Attachment-1_Plant General Design Conditions

The document outlines the general design conditions for the Quang Trach I Thermal Power Plant, which consists of two 700 MW coal-fired units. It includes information on project timelines, design standards, environmental regulations, and safety measures. The document is a revision based on owner comments and serves as a comprehensive guide for the engineering and construction of the plant.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
12 views

Attachment-1_Plant General Design Conditions

The document outlines the general design conditions for the Quang Trach I Thermal Power Plant, which consists of two 700 MW coal-fired units. It includes information on project timelines, design standards, environmental regulations, and safety measures. The document is a revision based on owner comments and serves as a comprehensive guide for the engineering and construction of the plant.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 35

FOR APPROVAL

B 21-DEC-2021 Revised as per Owner’s comments B.S. KIM S.W. KIM N.H. KIM

A 15-OCT-2021 Issue for Approval B.S. KIM S.W. KIM N.H. KIM

REV. DATE DESCRIPTION DSGN CHKD APPD

PROJECT :

TWO(2) x 700 MW QUANG TRACH I THERMAL POWER PLANT


38/2021/QT1-EVNPMB2-MC-HDEC-CC1
OWNER :

CONSULTANT :

CONTRACTOR :

DESIGNED BY DATE TITLE :

B.S. KIM 15-OCT-2021 PLANT GENERAL DESIGN CONDITIONS


CHECKED BY DATE PLANT AREA SUBDIVISION

S.W. KIM 15-OCT-2021 Overall General

APPROVED BY DATE DOCUMENT NUMBER REV.

N.H. KIM 15-OCT-2021 QT1-L-M-010-04-00001 B


TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
PLANT GENERAL DESIGN CONDITIONS REV. B

Revision History

REV. REVISED
NO.
ISSUE DATE
PAGE
DESCRIPTION REMARK

A 15-OCT-2021 - 1st Issue


2,3,6,8,9,1
Revised as per Owner’s Comments (0067 CaRs
1,12,15,16,
B 21-DEC-2021 R1 29Oct21) via. 1612/EVNPMB2-KTAT at
19~21,23,
Nov. 01, 2021
29,32
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
PLANT GENERAL DESIGN CONDITIONS REV. B

Contents

1. INTRODUCTION.............................................................................................. 1
2. GENERAL ........................................................................................................ 3
3. CODES AND STANDARDS............................................................................... 4
3.1 LIST OF REFERENCE CODES/STANDARDS ..............................................................................................4
3.2 LIST OF COMPULSORY VIETNAMESE REGULATIONS/ STANDARDS ........................................................5
3.2.1 ENVIRONMENTAL STANDARDS ..........................................................................................................5
3.2.2 COMPULSORY ELECTRIC SAFETY CODES AND STANDARDS...............................................................6
3.2.3 COMPULSORY EXPLOSION AND FIRE PROTECTION STANDARDS ........................................................7
3.2.4 CIVIL ENGINEERING STANDARDS ......................................................................................................9
3.2.5 OTHER VIETNAMESE CODE/REGULATION .........................................................................................9
4. ENERAL DESIGN CONDITIONS ................................................................... 10
4.1 GENERAL ............................................................................................................................................. 10
4.2 PLANT CAPABILITY AND OPERATIONAL CONDITIONS ......................................................................... 11
4.3 SITE AND DESIGN CONDITIONS............................................................................................................ 15
4.4 HVAC OUTDOOR DESIGN CONDITION ................................................................................................ 19
4.5 HVAC INDOOR DESIGN CONDITION.................................................................................................... 19
4.6 FLUID VELOCITIES ............................................................................................................................... 19
4.7 UNITS OF MEASUREMENT .................................................................................................................... 21
5. FUEL SPECIFICATIONS ............................................................................... 22
6. UTILITIES CONDITIONS .............................................................................. 27
7. ENVIRONMENT CONTROL.......................................................................... 29
7.1 GENERAL ............................................................................................................................................. 29
7.2 NOISE EMISSION LIMITS ...................................................................................................................... 30
7.3 VIBRATION LIMITS .............................................................................................................................. 30
7.4 INDUSTRIAL WASTE WATER EFFLUENT LIMIT (QCVN40:2011/BTNMT).......................................... 30
7.5 DOMESTIC WASTE WATER EFFLUENT LIMIT (QCVN14:2008/BTNMT) ............................................ 32

i
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
PLANT GENERAL DESIGN CONDITIONS REV. B

1. INTRODUCTION

The descriptions in this section shall be applied for the Quang Trach I Thermal Power Plant (2
x 701.5MW(Gross) Ultra-Supercritical Coal-Fired).

 Project Name : TWO(2) x 700MW QUANG TRACH I THERMAL POWER PLANT

 OWNER : Vietnam Electricity (EVN)


The planned site for the construction of the power plant is located in Vinh Son hamlet, Quang
Dong commune, Quang Trach district, Quang Binh province.
The Coal Fired Power Plant is composed of two(2) Boilers, two(2) Steam Turbine Generators,
and Balance of Plant equipment which are the most efficient and proven machines utilizing
the available technology in the world.
Land reclamation for Site had been done from EL +5.10m to EL +5.82m (Hon Dau National
Altitude) in the Main plant area and the auxiliary area. And land leveling on these areas with
level minimum at EL +5.10m will be conducted.

<Fig. 1 Site location>


Road transportation
National Road 1A is located in the West of Quang Trach I Power Plant and will connect to
Quang Trach I plant at front main gate to be located on Switchyard side by about 12m wide
road which will be constructed by the OWNER.
There is one road in the Southwestern of Plant area which is currently connecting to Hon La
Industrial zone with National Road 1A. This road is about 7.5m wide and it will be used as
main transportation route during construction period. Another access road shall be conducted
to connect Quang Trach I Power Plant with National high way Road No.1A. This road width
is about 12m and will be conducted by the OWNER.
Seaway transportation
The existing Hon La’s port in the Southeastern of Quang Trach Power Complex.

1 of 32
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
PLANT GENERAL DESIGN CONDITIONS REV. B

The Coal Jetty for common facilities of Quang Trach I comprises one 100,000DWT coal
berth and will be constructed at the coal unloading berth area of the coal entrepot.

Plant and Equipment Arrangement


Equipment of Unit 1 and 2 will be arranged in slide along (same hand) conception based on
the west-east center line of the units as shown in the plot plan and equipment arrangement
drawings. The general arrangement drawings indicate the layout of the principal equipment
and buildings including the required space for the access to the equipment for construction
and maintenance. The central control building will be located at the center between both
boilers. The main step-up transformer and auxiliary transformers are located at the west end
of the turbine building.
Both units have a reinforced concrete stack with inner flue for each unit receiving flue gases
from the De-SOx facilities and releasing to the atmosphere. The ash disposal area is located at
the east of the plant. Coal from the storage area is transferred to the coal silos arranged in
front of each steam generator by conveyors.

Project Schedule
The Works consists of two (2) units. It is imperative that the Works shall be completed to
meet the following schedules:

 Unit 1 is 42 months from the Effective Date to Completion Date,

 and Unit 2 is 48 months from the Effective Date to Completion Date.

The Supplier shall provide definite information on delivery of equipment and materials to the
site ready for the erection or installation in accordance with this milestone schedule. OWNER
reserves the right to adjust the above schedules but there will be no change in the contract
price due to the adjustment.

2 of 32
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
PLANT GENERAL DESIGN CONDITIONS REV. B

2. GENERAL

This section delineates the general design conditions & requirements made to perform the
engineering work and equipment selection for this Plant.

 The equipment is arranged as shown on the Plot Plan drawings contained in Reference
drawings. It can be modified during clarification according to discussion with the
OWNER.

 English language shall be used in all engineering and design data including technical
information.

