11/24 ACC 13/11/24 W-03 ACC 007 28-Nov-24 ACC
XI/2024

003
64 PEP-RJA-WM-JBI-TRL-001 4 OF 41 0 AFC 0+540 0+560 SMAW E6010 + E7010 PIPE PIPE 64 API 5L SCH.40 54349994 024-0853 API 5L SCH.40 54349994 024-0852 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 13/11/24 ACC 13/11/24 W-03 ACC 007 28-Nov-24 ACC
XI/2024

003
65 PEP-RJA-WM-JBI-TRL-001 4 OF 41 0 AFC 0+540 0+560 SMAW E6010 + E7010 PIPE PIPE 65 API 5L SCH.40 54349994 024-0852 API 5L SCH.40 54349994 024-0851 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 13/11/24 ACC 13/11/24 W-03 ACC 008 28-Nov-24 ACC
XI/2024

003
66 PEP-RJA-WM-JBI-TRL-001 4 OF 41 0 AFC 0+560 0+580 SMAW E6010 + E7010 PIPE PIPE 66 API 5L SCH.40 54349994 024-0851 API 5L SCH.40 54349994 024-0850 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 13/11/24 ACC 13/11/24 W-03 ACC 008 28-Nov-24 ACC
XI/2024

003
67 PEP-RJA-WM-JBI-TRL-001 4 OF 41 0 AFC 0+560 0+580 SMAW E6010 + E7010 PIPE PIPE 67 API 5L SCH.40 54349994 024-0850 API 5L SCH.40 54349994 024-0838 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 13/11/24 ACC 13/11/24 W-03 ACC 008 28-Nov-24 ACC
XI/2024

68 PEP-RJA-WM-JBI-TRL-001 4 OF 41 0 AFC SMAW E6010 + E7010 68 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

69 PEP-RJA-WM-JBI-TRL-001 4 OF 41 0 AFC SMAW E6010 + E7010 69 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

003
70 PEP-RJA-WM-JBI-TRL-001 5 OF 41 0 AFC 0+600 0+620 SMAW E6010 + E7010 PIPE PIPE 70 API 5L SCH.40 54349994 024-0871 API 5L SCH.40 54349994 024-0873 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 13/11/24 ACC 13/11/24 W-01 ACC 008 28-Nov-24 ACC
XI/2024

003
71 PEP-RJA-WM-JBI-TRL-001 5 OF 41 0 AFC 0+620 0+640 SMAW E6010 + E7010 PIPE PIPE 71 API 5L SCH.40 54349994 024-0873 API 5L SCH.40 54349994 024-0872 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 13/11/24 ACC 13/11/24 W-01 ACC 009 28-Nov-24 ACC
XI/2024

003
72 PEP-RJA-WM-JBI-TRL-001 5 OF 41 0 AFC 0+620 0+640 SMAW E6010 + E7010 PIPE PIPE 72 API 5L SCH.40 54349994 024-872 API 5L SCH.40 54349994 024-0874 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 13/11/24 ACC 13/11/24 W-01 ACC 009 28-Nov-24 ACC
XI/2024

003
73 PEP-RJA-WM-JBI-TRL-001 5 OF 41 0 AFC 0+640 0+660 SMAW E6010 + E7010 PIPE PIPE 73 API 5L SCH.40 54349994 024-0874 API 5L SCH.40 54349994 024-0870 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 13/11/24 ACC 13/11/24 W-01 ACC 009 28-Nov-24 ACC
XI/2024

003
74 PEP-RJA-WM-JBI-TRL-001 5 OF 41 0 AFC 0+640 0+660 SMAW E6010 + E7010 PIPE PIPE 74 API 5L SCH.40 54349994 024-0870 API 5L SCH.40 54349994 025-0881 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 13/11/24 ACC 13/11/24 W-01 ACC 009 28-Nov-24 ACC
XI/2024
Document No. 001/RJA.QA.QC/TRL/SG/XI/2024 WELDING VISUAL RADIOGRAPHY WRAPPING HOLIDAY TEST
PT. RAMAI JAYA ABADI
MONITORING PROGRESS WELDING Revision No. 0 WELDING
REP ACC ACC REP RSC DONE ACC REP ACC REPAIR
DONE
PENGGANTIAN TRUNKLINE 4 IN SEPANJANG 7.6 KM GS1 - GS2 DI FIELD JAMBI Page OF

PT. PERTAMINA EP ZONA 1 FIELD JAMBI Issue Date


528 0 644 523 34 5 0 0
CONTRACT NO 4710000889

CONNECTION MATERIAL 1 MATERIAL 2 FIT-UP INSP. VISUAL INSP. RADIOGRAPHY FIELD JOINT COATING HOLIDAYTEST LOWERING & BACKFILING

DRAWING
NO DRAWING NO SHEET OF REV. STA PROCESS WELDING ELECTRODE JOINT NO. J. TYPE SW/FW DIA-INCH THK(mm) REPORT NO. REMARKS
STATUS
REPORT
MATERIAL TO MATERIAL MATERIAL HEA .NO. PIPE NO. MATERIAL HEA .NO. PIPE NO. DATE ACC REP WELDING DATE WELDER STAMP ACC REP REPORT NO. DATE ACC REJ RSC REPORT NO. DATE ACC REP DATE ACC REP LOWERING BACKFILLING
NO.

003
75 PEP-RJA-WM-JBI-TRL-001 5 OF 41 0 AFC 0+660 0+680 SMAW E6010 + E7010 PIPE PIPE 75 API 5L SCH.40 54349994 025-0881 API 5L SCH.40 54349994 024-0869 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 13/11/24 ACC 13/11/24 W-01 ACC 010 28-Nov-24 ACC
XI/2024

003
76 PEP-RJA-WM-JBI-TRL-001 5 OF 41 0 AFC 0+660 0+680 SMAW E6010 + E7010 PIPE PIPE 76 API 5L SCH.40 54349994 024-0869 API 5L SCH.40 54349994 025-0876 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 13/11/24 ACC 13/11/24 W-01 ACC 010 28-Nov-24 ACC
XI/2024

003
77 PEP-RJA-WM-JBI-TRL-001 5 OF 41 0 AFC 0+680 0+700 SMAW E6010 + E7010 PIPE PIPE 77 API 5L SCH.40 54349994 025-0876 API 5L SCH.40 54349994 025-0878 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 13/11/24 ACC 13/11/24 W-01 ACC 010 28-Nov-24 ACC
XI/2024

003
78 PEP-RJA-WM-JBI-TRL-001 5 OF 41 0 AFC 0+700 0+720 SMAW E6010 + E7010 PIPE PIPE 78 API 5L SCH.40 54349994 025-0878 API 5L SCH.40 54349994 025-0880 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 13/11/24 ACC 13/11/24 W-01 ACC 011 29-Nov-24 ACC
XI/2024

004
79 PEP-RJA-WM-JBI-TRL-001 5 OF 41 0 AFC 0+700 0+720 SMAW E6010 + E7010 PIPE PIPE 79 API 5L SCH.40 54349994 025-0880 API 5L SCH.40 54349510 019-0675 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 14/11/24 ACC 14/11/24 W-01 ACC 011 29-Nov-24 ACC
XI/2024

004
80 PEP-RJA-WM-JBI-TRL-001 5 OF 41 0 AFC 0+720 0+740 SMAW E6010 + E7010 PIPE PIPE 80 API 5L SCH.40 54349510 019-0675 API 5L SCH.40 54349510 019-0669 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 14/11/24 ACC 14/11/24 W-01 ACC 012 29-Nov-24 ACC
XI/2024

004
81 PEP-RJA-WM-JBI-TRL-001 5 OF 41 0 AFC 0+740 0+760 SMAW E6010 + E7010 PIPE PIPE 81 API 5L SCH.40 54349510 019-0669 API 5L SCH.40 54349510 019-0672 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 14/11/24 ACC 14/11/24 W-01 ACC 012 29-Nov-24 ACC
XI/2024

004
82 PEP-RJA-WM-JBI-TRL-001 5 OF 41 0 AFC 0+740 0+760 SMAW E6010 + E7010 PIPE PIPE 82 API 5L SCH.40 54349510 019-0672 API 5L SCH.40 54349510 019-0671 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 14/11/24 ACC 14/11/24 W-01 ACC 012 29-Nov-24 ACC
XI/2024

004
83 PEP-RJA-WM-JBI-TRL-001 5 OF 41 0 AFC 0+760 0+780 SMAW E6010 + E7010 PIPE PIPE 83 API 5L SCH.40 54349510 019-0671 API 5L SCH.40 54349510 019-0674 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 14/11/24 ACC 14/11/24 W-01 ACC 012 29-Nov-24 ACC
XI/2024

004
84 PEP-RJA-WM-JBI-TRL-001 5 OF 41 0 AFC 0+760 0+780 SMAW E6010 + E7010 PIPE PIPE 84 API 5L SCH.40 54349510 019-0671 API 5L SCH.40 54349510 019-0673 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 14/11/24 ACC 14/11/24 W-01 ACC 013 29-Nov-24 ACC
XI/2024

004
85 PEP-RJA-WM-JBI-TRL-001 5 OF 41 0 AFC 0+780 0+800 SMAW E6010 + E7010 PIPE PIPE 85 API 5L SCH.40 54349510 019-0673 API 5L SCH.40 54349510 016-0581 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 14/11/24 ACC 14/11/24 W-01 ACC 013 29-Nov-24 ACC
XI/2024

004
86 PEP-RJA-WM-JBI-TRL-001 6 OF 41 0 AFC 0+800 0+820 SMAW E6010 + E7010 PIPE PIPE 86 API 5L SCH.40 54349510 016-0581 API 5L SCH.40 54349510 019-067- BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 14/11/24 ACC 14/11/24 W-03 ACC 013 29-Nov-24 ACC
XI/2024

87 PEP-RJA-WM-JBI-TRL-001 6 OF 41 0 AFC SMAW E6010 + E7010 87 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

88 PEP-RJA-WM-JBI-TRL-001 6 OF 41 0 AFC SMAW E6010 + E7010 88 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

003
89 PEP-RJA-WM-JBI-TRL-001 6 OF 41 0 AFC 0+820 0+840 SMAW E6010 + E7010 PIPE PIPE 89 API 5L SCH.40 54349510 019-0683 API 5L SCH.40 54349510 019-0678 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 13/11/24 ACC 13/11/24 W-03 ACC 013 29-Nov-24 ACC
XI/2024

003
90 PEP-RJA-WM-JBI-TRL-001 6 OF 41 0 AFC 0+840 0+860 SMAW E6010 + E7010 PIPE PIPE 90 API 5L SCH.40 54349510 019-0678 API 5L SCH.40 54349510 019-0670 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 13/11/24 ACC 13/11/24 W-03 ACC 014 29-Nov-24 ACC
XI/2024

004
91 PEP-RJA-WM-JBI-TRL-001 6 OF 41 0 AFC 0+860 0+880 SMAW E6010 + E7010 PIPE PIPE 91 API 5L SCH.40 54349510 019-0670 API 5L SCH.40 54349510 019-0676 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 14/11/24 ACC 14/11/24 W-03 ACC 014 29-Nov-24 REP
XI/2024

004
92 PEP-RJA-WM-JBI-TRL-001 6 OF 41 0 AFC 0+860 0+880 SMAW E6010 + E7010 PIPE PIPE 92 API 5L SCH.40 54349510 019-0676 API 5L SCH.40 54349510 019-0680 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 14/11/24 ACC 14/11/24 W-03 ACC 014 29-Nov-24 ACC
XI/2024

004
93 PEP-RJA-WM-JBI-TRL-001 6 OF 41 0 AFC 0+860 0+880 SMAW E6010 + E7010 PIPE PIPE 93 API 5L SCH.40 54349510 019-0680 API 5L SCH.40 54349510 019-0588 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 14/11/24 ACC 14/11/24 W-03 ACC 014 29-Nov-24 ACC
XI/2024

004
94 PEP-RJA-WM-JBI-TRL-001 6 OF 41 0 AFC 0+880 0+900 SMAW E6010 + E7010 PIPE PIPE 94 API 5L SCH.40 54349510 019-0588 API 5L SCH.40 54349510 019-0585 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 14/11/24 ACC 14/11/24 W-03 ACC 015 29-Nov-24 ACC
XI/2024

004
95 PEP-RJA-WM-JBI-TRL-001 6 OF 41 0 AFC 0+900 0+920 SMAW E6010 + E7010 PIPE PIPE 95 API 5L SCH.40 54349510 019-0585 API 5L SCH.40 54349510 019-0581 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 14/11/24 ACC 14/11/24 W-03 ACC 015 29-Nov-24 ACC
XI/2024

004
96 PEP-RJA-WM-JBI-TRL-001 6 OF 41 0 AFC 0+920 0+940 SMAW E6010 + E7010 PIPE PIPE 96 API 5L SCH.40 54349510 019-0581 API 5L SCH.40 54349510 019-0587 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 14/11/24 ACC 14/11/24 W-03 ACC 019 30-Nov-24 ACC
XI/2024

004
97 PEP-RJA-WM-JBI-TRL-001 6 OF 41 0 AFC 0+920 0+940 SMAW E6010 + E7010 PIPE PIPE 97 API 5L SCH.40 54349510 015-0587 API 5L SCH.40 54349510 015-0526 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 14/11/24 ACC 14/11/24 W-03 ACC 015 29-Nov-24 ACC
XI/2024

004
98 PEP-RJA-WM-JBI-TRL-001 6 OF 41 0 AFC 0+940 0+960 SMAW E6010 + E7010 PIPE PIPE 98 API 5L SCH.40 54349510 015-0526 API 5L SCH.40 54349510 015-0524 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 14/11/24 ACC 14/11/24 W-03 ACC 015 29-Nov-24 ACC
XI/2024

004
99 PEP-RJA-WM-JBI-TRL-001 6 OF 41 0 AFC 0+940 0+960 SMAW E6010 + E7010 PIPE PIPE 99 API 5L SCH.40 54349510 015-0526 API 5L SCH.40 54349510 015-0523 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 14/11/24 ACC 14/11/24 W-03 ACC 016 29-Nov-24 ACC
XI/2024

005
100 PEP-RJA-WM-JBI-TRL-001 6 OF 41 0 AFC 0+960 0+980 SMAW E6010 + E7010 PIPE PIPE 100 API 5L SCH.40 54349510 015-0523 API 5L SCH.40 54349510 016-0589 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 15/11/24 ACC 15/11/24 W-03 ACC 016 29-Nov-24 ACC
XI/2024

005
101 PEP-RJA-WM-JBI-TRL-001 6 OF 41 0 AFC 0+980 1+0 SMAW E6010 + E7010 PIPE PIPE 101 API 5L SCH.40 54349510 016-0589 API 5L SCH.40 54349510 016-0569 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 15/11/24 ACC 15/11/24 W-03 ACC 019 30-Nov-24 ACC
XI/2024

005
102 PEP-RJA-WM-JBI-TRL-001 7 OF 41 0 AFC 0+980 1+0 SMAW E6010 + E7010 PIPE PIPE 102 API 5L SCH.40 54349510 016-0569 API 5L SCH.40 54349510 014-0551 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 15/11/24 ACC 15/11/24 W-03 ACC 020 30-Nov-24 ACC
XI/2024

005
103 PEP-RJA-WM-JBI-TRL-001 7 OF 41 0 AFC 1+0 1+020 SMAW E6010 + E7010 PIPE PIPE 103 API 5L SCH.40 54349510 014-0551 API 5L SCH.40 54349510 015-0520 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 15/11/24 ACC 15/11/24 W-03 ACC 020 30-Nov-24 ACC
XI/2024

005
104 PEP-RJA-WM-JBI-TRL-001 7 OF 41 0 AFC 1+0 1+020 SMAW E6010 + E7010 PIPE PIPE 104 API 5L SCH.40 54349510 015-0520 API 5L SCH.40 54349510 014-0516 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 15/11/24 ACC 15/11/24 W-03 ACC 020 30-Nov-24 ACC
XI/2024

005
105 PEP-RJA-WM-JBI-TRL-001 7 OF 41 0 AFC 1+0 1+020 SMAW E6010 + E7010 PIPE PIPE 105 API 5L SCH.40 54349510 014-0516 API 5L SCH.40 54349510 014-0514 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 15/11/24 ACC 15/11/24 W-03 ACC 020 30-Nov-24 ACC
XI/2024

005
106 PEP-RJA-WM-JBI-TRL-001 7 OF 41 0 AFC 1+040 1+060 SMAW E6010 + E7010 PIPE PIPE 106 API 5L SCH.40 54349510 014-0514 API 5L SCH.40 54349510 016-0576 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 15/11/24 ACC 15/11/24 W-03 ACC 021 30-Nov-24 ACC
XI/2024

005
107 PEP-RJA-WM-JBI-TRL-001 7 OF 41 0 AFC 1+040 1+060 SMAW E6010 + E7010 PIPE PIPE 107 API 5L SCH.40 54349510 016-0576 API 5L SCH.40 54349510 016-0575 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 15/11/24 ACC 15/11/24 W-03 ACC 021 30-Nov-24 REP
XI/2024

006
108 PEP-RJA-WM-JBI-TRL-001 7 OF 41 0 AFC 1+040 1+160 SMAW E6010 + E7010 PIPE PIPE 108 API 5L SCH.40 54349510 016-0575 API 5L SCH.40 54349510 016-0573 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 16/11/24 ACC 16/11/24 W-03 ACC 021 30-Nov-24 ACC
XI/2024

006
109 PEP-RJA-WM-JBI-TRL-001 7 OF 41 0 AFC 1+060 1+080 SMAW E6010 + E7010 PIPE PIPE 109 API 5L SCH.40 54349510 016-0573 API 5L SCH.40 54349510 015-0525 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 16/11/24 ACC 16/11/24 W-03 ACC 021 30-Nov-24 ACC
XI/2024

006
110 PEP-RJA-WM-JBI-TRL-001 7 OF 41 0 AFC 1+080 1+100 SMAW E6010 + E7010 PIPE PIPE 110 API 5L SCH.40 54349510 015-0522 API 5L SCH.40 54349510 015-0525 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 16/11/24 ACC 16/11/24 W-03 ACC 022 30-Nov-24 ACC
XI/2024

006
111 PEP-RJA-WM-JBI-TRL-001 7 OF 41 0 AFC 1+100 1+120 SMAW E6010 + E7010 PIPE PIPE 111 API 5L SCH.40 54349510 015-0525 API 5L SCH.40 54349510 016-0578 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 16/11/24 ACC 16/11/24 W-03 ACC 022 30-Nov-24 ACC
XI/2024

006
112 PEP-RJA-WM-JBI-TRL-001 7 OF 41 0 AFC 1+100 1+120 SMAW E6010 + E7010 PIPE PIPE 112 API 5L SCH.40 54349510 015-0525 API 5L SCH.40 54349510 015-0521 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 16/11/24 ACC 16/11/24 W-03 ACC 022 30-Nov-24 ACC
XI/2024

006
113 PEP-RJA-WM-JBI-TRL-001 7 OF 41 0 AFC 1+120 1+140 SMAW E6010 + E7010 PIPE PIPE 113 API 5L SCH.40 54349510 015-0525 API 5L SCH.40 54349510 016-0572 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 16/11/24 ACC 16/11/24 W-03 ACC 022 30-Nov-24 ACC
XI/2024

006
114 PEP-RJA-WM-JBI-TRL-001 7 OF 41 0 AFC 1+120 1+140 SMAW E6010 + E7010 PIPE PIPE 114 API 5L SCH.40 54349510 016-0572 API 5L SCH.40 54349510 016-0574 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 16/11/24 ACC 16/11/24 W-03 ACC 023 30-Nov-24 ACC
XI/2024

007
115 PEP-RJA-WM-JBI-TRL-001 7 OF 41 0 AFC 1+140 1+160 SMAW E6010 + E7010 PIPE PIPE 115 API 5L SCH.40 54349510 016-0574 API 5L SCH.40 54349510 016-0571 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 17/11/24 ACC 17/11/24 W-03 ACC 023 30-Nov-24 ACC
XI/2024

007
116 PEP-RJA-WM-JBI-TRL-001 7 OF 41 0 AFC 1+160 1+180 SMAW E6010 + E7010 PIPE PIPE 116 API 5L SCH.40 54349510 016-0574 API 5L SCH.40 54349510 016-0579 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 17/11/24 ACC 17/11/24 W-03 ACC 036 2-Dec-24 ACC
XI/2024

007
117 PEP-RJA-WM-JBI-TRL-001 7 OF 41 0 AFC 1+160 1+180 SMAW E6010 + E7010 PIPE PIPE 117 API 5L SCH.40 54349510 016-0579 API 5L SCH.40 54349994 022-0784 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 17/11/24 ACC 17/11/24 W-03 ACC 023 30-Nov-24 ACC
XI/2024

007
118 PEP-RJA-WM-JBI-TRL-001 8 OF 41 0 AFC 1+180 1+200 SMAW E6010 + E7010 PIPE PIPE 118 API 5L SCH.40 54349994 022-0784 API 5L SCH.40 54349994 022-0786 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 17/11/24 ACC 17/11/24 W-03 ACC 023 30-Nov-24 ACC
XI/2024

119 PEP-RJA-WM-JBI-TRL-001 8 OF 41 0 AFC SMAW E6010 + E7010 119 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

005
120 PEP-RJA-WM-JBI-TRL-001 8 OF 41 0 AFC 1+200 1+220 SMAW E6010 + E7010 PIPE PIPE 120 API 5L SCH.40 54349510 016-0562 API 5L SCH.40 54349510 016-0570 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 15/11/24 ACC 15/11/24 W-01 ACC 024 30-Nov-24 ACC
XI/2024

005
121 PEP-RJA-WM-JBI-TRL-001 8 OF 41 0 AFC 1+220 1+240 SMAW E6010 + E7010 PIPE PIPE 121 API 5L SCH.40 54349510 016-0570 API 5L SCH.40 54349510 018-0660 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 15/11/24 ACC 15/11/24 W-01 ACC 024 30-Nov-24 ACC
XI/2024

005
122 PEP-RJA-WM-JBI-TRL-001 8 OF 41 0 AFC 1+240 1+260 SMAW E6010 + E7010 PIPE PIPE 122 API 5L SCH.40 54349510 018-0660 API 5L SCH.40 54349510 018-0664 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 15/11/24 ACC 15/11/24 W-01 ACC 024 30-Nov-24 REP
XI/2024

005
123 PEP-RJA-WM-JBI-TRL-001 8 OF 41 0 AFC 1+240 1+260 SMAW E6010 + E7010 PIPE PIPE 123 API 5L SCH.40 54349510 018-0664 API 5L SCH.40 54349510 018-0663 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 15/11/24 ACC 15/11/24 W-01 ACC 024 30-Nov-24 ACC
XI/2024

005
124 PEP-RJA-WM-JBI-TRL-001 8 OF 41 0 AFC 1+240 1+260 SMAW E6010 + E7010 PIPE PIPE 124 API 5L SCH.40 54349510 018-0663 API 5L SCH.40 54349510 018-0665 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 15/11/24 ACC 15/11/24 W-01 ACC 025 30-Nov-24 ACC
XI/2024

005
125 PEP-RJA-WM-JBI-TRL-001 8 OF 41 0 AFC 1+260 1+280 SMAW E6010 + E7010 PIPE PIPE 125 API 5L SCH.40 54349510 018-0665 API 5L SCH.40 54349510 018-0659 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 15/11/24 ACC 15/11/24 W-01 ACC 025 30-Nov-24 ACC
XI/2024

005
126 PEP-RJA-WM-JBI-TRL-001 8 OF 41 0 AFC 1+280 1+300 SMAW E6010 + E7010 PIPE PIPE 126 API 5L SCH.40 54349510 018-0659 API 5L SCH.40 54349510 018-0658 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 15/11/24 ACC 15/11/24 W-01 ACC 025 30-Nov-24 ACC
XI/2024

005
127 PEP-RJA-WM-JBI-TRL-001 8 OF 41 0 AFC 1+280 1+300 SMAW E6010 + E7010 PIPE PIPE 127 API 5L SCH.40 54349510 018-0658 API 5L SCH.40 54349510 018-0664 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 15/11/24 ACC 15/11/24 W-01 ACC 025 30-Nov-24 ACC
XI/2024

005
128 PEP-RJA-WM-JBI-TRL-001 8 OF 41 0 AFC 1+300 1+320 SMAW E6010 + E7010 PIPE PIPE 128 API 5L SCH.40 54349510 018-0664 API 5L SCH.40 54349510 019-0668 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 15/11/24 ACC 15/11/24 W-01 ACC 026 30-Nov-24 ACC
XI/2024

005
129 PEP-RJA-WM-JBI-TRL-001 8 OF 41 0 AFC 1+300 1+320 SMAW E6010 + E7010 PIPE PIPE 129 API 5L SCH.40 54349510 019-0668 API 5L SCH.40 54349510 019-0662 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 15/11/24 ACC 15/11/24 W-01 ACC 026A 30-Nov-24 ACC
XI/2024

130 PEP-RJA-WM-JBI-TRL-001 8 OF 41 0 AFC SMAW E6010 + E7010 130 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

005
131 PEP-RJA-WM-JBI-TRL-001 8 OF 41 0 AFC 1+340 1+360 SMAW E6010 + E7010 PIPE PIPE 131 API 5L SCH.40 54349510 018-0656 API 5L SCH.40 54349510 021-0767 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 15/11/24 ACC 15/11/24 W-02 ACC 026 30-Nov-24 REP
XI/2024

