The Radant Gemba Board Work Center Monthly Summary for November 2022 highlights safety, quality, delivery, and availability issues across various departments including Stock Room, Laminating, Trim & Drill, Coatings, Machine Shop, Quality, and Shipping. Key takeaways include unplanned absences, incomplete MPS's, and safety hazards such as blocked fire extinguishers and slippery floors. Additionally, several Kaizen opportunities have been identified with corresponding action plans to improve processes and address root causes.

Uploaded by

scottspeagle2011
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
4 views2 pages

cpiGembaSummary11 22

The Radant Gemba Board Work Center Monthly Summary for November 2022 highlights safety, quality, delivery, and availability issues across various departments including Stock Room, Laminating, Trim & Drill, Coatings, Machine Shop, Quality, and Shipping. Key takeaways include unplanned absences, incomplete MPS's, and safety hazards such as blocked fire extinguishers and slippery floors. Additionally, several Kaizen opportunities have been identified with corresponding action plans to improve processes and address root causes.

Uploaded by

scottspeagle2011
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Radant Gemba Board Work Center Monthly Summary - November 2022

Stock Room Laminating Trim & Drill Coatings


25 20 14 20
12
20
15 10 15
15 8
Days

10 10

Days

Days

Days
17 6 13 18
10 20 19 20 15
13 10 10 10 10
15 5 12 4 5 12 11
5 10 10 7 6 7 9
8 7 7
1 5 3 2 4 5 2
0 0 0 0
Safety Quality Delivery Availability Safety Quality Delivery Availability Safety Quality Delivery Availability Safety Quality Delivery Availability

Category Category Category Category

Stock Room Takeaways: Laminating Takeaways: Trim & Drill Takeaways: Coatings Takeaways:

Safety - PPE, fire extinguisher, paint on top of cabinets Safety - PPE, extension cords on floor, slippery floor Safety - PPE, hoist issue, slippery floor Safety - PPE, blocked eye wash station, locked fire
Availability - unplanned absences Quality - MPS's incomplete, missed ply, wrong part on MPS, Quality - MPS's incomplete, missed inspection, thin foam extinguisher
Quality - expired inventory needs disposition incomplete process data on MPS Delivery - scheduling, lack of capacity Quality - paint rework, MPS's incomplete
Delivery - manning, scheduling, unorganized work area Availability - unplanned absences Delivery - scheduling
Availability - unplanned absences Availability - unplanned absences

Machine Shop Quality Shipping


25 20 20

20
15 15
15
Days

10 10
Days

Days
10 20 16 17
18 15
15 12 13 13
5 9 9 5
5 7 7
2 5 4 3 2 6 3 5 3
0 0 0
Safety Quality Availability Safety Quality Delivery Availability Safety Quality Delivery Availability

Category Category Category

Machine Shop Takeaways: Quality Takeaways: Shipping Takeaways:

Safety - PPE, fire extinguisher Safety - PPE, blocked aisles Quality - Training, no receiving Safety - PPE, blocked fire extinguisher
Availability - unplanned absences inspection, traveler sign offs Quality - RMA's using floor space
Delivery - Viz transactions, incomplete MPS's incomplete, Delivery - no product to ship, scheduling, waiting on
physical moves customer pick-ups
Availability - planned absences Availability - unplanned absences
Kaizen Newspaper
Root cause Countermeasure Countermeasure
Area: Packaging Status: 25% determined 50% established 75% implemented 100% Issue resolved

Kaizen Opportunity Owner Root Cause Action/Counter Measure 🗹 Status Finish Date
25%
Create template to mask inner
50%
surface of dorsal radome during Mark Excessive labor in taping and bagging Create template
75%
paining
100%
25%
ERP Standardize Route steps in ERP (i.e. Prime is 50%
Standardize ERP Routing Dispatch List is different from part to part
Admin/Planner OP40 on all routers) 75%
100%
25%
50%
Improve WI-FI on Floor IT Can’t connect to internet on floor Improve WI-FI
75%
100%
25%
Create In/Out boxes for paint There are currently no visual controls displaying Lay floor tape identifying In/Out boxes as well 50%
Lean Team
station where things go as walking lanes, safety areas, etc. 75%
100%
25%
Visual Identification Stickers for Create standard labels/stickers for 100% 50%
Quality No visual for finished product, 100% inspections
Quality Inspection inspections 75%
100%
25%
50%
RMA Process Shipping Product in shipping waiting for dispassion
75%
100%
25%
Process conm panel stacked and Engineering Ron Need to develop a place and process for storage of Work with engineering, facilities to develop a 50%
unorganized Gross process connol panels stack ready to fall over plan 75%
100%
25%
Shipping don’t know when trucks, or FedEx etc 50%
Dock camera Josh/Tim Small camera or buzzer for dock door.
shows up 75%
100%
25%
Cluttered unorganized with all 50%
John M / lam New shelfs needed to keep everything in a place
supplies 75%
100%
25%
Jhon M / Unable to do leak test check before removing parts 50%
New gages Autoclaves need 1 or 2 gages
Autoclave from lam 75%
100%
25%
50%
Rack for Autoclave Jhon M Hoses stored on ground Place for everything
75%
100%

MF-1409A