MEP Weekly Progress Report cs

The weekly progress report for ADIT 02-L2N4 details various MEP work activities completed as of November 30, 2024. Key tasks include the installation of fire hose/water supply pipes, drainage, lighting, electrical panels, and ventilation ducts, all marked as 'fair' in progress. The report also notes the installation of communication systems and safety features such as gas monitors and fire alarm systems.

Uploaded by

taimurshehzad265
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
6 views

MEP Weekly Progress Report cs

The weekly progress report for ADIT 02-L2N4 details various MEP work activities completed as of November 30, 2024. Key tasks include the installation of fire hose/water supply pipes, drainage, lighting, electrical panels, and ventilation ducts, all marked as 'fair' in progress. The report also notes the installation of communication systems and safety features such as gas monitors and fire alarm systems.

Uploaded by

taimurshehzad265
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

WEEKLY PROGRESS REPORT

Location: ADIT 02- L2N4 Date: 30-11-2024


Tunnal chainage stencil 117+135.900
Starting Chainage Extended Chainage
S/N MEP WORK DESCRIPTION Total Remarks

1 Fire Hose/Water Supply 6" Pipe 116+050 117+080 55Mtrs FAIR

2 Drainage 4" Pipe 116+915 116+940 95metrs FAIR

Lighting (Includes Regular and Emergency Lights with connection cables)


3 117+065 117+100 35Mtrs FAIR

4 Electrical Panel (Current Position) 117+060 75MTRS FAIR

Cable Installation (Panel - 300mm 2

2
5 240mm 117+015 117+060 47METRS FAIR

6 Convex Hanger Support 117+060 117+095 40mters FAIR

7 Ventilation Duct 117+060 117+085 50Mtrs FAIR

8 Phone 116+950 116+950 57mtrs FAIR

9 WIFI 116+950 116+950 57mtrs FAIR

85mtrs
10 Refugee chamber 116+950 116+950 high

11 Gas monitor 117+020 117+020 115mtrs FAIR

12 Fire Alarm system 116+880 116+950 85mtrs FAIR

13 Fire haydrant 116+050 117+080 55metrs FAIR

14 Walk way 117+015 117+070 65metrs FAIR