Attachment-1_Plant General Design Conditions
Attachment-1_Plant General Design Conditions
B 21-DEC-2021 Revised as per Owner’s comments B.S. KIM S.W. KIM N.H. KIM
A 15-OCT-2021 Issue for Approval B.S. KIM S.W. KIM N.H. KIM
PROJECT :
CONSULTANT :
CONTRACTOR :
Revision History
REV. REVISED
NO.
ISSUE DATE
PAGE
DESCRIPTION REMARK
Contents
1. INTRODUCTION.............................................................................................. 1
2. GENERAL ........................................................................................................ 3
3. CODES AND STANDARDS............................................................................... 4
3.1 LIST OF REFERENCE CODES/STANDARDS ..............................................................................................4
3.2 LIST OF COMPULSORY VIETNAMESE REGULATIONS/ STANDARDS ........................................................5
3.2.1 ENVIRONMENTAL STANDARDS ..........................................................................................................5
3.2.2 COMPULSORY ELECTRIC SAFETY CODES AND STANDARDS...............................................................6
3.2.3 COMPULSORY EXPLOSION AND FIRE PROTECTION STANDARDS ........................................................7
3.2.4 CIVIL ENGINEERING STANDARDS ......................................................................................................9
3.2.5 OTHER VIETNAMESE CODE/REGULATION .........................................................................................9
4. ENERAL DESIGN CONDITIONS ................................................................... 10
4.1 GENERAL ............................................................................................................................................. 10
4.2 PLANT CAPABILITY AND OPERATIONAL CONDITIONS ......................................................................... 11
4.3 SITE AND DESIGN CONDITIONS............................................................................................................ 15
4.4 HVAC OUTDOOR DESIGN CONDITION ................................................................................................ 19
4.5 HVAC INDOOR DESIGN CONDITION.................................................................................................... 19
4.6 FLUID VELOCITIES ............................................................................................................................... 19
4.7 UNITS OF MEASUREMENT .................................................................................................................... 21
5. FUEL SPECIFICATIONS ............................................................................... 22
6. UTILITIES CONDITIONS .............................................................................. 27
7. ENVIRONMENT CONTROL.......................................................................... 29
7.1 GENERAL ............................................................................................................................................. 29
7.2 NOISE EMISSION LIMITS ...................................................................................................................... 30
7.3 VIBRATION LIMITS .............................................................................................................................. 30
7.4 INDUSTRIAL WASTE WATER EFFLUENT LIMIT (QCVN40:2011/BTNMT).......................................... 30
7.5 DOMESTIC WASTE WATER EFFLUENT LIMIT (QCVN14:2008/BTNMT) ............................................ 32
i
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
PLANT GENERAL DESIGN CONDITIONS REV. B
1. INTRODUCTION
The descriptions in this section shall be applied for the Quang Trach I Thermal Power Plant (2
x 701.5MW(Gross) Ultra-Supercritical Coal-Fired).
1 of 32
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
PLANT GENERAL DESIGN CONDITIONS REV. B
The Coal Jetty for common facilities of Quang Trach I comprises one 100,000DWT coal
berth and will be constructed at the coal unloading berth area of the coal entrepot.
Project Schedule
The Works consists of two (2) units. It is imperative that the Works shall be completed to
meet the following schedules:
The Supplier shall provide definite information on delivery of equipment and materials to the
site ready for the erection or installation in accordance with this milestone schedule. OWNER
reserves the right to adjust the above schedules but there will be no change in the contract
price due to the adjustment.
2 of 32
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
PLANT GENERAL DESIGN CONDITIONS REV. B
2. GENERAL
This section delineates the general design conditions & requirements made to perform the
engineering work and equipment selection for this Plant.
The equipment is arranged as shown on the Plot Plan drawings contained in Reference
drawings. It can be modified during clarification according to discussion with the
OWNER.
English language shall be used in all engineering and design data including technical
information.
All units, dimensions and calculations shall be in metric and as detailed in the OWNER’s
RFP (clause 1.2.1.4), however, pressure and energy shall also be put down with
International System of Units (SI). And especially pressure unit, MPa (or kPa
considering for small value notation such as Condenser vacuum, MPa(a) is notation for
absolute and MPa(g) is for gauge pressure) shall be used in the display in CCR, field
instruments. But it is except that those used internationally in the English measurement
system such as pipe sizes.
And the following shall be considered for Safety and Equipment Protection;
When the power source is failed, emergency system should be properly interlocked to be
prevented from other trouble.
Safety fence and safety cover should be provided where protection from danger is
required.
