0% found this document useful (0 votes)
3 views

Day-12

The document outlines a challenge day for Global Quest Technologies, focusing on topics of compound interest and time & work. It includes a series of aptitude questions related to these topics, with multiple-choice answers provided for each question. The challenge is scheduled for May 1, 2025.

Uploaded by

madhuragowda1803
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
3 views

Day-12

The document outlines a challenge day for Global Quest Technologies, focusing on topics of compound interest and time & work. It includes a series of aptitude questions related to these topics, with multiple-choice answers provided for each question. The challenge is scheduled for May 1, 2025.

Uploaded by

madhuragowda1803
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Global Quest Technologies

#324,2nd Floor,3 A Cross, Near Seshadripuram First Grade College,


Above City Union Bank, Yelahanka New Town, Bengaluru-560064.

Challenge Day : 12 Date : 1-05-2025

Topics Covered : 1. Compound Interest.


2. Time & Work.

Challenges :
Aptitude Questions

125. There is 60% increase in an amount in 6 years at simple interest. What will be
the compound interest of Rs. 12,000 after 3 years at the same rate?
A) Rs. 2160 B) Rs. 3120 C) Rs. 3972 D) Rs. 6240 E) None of these

126. The compound interest on Rs. 30,000 at 7% per annum is Rs. 4347. The period
(in years) is:
A) 2 B) 2 ½ C) 3 D) 4

127. A can do a work in 15 days and B in 20 days. If they work on it together for 4
days, then the fraction of the work that is left is :
A)1/4 B)1/10 C)7/15 D)8/15

128. A fort had provision of food for 150 men for 45 days. After 10 days, 25 men left
the fort. The number of days for which the remaining food will last, is:
A) 29 (1/5) B) 37 (1/4) C) 42 D) 54

129. 39 persons can repair a road in 12 days, working 5 hours a day. In how many
days will 30 persons, working 6 hours a day, complete the work?
A) 10 B) 13 C) 14 D) 15
130. A, B and C can do a piece of work in 20, 30 and 60 days respectively. In how
many days can A do the work if he is assisted by B and C on every third day?
A) 12 days B) 15 days C) 16 days D) 18 days

131. If 6 men and 8 boys can do a piece of work in 10 days while 26 men and 48
boys can do the same in 2 days, the time taken by 15 men and 20 boys in doing the
same type of work will be:
A) 4 days B) 5 days C) 6 days D) 7 days

132. 10 women can complete a work in 7 days and 10 children take 14 days to
complete the work. How many days will 5 women and 10 children take to complete
the work?
A) 3 B) 5 C) 7 D) Cannot be determined E) None of these

133. A is 30% more efficient than B. How much time will they, working together,
take to complete a job which A alone could have done in 23 days?
A) 11 days B) 13 days C) 20(3/17) days D) None of these

134. A tank is filled in 5 hours by three pipes A, B and C. The pipe C is twice as fast
as B and B is twice as fast as A. How much time will pipe A alone take to fill the
tank?
A) 20 hours B) 25 hours C) 35 hours D) Cannot be determined E) None of these

135. Two pipes A and B together can fill a cistern in 4 hours. Had they been opened
separately, then B would have taken 6 hours more than A to fill the cistern. How
much time will be taken by A to fill the cistern separately?
A) 1 hour B) 2 hours C) 6 hours D) 8 hours

136. Two pipes A and B can fill a tank in 15 minutes and 20 minutes respectively.
Both the pipes are opened together but after 4 minutes, pipe A is turned off. What is
the total time required to fill the tank?
A) 10 min. 20 sec. B) 11 min. 45 sec. C) 12 min. 30 sec. D) 14 min. 40 sec.

You might also like