 All units, dimensions and calculations shall be in metric and as detailed in the OWNER’s
RFP (clause 1.2.1.4), however, pressure and energy shall also be put down with
International System of Units (SI). And especially pressure unit, MPa (or kPa
considering for small value notation such as Condenser vacuum, MPa(a) is notation for
absolute and MPa(g) is for gauge pressure) shall be used in the display in CCR, field
instruments. But it is except that those used internationally in the English measurement
system such as pipe sizes.

And the following shall be considered for Safety and Equipment Protection;

 All of equipment accessible to maintenance should be provided with mechanical or


electrical safety means (mechanical lock, electrical lock, etc.).

 Equipment should be properly interlocked to be prevented from break down or damage.

 When the power source is failed, emergency system should be properly interlocked to be
prevented from other trouble.

 Safety fence and safety cover should be provided where protection from danger is
required.

3 of 32
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
PLANT GENERAL DESIGN CONDITIONS REV. B

3. CODES AND STANDARDS

The Plant system will be designed, manufactured and tested in compliance with applicable
International Codes and Standards as well as local laws and regulations.
The latest editions will be used and are defined as the editions in force at the Contract date
unless specified otherwise in the applicable Codes and Standards.
Where codes or standards are not specifically mentioned elsewhere in this section, it will
comply with the following applicable Codes and Standards.
When codes or standards not specified in this section is applied, it is subject to approval by
the OWNER and shall be proved to be equivalent to international standards.
3.1 List of Reference Codes/Standards

ANSI - American National Standard Institute


ASME - American Society of Mechanical Engineers
ASTM - American Society for Testing and Materials
BS - British Standards Institute
DIN - German Institute of Standardization
IEC - International Electro Technical Commission
IEEE - Institute of Electrical and Electronics Engineers \
ISO - International Organization for Standardization
JIS - Japanese Industrial Standards
KS - Korean Industrial Standards
NEMA - National Electrical Manufacturers' Association
NFPA - National Fire Protection Association
TEMA - Tubular Exchanger Manufacturers Association
HEI - Heat Exchange Institute
HIS - Hydraulic Institute Standard
ACI - American Concrete Institute
AISC - American Institute of Steel Construction
AISI - American Iron and Steel Institute
API - American Petroleum Institute
ASHRAE - American Society of Heating, Refrigeration & Air Conditioning Engineers
AWS - American Welding Society
AWWA- American Water Works Association

4 of 32
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
PLANT GENERAL DESIGN CONDITIONS REV. B

AMCA - Air Movement and Control Association


ABMA - American Bearing Manufacturers Association
AGMA - American Gear Manufacturers Association
AS - Australia Standards
FEM - European Materials Handling Federation
NACE - National Association of Corrosion Engineers
OSHA - Occupational Safety and Health Administration
PFI - Pipe Fabrication Institute
AASHTO - American Association of State Highway and Transportation Officials
IBC - International Building Code
ASCE/SEI – American Society of Civil Engineers / Structural Engineering Institute
OCDI - The Overseas Coastal Area Development Institute of Japan
IGCI - Industrial Gas Cleaning Institute (USA)
MSS - Manufacturers Standardization Society
NEC - National Electrical Code
CEMA - Conveyor Equipment Manufacturers Association
CMAA - Crane Manufacturers Association of America
SMACNA - Sheet Metal and Air-Conditioning Contractors National Association
SSPC - Steel Structures Painting Manual
IPC - International Plumbing Code
UPC - Uniform Plumbing Code
SAMA - Scientific Apparatus Markers Association
ISA - Instrumentation, System and Automation Society

3.2 List of Compulsory Vietnamese Regulations/ Standards

3.2.1 Environmental Standards

QCVN 22: 2009/BTNMT - National technical regulation on Emission of Thermal power


industry
QCVN 05: 2013/BTNMT - National technical regulation on ambient air quality
QCVN 19: 2009/BTNMT - National technical regulation on industrial emission of
inorganic substances and dusts

5 of 32
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
PLANT GENERAL DESIGN CONDITIONS REV. B

QCVN 20: 2009/BTNMT - National technical regulation on industrial emission of


organic substances
QCVN 06: 2009/BTNMT - National technical regulation on hazardous substances in
ambient air quality
QCVN 40: 2011/BTNMT - National technical regulation on industrial wastewater
QCVN 14: 2008/BTNMT - National technical regulation on domestic wastewater
QCVN 25: 2009/BTNMT - National technical regulation on wastewater of solid waste
landfill sites
QCVN 08: 2008/BTNMT - National technical regulation on surface water quality
QCVN 09: 2008/BTNMT - National technical regulation on groundwater quality
QCVN 10: 2008/BTNMT - National technical regulation on coastal water quality
QCVN 15 : 2008/BTNMT - National technical regulation on the pesticide residues in the
soils
QCVN 43: 2012/BTNMT - National technical regulation on sediment quality
QCVN 26: 2010/BTNMT - National technical regulation on noise
QCVN 27: 2010/BTNMT - National technical regulation on vibration
TCVN 3985: 1999 - Acoustics – Allowable noise levels at workplace
QCVN 03: 2008/BTNMT - National technical regulation on the allowable limits of heavy
metal in soils
QCVN 50: 2013/BTNMT - National technical regulation on hazardous thresholds for
sludge from water treatment process
QCVN 01:2009/BYT - National technical regulation on drinking water quality
QCVN 02: 2009/BYT - National technical regulation on domestic water quality
Circular 36/2015/TT-BTNMT - Regulations of Hazardous waste management
Circular 31/2011/TT-BTNMT - Technical Regulations of seawater environment survey
(including sea bottom deposit and sea creature)
Circular 24/2017/TT-BTNMT - Technical Regulations of environmental monitoring
Decree 38/2015/NĐ-CP - Regulations of waste management
TCVN 5502 – 2003 - Domestic supply water – Quality requirements
TCVN 7957:2008 - Drainage and sewerage – External networks and facilities –
Design standard

3.2.2 Compulsory Electric Safety Codes and Standards

Vietnam Electrical Equipment Regulation 2006 (Part I, II, III, IV)

6 of 32
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
PLANT GENERAL DESIGN CONDITIONS REV. B

Circular 25/2016/TT-BCT - Ministry of Industry and Trade dated 30 November 2016


regarding to the Regulations on Electricity Transmission
system
Decision No. 1232/QĐ-EVN - Regulation of Metering Management at Terminal Point for
tariff metering points
Circular No. 42/2015/TT-BCT - Regulation on Power metering in Power system
Circular No. 23/2013/TT-BKHCN - Regulation Calibration, verification and testing for group
2 measuring instruments
TCXD 9385:2012 - Protection of Structures Against Lightning - Guide for design,
inspection and maintenance
Circular No. 40/2009/TT-BCT - National Technical Codes (Volume 5,6,7)
Circular No. 04/2011/TT-BCT - National Technical Code for Testing, Acceptance Test for
Power Facility (Volume 8)
Decision No. 52/QĐ-ĐTĐL - Procedure for measurement of Generator Characteristic of
Coal Thermal Power Plant in the Vietnam Competitive
Generation Market Other current equivalent standards

3.2.3 Compulsory Explosion and Fire Protection Standards

TCVN 2622: 1995 - Fire prevention and protection for buildings and structures
TCVN 5760: 1993 - Firefighting system – Design and application requirements
TCVN 5738: 2001 - Fire alarm system – Technical requirement
TCVN 5307: 2009 - Oil and petrol storage and oil product
TCVN 6153:1996 - Safety for pressure vessels – Design, installation and
utilization
TCVN 6100: 1996 - CO2 fire protection fire extinguishing media – carbon dioxide
TCVN 4090: 1985 - Oil pipe and oil product – Design standard
20 TCN 46 - Lightning in construction works
TCVN 6101: 1996 - Fire protection and fighting – CO2 used firefighting system
equipment – Design and Installation
TCVN 5303: 1990 - Fire safety – Terminology and definitions
TCVN 3254: 1989 - Fire safety – General requirement
TCVN 4878: 2009 - Fire classification
TCVN 4879: 1989 - Safety signs
TCVN 5040: 1990 - Fire protection and fighting equipment - Symbols