3 of 32
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
PLANT GENERAL DESIGN CONDITIONS REV. B
The Plant system will be designed, manufactured and tested in compliance with applicable
International Codes and Standards as well as local laws and regulations.
The latest editions will be used and are defined as the editions in force at the Contract date
unless specified otherwise in the applicable Codes and Standards.
Where codes or standards are not specifically mentioned elsewhere in this section, it will
comply with the following applicable Codes and Standards.
When codes or standards not specified in this section is applied, it is subject to approval by
the OWNER and shall be proved to be equivalent to international standards.
3.1 List of Reference Codes/Standards
4 of 32
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
PLANT GENERAL DESIGN CONDITIONS REV. B
5 of 32
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
PLANT GENERAL DESIGN CONDITIONS REV. B
6 of 32
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
PLANT GENERAL DESIGN CONDITIONS REV. B
TCVN 2622: 1995 - Fire prevention and protection for buildings and structures
TCVN 5760: 1993 - Firefighting system – Design and application requirements
TCVN 5738: 2001 - Fire alarm system – Technical requirement
TCVN 5307: 2009 - Oil and petrol storage and oil product
TCVN 6153:1996 - Safety for pressure vessels – Design, installation and
utilization
TCVN 6100: 1996 - CO2 fire protection fire extinguishing media – carbon dioxide
TCVN 4090: 1985 - Oil pipe and oil product – Design standard
20 TCN 46 - Lightning in construction works
TCVN 6101: 1996 - Fire protection and fighting – CO2 used firefighting system
equipment – Design and Installation
TCVN 5303: 1990 - Fire safety – Terminology and definitions
TCVN 3254: 1989 - Fire safety – General requirement
TCVN 4878: 2009 - Fire classification
TCVN 4879: 1989 - Safety signs
TCVN 5040: 1990 - Fire protection and fighting equipment - Symbols
7 of 32
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
PLANT GENERAL DESIGN CONDITIONS REV. B
TCVN 6103: 1996 - Fire protection and fighting – Terminology – Smoke control
TCVN 6305: 2013 - Fire protection and fighting – Automatic sprinkler system
TCVN 7336: 2003 - Fire protection and fighting – Design and installation
requirements
TCVN 7161: 2009 - Air used firefighting system – Physical property and system
design.
TCVN 6379: 1998 - Firefighting equipment – Fire hydrant – Technical
requirement
TCVN 7435-1: 2004 - Fire protection and fighting – Portable extinguishers and fire
trolley
TCVN 5279: 1990 - Explosion and fighting safety – General requirement
TCVN 3255: 1986 - Explosion safety – General requirement.
TCVN 4586: 1997 - Industrial explosive material – Safe requirement for reserve,
transport and utilization.
TCVN 6174: 1997 - Industrial explosive material – Safety requirement for
manufacturing, explosion testing and approval
TCVN 5334: 2007 - Electrical equipment for oil storage and oil products, safety
specifications for design and installation
TCVN 5684: 2003 - Fire safety for oil works and products – General requirement
TCVN 3991: 2012 - Fire protection standard in construction design – Terminology
- Definition
TCVN 6160: 1996 - Fire protection and fighting – Design requirement for high
story building – Design requirement
TCVN 4317: 1986 - Storage house – Basic principle for design
TCVN 4513: 1988 - Water supply within design standard
TCVN 6102: 1995 - Fire fighting system - Powder
20 TCN 33: 2001 - External and project’s water supply network – Design
standard
TCN 25: 1991 - Electrical line installation in living hoist and public work –
Design standard
TCN 18-24 - Code of electrical installation – General regulation
TCN 46-84 - Lightning for public construction works – Design standard
TCXD 218: 1998 - Fire detection and alarm system – General regulation
QCVN 02:2020/BCA - National Technical Regulation on Stationary Pumps for Fire
Protection
8 of 32
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
PLANT GENERAL DESIGN CONDITIONS REV. B
QCVN 01:2021/BXD - Vietnam Building Code: Regional and Urban Planning and
Rural Residential Planning
QCVN 02:2021/BXD - Vietnam Building Code: Natural Physical & Climatic Data
for Construction
QCVN 03:2012/BXD - National Technical Regulation on Rules of Classifications
and Grading of Civil and Industrial Buildings and Urban
Infrastructures
QCVN 05:2008/BXD - Vietnam Building Code on Dwellings and Public Buildings –
Occupational Health and Safety
QCVN 06:2021/BXD - Vietnam Building Code on Fire Safety of Buildings
QCVN 07:2019/BKHCN - National technical regulation on steel for the reinforcement of
concrete
QCVN QTĐ-07:2009/BCT - National Technical Codes for Installation Power Network
QCVN 09:2017 - Energy Efficiency Building Code (EEBC)
QCVN 18:2014/BXD - National technical regulation on Safety in Construction
QCVN 16:2019/BXD - Vietnam Building Code: Products, Goods of Building
Material- Portland cement and Portland cement clinker
products
QCVN 07:2012/ BLĐTBXH - National technical regulation on safe work of lift appliances.
