KINGSPARK
KINGSPARK
A3 Make Budget 8 10
Identify Key
A4.1 Stakeholders
7 10
Set up Management
A6.1 Resources
15 20
Manage Local
B2.2 Council Involvement
7 10
Obtain Building
Permits and
B4 Occupancy
10 13
Certificates
Inspect Permit
B5 Timelines
6 8
Ensure All
B6.1 Compliance is 8 10
Achieved
Conduct Site
B6.2 Inspections
25 30
C1 Make Tender 8 10
Pre-qualify
C2.1 Contractors
7 10
Contract Tender
C2.2 Process and Assess 13 15
Bids by Contractors
C3 Issue Contracts 10 13
Manage Changes and
C4.1 Claims
40 45
Inspect contractors’
C4.2 Performance and 35 40
Work Efficiency
Monitor progress on
D1 site
25 30
Inspect structural
D2.1 works
25 30
Follow up on the EV
D2.2 park construction 8 10
milestones
Ensure coordination
D3 between trades
4 5
Conduct site
D4 inspection
25 30
D5 Restore Conflicts 8 10
Ensure health, safety,
D6.1 and environmental 7 8
compliance
Check contractors’
D6.2 report
25 28
Monitor Milestone
D8 Achievement
35 40
Manage Scheduling
E1.1 and Delivery of 25 30
Equipment
Finalize Contracts for
E1.2 Solar and Wind 13 15
Components
Coordinate
Renewable
E2 Installation Timelines
18 20
with Construction
Oversee Wind
E3 Systems
28 30
Ensure Grid
E4.1 Connection and 23 25
Electrical Compliance
Track Performance
E4.2 Metrics
18 20
Address Inefficiency
E5 with the Suppliers
15 20
Approve Final
E6 Reports and 17 20
Warranties
Consult Energy
Consultants for
E7 Performance
15 20
Optimization
Register System with
E8 Energy Regulatory 15 20
Authorities
Communicate with
F1 Tenants, Retailors and 8 10
Service Contractors
Organize Opening
F2 Events
8 10
Provide Stakeholder
F7 Training
18 20
13 10.000 1.000
13 10.000 1.000
15 10.500 1.361
13 10.000 1.000
8 5.167 0.694
10 7.833 0.694
25 20.000 2.778
13 10.000 1.000
20 15.333 1.778
6.167 0.694
10 5.500 1.361
15 12.833 0.694
15 10.333 1.778
15 10.500 1.361
15 12.833 0.694
10 8.000 0.444
15 10.500 1.361
35 30.000 2.778
20 15.333 1.778
10 7.833 0.694
15 10.500 1.361
13 10.000 1.000
20 15.500 1.361
15 12.833 0.694
50 45.000 2.778
45 40.000 2.778
45 40.000 2.778
35 30.000 2.778
45 40.000 2.778
35 30.000 2.778
35 30.000 2.778
15 10.500 1.361
8 5.333 0.444
35 30.000 2.778
13 10.167 0.694
10 8.167 0.250
30 27.833 0.694
5 3.333 0.111
45 40.000 2.778
35 30.000 2.778
20 15.500 1.361
25 20.500 1.361
35 30.500 1.361
30 25.500 1.361
25 20.500 1.361
25 20.000 2.778
25 20.333 1.778
25 20.000 2.778
25 20.000 2.778
15 10.500 1.361
15 10.500 1.361
20 15.500 1.361
25 20.500 1.361
25 20.500 1.361
15 10.500 1.361
18 15.167 0.694
25 20.500 1.361
25 20.500 1.361
25 20.500 1.361
Days
σ^2 =
(σ) =
Check z score formula calc, use mean sum for mean and not CP
75.556
8.69
X = Project Duration
μ = Mean Duration
X = Project Duration
μ = Mean Duration