132 PEP-RJA-WM-JBI-TRL-001 8 OF 41 0 AFC SMAW E6010 + E7010 132 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

005
133 PEP-RJA-WM-JBI-TRL-001 8 OF 41 0 AFC 1+360 1+380 SMAW E6010 + E7010 PIPE PIPE 133 API 5L SCH.40 54349510 021-0766 API 5L SCH.40 54349510 021-0768 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 15/11/24 ACC 15/11/24 W-02 ACC 026 30-Nov-24 REP
XI/2024

005
134 PEP-RJA-WM-JBI-TRL-001 9 OF 41 0 AFC 1+360 1+380 SMAW E6010 + E7010 PIPE PIPE 134 API 5L SCH.40 54349510 021-078- API 5L SCH.40 54349510 021-0770 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 15/11/24 ACC 15/11/24 W-02 ACC 026 30-Nov-24 REP
XI/2024

005
135 PEP-RJA-WM-JBI-TRL-001 9 OF 41 0 AFC 1+380 1+400 SMAW E6010 + E7010 PIPE PIPE 135 API 5L SCH.40 54349510 021-0770 API 5L SCH.40 54349994 021-0785 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 15/11/24 ACC 15/11/24 W-02 ACC 027 1-Dec-24 REP
XI/2024

006
136 PEP-RJA-WM-JBI-TRL-001 9 OF 41 0 AFC 1+400 1+420 SMAW E6010 + E7010 PIPE PIPE 136 API 5L SCH.40 54349994 021-0785 API 5L SCH.40 54349510 021-0766 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 16/11/24 ACC 16/11/24 W-02 ACC 027 1-Dec-24 REP
XI/2024

006
137 PEP-RJA-WM-JBI-TRL-001 9 OF 41 0 AFC 1+400 1+420 SMAW E6010 + E7010 PIPE PIPE 137 API 5L SCH.40 54349510 021-0766 API 5L SCH.40 54349510 021-0761 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 16/11/24 ACC 16/11/24 W-02 ACC 027 1-Dec-24 REP
XI/2024

138 PEP-RJA-WM-JBI-TRL-001 9 OF 41 0 AFC SMAW E6010 + E7010 138 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

006
139 PEP-RJA-WM-JBI-TRL-001 9 OF 41 0 AFC 1+440 1+460 SMAW E6010 + E7010 PIPE PIPE 139 API 5L SCH.40 54349994 022-0785 API 5L SCH.40 54349510 021-0771 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 16/11/24 ACC 16/11/24 W-02 ACC 027 1-Dec-24 ACC
XI/2024

140 PEP-RJA-WM-JBI-TRL-001 9 OF 41 0 AFC SMAW E6010 + E7010 140 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

006
141 PEP-RJA-WM-JBI-TRL-001 9 OF 41 0 AFC 1+460 1+480 SMAW E6010 + E7010 PIPE PIPE 141 API 5L SCH.40 54349510 021-0769 API 5L SCH.40 54349994 022-0782 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 16/11/24 ACC 16/11/24 W-02 ACC 028 1-Dec-24 REP
XI/2024

006
142 PEP-RJA-WM-JBI-TRL-001 9 OF 41 0 AFC 1+460 1+480 SMAW E6010 + E7010 PIPE PIPE 142 API 5L SCH.40 54349994 022-0782 API 5L SCH.40 54349510 021-0764 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 16/11/24 ACC 16/11/24 W-02 ACC 028 1-Dec-24 ACC
XI/2024

007
143 PEP-RJA-WM-JBI-TRL-001 9 OF 41 0 AFC 1+480 1+500 SMAW E6010 + E7010 PIPE PIPE 143 API 5L SCH.40 54349510 021-0764 API 5L SCH.40 54349994 022-0779 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 17/11/24 ACC 17/11/24 W-02 ACC 028 1-Dec-24 REP
XI/2024

007
144 PEP-RJA-WM-JBI-TRL-001 9 OF 41 0 AFC 1+480 1+500 SMAW E6010 + E7010 PIPE PIPE 144 API 5L SCH.40 54349994 022-0779 API 5L SCH.40 54349994 022-0781 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 17/11/24 ACC 17/11/24 W-02 ACC 028 1-Dec-24 ACC
XI/2024

145 PEP-RJA-WM-JBI-TRL-001 9 OF 41 0 AFC SMAW E6010 + E7010 145 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

007
146 PEP-RJA-WM-JBI-TRL-001 9 OF 41 0 AFC 1+520 1+540 SMAW E6010 + E7010 PIPE PIPE 146 API 5L SCH.40 54349510 021-0772 API 5L SCH.40 54349994 022-0787 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 17/11/24 ACC 17/11/24 W-02 ACC 029 1-Dec-24 ACC
XI/2024

147 PEP-RJA-WM-JBI-TRL-001 9 OF 41 0 AFC SMAW E6010 + E7010 147 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

006
148 PEP-RJA-WM-JBI-TRL-001 9 OF 41 0 AFC 1+540 1+560 SMAW E6010 + E7010 PIPE PIPE 148 API 5L SCH.40 54349510 021-0772 API 5L SCH.40 54349994 022-0780 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 16/11/24 ACC 16/11/24 W-01 ACC 029 1-Dec-24 ACC
XI/2024
Document No. 001/RJA.QA.QC/TRL/SG/XI/2024 WELDING VISUAL RADIOGRAPHY WRAPPING HOLIDAY TEST
PT. RAMAI JAYA ABADI
MONITORING PROGRESS WELDING Revision No. 0 WELDING
REP ACC ACC REP RSC DONE ACC REP ACC REPAIR
DONE
PENGGANTIAN TRUNKLINE 4 IN SEPANJANG 7.6 KM GS1 - GS2 DI FIELD JAMBI Page OF

PT. PERTAMINA EP ZONA 1 FIELD JAMBI Issue Date


528 0 644 523 34 5 0 0
CONTRACT NO 4710000889

CONNECTION MATERIAL 1 MATERIAL 2 FIT-UP INSP. VISUAL INSP. RADIOGRAPHY FIELD JOINT COATING HOLIDAYTEST LOWERING & BACKFILING

DRAWING
NO DRAWING NO SHEET OF REV. STA PROCESS WELDING ELECTRODE JOINT NO. J. TYPE SW/FW DIA-INCH THK(mm) REPORT NO. REMARKS
STATUS
REPORT
MATERIAL TO MATERIAL MATERIAL HEA .NO. PIPE NO. MATERIAL HEA .NO. PIPE NO. DATE ACC REP WELDING DATE WELDER STAMP ACC REP REPORT NO. DATE ACC REJ RSC REPORT NO. DATE ACC REP DATE ACC REP LOWERING BACKFILLING
NO.

006
149 PEP-RJA-WM-JBI-TRL-001 9 OF 41 0 AFC 1+540 1+560 SMAW E6010 + E7010 PIPE PIPE 149 API 5L SCH.40 54349994 022-0780 API 5L SCH.40 54349510 018-0651 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 16/11/24 ACC 16/11/24 W-01 ACC 029 1-Dec-24 ACC
XI/2024

006
150 PEP-RJA-WM-JBI-TRL-001 10 OF 41 0 AFC 1+560 1+580 SMAW E6010 + E7010 PIPE PIPE 150 API 5L SCH.40 54349510 018-0651 API 5L SCH.40 54349510 018-0655 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 16/11/24 ACC 16/11/24 W-01 ACC 029 1-Dec-24 ACC
XI/2024

006
151 PEP-RJA-WM-JBI-TRL-001 10 OF 41 0 AFC 1+580 1+600 SMAW E6010 + E7010 PIPE PIPE 151 API 5L SCH.40 54349510 018-0655 API 5L SCH.40 54349510 018-0654 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 16/11/24 ACC 16/11/24 W-01 ACC 030 1-Dec-24 ACC
XI/2024

006
152 PEP-RJA-WM-JBI-TRL-001 10 OF 41 0 AFC 1+580 1+600 SMAW E6010 + E7010 PIPE PIPE 152 API 5L SCH.40 54349510 018-0654 API 5L SCH.40 54349510 018-0650 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 16/11/24 ACC 16/11/24 W-01 ACC 030 1-Dec-24 ACC
XI/2024

006
153 PEP-RJA-WM-JBI-TRL-001 10 OF 41 0 AFC 1+600 1+620 SMAW E6010 + E7010 PIPE PIPE 153 API 5L SCH.40 54349510 018-0650 API 5L SCH.40 54349510 018-0647 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 16/11/24 ACC 16/11/24 W-01 ACC 030 1-Dec-24 ACC
XI/2024

006
154 PEP-RJA-WM-JBI-TRL-001 10 OF 41 0 AFC 1+620 1+640 SMAW E6010 + E7010 PIPE PIPE 154 API 5L SCH.40 54349510 018-0647 API 5L SCH.40 54349510 018-0648 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 16/11/24 ACC 16/11/24 W-01 ACC 030 1-Dec-24 ACC
XI/2024

006
155 PEP-RJA-WM-JBI-TRL-001 10 OF 41 0 AFC 1+620 1+640 SMAW E6010 + E7010 PIPE PIPE 155 API 5L SCH.40 54349510 018-0648 API 5L SCH.40 54349510 018-0649 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 16/11/24 ACC 16/11/24 W-01 ACC 031 1-Dec-24 ACC
XI/2024

007
156 PEP-RJA-WM-JBI-TRL-001 10 OF 41 0 AFC 1+640 1+660 SMAW E6010 + E7010 PIPE PIPE 156 API 5L SCH.40 54349510 018-0649 API 5L SCH.40 54349510 018-0646 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 17/11/24 ACC 17/11/24 W-01 ACC 031 1-Dec-24 REP
XI/2024

007
157 PEP-RJA-WM-JBI-TRL-001 10 OF 41 0 AFC 1+640 1+660 SMAW E6010 + E7010 PIPE PIPE 157 API 5L SCH.40 54349510 018-0646 API 5L SCH.40 54349510 018-0656 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 17/11/24 ACC 17/11/24 W-01 ACC 031 1-Dec-24 ACC
XI/2024

007
158 PEP-RJA-WM-JBI-TRL-001 10 OF 41 0 AFC 1+660 1+680 SMAW E6010 + E7010 PIPE PIPE 158 API 5L SCH.40 54349510 018-0656 API 5L SCH.40 54349994 023-0814 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 17/11/24 ACC 17/11/24 W-01 ACC 031 1-Dec-24 ACC
XI/2024

007
159 PEP-RJA-WM-JBI-TRL-001 10 OF 41 0 AFC 1+660 1+680 SMAW E6010 + E7010 PIPE PIPE 159 API 5L SCH.40 54349994 023-0814 API 5L SCH.40 54349994 022-0880 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 17/11/24 ACC 17/11/24 W-01 ACC 032 1-Dec-24 ACC
XI/2024

007
160 PEP-RJA-WM-JBI-TRL-001 10 OF 41 0 AFC 1+680 1+700 SMAW E6010 + E7010 PIPE PIPE 160 API 5L SCH.40 54349994 022-0880 API 5L SCH.40 54349510 018-0623 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 17/11/24 ACC 17/11/24 W-01 ACC 032 1-Dec-24 ACC
XI/2024

007
161 PEP-RJA-WM-JBI-TRL-001 10 OF 41 0 AFC 1+700 1+720 SMAW E6010 + E7010 PIPE PIPE 161 API 5L SCH.40 54349510 018-0623 API 5L SCH.40 54349510 021-0745 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 17/11/24 ACC 17/11/24 W-01 ACC 032 1-Dec-24 ACC
XI/2024

007
162 PEP-RJA-WM-JBI-TRL-001 10 OF 41 0 AFC 1+700 1+720 SMAW E6010 + E7010 PIPE PIPE 162 API 5L SCH.40 54349510 021-0745 API 5L SCH.40 54349510 021-0732 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 17/11/24 ACC 17/11/24 W-01 ACC 032 1-Dec-24 ACC
XI/2024

007
163 PEP-RJA-WM-JBI-TRL-001 10 OF 41 0 AFC 1+720 1+740 SMAW E6010 + E7010 PIPE PIPE 163 API 5L SCH.40 54349510 021-0732 API 5L SCH.40 54349510 020-0738 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 17/11/24 ACC 17/11/24 W-01 ACC 033 1-Dec-24 ACC
XI/2024

007
164 PEP-RJA-WM-JBI-TRL-001 10 OF 41 0 AFC 1+720 1+740 SMAW E6010 + E7010 PIPE PIPE 164 API 5L SCH.40 54349510 020-0738 API 5L SCH.40 54349510 020-0735 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 17/11/24 ACC 17/11/24 W-01 ACC 033 1-Dec-24 ACC
XI/2024

165 PEP-RJA-WM-JBI-TRL-001 10 OF 41 0 AFC SMAW E6010 + E7010 165 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

166 PEP-RJA-WM-JBI-TRL-001 11 OF 41 0 AFC SMAW E6010 + E7010 166 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

007
167 PEP-RJA-WM-JBI-TRL-001 11 OF 41 0 AFC 1+760 1+780 SMAW E6010 + E7010 PIPE PIPE 167 API 5L SCH.40 54349510 020-0737 API 5L SCH.40 54349510 020-0733 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 17/11/24 ACC 17/11/24 W-01 ACC 033 1-Dec-24 ACC
XI/2024

007
168 PEP-RJA-WM-JBI-TRL-001 11 OF 41 0 AFC 1+780 1+800 SMAW E6010 + E7010 PIPE PIPE 168 API 5L SCH.40 54349510 020-0733 API 5L SCH.40 54349510 020-0786 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 17/11/24 ACC 17/11/24 W-01 ACC 033 1-Dec-24 ACC
XI/2024

008
169 PEP-RJA-WM-JBI-TRL-001 11 OF 41 0 AFC 1+780 1+800 SMAW E6010 + E7010 PIPE PIPE 169 API 5L SCH.40 54349510 020-0706 API 5L SCH.40 54349510 021-0741 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 18/11/24 ACC 18/11/24 W-01 ACC 034 1-Dec-24 ACC
XI/2024

008
170 PEP-RJA-WM-JBI-TRL-001 11 OF 41 0 AFC 1+800 1+820 SMAW E6010 + E7010 PIPE PIPE 170 API 5L SCH.40 54349510 021-0741 API 5L SCH.40 54349510 020-0734 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 18/11/24 ACC 18/11/24 W-01 ACC 034 1-Dec-24 ACC
XI/2024

171 PEP-RJA-WM-JBI-TRL-001 11 OF 41 0 AFC SMAW E6010 + E7010 171 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

008
172 PEP-RJA-WM-JBI-TRL-001 11 OF 41 0 AFC 1+820 1+840 SMAW E6010 + E7010 PIPE PIPE 172 API 5L SCH.40 54349509 001-0011 API 5L SCH.40 54349510 024-0845 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 18/11/24 ACC 18/11/24 W-01 ACC 034 1-Dec-24 ACC
XI/2024

173 PEP-RJA-WM-JBI-TRL-001 11 OF 41 0 AFC SMAW E6010 + E7010 173 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

008
174 PEP-RJA-WM-JBI-TRL-001 11 OF 41 0 AFC 1+840 1+860 SMAW E6010 + E7010 PIPE PIPE 174 API 5L SCH.40 54349509 001-0009 API 5L SCH.40 54349509 001-0012 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 18/11/24 ACC 18/11/24 W-01 ACC 034 1-Dec-24 ACC
XI/2024

175 PEP-RJA-WM-JBI-TRL-001 11 OF 41 0 AFC SMAW E6010 + E7010 175 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

008
176 PEP-RJA-WM-JBI-TRL-001 11 OF 41 0 AFC 1+880 1+900 SMAW E6010 + E7010 PIPE PIPE 176 API 5L SCH.40 54349994 021-0847 API 5L SCH.40 54349509 001-0007 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 18/11/24 ACC 18/11/24 W-01 ACC 035 1-Dec-24 ACC
XI/2024

177 PEP-RJA-WM-JBI-TRL-001 11 OF 41 0 AFC SMAW E6010 + E7010 177 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

007
178 PEP-RJA-WM-JBI-TRL-001 11 OF 41 0 AFC 1+900 1+920 SMAW E6010 + E7010 PIPE PIPE 178 API 5L SCH.40 54349994 023-0782 API 5L SCH.40 54349994 023-0776 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 17/11/24 ACC 17/11/24 W-03 ACC 040 3-Dec-24 ACC
XI/2024

007
179 PEP-RJA-WM-JBI-TRL-001 11 OF 41 0 AFC 1+900 1+920 SMAW E6010 + E7010 PIPE PIPE 179 API 5L SCH.40 54349994 023-0776 API 5L SCH.40 54349994 023-0778 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 17/11/24 ACC 17/11/24 W-03 ACC 040 3-Dec-24 ACC
XI/2024

007
180 PEP-RJA-WM-JBI-TRL-001 11 OF 41 0 AFC 1+920 1+940 SMAW E6010 + E7010 PIPE PIPE 180 API 5L SCH.40 54349994 023-0778 API 5L SCH.40 54349994 023-0813 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 17/11/24 ACC 17/11/24 W-03 ACC 040 3-Dec-24 ACC
XI/2024

007
181 PEP-RJA-WM-JBI-TRL-001 11 OF 41 0 AFC 1+940 1+960 SMAW E6010 + E7010 PIPE PIPE 181 API 5L SCH.40 54349994 023-0813 API 5L SCH.40 54349994 023-0812 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 17/11/24 ACC 17/11/24 W-03 ACC 040 3-Dec-24 ACC
XI/2024

007
182 PEP-RJA-WM-JBI-TRL-001 12 OF 41 0 AFC 1+940 1+960 SMAW E6010 + E7010 PIPE PIPE 182 API 5L SCH.40 54349994 023-0812 API 5L SCH.40 54349994 023-0820 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 17/11/24 ACC 17/11/24 W-03 ACC 041 3-Dec-24 ACC
XI/2024

007
183 PEP-RJA-WM-JBI-TRL-001 12 OF 41 0 AFC 1+960 1+980 SMAW E6010 + E7010 PIPE PIPE 183 API 5L SCH.40 54349994 023-0820 API 5L SCH.40 54349994 023-0815 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 17/11/24 ACC 17/11/24 W-02 ACC 041 3-Dec-24 ACC
XI/2024

008
184 PEP-RJA-WM-JBI-TRL-001 12 OF 41 0 AFC 1+960 1+980 SMAW E6010 + E7010 PIPE PIPE 184 API 5L SCH.40 54349994 023-0815 API 5L SCH.40 54349994 023-0819 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 18/11/24 ACC 18/11/24 W-03 ACC 041 3-Dec-24 ACC
XI/2024

008
185 PEP-RJA-WM-JBI-TRL-001 12 OF 41 0 AFC 2+0 2+020 SMAW E6010 + E7010 PIPE PIPE 185 API 5L SCH.40 54349994 023-0819 API 5L SCH.40 54349994 023-0818 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 18/11/24 ACC 18/11/24 W-03 ACC 041 3-Dec-24 ACC
XI/2024

008
186 PEP-RJA-WM-JBI-TRL-001 12 OF 41 0 AFC 2+0 2+020 SMAW E6010 + E7010 PIPE PIPE 186 API 5L SCH.40 54349994 023-0818 API 5L SCH.40 54349994 023-0816 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 18/11/24 ACC 18/11/24 W-03 ACC 042 3-Dec-24 ACC
XI/2024

008
187 PEP-RJA-WM-JBI-TRL-001 12 OF 41 0 AFC 2+0 2+020 SMAW E6010 + E7010 PIPE PIPE 187 API 5L SCH.40 54349994 023-0816 API 5L SCH.40 54349994 023-0817 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 18/11/24 ACC 18/11/24 W-03 ACC 042 3-Dec-24 ACC
XI/2024

008
188 PEP-RJA-WM-JBI-TRL-001 12 OF 41 0 AFC 2+020 2+040 SMAW E6010 + E7010 PIPE PIPE 188 API 5L SCH.40 54349994 023-0817 API 5L SCH.40 54349510 019-0696 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 18/11/24 ACC 18/11/24 W-03 ACC 042 3-Dec-24 ACC
XI/2024

008
189 PEP-RJA-WM-JBI-TRL-001 12 OF 41 0 AFC 2+020 2+040 SMAW E6010 + E7010 PIPE PIPE 189 API 5L SCH.40 54349510 019-0696 API 5L SCH.40 54349510 019-0690 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 18/11/24 ACC 18/11/24 W-03 ACC 042 3-Dec-24 ACC
XI/2024

008
190 PEP-RJA-WM-JBI-TRL-001 12 OF 41 0 AFC 2+040 2+060 SMAW E6010 + E7010 PIPE PIPE 190 API 5L SCH.40 54349510 019-0690 API 5L SCH.40 54349510 020-0715 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 18/11/24 ACC 18/11/24 W-03 ACC 043 3-Dec-24 ACC
XI/2024

007
191 PEP-RJA-WM-JBI-TRL-001 12 OF 41 0 AFC 2+060 2+080 SMAW E6010 + E7010 PIPE PIPE 191 API 5L SCH.40 54349510 020-0715 API 5L SCH.40 54349510 020-0715 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 17/11/24 ACC 17/11/24 W-02 ACC 043 3-Dec-24 ACC
XI/2024

192 PEP-RJA-WM-JBI-TRL-001 12 OF 41 0 AFC SMAW E6010 + E7010 192 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

007
193 PEP-RJA-WM-JBI-TRL-001 12 OF 41 0 AFC 2+080 2+100 SMAW E6010 + E7010 PIPE PIPE 193 API 5L SCH.40 54349510 020-0718 API 5L SCH.40 54349510 020-0713 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 17/11/24 ACC 17/11/24 W-02 ACC 043 3-Dec-24 ACC
XI/2024

007
194 PEP-RJA-WM-JBI-TRL-001 12 OF 41 0 AFC 2+080 2+100 SMAW E6010 + E7010 PIPE PIPE 194 API 5L SCH.40 54349510 020-0713 API 5L SCH.40 54349510 020-0716 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 17/11/24 ACC 17/11/24 W-02 ACC 043 3-Dec-24 ACC
XI/2024

007
195 PEP-RJA-WM-JBI-TRL-001 12 OF 41 0 AFC 2+100 2+120 SMAW E6010 + E7010 PIPE PIPE 195 API 5L SCH.40 54349510 020-0716 API 5L SCH.40 54349510 020-0719 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 17/11/24 ACC 17/11/24 W-02 ACC 044 3-Dec-24 ACC
XI/2024

196 PEP-RJA-WM-JBI-TRL-001 12 OF 41 0 AFC SMAW E6010 + E7010 196 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

008
197 PEP-RJA-WM-JBI-TRL-001 12 OF 41 0 AFC 2+120 2+140 SMAW E6010 + E7010 PIPE PIPE 197 API 5L SCH.40 54349510 020-0721 API 5L SCH.40 54349510 020-0725 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 18/11/24 ACC 18/11/24 W-02 ACC 044 3-Dec-24 ACC
XI/2024

198 PEP-RJA-WM-JBI-TRL-001 13 OF 41 0 AFC SMAW E6010 + E7010 198 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

008
199 PEP-RJA-WM-JBI-TRL-001 13 OF 41 0 AFC 2+140 2+160 SMAW E6010 + E7010 PIPE PIPE 199 API 5L SCH.40 54349510 020-0717 API 5L SCH.40 54349510 020-0714 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 18/11/24 ACC 18/11/24 W-02 ACC 044 3-Dec-24 ACC
XI/2024

008
200 PEP-RJA-WM-JBI-TRL-001 13 OF 41 0 AFC 2+160 2+180 SMAW E6010 + E7010 PIPE PIPE 200 API 5L SCH.40 54349510 020-0714 API 5L SCH.40 54349510 019-0694 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 18/11/24 ACC 18/11/24 W-02 ACC 044 3-Dec-24 ACC
XI/2024

008
201 PEP-RJA-WM-JBI-TRL-001 13 OF 41 0 AFC 2+160 2+180 SMAW E6010 + E7010 PIPE PIPE 201 API 5L SCH.40 54349510 019-0694 API 5L SCH.40 54349510 019-0693 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 18/11/24 ACC 18/11/24 W-02 ACC 045 3-Dec-24 ACC
XI/2024

008
202 PEP-RJA-WM-JBI-TRL-001 13 OF 41 0 AFC 2+180 2+200 SMAW E6010 + E7010 PIPE PIPE 202 API 5L SCH.40 54349510 019-0693 API 5L SCH.40 54349510 019-0695 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 18/11/24 ACC 18/11/24 W-02 ACC 045 3-Dec-24 ACC
XI/2024

008
203 PEP-RJA-WM-JBI-TRL-001 13 OF 41 0 AFC 2+200 2+220 SMAW E6010 + E7010 PIPE PIPE 203 API 5L SCH.40 54349510 019-0695 API 5L SCH.40 54349510 019-0698 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 18/11/24 ACC 18/11/24 W-02 ACC 045 3-Dec-24 ACC
XI/2024

204 PEP-RJA-WM-JBI-TRL-001 13 OF 41 0 AFC SMAW E6010 + E7010 204 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

008
205 PEP-RJA-WM-JBI-TRL-001 13 OF 41 0 AFC 2+220 2+240 SMAW E6010 + E7010 PIPE PIPE 205 API 5L SCH.40 54349510 019-0692 API 5L SCH.40 54349510 019-0689 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 18/11/24 ACC 18/11/24 W-02 ACC 045 3-Dec-24 ACC
XI/2024