7 of 32
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
PLANT GENERAL DESIGN CONDITIONS REV. B

TCVN 6103: 1996 - Fire protection and fighting – Terminology – Smoke control
TCVN 6305: 2013 - Fire protection and fighting – Automatic sprinkler system
TCVN 7336: 2003 - Fire protection and fighting – Design and installation
requirements
TCVN 7161: 2009 - Air used firefighting system – Physical property and system
design.
TCVN 6379: 1998 - Firefighting equipment – Fire hydrant – Technical
requirement
TCVN 7435-1: 2004 - Fire protection and fighting – Portable extinguishers and fire
trolley
TCVN 5279: 1990 - Explosion and fighting safety – General requirement
TCVN 3255: 1986 - Explosion safety – General requirement.
TCVN 4586: 1997 - Industrial explosive material – Safe requirement for reserve,
transport and utilization.
TCVN 6174: 1997 - Industrial explosive material – Safety requirement for
manufacturing, explosion testing and approval
TCVN 5334: 2007 - Electrical equipment for oil storage and oil products, safety
specifications for design and installation
TCVN 5684: 2003 - Fire safety for oil works and products – General requirement
TCVN 3991: 2012 - Fire protection standard in construction design – Terminology
- Definition
TCVN 6160: 1996 - Fire protection and fighting – Design requirement for high
story building – Design requirement
TCVN 4317: 1986 - Storage house – Basic principle for design
TCVN 4513: 1988 - Water supply within design standard
TCVN 6102: 1995 - Fire fighting system - Powder
20 TCN 33: 2001 - External and project’s water supply network – Design
standard
TCN 25: 1991 - Electrical line installation in living hoist and public work –
Design standard
TCN 18-24 - Code of electrical installation – General regulation
TCN 46-84 - Lightning for public construction works – Design standard
TCXD 218: 1998 - Fire detection and alarm system – General regulation
QCVN 02:2020/BCA - National Technical Regulation on Stationary Pumps for Fire
Protection

8 of 32
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
PLANT GENERAL DESIGN CONDITIONS REV. B

3.2.4 Civil Engineering Standards

QCVN 01:2021/BXD - Vietnam Building Code: Regional and Urban Planning and
Rural Residential Planning
QCVN 02:2021/BXD - Vietnam Building Code: Natural Physical & Climatic Data
for Construction
QCVN 03:2012/BXD - National Technical Regulation on Rules of Classifications
and Grading of Civil and Industrial Buildings and Urban
Infrastructures
QCVN 05:2008/BXD - Vietnam Building Code on Dwellings and Public Buildings –
Occupational Health and Safety
QCVN 06:2021/BXD - Vietnam Building Code on Fire Safety of Buildings
QCVN 07:2019/BKHCN - National technical regulation on steel for the reinforcement of
concrete
QCVN QTĐ-07:2009/BCT - National Technical Codes for Installation Power Network
QCVN 09:2017 - Energy Efficiency Building Code (EEBC)
QCVN 18:2014/BXD - National technical regulation on Safety in Construction
QCVN 16:2019/BXD - Vietnam Building Code: Products, Goods of Building
Material- Portland cement and Portland cement clinker
products
QCVN 07:2012/ BLĐTBXH - National technical regulation on safe work of lift appliances.
QCVN 20:2010/ BGTVT - National Technical Regulation on aids to Navigation

3.2.5 Other Vietnamese Code/Regulation

QCVN 16: 2013/BLĐTBXH - National technical regulation on safe work for electrical
tackle
QCVN 20: 2015/BLĐTBXH - National technical regulation on safe work of Elevating
Platform for lifting people
QCVN 07: 2010/BLĐTBXH - National technical regulation on safe work of Elevating
Platform for lifting people
QCVN 02:2019/BLĐTBXH - National technical regulation on safety for lift
QCVN 24:2016/BYT - National technical regulation on noise - permissible exposure
levels of noise in the workplace
QCVN 21:2015/BLĐTBXH - National technical regulation on safe work of refrigerating
system

9 of 32
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
PLANT GENERAL DESIGN CONDITIONS REV. B

4. ENERAL DESIGN CONDITIONS

4.1 General

1) Plant design life

The Works will be designed for the utilization of proven design directed toward extended
plant life (30 years) without excessive maintenance and without excessive replacement of
parts normally subject to wear and tear and deterioration in service, assuming the Plant is
operated in line with the operating instructions provided, maintained in accordance with
the maintenance schedules and procedures and has been operating within the defined Plant
operational envelope.
The exception to the above being:

 Components or equipment that are subject to wear in service and replacement as part of
planned maintenance procedures such as seals, wear rings, wear rings, seats, bearings
and similar items.

 Components that are designed to fail in service as part of their function e.g. fuses,
bursting discs etc.

 Consumable items required for operation


 Components for which a longer design life is specified herein
Special attention shall be paid to high pressure and temperature components and major
components such as boiler, steam turbine and generators which are subject to cycling as
result of the starting and operating regime specified in clause 4.2.
2) Degree of Plant Automation

The Facility will be partially automated and require minimum operator intervention for
normal operation. The degree of automation provided will ensure the Facility can be:

 Safely and reliably started, shut down, controlled and monitored from the CCR; and
 Operated with two operators, one in the CCR and the other in the CCR or roving the
plant as required.
It will be possible to start the any Generating Block and bring it to full capacity without
operator intervention outside of the CCR. Manual preparation may be required by operator
in CCR or field to fulfill ready to start- up permissive condition for safe plant operation.
For example, Coal handling system, Ash handling system, ESP system, Condenser water
make-up, Compressed air system, Closed cooling water system, Water and waste water
treatment system, etc. shall be in service prior to automatic start.
Some device (motor, damper, drain, vent, control or isolating valve) that may be required
to operate during start-up, shut-down, normal operation or transfer from one operating
mode to another shall be automated. Transfers include the safe shutting down of systems
in the event of a trip or malfunction of some element of the Facility. Notwithstanding this,
it will also be possible for the operator to interrupt the automatic, programmed sequences
and control the plant manually.
Notwithstanding the above, local control facilities will be provided for auxiliary equipment
at their local control panels. The controls provided at the panels will allow starting,

10 of 32
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
PLANT GENERAL DESIGN CONDITIONS REV. B

stopping and emergency tripping of the controlled equipment. Indication of the status of
auxiliary equipment will be provided in the CCR.
The following design and provisions are necessary for:

 All process and equipment alarm status to be remotely monitored at the CCR for
operator access and operation; and

 All process and individual equipment failure and tripping status to be independently
monitored by a sequence of events monitoring system.
Information from balance of plant systems will be made available at the CCR and any
other remote monitoring centers. The grouping of alarms from balance of plant equipment
will be minimized, with the extent of grouping being to the approval of the OWNER.
3) Unit Load Conditions

The Plant shall be operated not only for the base load operation but also for the load
cycling operation.

4.2 Plant Capability and Operational Conditions

1) Rated Output (RO)

The Rated Output of each unit shall be the continuous electrical power output of 654.7
MW (net capacity) under following conditions:

 Main steam pressure at main stop valve inlet 27.0 MPa(a)

 Main steam temperature at main stop valve inlet 600 ºC

 Reheat steam temperature at reheat stop valve inlet 610 ºC

 Final feed water temperature 305.5 ºC

 Opening of all extractions 100 %

 Exhaust Pressure 0.00563 MPa(a)

 Circulating water temperature 26 ºC

 Circulating water temperature rise by condenser 6 ºC

 Make up water flow to condenser 0 %

 Turbine speed 3,000 rpm

 Generator power factor, lagging/leading 0.85/0.9

 Generator frequency 50 Hz
Note 1: The above conditions can be referred on Heat Balance Diagram, which is separately
submitted for Owner’s approval.