QCVN 20:2010/ BGTVT - National Technical Regulation on aids to Navigation
QCVN 16: 2013/BLĐTBXH - National technical regulation on safe work for electrical
tackle
QCVN 20: 2015/BLĐTBXH - National technical regulation on safe work of Elevating
Platform for lifting people
QCVN 07: 2010/BLĐTBXH - National technical regulation on safe work of Elevating
Platform for lifting people
QCVN 02:2019/BLĐTBXH - National technical regulation on safety for lift
QCVN 24:2016/BYT - National technical regulation on noise - permissible exposure
levels of noise in the workplace
QCVN 21:2015/BLĐTBXH - National technical regulation on safe work of refrigerating
system
9 of 32
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
PLANT GENERAL DESIGN CONDITIONS REV. B
4.1 General
The Works will be designed for the utilization of proven design directed toward extended
plant life (30 years) without excessive maintenance and without excessive replacement of
parts normally subject to wear and tear and deterioration in service, assuming the Plant is
operated in line with the operating instructions provided, maintained in accordance with
the maintenance schedules and procedures and has been operating within the defined Plant
operational envelope.
The exception to the above being:
Components or equipment that are subject to wear in service and replacement as part of
planned maintenance procedures such as seals, wear rings, wear rings, seats, bearings
and similar items.
Components that are designed to fail in service as part of their function e.g. fuses,
bursting discs etc.
The Facility will be partially automated and require minimum operator intervention for
normal operation. The degree of automation provided will ensure the Facility can be:
Safely and reliably started, shut down, controlled and monitored from the CCR; and
Operated with two operators, one in the CCR and the other in the CCR or roving the
plant as required.
It will be possible to start the any Generating Block and bring it to full capacity without
operator intervention outside of the CCR. Manual preparation may be required by operator
in CCR or field to fulfill ready to start- up permissive condition for safe plant operation.
For example, Coal handling system, Ash handling system, ESP system, Condenser water
make-up, Compressed air system, Closed cooling water system, Water and waste water
treatment system, etc. shall be in service prior to automatic start.
Some device (motor, damper, drain, vent, control or isolating valve) that may be required
to operate during start-up, shut-down, normal operation or transfer from one operating
mode to another shall be automated. Transfers include the safe shutting down of systems
in the event of a trip or malfunction of some element of the Facility. Notwithstanding this,
it will also be possible for the operator to interrupt the automatic, programmed sequences
and control the plant manually.
Notwithstanding the above, local control facilities will be provided for auxiliary equipment
at their local control panels. The controls provided at the panels will allow starting,
10 of 32
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
PLANT GENERAL DESIGN CONDITIONS REV. B
stopping and emergency tripping of the controlled equipment. Indication of the status of
auxiliary equipment will be provided in the CCR.
The following design and provisions are necessary for:
All process and equipment alarm status to be remotely monitored at the CCR for
operator access and operation; and
All process and individual equipment failure and tripping status to be independently
monitored by a sequence of events monitoring system.
Information from balance of plant systems will be made available at the CCR and any
other remote monitoring centers. The grouping of alarms from balance of plant equipment
will be minimized, with the extent of grouping being to the approval of the OWNER.
3) Unit Load Conditions
The Plant shall be operated not only for the base load operation but also for the load
cycling operation.
The Rated Output of each unit shall be the continuous electrical power output of 654.7
MW (net capacity) under following conditions:
Generator frequency 50 Hz
Note 1: The above conditions can be referred on Heat Balance Diagram, which is separately
submitted for Owner’s approval.
11 of 32
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
PLANT GENERAL DESIGN CONDITIONS REV. B
The Turbine Capability Condition (TCC) of each unit is defined as the continuous sent out
power of 100% Rated Output under the following conditions:
Other conditions such as steam conditions, speed, etc. shall be the same as the Rated
Output conditions.
Note 1: The above conditions can be referred on Heat Balance Diagram, which is separately
submitted for Owner’s approval.
The Turbine VWO condition shall be decided by the Turbine manufacturer in order to
secure the generator output at the Turbine Capability Condition.
4) Boiler Maximum Continuous Rating (BMCR)
The BMCR of the coal fired boiler is defined as the steam flow at the inlet to the turbine
main control valves corresponding to the steam flow for the VWO condition plus the
auxiliary steam flow for boiler and other equipment. SH (Superheater) Steam flow for
BMCR condition will be 102% of SH Steam flow at VWO.