206 PEP-RJA-WM-JBI-TRL-001 13 OF 41 0 AFC SMAW E6010 + E7010 206 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

008
207 PEP-RJA-WM-JBI-TRL-001 13 OF 41 0 AFC 2+240 2+260 SMAW E6010 + E7010 PIPE PIPE 207 API 5L SCH.40 54349510 019-0697 API 5L SCH.40 54349510 019-0691 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 18/11/24 ACC 18/11/24 W-02 ACC 046 3-Dec-24 ACC
XI/2024

009
208 PEP-RJA-WM-JBI-TRL-001 13 OF 41 0 AFC 2+260 2+280 SMAW E6010 + E7010 PIPE PIPE 208 API 5L SCH.40 54349510 019-0691 API 5L SCH.40 54349509 008-0291 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 19/11/24 ACC 19/11/24 W-02 ACC 046 3-Dec-24 ACC
XI/2024

009
209 PEP-RJA-WM-JBI-TRL-001 13 OF 41 0 AFC 2+260 2+280 SMAW E6010 + E7010 PIPE PIPE 209 API 5L SCH.40 54349509 008-0291 API 5L SCH.40 54349509 008-0289 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 19/11/24 ACC 19/11/24 W-02 ACC 046 3-Dec-24 ACC
XI/2024

009
210 PEP-RJA-WM-JBI-TRL-001 13 OF 41 0 AFC 2+300 2+320 SMAW E6010 + E7010 PIPE PIPE 210 API 5L SCH.40 54349509 008-0289 API 5L SCH.40 54349509 008-0290 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 19/11/24 ACC 19/11/24 W-02 ACC 046 3-Dec-24 ACC
XI/2024

009
211 PEP-RJA-WM-JBI-TRL-001 13 OF 41 0 AFC 2+300 2+320 SMAW E6010 + E7010 PIPE PIPE 211 API 5L SCH.40 54349509 008-0290 API 5L SCH.40 54349509 008-0288 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 19/11/24 ACC 19/11/24 W-02 ACC 047 3-Dec-24 ACC
XI/2024

009
212 PEP-RJA-WM-JBI-TRL-001 13 OF 41 0 AFC 2+300 2+320 SMAW E6010 + E7010 PIPE PIPE 212 API 5L SCH.40 54349509 008-0288 API 5L SCH.40 54349509 008-0285 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 19/11/24 ACC 19/11/24 W-01 ACC 047 3-Dec-24 ACC
XI/2024

009
213 PEP-RJA-WM-JBI-TRL-001 13 OF 41 0 AFC 2+320 2+340 SMAW E6010 + E7010 PIPE PIPE 213 API 5L SCH.40 54349509 008-0285 API 5L SCH.40 54349509 008-0287 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 19/11/24 ACC 19/11/24 W-01 ACC 047 3-Dec-24 ACC
XI/2024

214 PEP-RJA-WM-JBI-TRL-001 14 OF 41 0 AFC SMAW E6010 + E7010 214 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

010
215 PEP-RJA-WM-JBI-TRL-001 14 OF 41 0 AFC 2+340 2+360 SMAW E6010 + E7010 PIPE PIPE 215 API 5L SCH.40 54349509 008-0292 API 5L SCH.40 54349509 008-0294 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 20/11/24 ACC 20/11/24 W-02 ACC 047 3-Dec-24 ACC
XI/2024

216 PEP-RJA-WM-JBI-TRL-001 14 OF 41 0 AFC SMAW E6010 + E7010 216 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

010
217 PEP-RJA-WM-JBI-TRL-001 14 OF 41 0 AFC 2+360 2+380 SMAW E6010 + E7010 PIPE PIPE 217 API 5L SCH.40 54349509 008-0293 API 5L SCH.40 54349509 008-0286 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 20/11/24 ACC 20/11/24 W-02 ACC 048 3-Dec-24 ACC
XI/2024

009
218 PEP-RJA-WM-JBI-TRL-001 14 OF 41 0 AFC 2+380 2+400 SMAW E6010 + E7010 PIPE PIPE 218 API 5L SCH.40 54349509 008-0286 API 5L SCH.40 54349509 008-0281 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 19/11/24 ACC 19/11/24 W-02 ACC 048 3-Dec-24 ACC
XI/2024

009
219 PEP-RJA-WM-JBI-TRL-001 14 OF 41 0 AFC 2+380 2+400 SMAW E6010 + E7010 PIPE PIPE 219 API 5L SCH.40 54349509 008-0281 API 5L SCH.40 54349509 008-0272 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 19/11/24 ACC 19/11/24 W-01 ACC 036 2-Dec-24 ACC
XI/2024

009
220 PEP-RJA-WM-JBI-TRL-001 14 OF 41 0 AFC 2+400 2+420 SMAW E6010 + E7010 PIPE PIPE 220 API 5L SCH.40 54349509 008-0272 API 5L SCH.40 54349994 022-0867 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 19/11/24 ACC 19/11/24 W-01 ACC 036 2-Dec-24 ACC
XI/2024

009
221 PEP-RJA-WM-JBI-TRL-001 14 OF 41 0 AFC 2+420 2+440 SMAW E6010 + E7010 PIPE PIPE 221 API 5L SCH.40 54349994 022-0867 API 5L SCH.40 54349994 022-0896 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 19/11/24 ACC 19/11/24 W-01 ACC 036 2-Dec-24 ACC
XI/2024

009
222 PEP-RJA-WM-JBI-TRL-001 14 OF 41 0 AFC 2+420 2+440 SMAW E6010 + E7010 PIPE PIPE 222 API 5L SCH.40 54349994 022-0896 API 5L SCH.40 54349994 022-0882 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 19/11/24 ACC 19/11/24 W-01 ACC 037 2-Dec-24 ACC
XI/2024
Document No. 001/RJA.QA.QC/TRL/SG/XI/2024 WELDING VISUAL RADIOGRAPHY WRAPPING HOLIDAY TEST
PT. RAMAI JAYA ABADI
MONITORING PROGRESS WELDING Revision No. 0 WELDING
REP ACC ACC REP RSC DONE ACC REP ACC REPAIR
DONE
PENGGANTIAN TRUNKLINE 4 IN SEPANJANG 7.6 KM GS1 - GS2 DI FIELD JAMBI Page OF

PT. PERTAMINA EP ZONA 1 FIELD JAMBI Issue Date


528 0 644 523 34 5 0 0
CONTRACT NO 4710000889

CONNECTION MATERIAL 1 MATERIAL 2 FIT-UP INSP. VISUAL INSP. RADIOGRAPHY FIELD JOINT COATING HOLIDAYTEST LOWERING & BACKFILING

DRAWING
NO DRAWING NO SHEET OF REV. STA PROCESS WELDING ELECTRODE JOINT NO. J. TYPE SW/FW DIA-INCH THK(mm) REPORT NO. REMARKS
STATUS
REPORT
MATERIAL TO MATERIAL MATERIAL HEA .NO. PIPE NO. MATERIAL HEA .NO. PIPE NO. DATE ACC REP WELDING DATE WELDER STAMP ACC REP REPORT NO. DATE ACC REJ RSC REPORT NO. DATE ACC REP DATE ACC REP LOWERING BACKFILLING
NO.

009
223 PEP-RJA-WM-JBI-TRL-001 14 OF 41 0 AFC 2+440 2+460 SMAW E6010 + E7010 PIPE PIPE 223 API 5L SCH.40 54349994 022-0882 API 5L SCH.40 54349994 022-0886 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 19/11/24 ACC 19/11/24 W-01 ACC 037 2-Dec-24 ACC
XI/2024

009
224 PEP-RJA-WM-JBI-TRL-001 14 OF 41 0 AFC 2+440 2+460 SMAW E6010 + E7010 PIPE PIPE 224 API 5L SCH.40 54349994 022-0886 API 5L SCH.40 54349994 022-0802 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 19/11/24 ACC 19/11/24 W-01 ACC 037 2-Dec-24 ACC
XI/2024

225 PEP-RJA-WM-JBI-TRL-001 14 OF 41 0 AFC SMAW E6010 + E7010 225 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

009
226 PEP-RJA-WM-JBI-TRL-001 14 OF 41 0 AFC 2+480 2+500 SMAW E6010 + E7010 PIPE PIPE 226 API 5L SCH.40 54349994 027-0801 API 5L SCH.40 54349994 023-0799 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 19/11/24 ACC 19/11/24 W-01 ACC 037 2-Dec-24 ACC
XI/2024

227 PEP-RJA-WM-JBI-TRL-001 14 OF 41 0 AFC SMAW E6010 + E7010 227 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

009
228 PEP-RJA-WM-JBI-TRL-001 14 OF 41 0 AFC 2+500 2+520 SMAW E6010 + E7010 PIPE PIPE 228 API 5L SCH.40 54349510 021-0742 API 5L SCH.40 54349510 021-0756 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 19/11/24 ACC 19/11/24 W-01 ACC 038 2-Dec-24 ACC
XI/2024

009
229 PEP-RJA-WM-JBI-TRL-001 14 OF 41 0 AFC 2+500 2+520 SMAW E6010 + E7010 PIPE PIPE 229 API 5L SCH.40 54349510 021-0756 API 5L SCH.40 54349510 021-0788 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 19/11/24 ACC 19/11/24 W-01 ACC 038 2-Dec-24 ACC
XI/2024

230 PEP-RJA-WM-JBI-TRL-001 15 OF 41 0 AFC SMAW E6010 + E7010 230 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

231 PEP-RJA-WM-JBI-TRL-001 15 OF 41 0 AFC SMAW E6010 + E7010 231 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

009
232 PEP-RJA-WM-JBI-TRL-001 15 OF 41 0 AFC 2+540 2+560 SMAW E6010 + E7010 PIPE PIPE 232 API 5L SCH.40 54349510 021-0763 API 5L SCH.40 54349510 021-0762 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 19/11/24 ACC 19/11/24 W-01 ACC 049 04/12/24 ACC
XI/2024

009
233 PEP-RJA-WM-JBI-TRL-001 15 OF 41 0 AFC 2+560 2+580 SMAW E6010 + E7010 PIPE PIPE 233 API 5L SCH.40 54349510 021-0762 API 5L SCH.40 54349994 025-0891 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 19/11/24 ACC 19/11/24 W-01 ACC 049 04/12/24 ACC
XI/2024

009
234 PEP-RJA-WM-JBI-TRL-001 15 OF 41 0 AFC 2+560 2+580 SMAW E6010 + E7010 PIPE PIPE 234 API 5L SCH.40 54349994 025-0891 API 5L SCH.40 54349994 025-0890 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 19/11/24 ACC 19/11/24 W-01 ACC 049 04/12/24 ACC
XI/2024

009
235 PEP-RJA-WM-JBI-TRL-001 15 OF 41 0 AFC 2+580 2+600 SMAW E6010 + E7010 PIPE PIPE 235 API 5L SCH.40 54349994 025-0890 API 5L SCH.40 54349994 025-0896 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 19/11/24 ACC 19/11/24 W-01 ACC 049 04/12/24 ACC
XI/2024

009
236 PEP-RJA-WM-JBI-TRL-001 15 OF 41 0 AFC 2+600 2+620 SMAW E6010 + E7010 PIPE PIPE 236 API 5L SCH.40 54349994 025-0896 API 5L SCH.40 54349994 025-0885 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 19/11/24 ACC 19/11/24 W-03 ACC 050 04/12/24 ACC
XI/2024

009
237 PEP-RJA-WM-JBI-TRL-001 15 OF 41 0 AFC 2+600 2+620 SMAW E6010 + E7010 PIPE PIPE 237 API 5L SCH.40 54349994 025-0885 API 5L SCH.40 54349994 025-0887 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 19/11/24 ACC 19/11/24 W-03 ACC 050 04/12/24 ACC
XI/2024

009
238 PEP-RJA-WM-JBI-TRL-001 15 OF 41 0 AFC 2+620 2+640 SMAW E6010 + E7010 PIPE PIPE 238 API 5L SCH.40 54349994 025-0885 API 5L SCH.40 54349510 021-0758 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 19/11/24 ACC 19/11/24 W-03 ACC 050 04/12/24 ACC
XI/2024

009
239 PEP-RJA-WM-JBI-TRL-001 15 OF 41 0 AFC 2+620 2+640 SMAW E6010 + E7010 PIPE PIPE 239 API 5L SCH.40 54349510 021-0758 API 5L SCH.40 54349510 021-0760 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 19/11/24 ACC 19/11/24 W-03 ACC 050 04/12/24 ACC
XI/2024

240 PEP-RJA-WM-JBI-TRL-001 15 OF 41 0 AFC SMAW E6010 + E7010 240 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

241 PEP-RJA-WM-JBI-TRL-001 15 OF 41 0 AFC SMAW E6010 + E7010 241 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

009
242 PEP-RJA-WM-JBI-TRL-001 15 OF 41 0 AFC 2+660 2+680 SMAW E6010 + E7010 PIPE PIPE 242 API 5L SCH.40 54349510 021-0759 API 5L SCH.40 54349510 021-0757 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 19/11/24 ACC 19/11/24 W-03 ACC 051 04/12/24 ACC
XI/2024

009
243 PEP-RJA-WM-JBI-TRL-001 15 OF 41 0 AFC 2+680 2+700 SMAW E6010 + E7010 PIPE PIPE 243 API 5L SCH.40 54349510 021-0757 API 5L SCH.40 54349509 008-0282 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 19/11/24 ACC 19/11/24 W-03 ACC 051 04/12/24 ACC
XI/2024

009
244 PEP-RJA-WM-JBI-TRL-001 15 OF 41 0 AFC 2+680 2+700 SMAW E6010 + E7010 PIPE PIPE 244 API 5L SCH.40 54349509 008-0282 API 5L SCH.40 54349509 008-0281 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 19/11/24 ACC 19/11/24 W-03 ACC 051 04/12/24 ACC
XI/2024

245 PEP-RJA-WM-JBI-TRL-001 15 OF 41 0 AFC SMAW E6010 + E7010 245 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

009
246 PEP-RJA-WM-JBI-TRL-001 16 OF 41 0 AFC 2+720 2+740 SMAW E6010 + E7010 PIPE PIPE 246 API 5L SCH.40 54349509 008-0386 API 5L SCH.40 54349509 008-0384 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 19/11/24 ACC 19/11/24 W-03 ACC 051 04/12/24 ACC
XI/2024

247 PEP-RJA-WM-JBI-TRL-001 16 OF 41 0 AFC SMAW E6010 + E7010 247 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

009
248 PEP-RJA-WM-JBI-TRL-001 16 OF 41 0 AFC 2+740 2+760 SMAW E6010 + E7010 PIPE PIPE 248 API 5L SCH.40 54349994 025-0884 API 5L SCH.40 54349994 025-0888 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 19/11/24 ACC 19/11/24 W-03 ACC 052 4-Dec-24 ACC
XI/2024

009
249 PEP-RJA-WM-JBI-TRL-001 16 OF 41 0 AFC 2+740 2+760 SMAW E6010 + E7010 PIPE PIPE 249 API 5L SCH.40 54349994 025-0888 API 5L SCH.40 54349994 025-0883 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 19/11/24 ACC 19/11/24 W-03 ACC 052 04/12/24 ACC
XI/2024

010
250 PEP-RJA-WM-JBI-TRL-001 16 OF 41 0 AFC 2+760 2+780 SMAW E6010 + E7010 PIPE PIPE 250 API 5L SCH.40 54349994 025-0883 API 5L SCH.40 54349994 025-0882 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 20/11/24 ACC 20/11/24 W-03 ACC 052 04/12/24 ACC
XI/2024

010
251 PEP-RJA-WM-JBI-TRL-001 16 OF 41 0 AFC 2+780 2+800 SMAW E6010 + E7010 PIPE PIPE 251 API 5L SCH.40 54349994 025-0882 API 5L SCH.40 54349509 008-0275 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 20/11/24 ACC 20/11/24 W-03 ACC 052 04/12/24 ACC
XI/2024

010
252 PEP-RJA-WM-JBI-TRL-001 16 OF 41 0 AFC 2+780 2+800 SMAW E6010 + E7010 PIPE PIPE 252 API 5L SCH.40 54349509 008-0275 API 5L SCH.40 54349509 008-0279 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 20/11/24 ACC 20/11/24 W-03 ACC 053 04/12/24 ACC
XI/2024

010
253 PEP-RJA-WM-JBI-TRL-001 16 OF 41 0 AFC 2+800 2+820 SMAW E6010 + E7010 PIPE PIPE 253 API 5L SCH.40 54349509 008-0279 API 5L SCH.40 54349509 008-0283 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 20/11/24 ACC 20/11/24 W-03 ACC 053 04/12/24 ACC
XI/2024

010
254 PEP-RJA-WM-JBI-TRL-001 16 OF 41 0 AFC 2+800 2+820 SMAW E6010 + E7010 PIPE PIPE 254 API 5L SCH.40 54349509 008-0283 API 5L SCH.40 54349509 008-0277 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 20/11/24 ACC 20/11/24 W-03 ACC 053 04/12/24 ACC
XI/2024

010
255 PEP-RJA-WM-JBI-TRL-001 16 OF 41 0 AFC 2+820 2+840 SMAW E6010 + E7010 PIPE PIPE 255 API 5L SCH.40 54349509 008-0277 API 5L SCH.40 54349509 008-0276 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 20/11/24 ACC 20/11/24 W-03 ACC 053 04/12/24 ACC
XI/2024

010
256 PEP-RJA-WM-JBI-TRL-001 16 OF 41 0 AFC 2+840 2+860 SMAW E6010 + E7010 PIPE PIPE 256 API 5L SCH.40 54349509 008-0276 API 5L SCH.40 54349509 008-0278 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 20/11/24 ACC 20/11/24 W-03 ACC 054 04/12/24 RSC
XI/2024

010
258 PEP-RJA-WM-JBI-TRL-001 16 OF 41 0 AFC 2+840 2+860 SMAW E6010 + E7010 PIPE PIPE 257 API 5L SCH.40 54349509 008-0278 API 5L SCH.40 54349509 008-0280 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 20/11/24 ACC 20/11/24 W-03 ACC 054 04/12/24 ACC
XI/2024

010
259 PEP-RJA-WM-JBI-TRL-001 16 OF 41 0 AFC 2+860 2+880 SMAW E6010 + E7010 PIPE PIPE 258 API 5L SCH.40 54349509 008-0280 API 5L SCH.40 54349509 009-0324 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 20/11/24 ACC 20/11/24 W-03 ACC 054 04/12/24 ACC
XI/2024

010
260 PEP-RJA-WM-JBI-TRL-001 16 OF 41 0 AFC 2+860 2+880 SMAW E6010 + E7010 PIPE PIPE 259 API 5L SCH.40 54349509 009-0324 API 5L SCH.40 54349509 009-0323 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 20/11/24 ACC 20/11/24 W-03 ACC 054 04/12/24 ACC
XI/2024

010
261 PEP-RJA-WM-JBI-TRL-001 16 OF 41 0 AFC 2+880 2+900 SMAW E6010 + E7010 PIPE PIPE 260 API 5L SCH.40 54349509 009-0323 API 5L SCH.40 54349509 009-0328 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 20/11/24 ACC 20/11/24 W-03 ACC 055 04/12/24 ACC
XI/2024

011
262 PEP-RJA-WM-JBI-TRL-001 16 OF 41 0 AFC 2+900 2+920 SMAW E6010 + E7010 PIPE PIPE 261 API 5L SCH.40 54349509 009-0328 API 5L SCH.40 54349509 009-0326 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 21/11/24 ACC 21/11/24 W-03 ACC 055 04/12/24 ACC
XI/2024

011
263 PEP-RJA-WM-JBI-TRL-001 17 OF 41 0 AFC 2+900 2+920 SMAW E6010 + E7010 PIPE PIPE 262 API 5L SCH.40 54349509 009-0326 API 5L SCH.40 54349509 009-0327 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 21/11/24 ACC 21/11/24 W-03 ACC 055 04/12/24 ACC
XI/2024

011
264 PEP-RJA-WM-JBI-TRL-001 17 OF 41 0 AFC 2+900 2+920 SMAW E6010 + E7010 PIPE PIPE 263 API 5L SCH.40 54349509 009-0327 API 5L SCH.40 54349509 009-0318 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 21/11/24 ACC 21/11/24 W-03 ACC 055 04/12/24 ACC
XI/2024

011
265 PEP-RJA-WM-JBI-TRL-001 17 OF 41 0 AFC 2+920 2+940 SMAW E6010 + E7010 PIPE PIPE 264 API 5L SCH.40 54349509 009-0318 API 5L SCH.40 54349509 009-0321 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 21/11/24 ACC 21/11/24 W-03 ACC 056 04/12/24 ACC
XI/2024

011
266 PEP-RJA-WM-JBI-TRL-001 17 OF 41 0 AFC 2+940 2+960 SMAW E6010 + E7010 PIPE PIPE 265 API 5L SCH.40 54349509 009-0321 API 5L SCH.40 54349509 009-0319 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 21/11/24 ACC 21/11/24 W-03 ACC 056 04/12/24 ACC
XI/2024

267 PEP-RJA-WM-JBI-TRL-001 17 OF 41 0 AFC SMAW E6010 + E7010 266 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

011
268 PEP-RJA-WM-JBI-TRL-001 17 OF 41 0 AFC 2+960 2+980 SMAW E6010 + E7010 PIPE PIPE 267 API 5L SCH.40 54349509 009-0320 API 5L SCH.40 54349509 009-0322 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 21/11/24 ACC 21/11/24 W-03 ACC 056 04/12/24 ACC
XI/2024

269 PEP-RJA-WM-JBI-TRL-001 17 OF 41 0 AFC SMAW E6010 + E7010 268 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

010
270 PEP-RJA-WM-JBI-TRL-001 17 OF 41 0 AFC 2+980 3+0 SMAW E6010 + E7010 PIPE PIPE 269 API 5L SCH.40 54349510 013-0472 API 5L SCH.40 54349510 013-0477 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 20/11/24 ACC 20/11/24 W-01 ACC 056 04/12/24 ACC
XI/2024

010
271 PEP-RJA-WM-JBI-TRL-001 17 OF 41 0 AFC 3+0 3+020 SMAW E6010 + E7010 PIPE PIPE 270 API 5L SCH.40 54349510 013-0477 API 5L SCH.40 54349510 013-0467 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 20/11/24 ACC 20/11/24 W-01 ACC 057 04/12/24 ACC
XI/2024

010
272 PEP-RJA-WM-JBI-TRL-001 17 OF 41 0 AFC 3+0 3+020 SMAW E6010 + E7010 PIPE PIPE 271 API 5L SCH.40 54349510 013-0467 API 5L SCH.40 54349510 013-0470 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 20/11/24 ACC 20/11/24 W-01 ACC 057 04/12/24 ACC
XI/2024

010
273 PEP-RJA-WM-JBI-TRL-001 17 OF 41 0 AFC 3+020 3+040 SMAW E6010 + E7010 PIPE PIPE 272 API 5L SCH.40 54349510 013-0470 API 5L SCH.40 54349510 013-0544 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 20/11/24 ACC 20/11/24 W-01 ACC 057 04/12/24 ACC
XI/2024

010
274 PEP-RJA-WM-JBI-TRL-001 17 OF 41 0 AFC 3+040 3+060 SMAW E6010 + E7010 PIPE PIPE 273 API 5L SCH.40 54349510 013-0544 API 5L SCH.40 54349510 015-0538 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 20/11/24 ACC 20/11/24 W-01 ACC 058 05/12/24 ACC
XI/2024

010
275 PEP-RJA-WM-JBI-TRL-001 17 OF 41 0 AFC 3+040 3+060 SMAW E6010 + E7010 PIPE PIPE 274 API 5L SCH.40 54349510 015-0538 API 5L SCH.40 54349510 015-0537 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 20/11/24 ACC 20/11/24 W-01 ACC 058 05/12/24 ACC
XI/2024

010
276 PEP-RJA-WM-JBI-TRL-001 17 OF 41 0 AFC 3+060 3+080 SMAW E6010 + E7010 PIPE PIPE 275 API 5L SCH.40 54349510 015-0537 API 5L SCH.40 54349510 015-0539 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 20/11/24 ACC 20/11/24 W-01 ACC 058 05/12/24 RSC
XI/2024

010
278 PEP-RJA-WM-JBI-TRL-001 17 OF 41 0 AFC 3+060 3+080 SMAW E6010 + E7010 PIPE PIPE 276 API 5L SCH.40 54349510 015-0539 API 5L SCH.40 54349510 015-0543 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 20/11/24 ACC 20/11/24 W-01 ACC 058 05/12/24 ACC
XI/2024

010
279 PEP-RJA-WM-JBI-TRL-001 17 OF 41 0 AFC 3+080 3+100 SMAW E6010 + E7010 PIPE PIPE 277 API 5L SCH.40 54349510 015-0543 API 5L SCH.40 54349510 015-0548 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 20/11/24 ACC 20/11/24 W-01 ACC 059 05/12/24 ACC
XI/2024

010
280 PEP-RJA-WM-JBI-TRL-001 18 OF 41 0 AFC 3+100 3+120 SMAW E6010 + E7010 PIPE PIPE 278 API 5L SCH.40 54349510 015-0548 API 5L SCH.40 54349510 015-0546 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 20/11/24 ACC 20/11/24 W-01 ACC 059 05/12/24 ACC
XI/2024

011
281 PEP-RJA-WM-JBI-TRL-001 18 OF 41 0 AFC 3+100 3+120 SMAW E6010 + E7010 PIPE PIPE 279 API 5L SCH.40 54349510 015-0546 API 5L SCH.40 54349510 015-0545 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 21/11/24 ACC 21/11/24 W-01 ACC 059 05/12/24 RSC
XI/2024

