ELECTRONICS-PERMIT
ELECTRONICS-PERMIT
City of Antipolo
Province of Rizal
OFFICE OF THE BUILDING OFFICIAL
ELECTRONICS PERMIT
APPLICATION NO. ELP NO. BUILDING PERMIT NO.
(LOCATION OF CONSTRUCTION) LOT NO. BLK NO. TCT NO. CURRENT TAX DEC. NO.
PREPARED BY:
BOX 3 BOX 4
DESIGN PROFESSIONAL, PLANS AND SPECIFICATIONS SUPERVISOR/ IN-CHARGE OF ELECTRONICS WORKS
BOX 5 BOX 6
BUILDING OWNER WITH MY CONSENT: LOT OWNER
BOX 8
PROGRESS FLOW
IN OUT
PROCESSED BY:
DATE TIME DATE TIME
ELECTRONICS
OTHERS (Specify)
BOX 9
ACTION TAKEN:
1. That the proposed electronic works shall be in accordance with the electronics plans filed with this office and in
conformity with the latest Electronics Code of the Philippines, the National Building Code and its IRR.
2. That upon completion of the electronic works, the licensed supervisor/in-charge shall submit the entry to the logbook
duly signed and sealed to the Building Official including as-built plans and other documents and shall also
accomplished the Certificate of Completion stating that the electronic works conform to the provision of the
Electronics Code of the Philippines, the National Building Code and its IRR.
3. That this permit is null and void unless accompanied by the building permit.