5) Minimum Load of Coal Firing
The unit shall be able to operate continuously at stable load 40% and above of the Rated
Output when firing the design coal without fuel oil support and under automatic control.
The unit shall also be capable to operate at loads below 40% of RO with fuel oil support
firing and under automatic control.
6) Number of Starts
The coal fired steam plant shall be capable of operating continuously on base load and
shall be capable of handling load changes specified herein without tripping. The coal fired
steam plant will be required to start in the cold, warm, or hot condition, and to restart in
any condition.
Each unit shall be capable of full load rejection down to house load operation without
tripping. The plant shall be designed the number of starts for 30 years of its life as shown
in the below table:
<Table 2-1. Number of Starts and Load Cycles>
Event Shutdown period No. of starts per year Total
12 of 32
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
PLANT GENERAL DESIGN CONDITIONS REV. B
The Unit shall also be designed to be from first oil ignition to full load within the
following durations for different start conditions:
<Table 2-2. Durations for different start conditions>
Start Types First oil ignition to full load (min.) Remarks
Cold start 630
(Shutdown > 48 hours)
Warm Start 315
(Shutdown in 18 - 48 hours)
Hot Start 192.5
(Shutdown < 18 hours)
To facilitate start-up of the Plant, and to improve operational flexibility, e.g. during rapid
load changes, HP(High pressure) and LP(Low pressure) steam bypass system shall be
installed.
HP steam bypass system shall be designed to cover 60% of steam flow at BMCR and LP
steam bypass system shall be designed to cover 100% of the downstream from the HP
steam bypass and located between the hot reheat and the condenser.
Desuperheating spray for the HP steam to the cold reheat shall be provided from the boiler
feed water pump and for the hot reheat to the condenser will be provided by the
condensate extraction booster pump discharge.
The bypass line is closed during normal running of the Steam turbine. The system is
operated automatically during start-up or in the event of Steam turbine trip. In the event of
the transient condition that the condenser is unable to accept excessive steam flow above
capacity of bypass valves, the excess steam will be blown off through start-up vent valve
and ERV (Electrical relief valve).
8) House Load Operation
In the event of total load rejection and disconnection from the external network, the unit
shall be able to operate safely at the “House Load” under full automatic control, feeding
only the unit auxiliary services. The minimum period of operation at “House Load” shall
be two (2) hours, after that the Unit shall be successful re-connect to the power grip and
the Contractor shall state any limitations on his machine if the above period cannot be
achieved.
9) Load Change Rate
The Unit shall be designed to vary (including ramp up and ramp down) the loads during
normal operation at the following rates:
13 of 32
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
PLANT GENERAL DESIGN CONDITIONS REV. B
14 of 32
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
PLANT GENERAL DESIGN CONDITIONS REV. B
(1) Elevation after site grading : EL +5.10m (Hon Dau National Altitude)
2) Meteorological conditions
(1) Ambient temperature & humidity
3) Wind Condition
(1) Code : ASCE 7-16
(2) Basic Wind Speed (V) : 67.28m/s (for occupancy category III with 1700 MRI)
Where, the basic wind speed V, corresponds to a 3 second gust speed at 10m above ground in exposure
category C.
4) Seismic Condition
(1) Code : ASCE 7-16
(2) Design Seismic Parameters
15 of 32
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
PLANT GENERAL DESIGN CONDITIONS REV. B
For garages and buildings/structures of security system will be designed with Peak
Ground Acceleration, PGA=0.05g.
Seismic Coefficient Values
Site Class SD SE
SDS 0.148 0.222
SD1 0.100 0.175
T0 0.135 0.158
TS 0.675 0.788
TL 2.0 2.0
Seismic design category (SDC) B C
Importance factor, I 1.25 1.25
16 of 32
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
PLANT GENERAL DESIGN CONDITIONS REV. B
17 of 32
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
PLANT GENERAL DESIGN CONDITIONS REV. B
18 of 32
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
PLANT GENERAL DESIGN CONDITIONS REV. B
Result QCVN08:
No. Item Unit 2015/BTNMT
S1 S2 (B2)
37 SS mg/l 12 15 N/A
38 Conductivity 120.5 125.0 N/A
39 Turbidity NTU 10 12 N/A
40 Temperature oC 23.1 23.2 N/A
41 Color Pt-Co 11 12 N/A
42 SO42- mg/l 3.0 3.0 N/A
43 Phosphor (organic) mg/l 0.6 0.6 N/A
44 Ca2+ mg/l 6.0 4.6 N/A
45 Mg2+ mg/l 3.6 3.2 N/A
46 K+ mg/l 0.32 0.32 N/A
47 Al3+ mg/l 0.01 0.01 N/A
Note: Source of Water: Vuc Tron Lake – Quang Trach District, Quang Binh province.