283 PEP-RJA-WM-JBI-TRL-001 18 OF 41 0 AFC SMAW E6010 + E7010 280 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

284 PEP-RJA-WM-JBI-TRL-001 18 OF 41 0 AFC SMAW E6010 + E7010 281 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

012
285 PEP-RJA-WM-JBI-TRL-001 18 OF 41 0 AFC 3+140 3+160 SMAW E6010 + E7010 PIPE PIPE 282 API 5L SCH.40 54349510 013-0461 API 5L SCH.40 54349510 013-0466 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 22/11/24 ACC 22/11/24 W-01 ACC 059 05/12/24 ACC
XI/2024

012
286 PEP-RJA-WM-JBI-TRL-001 18 OF 41 0 AFC 3+160 3+180 SMAW E6010 + E7010 PIPE PIPE 283 API 5L SCH.40 54349510 013-0466 API 5L SCH.40 54349509 012-0428 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 22/11/24 ACC 22/11/24 W-01 ACC 060 05/12/24 ACC
XI/2024

287 PEP-RJA-WM-JBI-TRL-001 18 OF 41 0 AFC SMAW E6010 + E7010 284 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

288 PEP-RJA-WM-JBI-TRL-001 18 OF 41 0 AFC SMAW E6010 + E7010 285 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

010
289 PEP-RJA-WM-JBI-TRL-001 18 OF 41 0 AFC 3+180 3+200 SMAW E6010 + E7010 PIPE PIPE 286 API 5L SCH.40 54349510 013-0465 API 5L SCH.40 54349510 013-0464 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 20/11/24 ACC 20/11/24 W-02 ACC 060 05/12/24 RSC
XI/2024

010
291 PEP-RJA-WM-JBI-TRL-001 18 OF 41 0 AFC 3+200 3+220 SMAW E6010 + E7010 PIPE PIPE 287 API 5L SCH.40 54349510 013-0464 API 5L SCH.40 54349510 013-0469 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 20/11/24 ACC 20/11/24 W-02 ACC 060 05/12/24 ACC
XI/2024

010
292 PEP-RJA-WM-JBI-TRL-001 18 OF 41 0 AFC 3+220 3+240 SMAW E6010 + E7010 PIPE PIPE 288 API 5L SCH.40 54349510 013-0469 API 5L SCH.40 54349510 014-0484 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 20/11/24 ACC 20/11/24 W-02 ACC 060 05/12/24 ACC
XI/2024

010
293 PEP-RJA-WM-JBI-TRL-001 18 OF 41 0 AFC 3+220 3+240 SMAW E6010 + E7010 PIPE PIPE 289 API 5L SCH.40 54349510 014-0484 API 5L SCH.40 54349510 014-0487 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 20/11/24 ACC 20/11/24 W-02 ACC 061 05/12/24 ACC
XI/2024

010
294 PEP-RJA-WM-JBI-TRL-001 18 OF 41 0 AFC 3+240 3+260 SMAW E6010 + E7010 PIPE PIPE 290 API 5L SCH.40 54349510 014-0487 API 5L SCH.40 54349510 014-0484 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 20/11/24 ACC 20/11/24 W-02 ACC 061 05/12/24 ACC
XI/2024

011
295 PEP-RJA-WM-JBI-TRL-001 18 OF 41 0 AFC 3+260 3+280 SMAW E6010 + E7010 PIPE PIPE 291 API 5L SCH.40 54349510 014-0484 API 5L SCH.40 54349510 014-0489 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 21/11/24 ACC 21/11/24 W-02 ACC 061 05/12/24 REP
XI/2024

011
296 PEP-RJA-WM-JBI-TRL-001 18 OF 41 0 AFC 3+260 3+280 SMAW E6010 + E7010 PIPE PIPE 292 API 5L SCH.40 54349510 014-0489 API 5L SCH.40 54349510 014-0488 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 21/11/24 ACC 21/11/24 W-02 ACC 061 05/12/24 ACC
XI/2024

011
297 PEP-RJA-WM-JBI-TRL-001 18 OF 41 0 AFC 3+280 3+300 SMAW E6010 + E7010 PIPE PIPE 293 API 5L SCH.40 54349510 014-0488 API 5L SCH.40 54349510 014-0493 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 21/11/24 ACC 21/11/24 W-03 ACC 062 05/12/24 ACC
XI/2024

011
298 PEP-RJA-WM-JBI-TRL-001 19 OF 41 0 AFC 3+280 3+300 SMAW E6010 + E7010 PIPE PIPE 294 API 5L SCH.40 54349510 014-0493 API 5L SCH.40 54349510 014-0485 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 21/11/24 ACC 21/11/24 W-02 ACC 062 05/12/24 REP
XI/2024

299 PEP-RJA-WM-JBI-TRL-001 19 OF 41 0 AFC SMAW E6010 + E7010 295 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

011
300 PEP-RJA-WM-JBI-TRL-001 19 OF 41 0 AFC 3+300 3+320 SMAW E6010 + E7010 PIPE PIPE 296 API 5L SCH.40 54349994 024-0862 API 5L SCH.40 54349510 014-0490 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 21/11/24 ACC 21/11/24 W-02 ACC 062 05/12/24 ACC
XI/2024
Document No. 001/RJA.QA.QC/TRL/SG/XI/2024 WELDING VISUAL RADIOGRAPHY WRAPPING HOLIDAY TEST
PT. RAMAI JAYA ABADI
MONITORING PROGRESS WELDING Revision No. 0 WELDING
REP ACC ACC REP RSC DONE ACC REP ACC REPAIR
DONE
PENGGANTIAN TRUNKLINE 4 IN SEPANJANG 7.6 KM GS1 - GS2 DI FIELD JAMBI Page OF

PT. PERTAMINA EP ZONA 1 FIELD JAMBI Issue Date


528 0 644 523 34 5 0 0
CONTRACT NO 4710000889

CONNECTION MATERIAL 1 MATERIAL 2 FIT-UP INSP. VISUAL INSP. RADIOGRAPHY FIELD JOINT COATING HOLIDAYTEST LOWERING & BACKFILING

DRAWING
NO DRAWING NO SHEET OF REV. STA PROCESS WELDING ELECTRODE JOINT NO. J. TYPE SW/FW DIA-INCH THK(mm) REPORT NO. REMARKS
STATUS
REPORT
MATERIAL TO MATERIAL MATERIAL HEA .NO. PIPE NO. MATERIAL HEA .NO. PIPE NO. DATE ACC REP WELDING DATE WELDER STAMP ACC REP REPORT NO. DATE ACC REJ RSC REPORT NO. DATE ACC REP DATE ACC REP LOWERING BACKFILLING
NO.

301 PEP-RJA-WM-JBI-TRL-001 19 OF 41 0 AFC SMAW E6010 + E7010 297 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

011
302 PEP-RJA-WM-JBI-TRL-001 19 OF 41 0 AFC 3+340 3+360 SMAW E6010 + E7010 PIPE PIPE 298 API 5L SCH.40 54349509 024-0882 API 5L SCH.40 54349509 024-0884 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 21/11/24 ACC 21/11/24 W-01 ACC 062 05/12/24 ACC
XI/2024

011
303 PEP-RJA-WM-JBI-TRL-001 19 OF 41 0 AFC 3+340 3+360 SMAW E6010 + E7010 PIPE PIPE 299 API 5L SCH.40 54349509 024-0884 API 5L SCH.40 54349509 024-0899 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 21/11/24 ACC 21/11/24 W-01 ACC 063 05/12/24 ACC
XI/2024

011
304 PEP-RJA-WM-JBI-TRL-001 19 OF 41 0 AFC 3+360 3+380 SMAW E6010 + E7010 PIPE PIPE 300 API 5L SCH.40 54349509 024-0899 API 5L SCH.40 54349994 024-0892 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 21/11/24 ACC 21/11/24 W-01 ACC 063 05/12/24 ACC
XI/2024

011
305 PEP-RJA-WM-JBI-TRL-001 19 OF 41 0 AFC 3+380 3+400 SMAW E6010 + E7010 PIPE PIPE 301 API 5L SCH.40 54349994 024-0892 API 5L SCH.40 54349994 024-0868 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 21/11/24 ACC 21/11/24 W-01 ACC 063 05/12/24 ACC
XI/2024

011
306 PEP-RJA-WM-JBI-TRL-001 19 OF 41 0 AFC 3+380 3+400 SMAW E6010 + E7010 PIPE PIPE 302 API 5L SCH.40 54349994 024-0868 API 5L SCH.40 54349994 024-0866 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 21/11/24 ACC 21/11/24 W-01 ACC 067 06/12/24 ACC
XI/2024

011
307 PEP-RJA-WM-JBI-TRL-001 19 OF 41 0 AFC 3+400 3+420 SMAW E6010 + E7010 PIPE PIPE 303 API 5L SCH.40 54349994 024-0867 API 5L SCH.40 54349994 024-0866 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 21/11/24 ACC 21/11/24 W-01 ACC 063 05/12/24 ACC
XI/2024

011
308 PEP-RJA-WM-JBI-TRL-001 19 OF 41 0 AFC 3+400 3+420 SMAW E6010 + E7010 PIPE PIPE 304 API 5L SCH.40 54349994 024-0866 API 5L SCH.40 54349994 024-0861 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 21/11/24 ACC 21/11/24 W-01 ACC 064 05/12/24 ACC
XI/2024

011
309 PEP-RJA-WM-JBI-TRL-001 19 OF 41 0 AFC 3+420 3+440 SMAW E6010 + E7010 PIPE PIPE 305 API 5L SCH.40 54349994 024-0861 API 5L SCH.40 54349994 024-0860 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 21/11/24 ACC 21/11/24 W-01 ACC 067 06/12/24 ACC
XI/2024

011
310 PEP-RJA-WM-JBI-TRL-001 19 OF 41 0 AFC 3+420 3+440 SMAW E6010 + E7010 PIPE PIPE 306 API 5L SCH.40 54349994 024-0860 API 5L SCH.40 54349510 014-0491 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 21/11/24 ACC 21/11/24 W-01 ACC 064 05/12/24 ACC
XI/2024

011
311 PEP-RJA-WM-JBI-TRL-001 19 OF 41 0 AFC 3+440 3+460 SMAW E6010 + E7010 PIPE PIPE 307 API 5L SCH.40 54349510 014-0491 API 5L SCH.40 54349510 014-0497 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 21/11/24 ACC 21/11/24 W-01 ACC 064 05/12/24 ACC
XI/2024

312 PEP-RJA-WM-JBI-TRL-001 19 OF 41 0 AFC SMAW E6010 + E7010 308 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

313 PEP-RJA-WM-JBI-TRL-001 19 OF 41 0 AFC SMAW E6010 + E7010 309 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

314 PEP-RJA-WM-JBI-TRL-001 20 OF 41 0 AFC SMAW E6010 + E7010 310 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

315 PEP-RJA-WM-JBI-TRL-001 20 OF 41 0 AFC SMAW E6010 + E7010 311 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

316 PEP-RJA-WM-JBI-TRL-001 20 OF 41 0 AFC SMAW E6010 + E7010 312 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

317 PEP-RJA-WM-JBI-TRL-001 20 OF 41 0 AFC SMAW E6010 + E7010 313 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

011
318 PEP-RJA-WM-JBI-TRL-001 20 OF 41 0 AFC 3+520 3+540 SMAW E6010 + E7010 PIPE PIPE 314 API 5L SCH.40 54349510 017-0601 API 5L SCH.40 54349510 017-0605 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 21/11/24 ACC 21/11/24 W-03 ACC 064 05/12/24 ACC
XI/2024

011
319 PEP-RJA-WM-JBI-TRL-001 20 OF 41 0 AFC 3+540 3+560 SMAW E6010 + E7010 PIPE PIPE 315 API 5L SCH.40 54349510 017-0605 API 5L SCH.40 54349510 017-0611 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 21/11/24 ACC 21/11/24 W-03 ACC 065 05/12/24 ACC
XI/2024

012
320 PEP-RJA-WM-JBI-TRL-001 20 OF 41 0 AFC 3+540 3+560 SMAW E6010 + E7010 PIPE PIPE 316 API 5L SCH.40 54349510 017-0611 API 5L SCH.40 54349510 017-0606 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 22/11/24 ACC 22/11/24 W-03 ACC 065 05/12/24 ACC
XI/2024

012
321 PEP-RJA-WM-JBI-TRL-001 20 OF 41 0 AFC 3+560 3+580 SMAW E6010 + E7010 PIPE PIPE 317 API 5L SCH.40 54349510 017-0606 API 5L SCH.40 54349510 017-0604 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 22/11/24 ACC 22/11/24 W-03 ACC 065 05/12/24 ACC
XI/2024

012
322 PEP-RJA-WM-JBI-TRL-001 20 OF 41 0 AFC 3+580 3+600 SMAW E6010 + E7010 PIPE PIPE 318 API 5L SCH.40 54349510 017-0604 API 5L SCH.40 54349510 017-0619 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 22/11/24 ACC 22/11/24 W-03 ACC 065 05/12/24 ACC
XI/2024

012
323 PEP-RJA-WM-JBI-TRL-001 20 OF 41 0 AFC 3+580 3+600 SMAW E6010 + E7010 PIPE PIPE 319 API 5L SCH.40 54349510 017-0619 API 5L SCH.40 54349510 017-0618 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 22/11/24 ACC 22/11/24 W-03 ACC 066 05/12/24 ACC
XI/2024

012
324 PEP-RJA-WM-JBI-TRL-001 20 OF 41 0 AFC 3+600 3+620 SMAW E6010 + E7010 PIPE PIPE 320 API 5L SCH.40 54349510 017-0618 API 5L SCH.40 54349510 017-0621 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 22/11/24 ACC 22/11/24 W-03 ACC 066 05/12/24 ACC
XI/2024

012
325 PEP-RJA-WM-JBI-TRL-001 20 OF 41 0 AFC 3+620 3+640 SMAW E6010 + E7010 PIPE PIPE 321 API 5L SCH.40 54349510 017-0621 API 5L SCH.40 54349510 017-0623 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 22/11/24 ACC 22/11/24 W-03 ACC 067 06/12/24 ACC
XI/2024

012
326 PEP-RJA-WM-JBI-TRL-001 20 OF 41 0 AFC 3+620 3+640 SMAW E6010 + E7010 PIPE PIPE 322 API 5L SCH.40 54349510 017-0623 API 5L SCH.40 54349510 017-0622 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 22/11/24 ACC 22/11/24 W-03 ACC 066 05/12/24 ACC
XI/2024

012
327 PEP-RJA-WM-JBI-TRL-001 20 OF 41 0 AFC 3+640 3+660 SMAW E6010 + E7010 PIPE PIPE 323 API 5L SCH.40 54349510 017-0622 API 5L SCH.40 54349510 017-0613 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 22/11/24 ACC 22/11/24 W-03 ACC 067 06/12/24 ACC
XI/2024

012
328 PEP-RJA-WM-JBI-TRL-001 20 OF 41 0 AFC 3+640 3+660 SMAW E6010 + E7010 PIPE PIPE 324 API 5L SCH.40 54349510 017-0613 API 5L SCH.40 54349510 017-0615 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 22/11/24 ACC 22/11/24 W-03 ACC 068 06/12/24 ACC
XI/2024

012
329 PEP-RJA-WM-JBI-TRL-001 20 OF 41 0 AFC 3+660 3+680 SMAW E6010 + E7010 PIPE PIPE 325 API 5L SCH.40 54349510 017-0615 API 5L SCH.40 54349510 017-0614 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 22/11/24 ACC 22/11/24 W-03 ACC 068 06/12/24 ACC
XI/2024

013
330 PEP-RJA-WM-JBI-TRL-001 21 OF 41 0 AFC 3+660 3+680 SMAW E6010 + E7010 PIPE PIPE 326 API 5L SCH.40 54349510 017-0614 API 5L SCH.40 54349510 017-0620 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 23/11/24 ACC 23/11/24 W-03 ACC 068 06/12/24 ACC
XI/2024

013
331 PEP-RJA-WM-JBI-TRL-001 21 OF 41 0 AFC 3+680 3+700 SMAW E6010 + E7010 PIPE PIPE 327 API 5L SCH.40 54349510 017-0620 API 5L SCH.40 54349510 017-0621 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 23/11/24 ACC 23/11/24 W-03 ACC 068 06/12/24 ACC
XI/2024

013
332 PEP-RJA-WM-JBI-TRL-001 21 OF 41 0 AFC 3+700 3+720 SMAW E6010 + E7010 PIPE PIPE 328 API 5L SCH.40 54349510 017-0621 API 5L SCH.40 54349509 010-0355 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 23/11/24 ACC 23/11/24 W-03 ACC 069 06/12/24 ACC
XI/2024

013
333 PEP-RJA-WM-JBI-TRL-001 21 OF 41 0 AFC 3+700 3+720 SMAW E6010 + E7010 PIPE PIPE 329 API 5L SCH.40 54349509 010-0355 API 5L SCH.40 54349509 010-0354 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 23/11/24 ACC 23/11/24 W-03 ACC 069 06/12/24 ACC
XI/2024

013
334 PEP-RJA-WM-JBI-TRL-001 21 OF 41 0 AFC 3+720 3+740 SMAW E6010 + E7010 PIPE PIPE 330 API 5L SCH.40 54349509 010-0354 API 5L SCH.40 54349510 016-0557 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 23/11/24 ACC 23/11/24 W-03 ACC 069 06/12/24 ACC
XI/2024

335 PEP-RJA-WM-JBI-TRL-001 21 OF 41 0 AFC SMAW E6010 + E7010 331 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

336 PEP-RJA-WM-JBI-TRL-001 21 OF 41 0 AFC SMAW E6010 + E7010 332 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

012
337 PEP-RJA-WM-JBI-TRL-001 21 OF 41 0 AFC 3+760 3+780 SMAW E6010 + E7010 PIPE PIPE 333 API 5L SCH.40 54349509 010-0357 API 5L SCH.40 54349509 010-0352 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 22/11/24 ACC 22/11/24 W-02 ACC 069 06/12/24 ACC
XI/2024

338 PEP-RJA-WM-JBI-TRL-001 21 OF 41 0 AFC SMAW E6010 + E7010 334 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

339 PEP-RJA-WM-JBI-TRL-001 21 OF 41 0 AFC SMAW E6010 + E7010 335 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

012
340 PEP-RJA-WM-JBI-TRL-001 21 OF 41 0 AFC 3+780 3+800 SMAW E6010 + E7010 PIPE PIPE 336 API 5L SCH.40 54349509 010-0360 API 5L SCH.40 54349509 010-0361 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 22/11/24 ACC 22/11/24 W-02 ACC 070 06/12/24 ACC
XI/2024

341 PEP-RJA-WM-JBI-TRL-001 21 OF 41 0 AFC SMAW E6010 + E7010 337 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

012
342 PEP-RJA-WM-JBI-TRL-001 21 OF 41 0 AFC 3+820 3+840 SMAW E6010 + E7010 PIPE PIPE 338 API 5L SCH.40 54349509 011-0393 API 5L SCH.40 54349509 010-0355 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 22/11/24 ACC 22/11/24 W-02 ACC 070 06/12/24 ACC
XI/2024

343 PEP-RJA-WM-JBI-TRL-001 21 OF 41 0 AFC SMAW E6010 + E7010 339 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

012
344 PEP-RJA-WM-JBI-TRL-001 21 OF 41 0 AFC 3+840 3+860 SMAW E6010 + E7010 PIPE PIPE 340 API 5L SCH.40 54349509 011-0388 API 5L SCH.40 54349509 011-0397 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 22/11/24 ACC 22/11/24 W-02 ACC 070 06/12/24 ACC
XI/2024

345 PEP-RJA-WM-JBI-TRL-001 21 OF 41 0 AFC SMAW E6010 + E7010 341 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

012
346 PEP-RJA-WM-JBI-TRL-001 22 OF 41 0 AFC 3+860 3+880 SMAW E6010 + E7010 PIPE PIPE 342 API 5L SCH.40 54349509 011-0391 API 5L SCH.40 54349509 011-0394 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 22/11/24 ACC 22/11/24 W-02 ACC 070 06/12/24 ACC
XI/2024

012
347 PEP-RJA-WM-JBI-TRL-001 22 OF 41 0 AFC 3+880 3+900 SMAW E6010 + E7010 PIPE PIPE 343 API 5L SCH.40 54349509 011-0394 API 5L SCH.40 54349509 011-0385 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 22/11/24 ACC 22/11/24 W-02 ACC 071 06/12/24 ACC
XI/2024

012
348 PEP-RJA-WM-JBI-TRL-001 22 OF 41 0 AFC 3+880 3+900 SMAW E6010 + E7010 PIPE PIPE 344 API 5L SCH.40 54349509 011-0385 API 5L SCH.40 54349509 011-0390 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 22/11/24 ACC 22/11/24 W-02 ACC 071 06/12/24 REP
XI/2024

012
349 PEP-RJA-WM-JBI-TRL-001 22 OF 41 0 AFC 3+900 3+920 SMAW E6010 + E7010 PIPE PIPE 345 API 5L SCH.40 54349509 011-0390 API 5L SCH.40 54349509 011-0389 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 22/11/24 ACC 22/11/24 W-02 ACC 071 06/12/24 ACC
XI/2024

013
350 PEP-RJA-WM-JBI-TRL-001 22 OF 41 0 AFC 3+900 3+920 SMAW E6010 + E7010 PIPE PIPE 346 API 5L SCH.40 54349509 011-0389 API 5L SCH.40 54349509 011-0358 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 23/11/24 ACC 23/11/24 W-02 ACC 071 06/12/24 ACC
XI/2024

351 PEP-RJA-WM-JBI-TRL-001 22 OF 41 0 AFC SMAW E6010 + E7010 347 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC 072 6-Dec-24 ACC

013
352 PEP-RJA-WM-JBI-TRL-001 22 OF 41 0 AFC 3+940 3+960 SMAW E6010 + E7010 PIPE PIPE 348 API 5L SCH.40 54349510 016-0559 API 5L SCH.40 54349509 012-0359 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 23/11/24 ACC 23/11/24 W-02 ACC
XI/2024

353 PEP-RJA-WM-JBI-TRL-001 22 OF 41 0 AFC SMAW E6010 + E7010 349 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

012
354 PEP-RJA-WM-JBI-TRL-001 22 OF 41 0 AFC 3+960 3+980 SMAW E6010 + E7010 PIPE PIPE 350 API 5L SCH.40 54349510 015-0542 API 5L SCH.40 54349510 015-0547 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 22/11/24 ACC 22/11/24 W-01 ACC 072 06/12/24 ACC
XI/2024

012
355 PEP-RJA-WM-JBI-TRL-001 22 OF 41 0 AFC 3+980 4+0 SMAW E6010 + E7010 PIPE PIPE 351 API 5L SCH.40 54349510 015-0547 API 5L SCH.40 54349510 015-0552 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 22/11/24 ACC 22/11/24 W-01 ACC 072 06/12/24 ACC
XI/2024

012
356 PEP-RJA-WM-JBI-TRL-001 22 OF 41 0 AFC 3+980 4+0 SMAW E6010 + E7010 PIPE PIPE 352 API 5L SCH.40 54349510 015-0552 API 5L SCH.40 54349510 015-0553 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 22/11/24 ACC 22/11/24 W-01 ACC 072 06/12/24 ACC
XI/2024

012
357 PEP-RJA-WM-JBI-TRL-001 22 OF 41 0 AFC 4+0 4+020 SMAW E6010 + E7010 PIPE PIPE 353 API 5L SCH.40 54349510 015-0553 API 5L SCH.40 54349510 015-0551 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 22/11/24 ACC 22/11/24 W-01 ACC 073 06/12/24 ACC
XI/2024

012
358 PEP-RJA-WM-JBI-TRL-001 22 OF 41 0 AFC 4+0 4+020 SMAW E6010 + E7010 PIPE PIPE 354 API 5L SCH.40 54349510 015-0551 API 5L SCH.40 54349509 011-0386 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 22/11/24 ACC 22/11/24 W-01 ACC 073 06/12/24 ACC
XI/2024

012
359 PEP-RJA-WM-JBI-TRL-001 22 OF 41 0 AFC 4+020 4+040 SMAW E6010 + E7010 PIPE PIPE 355 API 5L SCH.40 54349509 011-0386 API 5L SCH.40 54349510 015-0550 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 22/11/24 ACC 22/11/24 W-01 ACC 073 06/12/24 ACC
XI/2024

012
360 PEP-RJA-WM-JBI-TRL-001 22 OF 41 0 AFC 4+020 4+040 SMAW E6010 + E7010 PIPE PIPE 356 API 5L SCH.40 54349510 015-0550 API 5L SCH.40 54349509 011-0387 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 22/11/24 ACC 22/11/24 W-01 ACC 073 06/12/24 ACC
XI/2024

013
361 PEP-RJA-WM-JBI-TRL-001 22 OF 41 0 AFC 4+040 4+060 SMAW E6010 + E7010 PIPE PIPE 357 API 5L SCH.40 54349509 011-0387 API 5L SCH.40 54349509 007-0249 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 23/11/24 ACC 23/11/24 W-01 ACC 074 06/12/24 ACC
XI/2024

013
362 PEP-RJA-WM-JBI-TRL-001 23 OF 41 0 AFC 4+060 4+080 SMAW E6010 + E7010 PIPE PIPE 358 API 5L SCH.40 54349509 007-0249 API 5L SCH.40 54349510 014-0498 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 23/11/24 ACC 23/11/24 W-01 ACC 075 7-Dec-24 ACC
XI/2024

