The Executive Engineer of the R&B Division Shopian is submitting a Detailed Estimate for the construction of a dug-out pond at Toolihalan Sedow Ismail Nallah, with an estimated cost of Rs 0.76 lacs. This submission is in response to an administrative approval and a request from the District Soil & Water Conservation Officer. The total allocation for this project is Rs 4.44 lacs, with Rs 0.80 lacs approved for the current year.

Uploaded by

solihasalika
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
3 views

5896

The Executive Engineer of the R&B Division Shopian is submitting a Detailed Estimate for the construction of a dug-out pond at Toolihalan Sedow Ismail Nallah, with an estimated cost of Rs 0.76 lacs. This submission is in response to an administrative approval and a request from the District Soil & Water Conservation Officer. The total allocation for this project is Rs 4.44 lacs, with Rs 0.80 lacs approved for the current year.

Uploaded by

solihasalika
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

OFFICE OF THE EXECUTIVE ENGINEER R&B DIVISION SHOPIAN

Fax no/Tell No: 01933-260226


Email: - [email protected]
*******************************************

The District Soil & Water Conservation Officer, No:-


District Pulwama/Shopian Dt:-

Subject:- Submission of Detailed Estimate for “Construction of Dug out pond at


Toolihalan Sedow Ismail Nallah Shopian”.
Reference: 1. Joint Director Soil and Water conservation Department Kashmir’s
Administrative Approval No:-14JDKMR of 2024-25 Dated:-04-10-
2024..
2.Your Office Letter No: - ASCO/PUL/SPN/works/UT CAPEX/253-55
Dated:-12-12-2024.

Sir,
Regarding the above-mentioned reference, wherein this office has been asked to
undertake the above subjected work with an approved allocation of Rs 0.80 lacs for
the current year out of the total accorded amount of Rs 4.44 lacs. As the nomenclature
of these two works is not matching with each other as such I am directed to forward
the Detailed Estimate for “Construction of Dug out pond at Toolihalan Sedow Ismail
Nallah Shopian” amounting to Rs. 0.76 lacs for the required authorization to initiate
the tendering process for the submitted detailed estimate.

Yours faithfully,

Executive Engineer
R&B Division Shopian

Copy to the: -.
1. Assistant Executive Engineer R&B Sub Division Ramnagri for information. This is with reference to
his office letter No:- R&B/RSD/259 Dated:-23-01-2025.