S1: sample taken from upstream of Vuc Tron lake (17°54'24.60"N; 106°20'36.20"E).
S2: sample taken from downstream of Vuc Tron lake (17°53'40.10"N; 106°22'24.10"E).
Refer to the indoor design condition for each building through clause 2.2 of “QT1-0-H-SA_-
04-10001 Design Criteria for HVAC”.
Steam lines:
Main steam, Hot reheats & Cold reheat lines 50 m/s
H.P Turbine bypass lines & L.P Turbine bypass lines 200 m/s
Low-pressure steam lines above 5 kg/cm2(including
40 m/s
extraction steam lines)
Low-pressure steam lines 1 kg/cm2g up to 5
45 m/s
kg/cm2(including extraction steam lines)
19 of 32
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
PLANT GENERAL DESIGN CONDITIONS REV. B
20 of 32
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
PLANT GENERAL DESIGN CONDITIONS REV. B
All units, dimensions and calculations shall be in metric and as detailed in the OWNER’s RFP
(clause 1.2.1.4), however, pressure and energy shall also be put down with International
System of Units (SI). And especially pressure unit, MPa (or kPa considering for small value
notation such as Condenser vacuum, MPa(a) is notation for absolute and MPa(g) is for gauge
pressure) shall be used in the display in CCR, field instruments. But it is except that those
used internationally in the English measurement system such as pipe sizes.
Length mm, m, km
21 of 32
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
PLANT GENERAL DESIGN CONDITIONS REV. B
5. FUEL SPECIFICATIONS
This means fuel having specifications and characteristics to be used in the design of the Plant.
1) Design Coal
The Units must be capable of economic and efficient operation over the design coal range
as given. Specifically, the following parameters of the coal specification must be used for
the respective testing and design.
<Table 5. Coal Specification>
Sub-Bituminous coal Bituminous coal Design Coal
Item Unit
Typical Range Typical Range Performance Range
Total Moisture % arb 34.00 <38.00 12.00 <14.00 27.40 <38.00
Proximate analysis
Inherent
% adb 15.00 <25.00 8.00 <12.00 12.90 <20.00
Moisture
Ash % adb 4.00 <8.00 9.50 <17.00 5.88 <14.00
35.00 - 22.00 - 25.00 -
Volatile matter % adb 42.00 40.00 41.16
55.00 42.00 50.00
30.00 -
Fixed carbon % adb 39.00 By diff 42.50 By diff 40.06
42.50
Total % adb 100.00 100.00 100.00
0.10
0.35 -
Total Sulphur % adb 0.15 0.35 0.85 Max 1.10
- 1.20
0.70
Ultimate analysis
Carbon % daf 74.12 77.30
Hydrogen % daf 5.51 5.60
Nitrogen % daf 1.07 1.10
Sulphur % daf 1.0 1.0
Chlorine % daf 0.01 0.02
Oxygen + Others % daf 18.29 27.56
Total % daf 100.00
Caloric value
Gross (adb) kCal/ kg 5,500 > 4,800 6,300 > 6,000 5,740 > 4,950
Gross (arb) kCal/ kg 4,271 > 4,100 6,025 > 5,600 4,797 > 3,850
Net (arb) kCal/ kg 3,898 > 3,500 5,750 > 5,350 4,450 >3,500
Hardness HGI 55 40 – 60 36 34 – 60 36 34 – 60
Ash fusion (reducing)
Initial oC 1,150 >1,150 1,350 >1,200 1,150 >1,100
deformation
Spherical oC 1,200
Hemisphere oC 1,250 1,600
Flow oC 1,300 1,600
Note 1: Boiler can generate steam flow rate as same as 100% BMCR case with 3,850kcal/kg (gross,
arb) and 6 pulverizer operation.
Note 2 : The values/parameters in italic type are used for reference only.