013
363 PEP-RJA-WM-JBI-TRL-001 23 OF 41 0 AFC 4+060 4+080 SMAW E6010 + E7010 PIPE PIPE 359 API 5L SCH.40 54349510 014-0498 API 5L SCH.40 54349510 014-0496 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 23/11/24 ACC 23/11/24 W-01 ACC 075 7-Dec-24 ACC
XI/2024

013
364 PEP-RJA-WM-JBI-TRL-001 23 OF 41 0 AFC 4+080 4+100 SMAW E6010 + E7010 PIPE PIPE 360 API 5L SCH.40 54349510 014-0496 API 5L SCH.40 54349510 015-0549 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 23/11/24 ACC 23/11/24 W-01 ACC 075 7-Dec-24 ACC
XI/2024

013
365 PEP-RJA-WM-JBI-TRL-001 23 OF 41 0 AFC 4+100 4+120 SMAW E6010 + E7010 PIPE PIPE 361 API 5L SCH.40 54349510 015-0549 API 5L SCH.40 54349510 014-0501 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 23/11/24 ACC 23/11/24 W-01 ACC 075 7-Dec-24 ACC
XI/2024

013
366 PEP-RJA-WM-JBI-TRL-001 23 OF 41 0 AFC 4+100 4+120 SMAW E6010 + E7010 PIPE PIPE 362 API 5L SCH.40 54349510 014-0501 API 5L SCH.40 54349510 014-0500 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 23/11/24 ACC 23/11/24 W-01 ACC 076 7-Dec-24 ACC
XI/2024

013
367 PEP-RJA-WM-JBI-TRL-001 23 OF 41 0 AFC 4+120 4+140 SMAW E6010 + E7010 PIPE PIPE 363 API 5L SCH.40 54349510 014-0500 API 5L SCH.40 54349510 014-0495 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 23/11/24 ACC 23/11/24 W-01 ACC 076 7-Dec-24 ACC
XI/2024

013
368 PEP-RJA-WM-JBI-TRL-001 23 OF 41 0 AFC 4+120 4+140 SMAW E6010 + E7010 PIPE PIPE 364 API 5L SCH.40 54349510 014-0495 API 5L SCH.40 54349510 014-0499 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 23/11/24 ACC 23/11/24 W-01 ACC 110 11-Dec-24 ACC
XI/2024

013
369 PEP-RJA-WM-JBI-TRL-001 23 OF 41 0 AFC 4+140 4+160 SMAW E6010 + E7010 PIPE PIPE 365 API 5L SCH.40 54349510 014-0499 API 5L SCH.40 54349510 014-0494 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 23/11/24 ACC 23/11/24 W-01 ACC 076 7-Dec-24 ACC
XI/2024

013
370 PEP-RJA-WM-JBI-TRL-001 23 OF 41 0 AFC 4+140 4+160 SMAW E6010 + E7010 PIPE PIPE 366 API 5L SCH.40 54349510 014-0494 API 5L SCH.40 54349510 014-0497 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 23/11/24 ACC 23/11/24 W-01 ACC 076 7-Dec-24 ACC
XI/2024

014
371 PEP-RJA-WM-JBI-TRL-001 23 OF 41 0 AFC 4+160 4+180 SMAW E6010 + E7010 PIPE PIPE 367 API 5L SCH.40 54349510 014-0497 API 5L SCH.40 54349510 014-0503 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 24/11/24 ACC 24/11/24 W-01 ACC 077 7-Dec-24 ACC
XI/2024

014
372 PEP-RJA-WM-JBI-TRL-001 23 OF 41 0 AFC 4+180 4+200 SMAW E6010 + E7010 PIPE PIPE 368 API 5L SCH.40 54349510 014-0503 API 5L SCH.40 54349509 007-0248 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 24/11/24 ACC 24/11/24 W-01 ACC 077 7-Dec-24 ACC
XI/2024

014
373 PEP-RJA-WM-JBI-TRL-001 23 OF 41 0 AFC 4+180 4+200 SMAW E6010 + E7010 PIPE PIPE 369 API 5L SCH.40 54349509 007-0248 API 5L SCH.40 54349509 007-0251 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 24/11/24 ACC 24/11/24 W-01 ACC 077 7-Dec-24 ACC
XI/2024

014
374 PEP-RJA-WM-JBI-TRL-001 23 OF 41 0 AFC 4+200 4+220 SMAW E6010 + E7010 PIPE PIPE 370 API 5L SCH.40 54349509 007-0251 API 5L SCH.40 54349509 007-0249 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 24/11/24 ACC 24/11/24 W-01 ACC 077 7-Dec-24 ACC
XI/2024
Document No. 001/RJA.QA.QC/TRL/SG/XI/2024 WELDING VISUAL RADIOGRAPHY WRAPPING HOLIDAY TEST
PT. RAMAI JAYA ABADI
MONITORING PROGRESS WELDING Revision No. 0 WELDING
REP ACC ACC REP RSC DONE ACC REP ACC REPAIR
DONE
PENGGANTIAN TRUNKLINE 4 IN SEPANJANG 7.6 KM GS1 - GS2 DI FIELD JAMBI Page OF

PT. PERTAMINA EP ZONA 1 FIELD JAMBI Issue Date


528 0 644 523 34 5 0 0
CONTRACT NO 4710000889

CONNECTION MATERIAL 1 MATERIAL 2 FIT-UP INSP. VISUAL INSP. RADIOGRAPHY FIELD JOINT COATING HOLIDAYTEST LOWERING & BACKFILING

DRAWING
NO DRAWING NO SHEET OF REV. STA PROCESS WELDING ELECTRODE JOINT NO. J. TYPE SW/FW DIA-INCH THK(mm) REPORT NO. REMARKS
STATUS
REPORT
MATERIAL TO MATERIAL MATERIAL HEA .NO. PIPE NO. MATERIAL HEA .NO. PIPE NO. DATE ACC REP WELDING DATE WELDER STAMP ACC REP REPORT NO. DATE ACC REJ RSC REPORT NO. DATE ACC REP DATE ACC REP LOWERING BACKFILLING
NO.

014
375 PEP-RJA-WM-JBI-TRL-001 23 OF 41 0 AFC 4+220 4+240 SMAW E6010 + E7010 PIPE PIPE 371 API 5L SCH.40 54349509 007-0249 API 5L SCH.40 54349509 007-0242 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 24/11/24 ACC 24/11/24 W-01 ACC 078 7-Dec-24 ACC
XI/2024

014
376 PEP-RJA-WM-JBI-TRL-001 23 OF 41 0 AFC 4+220 4+240 SMAW E6010 + E7010 PIPE PIPE 372 API 5L SCH.40 54349509 007-0242 API 5L SCH.40 54349509 007-0250 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 24/11/24 ACC 24/11/24 W-01 ACC 078 7-Dec-24 ACC
XI/2024

014
377 PEP-RJA-WM-JBI-TRL-001 23 OF 41 0 AFC 4+240 4+260 SMAW E6010 + E7010 PIPE PIPE 373 API 5L SCH.40 54349509 007-0250 API 5L SCH.40 54349509 007-0247 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 24/11/24 ACC 24/11/24 W-01 ACC 078 7-Dec-24 ACC
XI/2024

014
378 PEP-RJA-WM-JBI-TRL-001 24 OF 41 0 AFC 4+240 4+260 SMAW E6010 + E7010 PIPE PIPE 374 API 5L SCH.40 54349509 007-0247 API 5L SCH.40 54349510 014-0502 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 24/11/24 ACC 24/11/24 W-01 ACC 078 7-Dec-24 ACC
XI/2024

014
379 PEP-RJA-WM-JBI-TRL-001 24 OF 41 0 AFC 4+260 4+280 SMAW E6010 + E7010 PIPE PIPE 375 API 5L SCH.40 54349510 014-0502 API 5L SCH.40 54349509 007-0246 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 24/11/24 ACC 24/11/24 W-01 ACC 079 7-Dec-24 ACC
XI/2024

380 PEP-RJA-WM-JBI-TRL-001 24 OF 41 0 AFC SMAW E6010 + E7010 376 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

381 PEP-RJA-WM-JBI-TRL-001 24 OF 41 0 AFC SMAW E6010 + E7010 377 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

013
382 PEP-RJA-WM-JBI-TRL-001 24 OF 41 0 AFC 4+300 4+320 SMAW E6010 + E7010 PIPE PIPE 378 API 5L SCH.40 54349509 010-0348 API 5L SCH.40 54349509 007-0243 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 23/11/24 ACC 23/11/24 W-02 ACC 079 7-Dec-24 ACC
XI/2024

013
383 PEP-RJA-WM-JBI-TRL-001 24 OF 41 0 AFC 4+300 4+320 SMAW E6010 + E7010 PIPE PIPE 379 API 5L SCH.40 54349509 007-0243 API 5L SCH.40 54349509 010-0349 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 23/11/24 ACC 23/11/24 W-02 ACC 079 7-Dec-24 RSC
XI/2024

013
384 PEP-RJA-WM-JBI-TRL-001 24 OF 41 0 AFC 4+320 4+340 SMAW E6010 + E7010 PIPE PIPE 380 API 5L SCH.40 54349509 010-0349 API 5L SCH.40 54349509 010-0347 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 23/11/24 ACC 23/11/24 W-02 ACC 079 7-Dec-24 ACC
XI/2024

013
385 PEP-RJA-WM-JBI-TRL-001 24 OF 41 0 AFC 4+340 4+360 SMAW E6010 + E7010 PIPE PIPE 381 API 5L SCH.40 54349509 010-0347 API 5L SCH.40 54349509 010-0346 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 23/11/24 ACC 23/11/24 W-02 ACC 080 7-Dec-24 ACC
XI/2024

014
386 PEP-RJA-WM-JBI-TRL-001 24 OF 41 0 AFC 4+340 4+360 SMAW E6010 + E7010 PIPE PIPE 382 API 5L SCH.40 54349509 010-0346 API 5L SCH.40 54349509 010-0345 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 24/11/24 ACC 24/11/24 W-02 ACC 080 7-Dec-24 ACC
XI/2024

014
387 PEP-RJA-WM-JBI-TRL-001 24 OF 41 0 AFC 4+360 4+380 SMAW E6010 + E7010 PIPE PIPE 383 API 5L SCH.40 54349509 010-0345 API 5L SCH.40 54349509 010-0350 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 24/11/24 ACC 24/11/24 W-02 ACC 080 7-Dec-24 ACC
XI/2024

014
388 PEP-RJA-WM-JBI-TRL-001 24 OF 41 0 AFC 4+360 4+380 SMAW E6010 + E7010 PIPE PIPE 384 API 5L SCH.40 54349509 010-0350 API 5L SCH.40 54349509 010-0341 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 24/11/24 ACC 24/11/24 W-02 ACC 080 7-Dec-24 ACC
XI/2024

014
389 PEP-RJA-WM-JBI-TRL-001 24 OF 41 0 AFC 4+380 4+400 SMAW E6010 + E7010 PIPE PIPE 385 API 5L SCH.40 54349509 010-0341 API 5L SCH.40 54349509 010-0351 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 24/11/24 ACC 24/11/24 W-02 ACC 081 7-Dec-24 ACC
XI/2024

014
390 PEP-RJA-WM-JBI-TRL-001 24 OF 41 0 AFC 4+380 4+400 SMAW E6010 + E7010 PIPE PIPE 386 API 5L SCH.40 54349509 010-0351 API 5L SCH.40 54349509 010-0343 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 24/11/24 ACC 24/11/24 W-02 ACC 081 7-Dec-24 ACC
XI/2024

014
391 PEP-RJA-WM-JBI-TRL-001 24 OF 41 0 AFC 4+400 4+420 SMAW E6010 + E7010 PIPE PIPE 387 API 5L SCH.40 54349509 010-0343 API 5L SCH.40 54349509 010-0342 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 24/11/24 ACC 24/11/24 W-02 ACC 081 7-Dec-24 ACC
XI/2024

014
392 PEP-RJA-WM-JBI-TRL-001 24 OF 41 0 AFC 4+420 4+440 SMAW E6010 + E7010 PIPE PIPE 388 API 5L SCH.40 54349509 010-0342 API 5L SCH.40 54349509 010-0338 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 24/11/24 ACC 24/11/24 W-02 ACC 081 7-Dec-24 REP
XI/2024

014
393 PEP-RJA-WM-JBI-TRL-001 24 OF 41 0 AFC 4+420 4+440 SMAW E6010 + E7010 PIPE PIPE 389 API 5L SCH.40 54349509 010-0338 API 5L SCH.40 54349509 010-0340 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 24/11/24 ACC 24/11/24 W-02 ACC 082 7-Dec-24 ACC
XI/2024

394 PEP-RJA-WM-JBI-TRL-001 25 OF 41 0 AFC SMAW E6010 + E7010 390 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

014
395 PEP-RJA-WM-JBI-TRL-001 25 OF 41 0 AFC 4+460 4+480 SMAW E6010 + E7010 PIPE PIPE 391 API 5L SCH.40 54349509 010-0336 API 5L SCH.40 54349509 010-0327 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 24/11/24 ACC 24/11/24 W-02 ACC 082 7-Dec-24 ACC
XI/2024

396 PEP-RJA-WM-JBI-TRL-001 25 OF 41 0 AFC SMAW E6010 + E7010 392 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

013
397 PEP-RJA-WM-JBI-TRL-001 25 OF 41 0 AFC 4+480 4+500 SMAW E6010 + E7010 PIPE PIPE 393 API 5L SCH.40 54349509 010-0339 API 5L SCH.40 54349509 010-0335 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 23/11/24 ACC 23/11/24 W-03 ACC 082 7-Dec-24 ACC
XI/2024

013
398 PEP-RJA-WM-JBI-TRL-001 25 OF 41 0 AFC 4+480 4+500 SMAW E6010 + E7010 PIPE PIPE 394 API 5L SCH.40 54349509 010-0335 API 5L SCH.40 54349509 010-0337 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 23/11/24 ACC 23/11/24 W-03 ACC 082 7-Dec-24 ACC
XI/2024

013
399 PEP-RJA-WM-JBI-TRL-001 25 OF 41 0 AFC 4+500 4+520 SMAW E6010 + E7010 PIPE PIPE 395 API 5L SCH.40 54349509 010-0337 API 5L SCH.40 54349509 010-0329 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 23/11/24 ACC 23/11/24 W-03 ACC 083 7-Dec-24 ACC
XI/2024

013
400 PEP-RJA-WM-JBI-TRL-001 25 OF 41 0 AFC 4+500 4+520 SMAW E6010 + E7010 PIPE PIPE 396 API 5L SCH.40 54349509 010-0329 API 5L SCH.40 54349509 010-0341 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 23/11/24 ACC 23/11/24 W-03 ACC 083 7-Dec-24 ACC
XI/2024

013
401 PEP-RJA-WM-JBI-TRL-001 25 OF 41 0 AFC 4+520 4+540 SMAW E6010 + E7010 PIPE PIPE 397 API 5L SCH.40 54349509 010-0341 API 5L SCH.40 54349509 010-0328 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 23/11/24 ACC 23/11/24 W-03 ACC 083 7-Dec-24 ACC
XI/2024

014
402 PEP-RJA-WM-JBI-TRL-001 25 OF 41 0 AFC 4+540 4+560 SMAW E6010 + E7010 PIPE PIPE 398 API 5L SCH.40 54349509 010-0328 API 5L SCH.40 54349509 002-0069 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 24/11/24 ACC 24/11/24 W-03 ACC 084 8-Dec-24 ACC
XI/2024

014
403 PEP-RJA-WM-JBI-TRL-001 25 OF 41 0 AFC 4+540 4+560 SMAW E6010 + E7010 PIPE PIPE 399 API 5L SCH.40 54349509 002-0069 API 5L SCH.40 54349509 002-0068 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 24/11/24 ACC 24/11/24 W-03 ACC 084 8-Dec-24 ACC
XI/2024

014
404 PEP-RJA-WM-JBI-TRL-001 25 OF 41 0 AFC 4+560 4+580 SMAW E6010 + E7010 PIPE PIPE 400 API 5L SCH.40 54349509 002-0068 API 5L SCH.40 54349509 002-0065 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 24/11/24 ACC 24/11/24 W-03 ACC 084 8-Dec-24 ACC
XI/2024

014
405 PEP-RJA-WM-JBI-TRL-001 25 OF 41 0 AFC 4+580 4+600 SMAW E6010 + E7010 PIPE PIPE 401 API 5L SCH.40 54349509 002-0065 API 5L SCH.40 54349509 002-0070 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 24/11/24 ACC 24/11/24 W-02 ACC 084 8-Dec-24 ACC
XI/2024

014
406 PEP-RJA-WM-JBI-TRL-001 25 OF 41 0 AFC 4+580 4+600 SMAW E6010 + E7010 PIPE PIPE 402 API 5L SCH.40 54349509 002-0070 API 5L SCH.40 54349509 002-0067 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 24/11/24 ACC 24/11/24 W-03 ACC 085 8-Dec-24 ACC
XI/2024

014
407 PEP-RJA-WM-JBI-TRL-001 25 OF 41 0 AFC 4+600 4+620 SMAW E6010 + E7010 PIPE PIPE 403 API 5L SCH.40 54349509 002-0067 API 5L SCH.40 54349509 002-0066 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 24/11/24 ACC 24/11/24 W-03 ACC 085 8-Dec-24 ACC
XI/2024

014
408 PEP-RJA-WM-JBI-TRL-001 25 OF 41 0 AFC 4+600 4+620 SMAW E6010 + E7010 PIPE PIPE 404 API 5L SCH.40 54349509 002-0066 API 5L SCH.40 54349509 002-0072 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 24/11/24 ACC 24/11/24 W-03 ACC 085 8-Dec-24 ACC
XI/2024

014
409 PEP-RJA-WM-JBI-TRL-001 25 OF 41 0 AFC 4+620 4+640 SMAW E6010 + E7010 PIPE PIPE 405 API 5L SCH.40 54349509 002-0072 API 5L SCH.40 54349509 002-0077 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 24/11/24 ACC 24/11/24 W-03 ACC 085 8-Dec-24 ACC
XI/2024

014
410 PEP-RJA-WM-JBI-TRL-001 26 OF 41 0 AFC 4+620 4+640 SMAW E6010 + E7010 PIPE PIPE 406 API 5L SCH.40 54349509 002-0077 API 5L SCH.40 54349509 002-0073 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 24/11/24 ACC 24/11/24 W-03 ACC 086 8-Dec-24 ACC
XI/2024

014
411 PEP-RJA-WM-JBI-TRL-001 26 OF 41 0 AFC 4+640 4+660 SMAW E6010 + E7010 PIPE PIPE 407 API 5L SCH.40 54349509 002-0073 API 5L SCH.40 54349509 002-0071 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 24/11/24 ACC 24/11/24 W-03 ACC 086 8-Dec-24 ACC
XI/2024

014
412 PEP-RJA-WM-JBI-TRL-001 26 OF 41 0 AFC 4+660 4+680 SMAW E6010 + E7010 PIPE PIPE 408 API 5L SCH.40 54349509 002-0071 API 5L SCH.40 54349509 004-0138 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 24/11/24 ACC 24/11/24 W-03 ACC 086 8-Dec-24 ACC
XI/2024

014
413 PEP-RJA-WM-JBI-TRL-001 26 OF 41 0 AFC 4+660 4+680 SMAW E6010 + E7010 PIPE PIPE 409 API 5L SCH.40 54349509 004-0138 API 5L SCH.40 54349509 004-0132 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 24/11/24 ACC 24/11/24 W-03 ACC 086 8-Dec-24 ACC
XI/2024

015
414 PEP-RJA-WM-JBI-TRL-001 26 OF 41 0 AFC 4+680 4+700 SMAW E6010 + E7010 PIPE PIPE 410 API 5L SCH.40 54349509 004-0132 API 5L SCH.40 54349509 004-0137 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 25/11/24 ACC 25/11/24 W-03 ACC 087 8-Dec-24 ACC
XI/2024

015
415 PEP-RJA-WM-JBI-TRL-001 26 OF 41 0 AFC 4+700 4+720 SMAW E6010 + E7010 PIPE PIPE 411 API 5L SCH.40 54349509 004-0137 API 5L SCH.40 54349509 004-0139 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 25/11/24 ACC 25/11/24 W-03 ACC 087 8-Dec-24 ACC
XI/2024

015
416 PEP-RJA-WM-JBI-TRL-001 26 OF 41 0 AFC 4+700 4+720 SMAW E6010 + E7010 PIPE PIPE 412 API 5L SCH.40 54349509 004-0139 API 5L SCH.40 54349509 004-0140 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 25/11/24 ACC 25/11/24 W-03 ACC 087 8-Dec-24 ACC
XI/2024

015
417 PEP-RJA-WM-JBI-TRL-001 26 OF 41 0 AFC 4+720 4+740 SMAW E6010 + E7010 PIPE PIPE 413 API 5L SCH.40 54349509 004-0140 API 5L SCH.40 54349509 004-0136 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 25/11/24 ACC 25/11/24 W-03 ACC 087 8-Dec-24 ACC
XI/2024

015
418 PEP-RJA-WM-JBI-TRL-001 26 OF 41 0 AFC 4+720 4+740 SMAW E6010 + E7010 PIPE PIPE 414 API 5L SCH.40 54349509 004-0136 API 5L SCH.40 54349509 004-0135 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 25/11/24 ACC 25/11/24 W-03 ACC 088 8-Dec-24 ACC
XI/2024

015
419 PEP-RJA-WM-JBI-TRL-001 26 OF 41 0 AFC 4+740 4+760 SMAW E6010 + E7010 PIPE PIPE 415 API 5L SCH.40 54349509 004-0135 API 5L SCH.40 54349509 004-0133 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 25/11/24 ACC 25/11/24 W-03 ACC 088 8-Dec-24 ACC
XI/2024

420 PEP-RJA-WM-JBI-TRL-001 26 OF 41 0 AFC SMAW E6010 + E7010 416 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

015
421 PEP-RJA-WM-JBI-TRL-001 26 OF 41 0 AFC 4+760 4+780 SMAW E6010 + E7010 PIPE PIPE 417 API 5L SCH.40 54349509 004-0134 API 5L SCH.40 54349510 015-0549 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 25/11/24 ACC 25/11/24 W-01 ACC 088 8-Dec-24 ACC
XI/2024

422 PEP-RJA-WM-JBI-TRL-001 26 OF 41 0 AFC SMAW E6010 + E7010 418 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

015
423 PEP-RJA-WM-JBI-TRL-001 26 OF 41 0 AFC 4+780 4+800 SMAW E6010 + E7010 PIPE PIPE 419 API 5L SCH.40 54349509 004-0131 API 5L SCH.40 54349510 021-0753 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 25/11/24 ACC 25/11/24 W-01 ACC 088 8-Dec-24 ACC
XI/2024

015
424 PEP-RJA-WM-JBI-TRL-001 26 OF 41 0 AFC 4+800 4+820 SMAW E6010 + E7010 PIPE PIPE 420 API 5L SCH.40 54349510 021-0753 API 5L SCH.40 54349510 021-0754 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 25/11/24 ACC 25/11/24 W-01 ACC 089 8-Dec-24 ACC
XI/2024

015
425 PEP-RJA-WM-JBI-TRL-001 26 OF 41 0 AFC 4+820 4+840 SMAW E6010 + E7010 PIPE PIPE 421 API 5L SCH.40 54349510 021-0754 API 5L SCH.40 54349510 021-0751 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 25/11/24 ACC 25/11/24 W-01 ACC 089 8-Dec-24 ACC
XI/2024

015
426 PEP-RJA-WM-JBI-TRL-001 27 OF 41 0 AFC 4+820 4+840 SMAW E6010 + E7010 PIPE PIPE 422 API 5L SCH.40 54349510 021-0751 API 5L SCH.40 54349510 021-0750 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 25/11/24 ACC 25/11/24 W-01 ACC 089 8-Dec-24 ACC
XI/2024

015
427 PEP-RJA-WM-JBI-TRL-001 27 OF 41 0 AFC 4+840 4+860 SMAW E6010 + E7010 PIPE PIPE 423 API 5L SCH.40 54349510 021-0750 API 5L SCH.40 54349510 021-0747 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 25/11/24 ACC 25/11/24 W-01 ACC 089 8-Dec-24 ACC
XI/2024

015
428 PEP-RJA-WM-JBI-TRL-001 27 OF 41 0 AFC 4+840 4+860 SMAW E6010 + E7010 PIPE PIPE 424 API 5L SCH.40 54349510 021-0747 API 5L SCH.40 54349510 021-0746 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 25/11/24 ACC 25/11/24 W-01 ACC 090 8-Dec-24 ACC
XI/2024

015
429 PEP-RJA-WM-JBI-TRL-001 27 OF 41 0 AFC 4+860 4+880 SMAW E6010 + E7010 PIPE PIPE 425 API 5L SCH.40 54349510 021-0746 API 5L SCH.40 54349510 021-0749 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 25/11/24 ACC 25/11/24 W-01 ACC 090 8-Dec-24 ACC
XI/2024

015
430 PEP-RJA-WM-JBI-TRL-001 27 OF 41 0 AFC 4+860 4+880 SMAW E6010 + E7010 PIPE PIPE 426 API 5L SCH.40 54349510 021-0749 API 5L SCH.40 54349510 021-0748 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 25/11/24 ACC 25/11/24 W-01 ACC 090 8-Dec-24 ACC
XI/2024