11 of 32
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
PLANT GENERAL DESIGN CONDITIONS REV. B

2) Turbine Capability Condition (TCC)

The Turbine Capability Condition (TCC) of each unit is defined as the continuous sent out
power of 100% Rated Output under the following conditions:

 Cooling water temperature at inlet to condenser 32.1 ºC

 Make up water flow 2.0 % of Boiler Outlet Steam flow

 Exhaust steam pressure 0.00792 MPa(a), as per corresponding to the


above cooling water inlet temperature

 Other conditions such as steam conditions, speed, etc. shall be the same as the Rated
Output conditions.
Note 1: The above conditions can be referred on Heat Balance Diagram, which is separately
submitted for Owner’s approval.

3) Turbine VWO (valve wide open) Capability

The Turbine VWO condition shall be decided by the Turbine manufacturer in order to
secure the generator output at the Turbine Capability Condition.
4) Boiler Maximum Continuous Rating (BMCR)

The BMCR of the coal fired boiler is defined as the steam flow at the inlet to the turbine
main control valves corresponding to the steam flow for the VWO condition plus the
auxiliary steam flow for boiler and other equipment. SH (Superheater) Steam flow for
BMCR condition will be 102% of SH Steam flow at VWO.
5) Minimum Load of Coal Firing

The unit shall be able to operate continuously at stable load 40% and above of the Rated
Output when firing the design coal without fuel oil support and under automatic control.
The unit shall also be capable to operate at loads below 40% of RO with fuel oil support
firing and under automatic control.
6) Number of Starts

The coal fired steam plant shall be capable of operating continuously on base load and
shall be capable of handling load changes specified herein without tripping. The coal fired
steam plant will be required to start in the cold, warm, or hot condition, and to restart in
any condition.
Each unit shall be capable of full load rejection down to house load operation without
tripping. The plant shall be designed the number of starts for 30 years of its life as shown
in the below table:
<Table 2-1. Number of Starts and Load Cycles>
Event Shutdown period No. of starts per year Total

Cold Start > 48 hours 6 180

Warm Start 18 - 48 hours 50 1500

12 of 32
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
PLANT GENERAL DESIGN CONDITIONS REV. B

Event Shutdown period No. of starts per year Total

Hot Start < 18 hours 160 4800

Very Hot Starts < 1 hour 2 60

The Unit shall also be designed to be from first oil ignition to full load within the
following durations for different start conditions:
<Table 2-2. Durations for different start conditions>
Start Types First oil ignition to full load (min.) Remarks
Cold start 630
(Shutdown > 48 hours)
Warm Start 315
(Shutdown in 18 - 48 hours)
Hot Start 192.5
(Shutdown < 18 hours)

7) Steam Bypass Operation

To facilitate start-up of the Plant, and to improve operational flexibility, e.g. during rapid
load changes, HP(High pressure) and LP(Low pressure) steam bypass system shall be
installed.
HP steam bypass system shall be designed to cover 60% of steam flow at BMCR and LP
steam bypass system shall be designed to cover 100% of the downstream from the HP
steam bypass and located between the hot reheat and the condenser.
Desuperheating spray for the HP steam to the cold reheat shall be provided from the boiler
feed water pump and for the hot reheat to the condenser will be provided by the
condensate extraction booster pump discharge.
The bypass line is closed during normal running of the Steam turbine. The system is
operated automatically during start-up or in the event of Steam turbine trip. In the event of
the transient condition that the condenser is unable to accept excessive steam flow above
capacity of bypass valves, the excess steam will be blown off through start-up vent valve
and ERV (Electrical relief valve).
8) House Load Operation

In the event of total load rejection and disconnection from the external network, the unit
shall be able to operate safely at the “House Load” under full automatic control, feeding
only the unit auxiliary services. The minimum period of operation at “House Load” shall
be two (2) hours, after that the Unit shall be successful re-connect to the power grip and
the Contractor shall state any limitations on his machine if the above period cannot be
achieved.
9) Load Change Rate

The Unit shall be designed to vary (including ramp up and ramp down) the loads during
normal operation at the following rates:

13 of 32
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
PLANT GENERAL DESIGN CONDITIONS REV. B

<Table 2-3. Ramping Rate>


Item Load Ramping Rate

40% RO ~ 95% RO 2% RO per minute


Ramp up
95% RO ~ 100% R0 1.2% RO per minute

Ramp down 100% RO ~ 40% RO 2% RO per minute


The Load changes shall be controlled by the ICMS without any manual intervention.
Dangerous conditions shall not occur in the boiler and stable conditions at 40% Rated load
boiler firing shall be designed on the above premise.

14 of 32
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
PLANT GENERAL DESIGN CONDITIONS REV. B

4.3 Site and Design Conditions

The following parameters shall be used for the Plant design:


1) Geographical conditions

(1) Elevation after site grading : EL +5.10m (Hon Dau National Altitude)

2) Meteorological conditions
(1) Ambient temperature & humidity

 Average ambient temperature : 24.5ºC


 Maximum ambient temperature : 41ºC

 Minimum ambient temperature : 6.8ºC


 Average relative humidity : 84.2%
 Maximum relative humidity : 100%

 Monthly max. relative humidity : 93.0%


(2) Design rainfall at Ky Anh Station

 Daily maximum rainfall : 573.0 mm


 Daily average maximum rainfall : 277.4 mm
(3) Atmospheric pressure

 Annual mean value : 100.9kPa(a) [=1009mbar(a)]

 For performance guarantee : 101.3kPa(a) [=1013mbar(a)]

3) Wind Condition
(1) Code : ASCE 7-16
(2) Basic Wind Speed (V) : 67.28m/s (for occupancy category III with 1700 MRI)
Where, the basic wind speed V, corresponds to a 3 second gust speed at 10m above ground in exposure
category C.

(3) Site Exposure Category : D

4) Seismic Condition
(1) Code : ASCE 7-16
(2) Design Seismic Parameters

15 of 32
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
PLANT GENERAL DESIGN CONDITIONS REV. B

All buildings and structures, except garages and buildings/structures of security


system shall be designed and adopt necessary earthquake design criteria provided in
the IBC/ASCE, TCVN 9386-2012 or equivalent with Peak Ground Acceleration,
PGA=0.1089g.
Seismic Coefficient Values
Site Class SD SE
SDS 0.3142 0.447
SD1 0.2112 0.381
T0 0.134 0.170
TS 0.672 0.852
TL 2.0 2.0
Seismic design category (SDC) D D
Importance factor, I 1.25 1.25

For garages and buildings/structures of security system will be designed with Peak
Ground Acceleration, PGA=0.05g.
Seismic Coefficient Values
Site Class SD SE
SDS 0.148 0.222
SD1 0.100 0.175
T0 0.135 0.158
TS 0.675 0.788
TL 2.0 2.0
Seismic design category (SDC) B C
Importance factor, I 1.25 1.25

(3) Sea water conditions


(1) Sea water temperature

 Maximum sea water temperature : 32.1ºC


 Design sea water temperature : 26ºC
 Minimum sea water temperature : 16.4ºC

(2) Sea water level

 Highest High Water Level (H.H.W.L.) : E.L. (+) 2.28 m


 Mean Water Level (M.W.L) : E.L. (+) 1.26 m

16 of 32
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
PLANT GENERAL DESIGN CONDITIONS REV. B

 Lowest Low Water Level (L.L.W.L.) : E.L. (-) 1.52 m


E.L. is the altitude based on the Hon Dau National Altitude System in Vietnam.