22 of 32
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
PLANT GENERAL DESIGN CONDITIONS REV. B
2) Fuel Oil
Fuel oil handling system and firing equipment shall be designed based on the following
Diesel Oil analysis (TCVN 5689:2018):
<Table 6. DO analysis>
No. Item Unit Value Test method
1 Sulfur content mg/kg max 500 TCVN 6701 (ASTM D 2622)
2 Cetane index min 46 TCVN 3180 (ASTM D 4737)
3 Distillation, 90°C Vol max 360 TCVN 2698 (ASTM D 86)
4 Flash Point °C min 55 TCVN 6608 (ASTM D 3828)
5 Viscosity at 40oC mm2/s 2- 4.5 TCVN 3171 (ASTM D 445)
6 Carbon Conradson Wt % max 0.3 TCVN 6324 (ASTM D 189)
7 Pour Point °C max + 6 TCVN 3753 (ASTM D 97)
8 Ash Wt % max 0.01 TCVN 2690 (ASTM D 482)
9 Moisture mg/kg max 200 TCVN 3182 (ASTM D 6304)
10 Particulate Impurities mg/l max 10 TCVN 2706 (ASTM D 6217)
Corrosion of copper at 50°C
11 No. 1 TCVN 2694 (ASTM D 130)
in 3 hours.
12 Density at 15oC kg/m3 820 - 860 TCVN 6594 (ASTM D 1298)
13 Lubricating µm max 460 TCVN 7758 (ASTM D 6079)
14 Visual Check clean TCVN 7759 (ASTM D 4176)
15 HHV kcal/kg ≥10,100
23 of 32
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
PLANT GENERAL DESIGN CONDITIONS REV. B
3) Design critical:
Under all firing conditions with any coal in the stated above range, the Unit must be
capable of operating at 100% BMCR.
Design Coal with ash =14% (adb) must be used for sizing, design and testing of ESP
and ash handling plant. (Refer to Max. Ash Coal in Table 7)
Design Coal with sulfur = 1.1% (adb) must be used for design and testing of FGD.
(Refer to Max. Sulfur Coal in Table 7)
<Table 7. Detail Coal / Ash Specification for Equipment Design>
Coal No. 1 2 3 4 5
Design
Coal Code Name Design Range Coals
Coal
Min. Max. Max.
Performa Max. Ash
Coal Brand Name HHV Moisture Sulfur
nce Coal Coal
Coal Coal coal
(as received :
Proximate Analysis
a.r)
Total Moisture TM %:a r 27.40 27.40 38.00 27.40 27.40
Fixed Carbon FC %:a.r 33.39 33.39 28.16 33.39 30.05
Volatile Matter VM %:a.r 34.31 34.31 28.94 34.31 30.88
Ash AS %:a.r 4.90 4.90 4.90 4.90 11.67
Total %:a.r 100.00 100.00 100.00 100.00 100.00
Surface Moisture SM %:a.r 16.65 16.65 N/A 16.65 16.65
Inherent Moisture IM %:a.r 10.75 10.75 N/A 10.75 10.75
Total Sulfur TS %:a.r 0.71 0.71 0.71 0 92 0.71
(air dry base :
Proximate Analysis
a.d.b)
Inherent Moisture IM %:a.d.b 12.90 12.90 N/A 12.90 12.90
Fixed Carbon FC %:a.d.b 40.06 40.06 N/A 40.06 36.05
Volatile Matter VM %:a.d.b 41.16 41.16 N/A 41.16 37.05
Ash AS %:a.d.b 5.88 5.88 N/A 5.88 14.00
Total %:a.d.b 100.00 100.00 N/A 100.00 100.00
Total Sulfur TS %:a.d.b 0.85 0.85 N/A 1.10 0.85
(as received :
Ultimate Analysis
a.r.)
Carbon C %:a.r 50.18 45.40 47.03 49.91 48.11
Hydrogen H %:a.r 3.73 3.37 3.50 3.71 3 57
Nitrogen N %:a.r 0.73 0.73 0.73 0.73 0.73
Sulfur S %:a.r 0.71 0.71 0.71 0.92 0.71
Oxygen O %:a.r 12.35 17.49 5.13 12.43 7.81
Total Moisture TM %:a.r 27.40 27.40 38.00 27.40 27.40
Ash AS %:a.r 4.90 4.90 4.90 4.90 11.67
Total %a.r 100.00 100.00 100.00 100.00 100.00
Chlorine Cl %:a.r
(air dry base :
Ultimate Analysis
a.d.b)
Carbon C %:a.d.b 60.20 54.47 N/A 59.88 57.72
Hydrogen H %.a.d.b 4.47 4.05 N/A 4.45 4.29
Nitrogen N %:a.d.b 0.88 0.88 N/A 0.88 0.88