015
431 PEP-RJA-WM-JBI-TRL-001 27 OF 41 0 AFC 4+880 4+900 SMAW E6010 + E7010 PIPE PIPE 427 API 5L SCH.40 54349510 021-0748 API 5L SCH.40 54349510 021-0743 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 25/11/24 ACC 25/11/24 W-01 ACC 090 8-Dec-24 ACC
XI/2024

016
432 PEP-RJA-WM-JBI-TRL-001 27 OF 41 0 AFC 4+900 4+920 SMAW E6010 + E7010 PIPE PIPE 428 API 5L SCH.40 54349510 021-0743 API 5L SCH.40 54349510 016-0567 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 26/11/24 ACC 26/11/24 W-01 ACC 091 8-Dec-24 ACC
XI/2024

016
433 PEP-RJA-WM-JBI-TRL-001 27 OF 41 0 AFC 4+900 4+920 SMAW E6010 + E7010 PIPE PIPE 429 API 5L SCH.40 54349510 016-0567 API 5L SCH.40 54349510 016-0568 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 26/11/24 ACC 26/11/24 W-01 ACC 091 8-Dec-24 ACC
XI/2024

016
434 PEP-RJA-WM-JBI-TRL-001 27 OF 41 0 AFC 4+920 4+940 SMAW E6010 + E7010 PIPE PIPE 430 API 5L SCH.40 54349510 016-0568 API 5L SCH.40 54349510 016-0569 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 26/11/24 ACC 26/11/24 W-01 ACC 091 8-Dec-24 ACC
XI/2024

016
435 PEP-RJA-WM-JBI-TRL-001 27 OF 41 0 AFC 4+940 4+960 SMAW E6010 + E7010 PIPE PIPE 431 API 5L SCH.40 54349510 016-0569 API 5L SCH.40 54349510 016-0566 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 26/11/24 ACC 26/11/24 W-01 ACC 091 8-Dec-24 ACC
XI/2024

016
436 PEP-RJA-WM-JBI-TRL-001 27 OF 41 0 AFC 4+940 4+960 SMAW E6010 + E7010 PIPE PIPE 432 API 5L SCH.40 54349510 016-0566 API 5L SCH.40 54349510 016-0565 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 26/11/24 ACC 26/11/24 W-01 ACC 092 9-Dec-24 ACC
XI/2024

016
437 PEP-RJA-WM-JBI-TRL-001 27 OF 41 0 AFC 4+960 4+980 SMAW E6010 + E7010 PIPE PIPE 433 API 5L SCH.40 54349510 016-0565 API 5L SCH.40 54349510 016-0562 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 26/11/24 ACC 26/11/24 W-01 ACC 092 9-Dec-24 ACC
XI/2024

016
438 PEP-RJA-WM-JBI-TRL-001 27 OF 41 0 AFC 4+960 4+980 SMAW E6010 + E7010 PIPE PIPE 434 API 5L SCH.40 54349510 016-0562 API 5L SCH.40 54349510 016-0564 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 26/11/24 ACC 26/11/24 W-01 ACC 092 9-Dec-24 ACC
XI/2024

016
439 PEP-RJA-WM-JBI-TRL-001 27 OF 41 0 AFC 4+980 5+0 SMAW E6010 + E7010 PIPE PIPE 435 API 5L SCH.40 54349510 016-0564 API 5L SCH.40 54349510 016-0561 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 26/11/24 ACC 26/11/24 W-01 ACC 092 9-Dec-24 ACC
XI/2024

016
440 PEP-RJA-WM-JBI-TRL-001 27 OF 41 0 AFC 4+980 5+0 SMAW E6010 + E7010 PIPE PIPE 436 API 5L SCH.40 54349510 016-0561 API 5L SCH.40 54349510 018-0632 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 26/11/24 ACC 26/11/24 W-01 ACC 093 9-Dec-24 ACC
XI/2024

016
441 PEP-RJA-WM-JBI-TRL-001 27 OF 41 0 AFC 5+0 5+020 SMAW E6010 + E7010 PIPE PIPE 437 API 5L SCH.40 54349510 018-0632 API 5L SCH.40 54349510 015-0534 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 26/11/24 ACC 26/11/24 W-01 ACC 093 9-Dec-24 ACC
XI/2024

016
442 PEP-RJA-WM-JBI-TRL-001 28 OF 41 0 AFC 5+020 5+040 SMAW E6010 + E7010 PIPE PIPE 438 API 5L SCH.40 54349510 015-0534 API 5L SCH.40 54349510 015-0535 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 26/11/24 ACC 26/11/24 W-01 ACC 093 9-Dec-24 ACC
XI/2024

017
443 PEP-RJA-WM-JBI-TRL-001 28 OF 41 0 AFC 5+020 5+040 SMAW E6010 + E7010 PIPE PIPE 439 API 5L SCH.40 54349510 015-0535 API 5L SCH.40 54349510 016-0563 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 27/11/24 ACC 27/11/24 W-01 ACC 093 9-Dec-24 REP
XI/2024

017
444 PEP-RJA-WM-JBI-TRL-001 28 OF 41 0 AFC 5+040 5+060 SMAW E6010 + E7010 PIPE PIPE 440 API 5L SCH.40 54349510 016-0563 API 5L SCH.40 54349510 016-0560 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 27/11/24 ACC 27/11/24 W-01 ACC 094 9-Dec-24 ACC
XI/2024

017
445 PEP-RJA-WM-JBI-TRL-001 28 OF 41 0 AFC 5+060 5+080 SMAW E6010 + E7010 PIPE PIPE 441 API 5L SCH.40 54349510 016-0560 API 5L SCH.40 54349510 015-0532 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 27/11/24 ACC 27/11/24 W-01 ACC 094 9-Dec-24 ACC
XI/2024

017
446 PEP-RJA-WM-JBI-TRL-001 28 OF 41 0 AFC 5+060 5+080 SMAW E6010 + E7010 PIPE PIPE 442 API 5L SCH.40 54349510 015-0532 API 5L SCH.40 54349510 015-0531 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 27/11/24 ACC 27/11/24 W-01 ACC 094 9-Dec-24 ACC
XI/2024

017
447 PEP-RJA-WM-JBI-TRL-001 28 OF 41 0 AFC 5+080 5+100 SMAW E6010 + E7010 PIPE PIPE 443 API 5L SCH.40 54349510 015-0531 API 5L SCH.40 54349510 015-0530 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 27/11/24 ACC 27/11/24 W-01 ACC 094 9-Dec-24 ACC
XI/2024

017
448 PEP-RJA-WM-JBI-TRL-001 28 OF 41 0 AFC 5+100 5+120 SMAW E6010 + E7010 PIPE PIPE 444 API 5L SCH.40 54349510 015-0530 API 5L SCH.40 54349510 015-0528 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 27/11/24 ACC 27/11/24 W-01 ACC 095 9-Dec-24 ACC
XI/2024
Document No. 001/RJA.QA.QC/TRL/SG/XI/2024 WELDING VISUAL RADIOGRAPHY WRAPPING HOLIDAY TEST
PT. RAMAI JAYA ABADI
MONITORING PROGRESS WELDING Revision No. 0 WELDING
REP ACC ACC REP RSC DONE ACC REP ACC REPAIR
DONE
PENGGANTIAN TRUNKLINE 4 IN SEPANJANG 7.6 KM GS1 - GS2 DI FIELD JAMBI Page OF

PT. PERTAMINA EP ZONA 1 FIELD JAMBI Issue Date


528 0 644 523 34 5 0 0
CONTRACT NO 4710000889

CONNECTION MATERIAL 1 MATERIAL 2 FIT-UP INSP. VISUAL INSP. RADIOGRAPHY FIELD JOINT COATING HOLIDAYTEST LOWERING & BACKFILING

DRAWING
NO DRAWING NO SHEET OF REV. STA PROCESS WELDING ELECTRODE JOINT NO. J. TYPE SW/FW DIA-INCH THK(mm) REPORT NO. REMARKS
STATUS
REPORT
MATERIAL TO MATERIAL MATERIAL HEA .NO. PIPE NO. MATERIAL HEA .NO. PIPE NO. DATE ACC REP WELDING DATE WELDER STAMP ACC REP REPORT NO. DATE ACC REJ RSC REPORT NO. DATE ACC REP DATE ACC REP LOWERING BACKFILLING
NO.

017
449 PEP-RJA-WM-JBI-TRL-001 28 OF 41 0 AFC 5+100 5+120 SMAW E6010 + E7010 PIPE PIPE 445 API 5L SCH.40 54349510 015-0528 API 5L SCH.40 54349510 015-0527 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 27/11/24 ACC 27/11/24 W-01 ACC 095 9-Dec-24 ACC
XI/2024

017
450 PEP-RJA-WM-JBI-TRL-001 28 OF 41 0 AFC 5+100 5+120 SMAW E6010 + E7010 PIPE PIPE 446 API 5L SCH.40 54349510 015-0527 API 5L SCH.40 54349510 015-0536 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 27/11/24 ACC 27/11/24 W-01 ACC 095 9-Dec-24 ACC
XI/2024

017
451 PEP-RJA-WM-JBI-TRL-001 28 OF 41 0 AFC 5+120 5+140 SMAW E6010 + E7010 PIPE PIPE 447 API 5L SCH.40 54349510 015-0536 API 5L SCH.40 54349510 015-0533 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 27/11/24 ACC 27/11/24 W-01 ACC 095 9-Dec-24 ACC
XI/2024

452 PEP-RJA-WM-JBI-TRL-001 28 OF 41 0 AFC SMAW E6010 + E7010 448 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

015
453 PEP-RJA-WM-JBI-TRL-001 28 OF 41 0 AFC 5+140 5+160 SMAW E6010 + E7010 PIPE PIPE 449 API 5L SCH.40 54349510 015-0529 API 5L SCH.40 54349510 018-0631 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 25/11/24 ACC 25/11/24 W-02 ACC 096 9-Dec-24 ACC
XI/2024

015
454 PEP-RJA-WM-JBI-TRL-001 28 OF 41 0 AFC 5+160 5+180 SMAW E6010 + E7010 PIPE PIPE 450 API 5L SCH.40 54349510 018-0631 API 5L SCH.40 54349510 018-0634 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 25/11/24 ACC 25/11/24 W-02 ACC 096 9-Dec-24 ACC
XI/2024

015
455 PEP-RJA-WM-JBI-TRL-001 28 OF 41 0 AFC 5+180 5+200 SMAW E6010 + E7010 PIPE PIPE 451 API 5L SCH.40 54349510 018-0634 API 5L SCH.40 54349510 018-0627 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 25/11/24 ACC 25/11/24 W-02 ACC 096 9-Dec-24 ACC
XI/2024

015
456 PEP-RJA-WM-JBI-TRL-001 28 OF 41 0 AFC 5+180 5+200 SMAW E6010 + E7010 PIPE PIPE 452 API 5L SCH.40 54349510 018-0627 API 5L SCH.40 54349510 018-0633 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 25/11/24 ACC 25/11/24 W-02 ACC 096 9-Dec-24 ACC
XI/2024

015
457 PEP-RJA-WM-JBI-TRL-001 28 OF 41 0 AFC 5+200 5+220 SMAW E6010 + E7010 PIPE PIPE 453 API 5L SCH.40 54349510 018-0633 API 5L SCH.40 54349510 017-0626 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 25/11/24 ACC 25/11/24 W-02 ACC 097 9-Dec-24 ACC
XI/2024

015
458 PEP-RJA-WM-JBI-TRL-001 29 OF 41 0 AFC 5+200 5+220 SMAW E6010 + E7010 PIPE PIPE 454 API 5L SCH.40 54349510 017-0626 API 5L SCH.40 54349510 017-0625 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 25/11/24 ACC 25/11/24 W-02 ACC 097 9-Dec-24 ACC
XI/2024

016
459 PEP-RJA-WM-JBI-TRL-001 29 OF 41 0 AFC 5+220 5+240 SMAW E6010 + E7010 PIPE PIPE 455 API 5L SCH.40 54349510 017-0625 API 5L SCH.40 54349510 018-0635 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 26/11/24 ACC 26/11/24 W-02 ACC 097 9-Dec-24 ACC
XI/2024

016
460 PEP-RJA-WM-JBI-TRL-001 29 OF 41 0 AFC 5+220 5+240 SMAW E6010 + E7010 PIPE PIPE 456 API 5L SCH.40 54349510 018-0635 API 5L SCH.40 54349510 017-0624 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 26/11/24 ACC 26/11/24 W-02 ACC 097 9-Dec-24 ACC
XI/2024

016
461 PEP-RJA-WM-JBI-TRL-001 29 OF 41 0 AFC 5+220 5+240 SMAW E6010 + E7010 PIPE PIPE 457 API 5L SCH.40 54349510 017-0624 API 5L SCH.40 54349510 017-0623 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 26/11/24 ACC 26/11/24 W-02 ACC 098 9-Dec-24 ACC
XI/2024

016
462 PEP-RJA-WM-JBI-TRL-001 29 OF 41 0 AFC 5+260 5+280 SMAW E6010 + E7010 PIPE PIPE 458 API 5L SCH.40 54349510 017-0623 API 5L SCH.40 54349509 007-0233 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 26/11/24 ACC 26/11/24 W-02 ACC 098 9-Dec-24 REP
XI/2024

016
463 PEP-RJA-WM-JBI-TRL-001 29 OF 41 0 AFC 5+260 5+280 SMAW E6010 + E7010 PIPE PIPE 459 API 5L SCH.40 54349509 007-0233 API 5L SCH.40 54349509 008-0265 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 26/11/24 ACC 26/11/24 W-02 ACC 098 9-Dec-24 ACC
XI/2024

016
464 PEP-RJA-WM-JBI-TRL-001 29 OF 41 0 AFC 5+280 5+300 SMAW E6010 + E7010 PIPE PIPE 460 API 5L SCH.40 54349509 008-0265 API 5L SCH.40 54349509 008-0273 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 26/11/24 ACC 26/11/24 W-02 ACC 098 9-Dec-24 REP
XI/2024

016
465 PEP-RJA-WM-JBI-TRL-001 29 OF 41 0 AFC 5+300 5+320 SMAW E6010 + E7010 PIPE PIPE 461 API 5L SCH.40 54349509 008-0273 API 5L SCH.40 54349509 008-0272 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 26/11/24 ACC 26/11/24 W-02 ACC 099 9-Dec-24 REP
XI/2024

016
466 PEP-RJA-WM-JBI-TRL-001 29 OF 41 0 AFC 5+300 5+320 SMAW E6010 + E7010 PIPE PIPE 462 API 5L SCH.40 54349509 008-0272 API 5L SCH.40 54349509 008-0274 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 26/11/24 ACC 26/11/24 W-02 ACC 099 9-Dec-24 REP
XI/2024

016
467 PEP-RJA-WM-JBI-TRL-001 29 OF 41 0 AFC 5+320 5+340 SMAW E6010 + E7010 PIPE PIPE 463 API 5L SCH.40 54349509 008-0274 API 5L SCH.40 54349509 007-0232 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 26/11/24 ACC 26/11/24 W-02 ACC 099 9-Dec-24 ACC
XI/2024

017
468 PEP-RJA-WM-JBI-TRL-001 29 OF 41 0 AFC 5+320 5+340 SMAW E6010 + E7010 PIPE PIPE 464 API 5L SCH.40 54349509 007-0232 API 5L SCH.40 54349509 007-0233 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 27/11/24 ACC 27/11/24 W-02 ACC 099 9-Dec-24 REP
XI/2024

017
469 PEP-RJA-WM-JBI-TRL-001 29 OF 41 0 AFC 5+340 5+360 SMAW E6010 + E7010 PIPE PIPE 465 API 5L SCH.40 54349509 007-0233 API 5L SCH.40 54349509 007-0240 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 27/11/24 ACC 27/11/24 W-02 ACC 100 9-Dec-24 ACC
XI/2024

017
470 PEP-RJA-WM-JBI-TRL-001 29 OF 41 0 AFC 5+340 5+360 SMAW E6010 + E7010 PIPE PIPE 466 API 5L SCH.40 54349509 007-0240 API 5L SCH.40 54349509 007-0236 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 27/11/24 ACC 27/11/24 W-02 ACC 100 9-Dec-24 REP
XI/2024

017
471 PEP-RJA-WM-JBI-TRL-001 29 OF 41 0 AFC 5+360 5+380 SMAW E6010 + E7010 PIPE PIPE 467 API 5L SCH.40 54349509 007-0236 API 5L SCH.40 54349509 007-0241 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 27/11/24 ACC 27/11/24 W-02 ACC 100 9-Dec-24 ACC
XI/2024

017
472 PEP-RJA-WM-JBI-TRL-001 29 OF 41 0 AFC 5+380 5+400 SMAW E6010 + E7010 PIPE PIPE 468 API 5L SCH.40 54349509 007-0241 API 5L SCH.40 54349509 007-0234 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 27/11/24 ACC 27/11/24 W-02 ACC 100 9-Dec-24 REP
XI/2024

017
473 PEP-RJA-WM-JBI-TRL-001 29 OF 41 0 AFC 5+380 5+400 SMAW E6010 + E7010 PIPE PIPE 469 API 5L SCH.40 54349509 007-0234 API 5L SCH.40 54349509 007-0238 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 27/11/24 ACC 27/11/24 W-02 ACC 101 9-Dec-24 ACC
XI/2024

017
474 PEP-RJA-WM-JBI-TRL-001 30 OF 41 0 AFC 5+400 5+420 SMAW E6010 + E7010 PIPE PIPE 470 API 5L SCH.40 54349509 007-0238 API 5L SCH.40 54349509 007-0237 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 27/11/24 ACC 27/11/24 W-02 ACC 102 10-Dec-24 ACC
XI/2024

018
475 PEP-RJA-WM-JBI-TRL-001 30 OF 41 0 AFC 5+420 5+440 SMAW E6010 + E7010 PIPE PIPE 471 API 5L SCH.40 54349509 007-0237 API 5L SCH.40 54349509 007-0235 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 28/11/24 ACC 28/11/24 W-02 ACC 102 10-Dec-24 REP
XI/2024

476 PEP-RJA-WM-JBI-TRL-001 30 OF 41 0 AFC SMAW E6010 + E7010 472 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC 102 10-Dec-24 ACC

015
477 PEP-RJA-WM-JBI-TRL-001 30 OF 41 0 AFC 5+440 5+460 SMAW E6010 + E7010 PIPE PIPE 473 API 5L SCH.40 54349510 019-0699 API 5L SCH.40 54349510 019-0700 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 25/11/24 ACC 25/11/24 W-03 ACC 102 10-Dec-24 ACC
XI/2024

015
478 PEP-RJA-WM-JBI-TRL-001 30 OF 41 0 AFC 5+440 5+460 SMAW E6010 + E7010 PIPE PIPE 474 API 5L SCH.40 54349510 019-0700 API 5L SCH.40 54349510 019-0707 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 25/11/24 ACC 25/11/24 W-03 ACC
XI/2024

015
479 PEP-RJA-WM-JBI-TRL-001 30 OF 41 0 AFC 5+460 5+480 SMAW E6010 + E7010 PIPE PIPE 475 API 5L SCH.40 54349510 020-0707 API 5L SCH.40 54349510 020-0706 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 25/11/24 ACC 25/11/24 W-03 ACC 103 10-Dec-24 ACC
XI/2024

016
480 PEP-RJA-WM-JBI-TRL-001 30 OF 41 0 AFC 5+460 5+480 SMAW E6010 + E7010 PIPE PIPE 476 API 5L SCH.40 54349510 020-0706 API 5L SCH.40 54349510 020-0705 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 26/11/24 ACC 26/11/24 W-03 ACC 103 10-Dec-24 REP
XI/2024

016
481 PEP-RJA-WM-JBI-TRL-001 30 OF 41 0 AFC 5+480 5+500 SMAW E6010 + E7010 PIPE PIPE 477 API 5L SCH.40 54349510 020-0705 API 5L SCH.40 54349510 020-0711 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 26/11/24 ACC 26/11/24 W-03 ACC 103 10-Dec-24 ACC
XI/2024

016
482 PEP-RJA-WM-JBI-TRL-001 30 OF 41 0 AFC 5+500 5+520 SMAW E6010 + E7010 PIPE PIPE 478 API 5L SCH.40 54349510 020-0711 API 5L SCH.40 54349510 019-0701 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 26/11/24 ACC 26/11/24 W-03 ACC 103 10-Dec-24 ACC
XI/2024

016
483 PEP-RJA-WM-JBI-TRL-001 30 OF 41 0 AFC 5+500 5+520 SMAW E6010 + E7010 PIPE PIPE 479 API 5L SCH.40 54349510 019-0701 API 5L SCH.40 54349510 020-0708 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 26/11/24 ACC 26/11/24 W-03 ACC 104 10-Dec-24 REP
XI/2024

016
484 PEP-RJA-WM-JBI-TRL-001 30 OF 41 0 AFC 5+520 5+540 SMAW E6010 + E7010 PIPE PIPE 480 API 5L SCH.40 54349510 020-0708 API 5L SCH.40 54349510 020-0710 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 26/11/24 ACC 26/11/24 W-03 ACC 104 10-Dec-24 ACC
XI/2024

016
485 PEP-RJA-WM-JBI-TRL-001 30 OF 41 0 AFC 5+540 5+560 SMAW E6010 + E7010 PIPE PIPE 481 API 5L SCH.40 54349510 020-0710 API 5L SCH.40 54349510 020-0709 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 26/11/24 ACC 26/11/24 W-03 ACC 104 10-Dec-24 ACC
XI/2024

016
486 PEP-RJA-WM-JBI-TRL-001 30 OF 41 0 AFC 5+540 5+560 SMAW E6010 + E7010 PIPE PIPE 482 API 5L SCH.40 54349510 020-0709 API 5L SCH.40 54349509 008-0276 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 26/11/24 ACC 26/11/24 W-03 ACC 104 10-Dec-24 ACC
XI/2024

016
487 PEP-RJA-WM-JBI-TRL-001 30 OF 41 0 AFC 5+560 5+580 SMAW E6010 + E7010 PIPE PIPE 483 API 5L SCH.40 54349509 008-0276 API 5L SCH.40 54349509 008-0271 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 26/11/24 ACC 26/11/24 W-03 ACC
XI/2024

016
488 PEP-RJA-WM-JBI-TRL-001 30 OF 41 0 AFC 5+560 5+580 SMAW E6010 + E7010 PIPE PIPE 484 API 5L SCH.40 54349509 008-0271 API 5L SCH.40 54349509 008-0266 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 26/11/24 ACC 26/11/24 W-03 ACC
XI/2024

016
489 PEP-RJA-WM-JBI-TRL-001 30 OF 41 0 AFC 5+580 5+600 SMAW E6010 + E7010 PIPE PIPE 485 API 5L SCH.40 54349509 008-0266 API 5L SCH.40 54349509 008-0268 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 26/11/24 ACC 26/11/24 W-03 ACC
XI/2024

016
490 PEP-RJA-WM-JBI-TRL-001 31 OF 41 0 AFC 5+580 5+600 SMAW E6010 + E7010 PIPE PIPE 486 API 5L SCH.40 54349509 008-0268 API 5L SCH.40 54349509 008-0269 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 26/11/24 ACC 26/11/24 W-03 ACC
XI/2024

016
491 PEP-RJA-WM-JBI-TRL-001 31 OF 41 0 AFC 5+600 5+620 SMAW E6010 + E7010 PIPE PIPE 487 API 5L SCH.40 54349509 008-0269 API 5L SCH.40 54349509 008-0270 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 26/11/24 ACC 26/11/24 W-03 ACC 105 10-Dec-24 ACC
XI/2024

017
492 PEP-RJA-WM-JBI-TRL-001 31 OF 41 0 AFC 5+620 5+640 SMAW E6010 + E7010 PIPE PIPE 488 API 5L SCH.40 54349509 008-0270 API 5L SCH.40 54349509 008-0262 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 27/11/24 ACC 27/11/24 W-03 ACC 105 10-Dec-24 REP
XI/2024

017
493 PEP-RJA-WM-JBI-TRL-001 31 OF 41 0 AFC 5+620 5+640 SMAW E6010 + E7010 PIPE PIPE 489 API 5L SCH.40 54349509 008-0262 API 5L SCH.40 54349509 007-0258 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 27/11/24 ACC 27/11/24 W-03 ACC 110 11-Dec-24 ACC
XI/2024

017
494 PEP-RJA-WM-JBI-TRL-001 31 OF 41 0 AFC 5+640 5+660 SMAW E6010 + E7010 PIPE PIPE 490 API 5L SCH.40 54349509 007-0258 API 5L SCH.40 54349509 007-0252 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 27/11/24 ACC 27/11/24 W-03 ACC 105 10-Dec-24 ACC
XI/2024

017
495 PEP-RJA-WM-JBI-TRL-001 31 OF 41 0 AFC 5+660 5+680 SMAW E6010 + E7010 PIPE PIPE 491 API 5L SCH.40 54349509 007-0252 API 5L SCH.40 54349509 007-0257 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 27/11/24 ACC 27/11/24 W-03 ACC 105 10-Dec-24 ACC
XI/2024

017
496 PEP-RJA-WM-JBI-TRL-001 31 OF 41 0 AFC 5+680 5+700 SMAW E6010 + E7010 PIPE PIPE 492 API 5L SCH.40 54349509 007-0257 API 5L SCH.40 54349509 007-0253 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 27/11/24 ACC 27/11/24 W-03 ACC 106 10-Dec-24 ACC
XI/2024