(3) Sea water analysis


The following data are assumed for reference only. However, and the sample and
analysis of the sea water will obtained for their equipment design.
<Table 3-1. Sea Water Sample Chemical Analysis>
QCVN 10-
No. Items Unit Result Test Method MT/2015
BTNMT
1 Temperature - 24.0 SMEWW 2550B:2012 -
2 pH - 8.19 TCVN 6492:2011 6.5 - 8.5
3 DO mg/l 5.98 TCVN 7325:2004 -
4 TSS mg/l 25 TCVN 6625:2000 -
5 NH4+- N mg/l 0.04 TCVN 6179-1:1996 0.5
6 PO43--P mg/l 0.04 TCVN 6202:2008 0.5
7 As mg/l 0.0029 SMEWW 3114B:2012 0.05
8 Hg mg/l 0.0008 SMEWW 3112B:2012 0.005
9 Pb mg/l 0.006 SMEWW 3111C:2012 0.1
SMEWW 4500-CN-
10 CN- mg/l <0.002
.C&E:2012
0.01

11 Cd mg/l 0.0006 SMEWW 3111C:2012 0.01


12 Cr6+ mg/l 0.004 SMEWW 3500Cr.B:2012 0.05
13 Cr (total) Mg/l 0.005 SMEWW 3113B:2012 0.5
14 Zn mg/l 0.102 SMEWW 3111B:2012 2.0
15 Cu mg/l 0.046 SMEWW 3111c:2012 1
16 Mn mg/l 0.072 SMEWW 3111B:2012 0.5
17 Fe mg/l 0.110 TCVN 6177:1996 0.5
18 Phenol (total) mg/l <0.003 TCVN 6216:1996 0.03
19 Grease (total) mg/l <0.3 SMEWW 5520.B&F:2012 0.5
MPN/
20 Coliform 390 SMEWW 9221B:2012 1000
100mL

(4) Raw water conditions


The following data are assumed for reference only. However, and the sample and
analyze of the raw water will obtained for their equipment design.

17 of 32
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
PLANT GENERAL DESIGN CONDITIONS REV. B

<Table 3-2. Raw Water Sample Chemical Analysis>


Result QCVN08:
No. Item Unit 2015/BTNMT
S1 S2 (B2)
1 pH - 7.28 7.16 5.5-9.0
2 BOD5 (20oC) mg/l 7.8 8.9 25
3 COD mg/l 12.0 12.8 50
4 DO mg/l 4.9 5.0 ≥2
5 TSS mg/l N/A N/A 100
6 NH4+ (by N) mg/l 0.01 0.01 1
7 Cl- mg/l 180.2 167.9 -
8 F- mg/l 0.01 0.01 -
9 NO2- mg/l 0.01 0.01 0.05
10 NO3- mg/l 0.68 0.80 15
11 PO43- (by P) mg/l N/A N/A 0.5
12 CN- mg/l - - 0.05
13 As mg/l - - 0.1
14 Cd mg/l - - 0.01
15 Pb mg/l 0.0022 0.0019 0.05
16 Cr6+ mg/l - - 0.05
17 Cr (total) mg/l - - 1
18 Cu mg/l 0.005 0.004 1
19 Zn mg/l 0.04 0.16 2
20 Ni mg/l - - 0.1
21 Mn mg/l 0.04 0.03 1
22 Hg mg/l 0.0012 0.001 0.002
23 Fe mg/l 0.22 0.20 2
24 Surfactant mg/l N/A N/A 0.5
25 Aldrin - - 0.1
Benzene hexachloride
26 - - 0.02
(BHC)
27 Dieldrin - - 0.1
Total Dichloro diphenyl
28 - - 1
trichloroethane (DDTs)
Heptachlor & Heptachlor
29 - - 0.2
epoxide
30 Total Phenol mg/l 0.004 0.004 0.02
31 Total oils & grease mg/l 0.02 0.02 1
32 Total Organic Carbon, TOC mg/l N/A N/A N/A
33 Alpha radioactive Bq/l N/A N/A 0.1
34 Beta radioactive Bq/l N/A N/A 1
MPN or
35 Coliform 1820 3680 10000
CFU/100ml
MPN or
36 E.coli N/A N/A 200
CFU/100ml

18 of 32
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
PLANT GENERAL DESIGN CONDITIONS REV. B

Result QCVN08:
No. Item Unit 2015/BTNMT
S1 S2 (B2)
37 SS mg/l 12 15 N/A
38 Conductivity 120.5 125.0 N/A
39 Turbidity NTU 10 12 N/A
40 Temperature oC 23.1 23.2 N/A
41 Color Pt-Co 11 12 N/A
42 SO42- mg/l 3.0 3.0 N/A
43 Phosphor (organic) mg/l 0.6 0.6 N/A
44 Ca2+ mg/l 6.0 4.6 N/A
45 Mg2+ mg/l 3.6 3.2 N/A
46 K+ mg/l 0.32 0.32 N/A
47 Al3+ mg/l 0.01 0.01 N/A
Note: Source of Water: Vuc Tron Lake – Quang Trach District, Quang Binh province.
S1: sample taken from upstream of Vuc Tron lake (17°54'24.60"N; 106°20'36.20"E).
S2: sample taken from downstream of Vuc Tron lake (17°53'40.10"N; 106°22'24.10"E).

4.4 HVAC Outdoor Design Condition

<Table 4. Outdoor design condition>


Dry Bulb Wet Bulb Relative
Temperature Temperature Humidity Remarks
(C DB) (C WB) (% RH)
As per P2CVIIS5
Summer 33.9 32.31 89.5
– Clause 5.12.1

4.5 HVAC Indoor Design Condition

Refer to the indoor design condition for each building through clause 2.2 of “QT1-0-H-SA_-
04-10001 Design Criteria for HVAC”.

4.6 Fluid Velocities

The maximum allowable velocity of flow in pipe shall be as the follows;

System Max. Velocity Remarks

Steam lines:
Main steam, Hot reheats & Cold reheat lines 50 m/s
H.P Turbine bypass lines & L.P Turbine bypass lines 200 m/s
Low-pressure steam lines above 5 kg/cm2(including
40 m/s
extraction steam lines)
Low-pressure steam lines 1 kg/cm2g up to 5
45 m/s
kg/cm2(including extraction steam lines)

19 of 32
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
PLANT GENERAL DESIGN CONDITIONS REV. B

System Max. Velocity Remarks


2
Low-pressure steam lines below 1 kg/cm (including
60 m/s (as Vacuum lines)
extraction steam lines)
Exhaust steam/Drain lines from Turbines to
20 m/s
Atmosphere/Flash Tank
Vacuum lines 60 m/s
Saturated steam lines 20 m/s
Auxiliary steam lines (as Low-pressure steam lines
40 m/s
above 5 kg/cm2)
Water lines:
Pump suction lines, in general, for the following systems 1.5 m/s
Pump discharge(delivery) lines, in general, for the
3.0 m/s
following systems
- Demi. water transfer(distribution) system
- Condensate water transfer(distribution) system
(condensate storage tank ~ condenser, etc.)
- Potable(drinking) water transfer(distribution) System
- Service water transfer(distribution) system
- Raw water transfer(distribution) system
- Closed cooling water system
- Auxiliary cooling water system
- LP heater drain transfer system (for LP HTR No.3,
No.5)
- SCAH drain transfer system
- Other miscellaneous water system
Feed water suction lines 1.5* m/s See Note 2.
Feed water discharge lines 4.0 m/s
Condensate water suction lines CEP : 1.2* m/s
(condenser ~ deaerator, spray water, etc.) CBP : 1.5* m/s
Condensate water discharge lines
3.0* m/s
(condenser ~ deaerator, spray water, etc.)
Main cooling(circulating) water discharge lines 3.0 m/s
Air lines:
Suction line for reciprocating compressors 18 m/s
Delivery line for reciprocating compressors 30 m/s
Suction and delivery lines for Compressors 25 m/s
Compressed air delivery lines 15 m/s
Oil lines:
Lubricating oil and fuel oil suction lines 1.0* m/s
Lubricating oil and fuel oil discharge lines 1.5* m/s
Notes : 1. Values marked with [*] are to be confirmed at later
2. Suction velocity of Start-up boiler Feed Pump (Motor driven) and Boiler Feedwater Booster
Pump (Turbine driven) should be as per NPSH transient (decay) analysis which is included
in QT1-1-M-LA_-06-00051, Calculation –Feed water system.