24 of 32
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
PLANT GENERAL DESIGN CONDITIONS REV. B
Coal No. 1 2 3 4 5
Sulfur S %:a.d.b 0.85 0.85 N/A 1.10 0.85
Oxygen O %:a.d.b 14 82 20.97 NIA 14.91 9.36
Inherent Moisture IM %:a.d.b 12.90 12.90 NIA 12.90 12.90
Ash AS %:a.d.b 5.88 5.88 N/A 5.88 14.00
Total %:a.d.b 100.00 100.00 N/A 100.00 100.00
Ultimate Analysis (dry base : d.b)
Carbon C %:d.b 69.12 62.53 75.85 68.75 66.27
Hydrogen H %:d.b 5.14 4.65 5.64 5.10 4.92
Nitrogen N %:d.b 1.01 1.01 1.18 1.01 1.01
Sulfur S %:d.b 0.98 0.98 1.15 1.26 0.98
Oxygen O %:d.b 17.00 24.08 8.28 17.13 10.75
Ash AS %·d.b 6 75 6.75 7.90 6.75 16.07
Total %:d.b 100.00 100.00 100.00 100.00 100.00
(dry ash free :
Ultimate Analysis
d.a.f)
Carbon C %:d.a.f 74.12 67.06 82.36 73.73 78.96
Hydrogen H %:da.f 5.51 4.98 6.12 5.47 5.86
Nitrogen N %:d.a.f 1.08 1.08 1.28 1.08 1.20
Sulfur S %:d.a.f 1.05 1.05 1.24 1.35 1.16
Oxygen O %:d.a.f 18.24 25.83 8.99 18.36 12.81
Total %:d.a.f 100.00 100.00 100.00 100.00 100.00
Heating Value
Higher Heating
Value
HHV(AD) HHV' kJ/kg 24,100 20,700 N/A 24,100 24,100
kcal/kg 5,760 4,950 N/A 5,760 5,760
HHV(AR) HHV' kJ/kg 20,100 17,200 20,100 20,100 20,100
kcal/ko 4,797 4,100 4,797 4,797 4,797
Lower Heating
Value
LHV(AR) LHV' kJ/kg 18,600 15,500 18,600 18,600 18,600
kcal/kg 4,454 3,700 4,454 4,454 4,454
HGI HGI - 36 36 36 36 36
Fuel Ratio FR - 0.97 0.97 0.97 0.97 0.97
Ash Analysis
Si02 %: dry 38.10 38.10 38.10 38.10 38.10
Al203 %: dry 18.20 18.20 18.20 18.20 18.20
Fe203 %: dry 9.40 9.40 9.40 9.40 9.40
Ti02 %: dry 0.54 0.54 0.54 0.54 0.54
Mn304 %: dry 0.07 0.07 0.07 0.07 0.07
Cao %: dry 23.90 23.90 23.90 23.90 23.90
MgO %: dry 3.09 3.09 3.09 3.09 3.09
Na20 %:dry 0.84 0.84 0.84 0.84 0.84
K20 %: dry 1.20 1.20 1.20 1.20 1.20
P20s %: dry 0.50 0.50 0.50 0.50 0.50
S03 %: dry 4.09 4.09 4.09 4.09 4.09
Mn02 %: dry
25 of 32
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
PLANT GENERAL DESIGN CONDITIONS REV. B
Coal No. 1 2 3 4 5
Others 0.07 0.07 0.07 0.07 0.07
Total %: dry 100.00 100.00 100.00 100.00 100.00
Na20+K20
Ash Fusion
Temperature
Atmosphere : Reducing
Initial
IDT ℃ 1,150 1,150 1,150 1,150 1,150
Deformation
Spherical ST ℃ 1,200 1,200 1,200 1,200 1,200
Hemispherical HT ℃ 1,250 1,250 1,250 1,250 1,250
Fluid FT ℃ 1,300 1,300 1,300 1,300 1,300
Atmosphere : Oxidized
Initial
IDT ℃ 1,200 1,200 1,200 1,200 1,200
Deformation
Spherical ST ℃ 1,250 1,250 1,250 1,250 1,250
Hemispherical HT ℃ 1,300 1,300 1,300 1,300 1,300
Fluid FT ℃ 1,350 1,350 1,350 1,350 1,350
26 of 32
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
PLANT GENERAL DESIGN CONDITIONS REV. B
6. UTILITIES CONDITIONS
Utilities pressure and temperature requirements at the takeover points between Contractor and
Provider are indicated below:
(Note-1) Pressure value shows the required pressure at 1m beside from each facility.
1) Electric power
(1) for Power
<NOTE>
1) The voltage at the terminals of consumers lies well within 0.90Un - 1.10Un for
steady state conditions and 0.85Un for transient conditions (i.e.: largest motor
starting)
2) Supplier shall equip the equipment to convert or supply other voltage in the
panel/board, if necessary.