017
497 PEP-RJA-WM-JBI-TRL-001 31 OF 41 0 AFC 5+680 5+700 SMAW E6010 + E7010 PIPE PIPE 493 API 5L SCH.40 54349509 007-0253 API 5L SCH.40 54349509 008-0263 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 27/11/24 ACC 27/11/24 W-03 ACC 106 10-Dec-24 ACC
XI/2024

017
498 PEP-RJA-WM-JBI-TRL-001 31 OF 41 0 AFC 5+680 5+700 SMAW E6010 + E7010 PIPE PIPE 494 API 5L SCH.40 54349509 008-0263 API 5L SCH.40 54349509 007-0254 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 27/11/24 ACC 27/11/24 W-03 ACC 106 10-Dec-24 ACC
XI/2024

017
499 PEP-RJA-WM-JBI-TRL-001 31 OF 41 0 AFC 5+700 5+720 SMAW E6010 + E7010 PIPE PIPE 495 API 5L SCH.40 54349509 007-0254 API 5L SCH.40 54349509 007-0236 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 27/11/24 ACC 27/11/24 W-03 ACC 106 10-Dec-24 ACC
XI/2024

017
500 PEP-RJA-WM-JBI-TRL-001 31 OF 41 0 AFC 5+700 5+720 SMAW E6010 + E7010 PIPE PIPE 496 API 5L SCH.40 54349509 007-0236 API 5L SCH.40 54349509 007-0255 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 27/11/24 ACC 27/11/24 W-03 ACC 107 10-Dec-24 ACC
XI/2024

017
501 PEP-RJA-WM-JBI-TRL-001 31 OF 41 0 AFC 5+720 5+740 SMAW E6010 + E7010 PIPE PIPE 497 API 5L SCH.40 54349509 007-0255 API 5L SCH.40 54349509 008-0264 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 27/11/24 ACC 27/11/24 W-03 ACC 107 10-Dec-24 ACC
XI/2024

018
502 PEP-RJA-WM-JBI-TRL-001 31 OF 41 0 AFC 5+740 5+760 SMAW E6010 + E7010 PIPE PIPE 498 API 5L SCH.40 54349509 008-0264 API 5L SCH.40 54349509 012-0422 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 28/11/24 ACC 28/11/24 W-03 ACC 107 10-Dec-24 ACC
XI/2024

018
503 PEP-RJA-WM-JBI-TRL-001 31 OF 41 0 AFC 5+740 5+760 SMAW E6010 + E7010 PIPE PIPE 499 API 5L SCH.40 54349509 012-0422 API 5L SCH.40 54349509 012-0419 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 28/11/24 ACC 28/11/24 W-03 ACC 107 10-Dec-24 REP
XI/2024

018
504 PEP-RJA-WM-JBI-TRL-001 31 OF 41 0 AFC 5+760 5+780 SMAW E6010 + E7010 PIPE PIPE 500 API 5L SCH.40 54349509 012-0419 API 5L SCH.40 54349509 012-0418 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 28/11/24 ACC 28/11/24 W-03 ACC 108 10-Dec-24 ACC
XI/2024

018
505 PEP-RJA-WM-JBI-TRL-001 31 OF 41 0 AFC 5+780 5+800 SMAW E6010 + E7010 PIPE PIPE 501 API 5L SCH.40 54349509 012-0418 API 5L SCH.40 54349509 012-0421 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 28/11/24 ACC 28/11/24 W-03 ACC
XI/2024

018
506 PEP-RJA-WM-JBI-TRL-001 32 OF 41 0 AFC 5+780 5+800 SMAW E6010 + E7010 PIPE PIPE 502 API 5L SCH.40 54349509 012-0421 API 5L SCH.40 54349509 012-0420 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 28/11/24 ACC 28/11/24 W-03 ACC 108 10-Dec-24 ACC
XI/2024

507 PEP-RJA-WM-JBI-TRL-001 32 OF 41 0 AFC SMAW E6010 + E7010 503 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC 108 10-Dec-24 ACC

018
508 PEP-RJA-WM-JBI-TRL-001 32 OF 41 0 AFC 5+800 5+820 SMAW E6010 + E7010 PIPE PIPE 504 API 5L SCH.40 54349509 012-0426 API 5L SCH.40 54349509 012-0424 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 28/11/24 ACC 28/11/24 W-01 ACC 110 11-Dec-24 ACC
XI/2024

018
509 PEP-RJA-WM-JBI-TRL-001 32 OF 41 0 AFC 5+820 5+840 SMAW E6010 + E7010 PIPE PIPE 505 API 5L SCH.40 54349509 012-0424 API 5L SCH.40 54349509 012-0423 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 28/11/24 ACC 28/11/24 W-01 ACC 108 10-Dec-24 ACC
XI/2024

018
510 PEP-RJA-WM-JBI-TRL-001 32 OF 41 0 AFC 5+820 5+840 SMAW E6010 + E7010 PIPE PIPE 506 API 5L SCH.40 54349509 012-0423 API 5L SCH.40 54349509 012-0427 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 28/11/24 ACC 28/11/24 W-01 ACC 109 10-Dec-24 ACC
XI/2024

511 PEP-RJA-WM-JBI-TRL-001 32 OF 41 0 AFC SMAW E6010 + E7010 507 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

018
512 PEP-RJA-WM-JBI-TRL-001 32 OF 41 0 AFC 5+860 5+880 SMAW E6010 + E7010 PIPE PIPE 508 API 5L SCH.40 54349509 012-0425 API 5L SCH.40 54349509 004-0120 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 28/11/24 ACC 28/11/24 W-01 ACC 110 11-Dec-24 ACC
XI/2024

018
513 PEP-RJA-WM-JBI-TRL-001 32 OF 41 0 AFC 5+860 5+880 SMAW E6010 + E7010 PIPE PIPE 509 API 5L SCH.40 54349509 004-0120 API 5L SCH.40 54349509 004-0115 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 28/11/24 ACC 28/11/24 W-01 ACC
XI/2024

018
514 PEP-RJA-WM-JBI-TRL-001 32 OF 41 0 AFC 5+880 5+900 SMAW E6010 + E7010 PIPE PIPE 510 API 5L SCH.40 54349509 004-0115 API 5L SCH.40 54349509 004-0106 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 28/11/24 ACC 28/11/24 W-01 ACC
XI/2024

515 PEP-RJA-WM-JBI-TRL-001 32 OF 41 0 AFC SMAW E6010 + E7010 511 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

018
516 PEP-RJA-WM-JBI-TRL-001 32 OF 41 0 AFC 5+900 5+920 SMAW E6010 + E7010 PIPE PIPE 512 API 5L SCH.40 54349509 004-0116 API 5L SCH.40 54349509 003-0108 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 28/11/24 ACC 28/11/24 W-01 ACC 111 11-Dec-24 ACC
XI/2024

517 PEP-RJA-WM-JBI-TRL-001 32 OF 41 0 AFC SMAW E6010 + E7010 513 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

518 PEP-RJA-WM-JBI-TRL-001 32 OF 41 0 AFC SMAW E6010 + E7010 514 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

018
519 PEP-RJA-WM-JBI-TRL-001 32 OF 41 0 AFC 5+940 5+960 SMAW E6010 + E7010 PIPE PIPE 515 API 5L SCH.40 54349509 004-0119 API 5L SCH.40 54349509 004-0117 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 28/11/24 ACC 28/11/24 W-01 ACC 111 11-Dec-24 ACC
XI/2024

520 PEP-RJA-WM-JBI-TRL-001 32 OF 41 0 AFC SMAW E6010 + E7010 516 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

018
521 PEP-RJA-WM-JBI-TRL-001 32 OF 41 0 AFC 5+960 5+980 SMAW E6010 + E7010 PIPE PIPE 517 API 5L SCH.40 54349509 004-0114 API 5L SCH.40 54349509 004-0118 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 28/11/24 ACC 28/11/24 W-01 ACC 112 11-Dec-24 ACC
XI/2024

018
522 PEP-RJA-WM-JBI-TRL-001 33 OF 41 0 AFC 5+980 6+0 SMAW E6010 + E7010 PIPE PIPE 518 API 5L SCH.40 54349509 004-0118 API 5L SCH.40 54349509 004-0111 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 28/11/24 ACC 28/11/24 W-01 ACC 112 11-Dec-24 ACC
XI/2024
Document No. 001/RJA.QA.QC/TRL/SG/XI/2024 WELDING VISUAL RADIOGRAPHY WRAPPING HOLIDAY TEST
PT. RAMAI JAYA ABADI
MONITORING PROGRESS WELDING Revision No. 0 WELDING
REP ACC ACC REP RSC DONE ACC REP ACC REPAIR
DONE
PENGGANTIAN TRUNKLINE 4 IN SEPANJANG 7.6 KM GS1 - GS2 DI FIELD JAMBI Page OF

PT. PERTAMINA EP ZONA 1 FIELD JAMBI Issue Date


528 0 644 523 34 5 0 0
CONTRACT NO 4710000889

CONNECTION MATERIAL 1 MATERIAL 2 FIT-UP INSP. VISUAL INSP. RADIOGRAPHY FIELD JOINT COATING HOLIDAYTEST LOWERING & BACKFILING

DRAWING
NO DRAWING NO SHEET OF REV. STA PROCESS WELDING ELECTRODE JOINT NO. J. TYPE SW/FW DIA-INCH THK(mm) REPORT NO. REMARKS
STATUS
REPORT
MATERIAL TO MATERIAL MATERIAL HEA .NO. PIPE NO. MATERIAL HEA .NO. PIPE NO. DATE ACC REP WELDING DATE WELDER STAMP ACC REP REPORT NO. DATE ACC REJ RSC REPORT NO. DATE ACC REP DATE ACC REP LOWERING BACKFILLING
NO.

523 PEP-RJA-WM-JBI-TRL-001 33 OF 41 0 AFC SMAW E6010 + E7010 519 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

018
524 PEP-RJA-WM-JBI-TRL-001 33 OF 41 0 AFC 6+0 6+020 SMAW E6010 + E7010 PIPE PIPE 520 API 5L SCH.40 54349510 013-0451 API 5L SCH.40 54349509 012-0443 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 28/11/24 ACC 28/11/24 W-02 ACC 112 11-Dec-24 ACC
XI/2024

018
525 PEP-RJA-WM-JBI-TRL-001 33 OF 41 0 AFC 6+020 6+040 SMAW E6010 + E7010 PIPE PIPE 521 API 5L SCH.40 54349509 012-0443 API 5L SCH.40 54349509 012-0441 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 28/11/24 ACC 28/11/24 W-02 ACC 112 11-Dec-24 ACC
XI/2024

018
526 PEP-RJA-WM-JBI-TRL-001 33 OF 41 0 AFC 6+020 6+040 SMAW E6010 + E7010 PIPE PIPE 522 API 5L SCH.40 54349509 012-0441 API 5L SCH.40 54349510 013-0446 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 28/11/24 ACC 28/11/24 W-02 ACC 113 11-Dec-24 REP
XI/2024

018
527 PEP-RJA-WM-JBI-TRL-001 33 OF 41 0 AFC 6+040 6+060 SMAW E6010 + E7010 PIPE PIPE 523 API 5L SCH.40 54349510 013-0446 API 5L SCH.40 54349510 013-0450 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 28/11/24 ACC 28/11/24 W-02 ACC 113 11-Dec-24 REP
XI/2024

528 PEP-RJA-WM-JBI-TRL-001 33 OF 41 0 AFC SMAW E6010 + E7010 524 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

018
529 PEP-RJA-WM-JBI-TRL-001 33 OF 41 0 AFC 6+060 6+080 SMAW E6010 + E7010 PIPE PIPE 525 API 5L SCH.40 54349510 013-0447 API 5L SCH.40 54349509 012-0440 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 28/11/24 ACC 28/11/24 W-03 ACC 113 11-Dec-24 ACC
XI/2024

018
530 PEP-RJA-WM-JBI-TRL-001 33 OF 41 0 AFC 6+060 6+080 SMAW E6010 + E7010 PIPE PIPE 526 API 5L SCH.40 54349509 012-0440 API 5L SCH.40 54349510 013-0448 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 28/11/24 ACC 28/11/24 W-03 ACC 113 11-Dec-24 ACC
XI/2024

018
531 PEP-RJA-WM-JBI-TRL-001 33 OF 41 0 AFC 6+080 6+100 SMAW E6010 + E7010 PIPE PIPE 527 API 5L SCH.40 54349510 013-0448 API 5L SCH.40 54349509 009-0304 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 28/11/24 ACC 28/11/24 W-03 ACC 114 11-Dec-24 ACC
XI/2024

018
532 PEP-RJA-WM-JBI-TRL-001 33 OF 41 0 AFC 6+100 6+120 SMAW E6010 + E7010 PIPE PIPE 528 API 5L SCH.40 54349509 009-0304 API 5L SCH.40 54349509 009-0299 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 28/11/24 ACC 28/11/24 W-03 ACC 114 11-Dec-24 ACC
XI/2024

533 PEP-RJA-WM-JBI-TRL-001 33 OF 41 0 AFC SMAW E6010 + E7010 529 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

018
534 PEP-RJA-WM-JBI-TRL-001 33 OF 41 0 AFC 6+120 6+140 SMAW E6010 + E7010 PIPE PIPE 530 API 5L SCH.40 54349509 008-0245 API 5L SCH.40 54349509 009-0307 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 28/11/24 ACC 28/11/24 W-03 ACC 114 11-Dec-24 ACC
XI/2024

018
535 PEP-RJA-WM-JBI-TRL-001 33 OF 41 0 AFC 6+140 6+160 SMAW E6010 + E7010 PIPE PIPE 531 API 5L SCH.40 54349509 009-0307 API 5L SCH.40 54349509 009-0303 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 28/11/24 ACC 28/11/24 W-03 ACC 114 11-Dec-24 ACC
XI/2024

019
536 PEP-RJA-WM-JBI-TRL-001 33 OF 41 0 AFC 6+140 6+160 SMAW E6010 + E7010 PIPE PIPE 532 API 5L SCH.40 54349509 009-0303 API 5L SCH.40 54349509 009-0306 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 29/11/24 ACC 29/11/24 W-03 ACC 115 11-Dec-24 ACC
XI/2024

537 PEP-RJA-WM-JBI-TRL-001 33 OF 41 0 AFC SMAW E6010 + E7010 533 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

018
538 PEP-RJA-WM-JBI-TRL-001 34 OF 41 0 AFC 6+160 6+180 SMAW E6010 + E7010 PIPE PIPE 534 API 5L SCH.40 54349509 009-0298 API 5L SCH.40 54349509 009-0300 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 28/11/24 ACC 28/11/24 W-02 ACC 115 11-Dec-24 ACC
XI/2024

019
539 PEP-RJA-WM-JBI-TRL-001 34 OF 41 0 AFC 6+180 6+200 SMAW E6010 + E7010 PIPE PIPE 535 API 5L SCH.40 54349509 009-0300 API 5L SCH.40 54349509 009-0302 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 29/11/24 ACC 29/11/24 W-02 ACC 115 11-Dec-24 ACC
XI/2024

019
540 PEP-RJA-WM-JBI-TRL-001 34 OF 41 0 AFC 6+180 6+200 SMAW E6010 + E7010 PIPE PIPE 536 API 5L SCH.40 54349509 009-0302 API 5L SCH.40 54349509 009-0305 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 29/11/24 ACC 29/11/24 W-02 ACC 115 11-Dec-24 ACC
XI/2024

541 PEP-RJA-WM-JBI-TRL-001 34 OF 41 0 AFC SMAW E6010 + E7010 537 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

019
542 PEP-RJA-WM-JBI-TRL-001 34 OF 41 0 AFC 6+220 6+240 SMAW E6010 + E7010 PIPE PIPE 538 API 5L SCH.40 54349510 014-0510 API 5L SCH.40 54349510 014-0513 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 29/11/24 ACC 29/11/24 W-02 ACC 116 11-Dec-24 ACC
XI/2024

543 PEP-RJA-WM-JBI-TRL-001 34 OF 41 0 AFC SMAW E6010 + E7010 539 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

019
544 PEP-RJA-WM-JBI-TRL-001 34 OF 41 0 AFC 6+240 6+260 SMAW E6010 + E7010 PIPE PIPE 540 API 5L SCH.40 54349510 014-0509 API 5L SCH.40 54349510 014-0508 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 29/11/24 ACC 29/11/24 W-03 ACC 116 11-Dec-24 ACC
XI/2024

545 PEP-RJA-WM-JBI-TRL-001 34 OF 41 0 AFC SMAW E6010 + E7010 541 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

019
546 PEP-RJA-WM-JBI-TRL-001 34 OF 41 0 AFC 6+260 6+280 SMAW E6010 + E7010 PIPE PIPE 542 API 5L SCH.40 54349510 014-0506 API 5L SCH.40 54349510 014-0504 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 29/11/24 ACC 29/11/24 W-01 ACC 116 11-Dec-24 ACC
XI/2024

019
547 PEP-RJA-WM-JBI-TRL-001 34 OF 41 0 AFC 6+280 6+300 SMAW E6010 + E7010 PIPE PIPE 543 API 5L SCH.40 54349510 014-0504 API 5L SCH.40 54349510 014-0507 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 29/11/24 ACC 29/11/24 W-01 ACC 116 11-Dec-24 ACC
XI/2024

548 PEP-RJA-WM-JBI-TRL-001 34 OF 41 0 AFC SMAW E6010 + E7010 544 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

019
549 PEP-RJA-WM-JBI-TRL-001 34 OF 41 0 AFC 6+300 6+320 SMAW E6010 + E7010 PIPE PIPE 545 API 5L SCH.40 54349509 010-0367 API 5L SCH.40 54349509 010-0366 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 29/11/24 ACC 29/11/24 W-01 ACC 117 11-Dec-24 ACC
XI/2024

550 PEP-RJA-WM-JBI-TRL-001 34 OF 41 0 AFC SMAW E6010 + E7010 546 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

020
551 PEP-RJA-WM-JBI-TRL-001 34 OF 41 0 AFC 6+320 6+340 SMAW E6010 + E7010 PIPE PIPE 547 API 5L SCH.40 54349509 010-0374 API 5L SCH.40 54349509 010-0365 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 30/11/24 ACC 30/11/24 W-01 ACC 117 11-Dec-24 ACC
XI/2024

020
552 PEP-RJA-WM-JBI-TRL-001 34 OF 41 0 AFC 6+340 6+360 SMAW E6010 + E7010 PIPE PIPE 548 API 5L SCH.40 54349509 010-0365 API 5L SCH.40 54349509 010-0364 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 30/11/24 ACC 30/11/24 W-01 ACC 117 11-Dec-24 ACC
XI/2024

020
553 PEP-RJA-WM-JBI-TRL-001 34 OF 41 0 AFC 6+340 6+360 SMAW E6010 + E7010 PIPE PIPE 549 API 5L SCH.40 54349509 010-0364 API 5L SCH.40 54349509 010-0363 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 30/11/24 ACC 30/11/24 W-01 ACC 117 11-Dec-24 ACC
XI/2024

554 PEP-RJA-WM-JBI-TRL-001 35 OF 41 0 AFC SMAW E6010 + E7010 550 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

555 PEP-RJA-WM-JBI-TRL-001 35 OF 41 0 AFC SMAW E6010 + E7010 551 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

020
556 PEP-RJA-WM-JBI-TRL-001 35 OF 41 0 AFC 6+380 6+400 SMAW E6010 + E7010 PIPE PIPE 552 API 5L SCH.40 54349509 010-0373 API 5L SCH.40 54349510 013-0472 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 30/11/24 ACC 30/11/24 W-02 ACC 118 11-Dec-24 ACC
XI/2024

020
557 PEP-RJA-WM-JBI-TRL-001 35 OF 41 0 AFC 6+400 6+420 SMAW E6010 + E7010 PIPE PIPE 553 API 5L SCH.40 54349510 013-0472 API 5L SCH.40 54349509 010-0362 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 30/11/24 ACC 30/11/24 W-02 ACC 118 11-Dec-24 ACC
XI/2024

020
558 PEP-RJA-WM-JBI-TRL-001 35 OF 41 0 AFC 6+400 6+420 SMAW E6010 + E7010 PIPE PIPE 554 API 5L SCH.40 54349509 010-0362 API 5L SCH.40 54349509 010-0368 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 30/11/24 ACC 30/11/24 W-02 ACC 118 11-Dec-24 ACC
XI/2024

020
559 PEP-RJA-WM-JBI-TRL-001 35 OF 41 0 AFC 6+420 6+440 SMAW E6010 + E7010 PIPE PIPE 555 API 5L SCH.40 54349509 010-0368 API 5L SCH.40 54349510 013-0475 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 30/11/24 ACC 30/11/24 W-02 ACC 118 11-Dec-24 ACC
XI/2024

020
560 PEP-RJA-WM-JBI-TRL-001 35 OF 41 0 AFC 6+420 6+440 SMAW E6010 + E7010 PIPE PIPE 556 API 5L SCH.40 54349510 013-0475 API 5L SCH.40 54349510 013-0478 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 30/11/24 ACC 30/11/24 W-02 ACC 119 11-Dec-24 ACC
XI/2024

561 PEP-RJA-WM-JBI-TRL-001 35 OF 41 0 AFC SMAW E6010 + E7010 557 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

020
562 PEP-RJA-WM-JBI-TRL-001 35 OF 41 0 AFC 6+460 6+480 SMAW E6010 + E7010 PIPE PIPE 558 API 5L SCH.40 54349510 013-0476 API 5L SCH.40 54349510 013-0477 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 30/11/24 ACC 30/11/24 W-03 ACC 119 11-Dec-24 ACC
XI/2024

020
563 PEP-RJA-WM-JBI-TRL-001 35 OF 41 0 AFC 6+460 6+480 SMAW E6010 + E7010 PIPE PIPE 559 API 5L SCH.40 54349510 013-0477 API 5L SCH.40 54349510 013-0474 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 30/11/24 ACC 30/11/24 W-03 ACC 119 11-Dec-24 ACC
XI/2024

020
564 PEP-RJA-WM-JBI-TRL-001 35 OF 41 0 AFC 6+480 6+500 SMAW E6010 + E7010 PIPE PIPE 560 API 5L SCH.40 54349510 013-0474 API 5L SCH.40 54349510 013-0479 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 30/11/24 ACC 30/11/24 W-03 ACC 120 12-Dec-24 ACC
XI/2024

020
565 PEP-RJA-WM-JBI-TRL-001 35 OF 41 0 AFC 6+500 6+520 SMAW E6010 + E7010 PIPE PIPE 561 API 5L SCH.40 54349510 013-0479 API 5L SCH.40 54349510 013-0471 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 30/11/24 ACC 30/11/24 W-03 ACC 120 12-Dec-24 ACC
XI/2024

020
566 PEP-RJA-WM-JBI-TRL-001 35 OF 41 0 AFC 6+500 6+520 SMAW E6010 + E7010 PIPE PIPE 562 API 5L SCH.40 54349510 013-0471 API 5L SCH.40 54349510 013-0483 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 30/11/24 ACC 30/11/24 W-03 ACC 120 12-Dec-24 ACC
XI/2024

020
567 PEP-RJA-WM-JBI-TRL-001 35 OF 41 0 AFC 6+520 6+540 SMAW E6010 + E7010 PIPE PIPE 563 API 5L SCH.40 54349510 013-0483 API 5L SCH.40 54349510 013-0473 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 30/11/24 ACC 30/11/24 W-03 ACC 120 12-Dec-24 ACC
XI/2024

020
568 PEP-RJA-WM-JBI-TRL-001 35 OF 41 0 AFC 6+520 6+540 SMAW E6010 + E7010 PIPE PIPE 564 API 5L SCH.40 54349510 013-0473 API 5L SCH.40 54349510 012-0439 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 30/11/24 ACC 30/11/24 W-03 ACC 121 12-Dec-24 ACC
XI/2024

020
569 PEP-RJA-WM-JBI-TRL-001 35 OF 41 0 AFC 6+540 6+560 SMAW E6010 + E7010 PIPE PIPE 565 API 5L SCH.40 54349509 012-0439 API 5L SCH.40 54349509 012-0437 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 30/11/24 ACC 30/11/24 W-03 ACC 121 12-Dec-24 ACC
XI/2024

020
570 PEP-RJA-WM-JBI-TRL-001 36 OF 41 0 AFC 6+540 6+560 SMAW E6010 + E7010 PIPE PIPE 566 API 5L SCH.40 54349509 012-0437 API 5L SCH.40 54349509 012-0438 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 30/11/24 ACC 30/11/24 W-03 ACC 121 12-Dec-24 ACC
XI/2024

020
571 PEP-RJA-WM-JBI-TRL-001 36 OF 41 0 AFC 6+560 6+580 SMAW E6010 + E7010 PIPE PIPE 567 API 5L SCH.40 54349509 012-0438 API 5L SCH.40 54349509 012-0430 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 30/11/24 ACC 30/11/24 W-03 ACC 121 12-Dec-24 ACC
XI/2024

020
572 PEP-RJA-WM-JBI-TRL-001 36 OF 41 0 AFC 6+580 6+600 SMAW E6010 + E7010 PIPE PIPE 568 API 5L SCH.40 54349509 012-0430 API 5L SCH.40 54349509 012-0431 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 30/11/24 ACC 30/11/24 W-03 ACC 122 12-Dec-24 ACC
XI/2024

020
573 PEP-RJA-WM-JBI-TRL-001 36 OF 41 0 AFC 6+580 6+600 SMAW E6010 + E7010 PIPE PIPE 569 API 5L SCH.40 54349509 012-0431 API 5L SCH.40 54349509 012-0432 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 30/11/24 ACC 30/11/24 W-03 ACC 122 12-Dec-24 ACC
XI/2024