20 of 32
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
PLANT GENERAL DESIGN CONDITIONS REV. B

4.7 Units of Measurement

All units, dimensions and calculations shall be in metric and as detailed in the OWNER’s RFP
(clause 1.2.1.4), however, pressure and energy shall also be put down with International
System of Units (SI). And especially pressure unit, MPa (or kPa considering for small value
notation such as Condenser vacuum, MPa(a) is notation for absolute and MPa(g) is for gauge
pressure) shall be used in the display in CCR, field instruments. But it is except that those
used internationally in the English measurement system such as pipe sizes.

Parameter Units Remarks

Weight kg, metric ton(t), kgf, tf

Volume cubic meter (m3), litre (l)

Length mm, m, km

Temperature Degrees Celsius (°C)

Pressure MPa(a), MPa(g), kPa(a), kPa(g), mmH2O

Differential Pressure MPa, kPa

Mass Flow (general) kg/s, kg/h, t/h


Steam Mass Flow t/h
Lube Oil Flow m3/s, m3/h
Water Flow;
- large quantities m3/s, m3/h, m3/day
- small quantities l/min
Volumetric flows;
- Gas (Flue, Service gases) Nm3/s, Nm3/h.
Liquid fuel;
- large quantities m3/s, m3/h
- small quantities l/min, l/s
Heat Flow kJ/h
Power W, kW, MW
Heat Rate kJ/kWh
Mass ton, kg, g, mg
Force kgf, tf
Stress kgf/cm2, tf/m2
Density kgf/m3, tf/m3

21 of 32
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
PLANT GENERAL DESIGN CONDITIONS REV. B

5. FUEL SPECIFICATIONS

This means fuel having specifications and characteristics to be used in the design of the Plant.

1) Design Coal

The Units must be capable of economic and efficient operation over the design coal range
as given. Specifically, the following parameters of the coal specification must be used for
the respective testing and design.
<Table 5. Coal Specification>
Sub-Bituminous coal Bituminous coal Design Coal
Item Unit
Typical Range Typical Range Performance Range
Total Moisture % arb 34.00 <38.00 12.00 <14.00 27.40 <38.00
Proximate analysis
Inherent
% adb 15.00 <25.00 8.00 <12.00 12.90 <20.00
Moisture
Ash % adb 4.00 <8.00 9.50 <17.00 5.88 <14.00
35.00 - 22.00 - 25.00 -
Volatile matter % adb 42.00 40.00 41.16
55.00 42.00 50.00
30.00 -
Fixed carbon % adb 39.00 By diff 42.50 By diff 40.06
42.50
Total % adb 100.00 100.00 100.00
0.10
0.35 -
Total Sulphur % adb 0.15 0.35 0.85 Max 1.10
- 1.20
0.70
Ultimate analysis
Carbon % daf 74.12 77.30
Hydrogen % daf 5.51 5.60
Nitrogen % daf 1.07 1.10
Sulphur % daf 1.0 1.0
Chlorine % daf 0.01 0.02
Oxygen + Others % daf 18.29 27.56
Total % daf 100.00
Caloric value
Gross (adb) kCal/ kg 5,500 > 4,800 6,300 > 6,000 5,740 > 4,950
Gross (arb) kCal/ kg 4,271 > 4,100 6,025 > 5,600 4,797 > 3,850
Net (arb) kCal/ kg 3,898 > 3,500 5,750 > 5,350 4,450 >3,500
Hardness HGI 55 40 – 60 36 34 – 60 36 34 – 60
Ash fusion (reducing)
Initial oC 1,150 >1,150 1,350 >1,200 1,150 >1,100
deformation
Spherical oC 1,200
Hemisphere oC 1,250 1,600
Flow oC 1,300 1,600
Note 1: Boiler can generate steam flow rate as same as 100% BMCR case with 3,850kcal/kg (gross,
arb) and 6 pulverizer operation.

Note 2 : The values/parameters in italic type are used for reference only.

22 of 32
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
PLANT GENERAL DESIGN CONDITIONS REV. B

2) Fuel Oil

Fuel oil handling system and firing equipment shall be designed based on the following
Diesel Oil analysis (TCVN 5689:2018):
<Table 6. DO analysis>
No. Item Unit Value Test method
1 Sulfur content mg/kg max 500 TCVN 6701 (ASTM D 2622)
2 Cetane index min 46 TCVN 3180 (ASTM D 4737)
3 Distillation, 90°C Vol max 360 TCVN 2698 (ASTM D 86)
4 Flash Point °C min 55 TCVN 6608 (ASTM D 3828)
5 Viscosity at 40oC mm2/s 2- 4.5 TCVN 3171 (ASTM D 445)
6 Carbon Conradson Wt % max 0.3 TCVN 6324 (ASTM D 189)
7 Pour Point °C max + 6 TCVN 3753 (ASTM D 97)
8 Ash Wt % max 0.01 TCVN 2690 (ASTM D 482)
9 Moisture mg/kg max 200 TCVN 3182 (ASTM D 6304)
10 Particulate Impurities mg/l max 10 TCVN 2706 (ASTM D 6217)
Corrosion of copper at 50°C
11 No. 1 TCVN 2694 (ASTM D 130)
in 3 hours.
12 Density at 15oC kg/m3 820 - 860 TCVN 6594 (ASTM D 1298)
13 Lubricating µm max 460 TCVN 7758 (ASTM D 6079)
14 Visual Check clean TCVN 7759 (ASTM D 4176)
15 HHV kcal/kg ≥10,100

23 of 32
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
PLANT GENERAL DESIGN CONDITIONS REV. B

3) Design critical:

 Under all firing conditions with any coal in the stated above range, the Unit must be
capable of operating at 100% BMCR.

 Design Coal with ash =14% (adb) must be used for sizing, design and testing of ESP
and ash handling plant. (Refer to Max. Ash Coal in Table 7)