3) Auxiliary Steam
4) Instrument air
5) Service air
27 of 32
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
PLANT GENERAL DESIGN CONDITIONS REV. B
6) Cooling water (for closed cooling water system) for equipment cooling
7) Service water
28 of 32
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
PLANT GENERAL DESIGN CONDITIONS REV. B
7. ENVIRONMENT CONTROL
7.1 General
The following environmental requirements in the design of the plant system and equipment
shall be followed. Furthermore, all the requirements in the approved EIA of the Quang Trach
I TPP and Vietnamese environmental Law and Regulations shall be studied.
Project’s EIA report has been prepared and approved by the MONRE by Decision No
303/QDD-BTNMT dated 29/01/2018 on Approval of EIA report on Quang Trach I TPP. The
report is base for Government and local authorities to supervise the implementation of
measures applied to mitigate the adverse impacts on the environment (including air, water,
soil etc.)
During contract’s performance, there might be changes related to Project’s scale, capacity,
technology or changes on treatment of air emission, waste water, solid wastes etc. and
changes on environmental mitigation measures. And these changes can be implemented only
when get official approval from the approval authority (MONRE). EVN will work with the
Contractor along the process to get the approval
The following environmental conditions shall be met as minimum requirements:
<Table 9. Environmental Conditions Requirements>
Item Unit Value Remarks
(a) Stack height m 229.5 EL
(b) NOx concentration (at 6% O2) at
mg/Nm3 ≤ 200 QCVN 05:2013/BTNMT
outlet of the stack
(c) SO2 concentration (at 6% O2) at
mg/Nm3 ≤ 200 QCVN 05:2013/BTNMT
outlet of the stack
(d) Dust concentration (at 6% O2) at
outlet of the stack mg/Nm3 ≤ 40
(e) Difference in temperature of
ºC Max. 7.9
cooling water
(f) Temperature of the cooling water
ºC Max. 40 QCVN 40:2011/BTNMT
discharge to the environment
(g) Noise level at boundary (on land 70 (from 06,00 to 21,00hrs) According to
dB(A) 55 (from 21,00 to 06,00 hrs) QCVN26:2010/BTNMT
side) at any load
(h) Noise level at 1 m from
dB(A) 85
equipment
(i) Noise level at working place,
Center control room and
dB(A) 65 TCVN3985: 1999
Administration Office with
ventilation/ Air cond.
As per Vietnamese industrial Class B (Main Offer);
(j) Industrial waste water waste water Standard– Class A (Alternative
QCVN 40:2011/BTNMT Offer).
As per National Technical
Regulation on Domestic
(k) Domestic waste water Class B
waste water - QCVN 14:
2008/BTNMT
Note: Nm3 (at dry, 1atm, 25degC, 6% O2)
29 of 32
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
PLANT GENERAL DESIGN CONDITIONS REV. B
Noise control shall be performed following the requirement of in accordance with the
approved EIA and QCVN 26:2010 National Technical Regulation on Noise. Suitable acoustic
treatment shall be provided to ensure that, when the plant is operating at any load up to and
including its maximum capabilities. The following shall apply:
(1) The noise level at the boundary of Site shall not exceed values listed in above <Table 9.
Environmental Conditions Requirement>.
(2) The equivalent sound pressure level at working places (except for Center control room and
Administration Office, 65dBA) in the Plant shall not exceed 85 dBA.
Prior to Provisional Acceptance, noise level measurements shall be taken by Contractor in the
presence of OWNER in various working areas in the plant and along the boundary of the site
in a manner to be agreed between the Contractor and OWNER to verify that the noise levels
conform to the above requirement mentioned in item (1) and (2) above. Noise level
measurements shall also be taken during factory performance tests as applicable.
Should the measured noise levels exceed these limitations, the Contractor shall proceed to
take appropriate steps to reduce the levels to within acceptable limits. Noise level
measurements shall be taken by the Contractor following any modification to verify
compliance with the Contract’s requirements.
The equipment shall be designed and constructed to operate without vibration in so far as the
nature of the works will permit. Appropriate action shall be undertaken by the Contractor
wherever vibration is excessive, and action is required to reduce it to an acceptable level.
The mechanical vibration at any operation load shall not exceed the zone A/B boundary as per
ISO 20816 for rotating machines such as turbine, pumps, fans, drives etc., for the type and
scope of tests required to prove compliance with the criteria laid. If the acceptable level of
vibration for equipment is not defined in ISO 20816, it should be complied with the relevant
code and standards in practice, but approved by Owner.
30 of 32
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
PLANT GENERAL DESIGN CONDITIONS REV. B
Note :
1) Treated waste water will be guaranteed when discharged to aeration basin of Seawater
FGD System. Guarantee point is before discharge to aeration basin of Seawater FGD
system.
31 of 32
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
PLANT GENERAL DESIGN CONDITIONS REV. B
32 of 32