574 PEP-RJA-WM-JBI-TRL-001 36 OF 41 0 AFC SMAW E6010 + E7010 570 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

575 PEP-RJA-WM-JBI-TRL-001 36 OF 41 0 AFC SMAW E6010 + E7010 571 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

020
576 PEP-RJA-WM-JBI-TRL-001 36 OF 41 0 AFC 6+620 6+640 SMAW E6010 + E7010 PIPE PIPE 572 API 5L SCH.40 54349509 012-0439 API 5L SCH.40 54349509 012-0448 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 30/11/24 ACC 30/11/24 W-01 ACC 122 12-Dec-24 ACC
XI/2024

020
577 PEP-RJA-WM-JBI-TRL-001 36 OF 41 0 AFC 6+640 6+660 SMAW E6010 + E7010 PIPE PIPE 573 API 5L SCH.40 54349509 012-0448 API 5L SCH.40 54349509 012-0436 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 30/11/24 ACC 30/11/24 W-01 ACC 122 12-Dec-24 ACC
XI/2024

020
578 PEP-RJA-WM-JBI-TRL-001 36 OF 41 0 AFC 6+640 6+660 SMAW E6010 + E7010 PIPE PIPE 574 API 5L SCH.40 54349509 012-0436 API 5L SCH.40 54349509 012-0410 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 30/11/24 ACC 30/11/24 W-01 ACC 123 12-Dec-24 ACC
XI/2024

020
579 PEP-RJA-WM-JBI-TRL-001 36 OF 41 0 AFC 6+660 6+680 SMAW E6010 + E7010 PIPE PIPE 575 API 5L SCH.40 54349509 012-0410 API 5L SCH.40 54349509 012-0415 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 30/11/24 ACC 30/11/24 W-01 ACC 123 12-Dec-24 ACC
XI/2024

020
580 PEP-RJA-WM-JBI-TRL-001 36 OF 41 0 AFC 6+660 6+680 SMAW E6010 + E7010 PIPE PIPE 576 API 5L SCH.40 54349509 012-0415 API 5L SCH.40 54349509 012-0412 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 30/11/24 ACC 30/11/24 W-01 ACC 123 12-Dec-24 ACC
XI/2024

020
581 PEP-RJA-WM-JBI-TRL-001 36 OF 41 0 AFC 6+680 6+700 SMAW E6010 + E7010 PIPE PIPE 577 API 5L SCH.40 54349509 012-0412 API 5L SCH.40 54349509 012-0405 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 30/11/24 ACC 30/11/24 W-01 ACC 123 12-Dec-24 ACC
XI/2024

020
582 PEP-RJA-WM-JBI-TRL-001 36 OF 41 0 AFC 6+700 6+720 SMAW E6010 + E7010 PIPE PIPE 578 API 5L SCH.40 54349509 012-0405 API 5L SCH.40 54349509 012-0413 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 30/11/24 ACC 30/11/24 W-01 ACC 124 12-Dec-24 ACC
XI/2024

020
583 PEP-RJA-WM-JBI-TRL-001 36 OF 41 0 AFC 6+700 6+720 SMAW E6010 + E7010 PIPE PIPE 579 API 5L SCH.40 54349509 012-0413 API 5L SCH.40 54349509 012-0416 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 30/11/24 ACC 30/11/24 W-01 ACC 124 12-Dec-24 ACC
XI/2024

021
584 PEP-RJA-WM-JBI-TRL-001 36 OF 41 0 AFC 6+720 6+740 SMAW E6010 + E7010 PIPE PIPE 580 API 5L SCH.40 54349509 012-0416 API 5L SCH.40 54349509 012-0419 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 01/12/24 ACC 01/12/24 W-01 ACC 124 12-Dec-24 ACC
XI/2024

021
585 PEP-RJA-WM-JBI-TRL-001 36 OF 41 0 AFC 6+740 6+760 SMAW E6010 + E7010 PIPE PIPE 581 API 5L SCH.40 54349509 012-0419 API 5L SCH.40 54349509 012-0411 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 01/12/24 ACC 01/12/24 W-01 ACC 124 12-Dec-24 ACC
XI/2024

021
586 PEP-RJA-WM-JBI-TRL-001 37 OF 41 0 AFC 6+740 6+760 SMAW E6010 + E7010 PIPE PIPE 582 API 5L SCH.40 54349509 012-0411 API 5L SCH.40 54349509 012-0409 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 01/12/24 ACC 01/12/24 W-01 ACC 125 12-Dec-24 ACC
XI/2024

587 PEP-RJA-WM-JBI-TRL-001 37 OF 41 0 AFC SMAW E6010 + E7010 583 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

588 PEP-RJA-WM-JBI-TRL-001 37 OF 41 0 AFC SMAW E6010 + E7010 584 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

021
589 PEP-RJA-WM-JBI-TRL-001 37 OF 41 0 AFC 6+780 6+800 SMAW E6010 + E7010 PIPE PIPE 585 API 5L SCH.40 54349509 004-0125 API 5L SCH.40 54349509 004-0121 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 01/12/24 ACC 01/12/24 W-02 ACC 125 12-Dec-24 ACC
XI/2024

021
590 PEP-RJA-WM-JBI-TRL-001 37 OF 41 0 AFC 6+780 6+800 SMAW E6010 + E7010 PIPE PIPE 586 API 5L SCH.40 54349509 004-0121 API 5L SCH.40 54349509 004-0126 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 01/12/24 ACC 01/12/24 W-02 ACC 125 12-Dec-24 ACC
XI/2024

021
591 PEP-RJA-WM-JBI-TRL-001 37 OF 41 0 AFC 6+800 6+820 SMAW E6010 + E7010 PIPE PIPE 587 API 5L SCH.40 54349509 004-0126 API 5L SCH.40 54349509 004-0128 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 01/12/24 ACC 01/12/24 W-02 ACC 125 12-Dec-24 ACC
XI/2024

021
592 PEP-RJA-WM-JBI-TRL-001 37 OF 41 0 AFC 6+820 6+840 SMAW E6010 + E7010 PIPE PIPE 588 API 5L SCH.40 54349509 004-0128 API 5L SCH.40 54349509 004-0124 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 01/12/24 ACC 01/12/24 W-02 ACC 126 12-Dec-24 ACC
XI/2024

021
593 PEP-RJA-WM-JBI-TRL-001 37 OF 41 0 AFC 6+820 6+840 SMAW E6010 + E7010 PIPE PIPE 589 API 5L SCH.40 54349509 004-0124 API 5L SCH.40 54349509 004-0122 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 01/12/24 ACC 01/12/24 W-02 ACC 126 12-Dec-24 ACC
XI/2024

021
594 PEP-RJA-WM-JBI-TRL-001 37 OF 41 0 AFC 6+840 6+860 SMAW E6010 + E7010 PIPE PIPE 590 API 5L SCH.40 54349509 004-0122 API 5L SCH.40 54349509 004-0127 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 01/12/24 ACC 01/12/24 W-02 ACC 126 12-Dec-24 REP
XI/2024

021
595 PEP-RJA-WM-JBI-TRL-001 37 OF 41 0 AFC 6+860 6+880 SMAW E6010 + E7010 PIPE PIPE 591 API 5L SCH.40 54349509 004-0127 API 5L SCH.40 54349509 004-0123 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 01/12/24 ACC 01/12/24 W-02 ACC 126 12-Dec-24 ACC
XI/2024

022
596 PEP-RJA-WM-JBI-TRL-001 37 OF 41 0 AFC 6+860 6+880 SMAW E6010 + E7010 PIPE PIPE 592 API 5L SCH.40 54349509 004-0123 API 5L SCH.40 54349509 004-0130 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 02/12/24 ACC 02/12/24 W-02 ACC 127 12-Dec-24 ACC
XI/2024
Document No. 001/RJA.QA.QC/TRL/SG/XI/2024 WELDING VISUAL RADIOGRAPHY WRAPPING HOLIDAY TEST
PT. RAMAI JAYA ABADI
MONITORING PROGRESS WELDING Revision No. 0 WELDING
REP ACC ACC REP RSC DONE ACC REP ACC REPAIR
DONE
PENGGANTIAN TRUNKLINE 4 IN SEPANJANG 7.6 KM GS1 - GS2 DI FIELD JAMBI Page OF

PT. PERTAMINA EP ZONA 1 FIELD JAMBI Issue Date


528 0 644 523 34 5 0 0
CONTRACT NO 4710000889

CONNECTION MATERIAL 1 MATERIAL 2 FIT-UP INSP. VISUAL INSP. RADIOGRAPHY FIELD JOINT COATING HOLIDAYTEST LOWERING & BACKFILING

DRAWING
NO DRAWING NO SHEET OF REV. STA PROCESS WELDING ELECTRODE JOINT NO. J. TYPE SW/FW DIA-INCH THK(mm) REPORT NO. REMARKS
STATUS
REPORT
MATERIAL TO MATERIAL MATERIAL HEA .NO. PIPE NO. MATERIAL HEA .NO. PIPE NO. DATE ACC REP WELDING DATE WELDER STAMP ACC REP REPORT NO. DATE ACC REJ RSC REPORT NO. DATE ACC REP DATE ACC REP LOWERING BACKFILLING
NO.

022
597 PEP-RJA-WM-JBI-TRL-001 37 OF 41 0 AFC 6+880 6+900 SMAW E6010 + E7010 PIPE PIPE 593 API 5L SCH.40 54349509 004-0130 API 5L SCH.40 54349509 004-0129 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 02/12/24 ACC 02/12/24 W-02 ACC 127 12-Dec-24 ACC
XI/2024

023
598 PEP-RJA-WM-JBI-TRL-001 37 OF 41 0 AFC 6+880 6+900 SMAW E6010 + E7010 PIPE PIPE 594 API 5L SCH.40 54349509 004-0129 API 5L SCH.40 54349509 002-005- BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 03/12/24 ACC 03/12/24 W-02 ACC 127 12-Dec-24 REP
XI/2024

023
599 PEP-RJA-WM-JBI-TRL-001 37 OF 41 0 AFC 6+900 6+920 SMAW E6010 + E7010 PIPE PIPE 595 API 5L SCH.40 54349509 002-005- API 5L SCH.40 54349509 002-0045 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 03/12/24 ACC 03/12/24 W-02 ACC 127 12-Dec-24 ACC
XI/2024

023
600 PEP-RJA-WM-JBI-TRL-001 37 OF 41 0 AFC 6+900 6+920 SMAW E6010 + E7010 PIPE PIPE 596 API 5L SCH.40 54349509 002-0045 API 5L SCH.40 54349509 002-0047 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 03/12/24 ACC 03/12/24 W-02 ACC 128 12-Dec-24 ACC
XI/2024

601 PEP-RJA-WM-JBI-TRL-001 37 OF 41 0 AFC SMAW E6010 + E7010 597 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC 128 12-Dec-24 ACC

023
602 PEP-RJA-WM-JBI-TRL-001 38 OF 41 0 AFC 6+940 6+960 SMAW E6010 + E7010 PIPE PIPE 598 API 5L SCH.40 54349509 002-0049 API 5L SCH.40 54349509 002-0046 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 03/12/24 ACC 03/12/24 W-02 ACC 128 12-Dec-24 ACC
XI/2024

603 PEP-RJA-WM-JBI-TRL-001 38 OF 41 0 AFC SMAW E6010 + E7010 599 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC 129 13-Dec-24 ACC

021
604 PEP-RJA-WM-JBI-TRL-001 38 OF 41 0 AFC 6+960 6+980 SMAW E6010 + E7010 PIPE PIPE 600 API 5L SCH.40 54349509 002-0054 API 5L SCH.40 54349509 002-0050 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 01/12/24 ACC 01/12/24 W-03 ACC 129 13-Dec-24 ACC
XI/2024

021
605 PEP-RJA-WM-JBI-TRL-001 38 OF 41 0 AFC 6+980 7+0 SMAW E6010 + E7010 PIPE PIPE 601 API 5L SCH.40 54349509 002-0050 API 5L SCH.40 54349509 002-0048 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 01/12/24 ACC 01/12/24 W-03 ACC 129 13-Dec-24 ACC
XI/2024

021
606 PEP-RJA-WM-JBI-TRL-001 38 OF 41 0 AFC 6+980 7+0 SMAW E6010 + E7010 PIPE PIPE 602 API 5L SCH.40 54349509 002-0048 API 5L SCH.40 54349509 002-0052 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 01/12/24 ACC 01/12/24 W-03 ACC 129 13-Dec-24 ACC
XI/2024

021
607 PEP-RJA-WM-JBI-TRL-001 38 OF 41 0 AFC 7+0 7+020 SMAW E6010 + E7010 PIPE PIPE 603 API 5L SCH.40 54349509 002-0052 API 5L SCH.40 54349509 002-0051 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 01/12/24 ACC 01/12/24 W-03 ACC 130 13-Dec-24 ACC
XI/2024

021
608 PEP-RJA-WM-JBI-TRL-001 38 OF 41 0 AFC 7+0 7+020 SMAW E6010 + E7010 PIPE PIPE 604 API 5L SCH.40 54349509 002-0051 API 5L SCH.40 54349509 011-0379 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 01/12/24 ACC 01/12/24 W-03 ACC 130 13-Dec-24 ACC
XI/2024

021
609 PEP-RJA-WM-JBI-TRL-001 38 OF 41 0 AFC 7+020 7+040 SMAW E6010 + E7010 PIPE PIPE 605 API 5L SCH.40 54349509 011-0379 API 5L SCH.40 54349510 013-0452 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 01/12/24 ACC 01/12/24 W-03 ACC 130 13-Dec-24 ACC
XI/2024

021
610 PEP-RJA-WM-JBI-TRL-001 38 OF 41 0 AFC 7+020 7+040 SMAW E6010 + E7010 PIPE PIPE 606 API 5L SCH.40 54349510 013-0452 API 5L SCH.40 54349510 013-0455 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 01/12/24 ACC 01/12/24 W-03 ACC 130 13-Dec-24 ACC
XI/2024

021
611 PEP-RJA-WM-JBI-TRL-001 38 OF 41 0 AFC 7+040 7+060 SMAW E6010 + E7010 PIPE PIPE 607 API 5L SCH.40 54349510 013-0455 API 5L SCH.40 54349510 013-0453 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 01/12/24 ACC 01/12/24 W-03 ACC 131 13-Dec-24 ACC
XI/2024

021
612 PEP-RJA-WM-JBI-TRL-001 38 OF 41 0 AFC 7+060 7+080 SMAW E6010 + E7010 PIPE PIPE 608 API 5L SCH.40 54349510 013-0453 API 5L SCH.40 54349510 013-0454 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 01/12/24 ACC 01/12/24 W-03 ACC 131 13-Dec-24 ACC
XI/2024

021
613 PEP-RJA-WM-JBI-TRL-001 38 OF 41 0 AFC 7+060 7+080 SMAW E6010 + E7010 PIPE PIPE 609 API 5L SCH.40 54349510 013-0454 API 5L SCH.40 54349510 013-0456 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 01/12/24 ACC 01/12/24 W-03 ACC 131 13-Dec-24 ACC
XI/2024

022
614 PEP-RJA-WM-JBI-TRL-001 38 OF 41 0 AFC 7+080 7+100 SMAW E6010 + E7010 PIPE PIPE 610 API 5L SCH.40 54349510 013-0456 API 5L SCH.40 54349510 013-0460 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 02/12/24 ACC 02/12/24 W-03 ACC 131 13-Dec-24 ACC
XI/2024

022
615 PEP-RJA-WM-JBI-TRL-001 38 OF 41 0 AFC 7+100 7+120 SMAW E6010 + E7010 PIPE PIPE 611 API 5L SCH.40 54349510 013-0460 API 5L SCH.40 54349510 013-0457 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 02/12/24 ACC 02/12/24 W-03 ACC 132 13-Dec-24 ACC
XI/2024

023
616 PEP-RJA-WM-JBI-TRL-001 38 OF 41 0 AFC 7+100 7+120 SMAW E6010 + E7010 PIPE PIPE 612 API 5L SCH.40 54349510 013-0457 API 5L SCH.40 54349510 013-0458 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 03/12/24 ACC 03/12/24 W-03 ACC 131 13-Dec-24 ACC
XI/2024

023
617 PEP-RJA-WM-JBI-TRL-001 38 OF 41 0 AFC 7+120 7+140 SMAW E6010 + E7010 PIPE PIPE 613 API 5L SCH.40 54349510 013-0458 API 5L SCH.40 54349510 013-0459 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 03/12/24 ACC 03/12/24 W-03 ACC 132 13-Dec-24 ACC
XI/2024

618 PEP-RJA-WM-JBI-TRL-001 39 OF 41 0 AFC SMAW E6010 + E7010 614 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

023
619 PEP-RJA-WM-JBI-TRL-001 39 OF 41 0 AFC 7+140 7+160 SMAW E6010 + E7010 PIPE PIPE 615 API 5L SCH.40 54349509 011-0377 API 5L SCH.40 54349509 011-0379 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 03/12/24 ACC 03/12/24 W-03 ACC 132 13-Dec-24 ACC
XI/2024

620 PEP-RJA-WM-JBI-TRL-001 39 OF 41 0 AFC SMAW E6010 + E7010 616 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

621 PEP-RJA-WM-JBI-TRL-001 39 OF 41 0 AFC SMAW E6010 + E7010 617 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

021
622 PEP-RJA-WM-JBI-TRL-001 39 OF 41 0 AFC 7+180 7+200 SMAW E6010 + E7010 PIPE PIPE 618 API 5L SCH.40 54349509 011-0380 API 5L SCH.40 54349509 011-0384 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 01/12/24 ACC 01/12/24 W-01 ACC 132 13-Dec-24 ACC
XI/2024

021
623 PEP-RJA-WM-JBI-TRL-001 39 OF 41 0 AFC 7+180 7+200 SMAW E6010 + E7010 PIPE PIPE 619 API 5L SCH.40 54349509 011-0384 API 5L SCH.40 54349509 011-0381 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 01/12/24 ACC 01/12/24 W-01 ACC 132 13-Dec-24 ACC
XI/2024

021
624 PEP-RJA-WM-JBI-TRL-001 39 OF 41 0 AFC 7+200 7+220 SMAW E6010 + E7010 PIPE PIPE 620 API 5L SCH.40 54349509 011-0381 API 5L SCH.40 54349509 011-0378 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 01/12/24 ACC 01/12/24 W-01 ACC 133 13-Dec-24 ACC
XI/2024

021
625 PEP-RJA-WM-JBI-TRL-001 39 OF 41 0 AFC 7+220 7+240 SMAW E6010 + E7010 PIPE PIPE 621 API 5L SCH.40 54349509 011-0378 API 5L SCH.40 54349509 011-0375 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 01/12/24 ACC 01/12/24 W-01 ACC 133 13-Dec-24 ACC
XI/2024

021
626 PEP-RJA-WM-JBI-TRL-001 39 OF 41 0 AFC 7+220 7+240 SMAW E6010 + E7010 PIPE PIPE 622 API 5L SCH.40 54349509 011-0375 API 5L SCH.40 54349509 011-0382 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 01/12/24 ACC 01/12/24 W-01 ACC 133 13-Dec-24 ACC
XI/2024

021
627 PEP-RJA-WM-JBI-TRL-001 39 OF 41 0 AFC 7+240 7+260 SMAW E6010 + E7010 PIPE PIPE 623 API 5L SCH.40 54349509 011-0382 API 5L SCH.40 54349509 011-0383 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 01/12/24 ACC 01/12/24 W-01 ACC 133 13-Dec-24 ACC
XI/2024

022
628 PEP-RJA-WM-JBI-TRL-001 39 OF 41 0 AFC 7+240 7+260 SMAW E6010 + E7010 PIPE PIPE 624 API 5L SCH.40 54349509 011-0383 API 5L SCH.40 54349509 011-0377 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 02/12/24 ACC 02/12/24 W-01 ACC 134 14-Dec-24 ACC
XI/2024

022
629 PEP-RJA-WM-JBI-TRL-001 39 OF 41 0 AFC 7+260 7+280 SMAW E6010 + E7010 PIPE PIPE 625 API 5L SCH.40 54349509 011-0377 API 5L SCH.40 54349509 011-0402 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 02/12/24 ACC 02/12/24 W-01 ACC 135 14-Dec-24 ACC
XI/2024

022
630 PEP-RJA-WM-JBI-TRL-001 39 OF 41 0 AFC 7+260 7+280 SMAW E6010 + E7010 PIPE PIPE 626 API 5L SCH.40 54349509 011-0402 API 5L SCH.40 54349509 011-0396 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 02/12/24 ACC 02/12/24 W-01 ACC 135 14-Dec-24 ACC
XI/2024

023
631 PEP-RJA-WM-JBI-TRL-001 39 OF 41 0 AFC 7+280 7+300 SMAW E6010 + E7010 PIPE PIPE 627 API 5L SCH.40 54349509 011-0396 API 5L SCH.40 54349509 011-0403 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 03/12/24 ACC 03/12/24 W-01 ACC 135 14-Dec-24 ACC
XI/2024

023
632 PEP-RJA-WM-JBI-TRL-001 39 OF 41 0 AFC 7+300 7+320 SMAW E6010 + E7010 PIPE PIPE 628 API 5L SCH.40 54349509 011-0403 API 5L SCH.40 54349509 011-0399 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 03/12/24 ACC 03/12/24 W-01 ACC 135 14-Dec-24 ACC
XI/2024

023
633 PEP-RJA-WM-JBI-TRL-001 39 OF 41 0 AFC 7+300 7+320 SMAW E6010 + E7010 PIPE PIPE 629 API 5L SCH.40 54349509 011-0399 API 5L SCH.40 54349509 011-0400 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 03/12/24 ACC 03/12/24 W-01 ACC 136 14-Dec-24 ACC
XI/2024

023
634 PEP-RJA-WM-JBI-TRL-001 40 OF 41 0 AFC 7+320 7+340 SMAW E6010 + E7010 PIPE PIPE 630 API 5L SCH.40 54349509 011-0400 API 5L SCH.40 54349509 011-0398 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 03/12/24 ACC 03/12/24 W-01 ACC 136 14-Dec-24 ACC
XI/2024

023
635 PEP-RJA-WM-JBI-TRL-001 40 OF 41 0 AFC 7+340 7+360 SMAW E6010 + E7010 PIPE PIPE 631 API 5L SCH.40 54349509 011-0398 API 5L SCH.40 54349509 011-0395 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 03/12/24 ACC 03/12/24 W-01 ACC 136 14-Dec-24 ACC
XI/2024

023
636 PEP-RJA-WM-JBI-TRL-001 40 OF 41 0 AFC 7+340 7+360 SMAW E6010 + E7010 PIPE PIPE 632 API 5L SCH.40 54349509 011-0395 API 5L SCH.40 54349509 011-0397 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 03/12/24 ACC 03/12/24 W-02 ACC 136 14-Dec-24 ACC
XI/2024

023
637 PEP-RJA-WM-JBI-TRL-001 40 OF 41 0 AFC 7+360 7+380 SMAW E6010 + E7010 PIPE PIPE 633 API 5L SCH.40 54349509 011-0397 API 5L SCH.40 54349509 011-0404 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 03/12/24 ACC 03/12/24 W-02 ACC 137 14-Dec-24 ACC
XI/2024

638 PEP-RJA-WM-JBI-TRL-001 40 OF 41 0 AFC SMAW E6010 + E7010 634 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

023
639 PEP-RJA-WM-JBI-TRL-001 40 OF 41 0 AFC 7+380 7+400 SMAW E6010 + E7010 PIPE PIPE 635 API 5L SCH.40 54349510 018-0637 API 5L SCH.40 54349510 018-0642 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 03/12/24 ACC 03/12/24 W-03 ACC 137 14-Dec-24 ACC
XI/2024

023
640 PEP-RJA-WM-JBI-TRL-001 40 OF 41 0 AFC 7+380 7+400 SMAW E6010 + E7010 PIPE PIPE 636 API 5L SCH.40 54349510 018-0642 API 5L SCH.40 54349510 018-0643 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 03/12/24 ACC 03/12/24 W-03 ACC 137 14-Dec-24 ACC
XI/2024

023
641 PEP-RJA-WM-JBI-TRL-001 40 OF 41 0 AFC 7+400 7+420 SMAW E6010 + E7010 PIPE PIPE 637 API 5L SCH.40 54349510 018-0643 API 5L SCH.40 54349510 018-0645 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 03/12/24 ACC 03/12/24 W-03 ACC 137 14-Dec-24 ACC
XI/2024

023
642 PEP-RJA-WM-JBI-TRL-001 40 OF 41 0 AFC 7+400 7+420 SMAW E6010 + E7010 PIPE PIPE 638 API 5L SCH.40 54349510 018-0645 API 5L SCH.40 54349510 018-0649 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 03/12/24 ACC 03/12/24 W-03 ACC 138 14-Dec-24 ACC
XI/2024

643 PEP-RJA-WM-JBI-TRL-001 40 OF 41 0 AFC SMAW E6010 + E7010 639 API 5L SCH.40 API 5L SCH.40 BW FW 6 6,02 ACC ACC

023
644 PEP-RJA-WM-JBI-TRL-001 41 OF 41 0 AFC 7+440 7+460 SMAW E6010 + E7010 PIPE PIPE 640 API 5L SCH.40 54349510 018-0641 API 5L SCH.40 54349510 018-0644 BW FW 6 6,02 /RJA.QC-VIS/TRL/SG/ 03/12/24 ACC 03/12/24 W-03 ACC 138 14-Dec-24 ACC
XI/2024

You might also like