 Design Coal with sulfur = 1.1% (adb) must be used for design and testing of FGD.
(Refer to Max. Sulfur Coal in Table 7)
<Table 7. Detail Coal / Ash Specification for Equipment Design>
Coal No. 1 2 3 4 5
Design
Coal Code Name Design Range Coals
Coal
Min. Max. Max.
Performa Max. Ash
Coal Brand Name HHV Moisture Sulfur
nce Coal Coal
Coal Coal coal
(as received :
Proximate Analysis
a.r)
Total Moisture TM %:a r 27.40 27.40 38.00 27.40 27.40
Fixed Carbon FC %:a.r 33.39 33.39 28.16 33.39 30.05
Volatile Matter VM %:a.r 34.31 34.31 28.94 34.31 30.88
Ash AS %:a.r 4.90 4.90 4.90 4.90 11.67
Total %:a.r 100.00 100.00 100.00 100.00 100.00
Surface Moisture SM %:a.r 16.65 16.65 N/A 16.65 16.65
Inherent Moisture IM %:a.r 10.75 10.75 N/A 10.75 10.75
Total Sulfur TS %:a.r 0.71 0.71 0.71 0 92 0.71
(air dry base :
Proximate Analysis
a.d.b)
Inherent Moisture IM %:a.d.b 12.90 12.90 N/A 12.90 12.90
Fixed Carbon FC %:a.d.b 40.06 40.06 N/A 40.06 36.05
Volatile Matter VM %:a.d.b 41.16 41.16 N/A 41.16 37.05
Ash AS %:a.d.b 5.88 5.88 N/A 5.88 14.00
Total %:a.d.b 100.00 100.00 N/A 100.00 100.00
Total Sulfur TS %:a.d.b 0.85 0.85 N/A 1.10 0.85
(as received :
Ultimate Analysis
a.r.)
Carbon C %:a.r 50.18 45.40 47.03 49.91 48.11
Hydrogen H %:a.r 3.73 3.37 3.50 3.71 3 57
Nitrogen N %:a.r 0.73 0.73 0.73 0.73 0.73
Sulfur S %:a.r 0.71 0.71 0.71 0.92 0.71
Oxygen O %:a.r 12.35 17.49 5.13 12.43 7.81
Total Moisture TM %:a.r 27.40 27.40 38.00 27.40 27.40
Ash AS %:a.r 4.90 4.90 4.90 4.90 11.67
Total %a.r 100.00 100.00 100.00 100.00 100.00
Chlorine Cl %:a.r
(air dry base :
Ultimate Analysis
a.d.b)
Carbon C %:a.d.b 60.20 54.47 N/A 59.88 57.72
Hydrogen H %.a.d.b 4.47 4.05 N/A 4.45 4.29
Nitrogen N %:a.d.b 0.88 0.88 N/A 0.88 0.88

24 of 32
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
PLANT GENERAL DESIGN CONDITIONS REV. B

Coal No. 1 2 3 4 5
Sulfur S %:a.d.b 0.85 0.85 N/A 1.10 0.85
Oxygen O %:a.d.b 14 82 20.97 NIA 14.91 9.36
Inherent Moisture IM %:a.d.b 12.90 12.90 NIA 12.90 12.90
Ash AS %:a.d.b 5.88 5.88 N/A 5.88 14.00
Total %:a.d.b 100.00 100.00 N/A 100.00 100.00
Ultimate Analysis (dry base : d.b)
Carbon C %:d.b 69.12 62.53 75.85 68.75 66.27
Hydrogen H %:d.b 5.14 4.65 5.64 5.10 4.92
Nitrogen N %:d.b 1.01 1.01 1.18 1.01 1.01
Sulfur S %:d.b 0.98 0.98 1.15 1.26 0.98
Oxygen O %:d.b 17.00 24.08 8.28 17.13 10.75
Ash AS %·d.b 6 75 6.75 7.90 6.75 16.07
Total %:d.b 100.00 100.00 100.00 100.00 100.00
(dry ash free :
Ultimate Analysis
d.a.f)
Carbon C %:d.a.f 74.12 67.06 82.36 73.73 78.96
Hydrogen H %:da.f 5.51 4.98 6.12 5.47 5.86
Nitrogen N %:d.a.f 1.08 1.08 1.28 1.08 1.20
Sulfur S %:d.a.f 1.05 1.05 1.24 1.35 1.16
Oxygen O %:d.a.f 18.24 25.83 8.99 18.36 12.81
Total %:d.a.f 100.00 100.00 100.00 100.00 100.00
Heating Value
Higher Heating
Value
HHV(AD) HHV' kJ/kg 24,100 20,700 N/A 24,100 24,100
kcal/kg 5,760 4,950 N/A 5,760 5,760
HHV(AR) HHV' kJ/kg 20,100 17,200 20,100 20,100 20,100
kcal/ko 4,797 4,100 4,797 4,797 4,797
Lower Heating
Value
LHV(AR) LHV' kJ/kg 18,600 15,500 18,600 18,600 18,600
kcal/kg 4,454 3,700 4,454 4,454 4,454

HGI HGI - 36 36 36 36 36
Fuel Ratio FR - 0.97 0.97 0.97 0.97 0.97

Ash Analysis
Si02 %: dry 38.10 38.10 38.10 38.10 38.10
Al203 %: dry 18.20 18.20 18.20 18.20 18.20
Fe203 %: dry 9.40 9.40 9.40 9.40 9.40
Ti02 %: dry 0.54 0.54 0.54 0.54 0.54
Mn304 %: dry 0.07 0.07 0.07 0.07 0.07
Cao %: dry 23.90 23.90 23.90 23.90 23.90
MgO %: dry 3.09 3.09 3.09 3.09 3.09
Na20 %:dry 0.84 0.84 0.84 0.84 0.84
K20 %: dry 1.20 1.20 1.20 1.20 1.20
P20s %: dry 0.50 0.50 0.50 0.50 0.50
S03 %: dry 4.09 4.09 4.09 4.09 4.09
Mn02 %: dry

25 of 32
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
PLANT GENERAL DESIGN CONDITIONS REV. B

Coal No. 1 2 3 4 5
Others 0.07 0.07 0.07 0.07 0.07
Total %: dry 100.00 100.00 100.00 100.00 100.00
Na20+K20
Ash Fusion
Temperature
Atmosphere : Reducing
Initial
IDT ℃ 1,150 1,150 1,150 1,150 1,150
Deformation
Spherical ST ℃ 1,200 1,200 1,200 1,200 1,200
Hemispherical HT ℃ 1,250 1,250 1,250 1,250 1,250
Fluid FT ℃ 1,300 1,300 1,300 1,300 1,300
Atmosphere : Oxidized
Initial
IDT ℃ 1,200 1,200 1,200 1,200 1,200
Deformation
Spherical ST ℃ 1,250 1,250 1,250 1,250 1,250
Hemispherical HT ℃ 1,300 1,300 1,300 1,300 1,300
Fluid FT ℃ 1,350 1,350 1,350 1,350 1,350

26 of 32
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
PLANT GENERAL DESIGN CONDITIONS REV. B

6. UTILITIES CONDITIONS

Utilities pressure and temperature requirements at the takeover points between Contractor and
Provider are indicated below:

(Note-1) Pressure value shows the required pressure at 1m beside from each facility.

1) Electric power
(1) for Power

 AC 11kV (± 10%), 3 Phase 50 Hz (47.5 ~ 52Hz)


 AC 400V (± 10%), 3 Phase 50 Hz (47.5 ~ 52Hz)
 AC 230V (± 10%), 1 Phase, 50 Hz (47.5 ~ 52Hz)
(2) for Control

 AC 230V (± 10%), Single Phase, 50 Hz (47.5 ~ 52Hz)


 DC 220V (± 10%)

<NOTE>
1) The voltage at the terminals of consumers lies well within 0.90Un - 1.10Un for
steady state conditions and 0.85Un for transient conditions (i.e.: largest motor
starting)
2) Supplier shall equip the equipment to convert or supply other voltage in the
panel/board, if necessary.

3) Auxiliary Steam

(1) Pressure : Approx. 2 MPa(a) [=20 bara]


(2) Temperature : 300°C

4) Instrument air

(1) Quality : Dried oil free air


(2) Operating Pressure (Min./Max.) : 0.68/0.88MPa(g) [=6.8 / 8.8 barg]
(3) Operating temperature : 50 C

(4) Dew point : -40 C

5) Service air

(1) Operating Pressure (Min./Max.) : 0.68/0.88MPa(g) [=6.8 / 8.8 barg]

27 of 32
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
PLANT GENERAL DESIGN CONDITIONS REV. B

(2) Operating temperature : 50 C

6) Cooling water (for closed cooling water system) for equipment cooling

(1) Quality : Demineralized water


(2) Supply temperature (Nor./Max.): 40 / 45 ºC
(3) Operating Pressure (Min./Max.) : 0.3 / 0.7 MPa(g) [= 3 / 7 barg]

7) Service water

(1) Quality : Treated water


(2) Operating temperature : Amb.
(3) Operating Pressure (Min./Max.) : 0.2 / 0.6 MPa(g) [= 2 / 6 barg]

8) Demi. water quality

<Table 8. Demi. Water quality>


Parameter Unit Value
1 Conductivity ㎲/cm at 25℃ ≤ 0.1
2 pH mg/L 7.0±0.2
3 Sodium as Na mg/L ≤ 0.015
4 Total silica as SiO2 mg/L ≤ 0.01
5 Total dissolved solids mg/L ≤ 0.05
6 Total hardness mg/L ≤ 0.005
7 TOC mg/L ≤ 0.03

28 of 32
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
PLANT GENERAL DESIGN CONDITIONS REV. B

7. ENVIRONMENT CONTROL

7.1 General

The following environmental requirements in the design of the plant system and equipment
shall be followed. Furthermore, all the requirements in the approved EIA of the Quang Trach
I TPP and Vietnamese environmental Law and Regulations shall be studied.
Project’s EIA report has been prepared and approved by the MONRE by Decision No
303/QDD-BTNMT dated 29/01/2018 on Approval of EIA report on Quang Trach I TPP. The
report is base for Government and local authorities to supervise the implementation of
measures applied to mitigate the adverse impacts on the environment (including air, water,
soil etc.)
During contract’s performance, there might be changes related to Project’s scale, capacity,
technology or changes on treatment of air emission, waste water, solid wastes etc. and
changes on environmental mitigation measures. And these changes can be implemented only
when get official approval from the approval authority (MONRE). EVN will work with the
Contractor along the process to get the approval
The following environmental conditions shall be met as minimum requirements:
<Table 9. Environmental Conditions Requirements>
Item Unit Value Remarks
(a) Stack height m 229.5 EL
(b) NOx concentration (at 6% O2) at
mg/Nm3 ≤ 200 QCVN 05:2013/BTNMT
outlet of the stack
(c) SO2 concentration (at 6% O2) at
mg/Nm3 ≤ 200 QCVN 05:2013/BTNMT
outlet of the stack
(d) Dust concentration (at 6% O2) at
outlet of the stack mg/Nm3 ≤ 40
(e) Difference in temperature of
ºC Max. 7.9
cooling water
(f) Temperature of the cooling water
ºC Max. 40 QCVN 40:2011/BTNMT
discharge to the environment
(g) Noise level at boundary (on land 70 (from 06,00 to 21,00hrs) According to
dB(A) 55 (from 21,00 to 06,00 hrs) QCVN26:2010/BTNMT
side) at any load
(h) Noise level at 1 m from
dB(A) 85
equipment
(i) Noise level at working place,
Center control room and
dB(A) 65 TCVN3985: 1999
Administration Office with
ventilation/ Air cond.
As per Vietnamese industrial Class B (Main Offer);
(j) Industrial waste water waste water Standard– Class A (Alternative
QCVN 40:2011/BTNMT Offer).
As per National Technical
Regulation on Domestic
(k) Domestic waste water Class B
waste water - QCVN 14:
2008/BTNMT
Note: Nm3 (at dry, 1atm, 25degC, 6% O2)

29 of 32
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
PLANT GENERAL DESIGN CONDITIONS REV. B

7.2 Noise Emission Limits

Noise control shall be performed following the requirement of in accordance with the
approved EIA and QCVN 26:2010 National Technical Regulation on Noise. Suitable acoustic
treatment shall be provided to ensure that, when the plant is operating at any load up to and
including its maximum capabilities. The following shall apply:
(1) The noise level at the boundary of Site shall not exceed values listed in above <Table 9.
Environmental Conditions Requirement>.
(2) The equivalent sound pressure level at working places (except for Center control room and
Administration Office, 65dBA) in the Plant shall not exceed 85 dBA.
Prior to Provisional Acceptance, noise level measurements shall be taken by Contractor in the
presence of OWNER in various working areas in the plant and along the boundary of the site
in a manner to be agreed between the Contractor and OWNER to verify that the noise levels
conform to the above requirement mentioned in item (1) and (2) above. Noise level
measurements shall also be taken during factory performance tests as applicable.
Should the measured noise levels exceed these limitations, the Contractor shall proceed to
take appropriate steps to reduce the levels to within acceptable limits. Noise level
measurements shall be taken by the Contractor following any modification to verify
compliance with the Contract’s requirements.

7.3 Vibration Limits

The equipment shall be designed and constructed to operate without vibration in so far as the
nature of the works will permit. Appropriate action shall be undertaken by the Contractor
wherever vibration is excessive, and action is required to reduce it to an acceptable level.

The mechanical vibration at any operation load shall not exceed the zone A/B boundary as per
ISO 20816 for rotating machines such as turbine, pumps, fans, drives etc., for the type and
scope of tests required to prove compliance with the criteria laid. If the acceptable level of
vibration for equipment is not defined in ISO 20816, it should be complied with the relevant
code and standards in practice, but approved by Owner.

7.4 Industrial Waste Water Effluent Limit (QCVN40:2011/BTNMT)

<Table 10. Industrial waste water effluent limit>


Parameter Unit Design Value
1 Temp °C 40
2 Colour Pt/Co 50
3 pH 6-9
4 BOD5 (20°C) mg/l 30
5 COD mg/l 75
6 Suspended solids mg/l 50
7 Arsenic mg/l 0.05
8 Mercury mg/l 0.005
9 Lead mg/l 0.1
10 Cadimium mg/l 0.05

30 of 32
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
PLANT GENERAL DESIGN CONDITIONS REV. B

Parameter Unit Design Value


11 Chromium (VI) mg/l 0.05
12 Chromium (III) mg/l 0.2
13 Cooper mg/l 2
14 Zinc mg/l 3
15 Nickel mg/l 0.2
16 Manganese mg/l 0.5
17 Iron mg/l 1
18 Cyanide mg/l 0.07
19 Phenol mg/l 0.1
20 Mineral Oil and Grease mg/l 5
21 Sunfide mg/l 0.2
22 Fluoride mg/l 5
23 Ammonia (as N) mg/l 5
24 Total Nitrogen mg/l 20
25 Total Phosphorous mg/l 4
Chloride (non application when wastewater
26 mg/l 500
discharged into brackish water, sea water).
27 Chlorine residual mg/l 1
28 Pesticide: organic chlorine mg/l 0.3
29 Pesticide: organic phosphrous mg/l 0.05
30 PCBs mg/l 0.003
31 Coliform MPN/100ml 3000
32 Gross α activity Bq/l 0.1
33 Gross β activity Bq/l 1.0

Note :
1) Treated waste water will be guaranteed when discharged to aeration basin of Seawater
FGD System. Guarantee point is before discharge to aeration basin of Seawater FGD
system.

31 of 32
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
PLANT GENERAL DESIGN CONDITIONS REV. B

7.5 Domestic Waste Water Effluent Limit (QCVN14:2008/BTNMT)

<Table 11. Domestic waste water effluent limit>


Parameter Unit Design Value
1 pH 5-9
4 BOD5 (20°C) mg/l 30
6 Total suspended solids (TSS) mg/l 50
7 Total dissolved solids (TDS) mg/l 500
8 Sulfur (as H2S) mg/l 1.0
9 Ammonia (as N) mg/l 5
10 Nitrate (NO3-) (as N) mg/l 30
11 Oil and fat mg/l 10
12 Surfactant mg/l 5
13 Phosphate (PO43-) (as P) mg/l 6
14 Total Coliforms MPN/ 100ml 3000

32 of 32