0% found this document useful (0 votes)
10 views

Task 1 KPI Answers

The document outlines key performance indicators (KPIs) for the Metroville Urban Rail Expansion project, categorized into technical feasibility, environmental sustainability, and community acceptance. Each KPI includes a name, definition, measurement method, and rationale for its importance. The KPIs aim to ensure project efficiency, environmental benefits, and community satisfaction.

Uploaded by

troysingh001
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
10 views

Task 1 KPI Answers

The document outlines key performance indicators (KPIs) for the Metroville Urban Rail Expansion project, categorized into technical feasibility, environmental sustainability, and community acceptance. Each KPI includes a name, definition, measurement method, and rationale for its importance. The KPIs aim to ensure project efficiency, environmental benefits, and community satisfaction.

Uploaded by

troysingh001
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 3

Metroville Urban Rail Expansion

Project - KPI Development


Template

Technical Feasibility KPIs


KPI 1:
KPI Name: Track Installation Rate
Definition (What it measures): Measures the speed and efficiency of rail track
installation across Metroville’s varying topography.

Measurement Method (How data will be gathered and calculated): Track


installation progress will be monitored weekly, measuring kilometers of track
laid versus planned schedule.

Rationale (Why this KPI is important): Ensures the project stays on schedule
and identifies potential delays due to geographical challenges.

KPI 2:
KPI Name: System Integration Efficiency

Definition (What it measures): Evaluates the successful integration of new


rail lines with existing systems.

Measurement Method (How data will be gathered and calculated):


Percentage of successfully integrated stations and operational efficiency
reports.

Rationale (Why this KPI is important): A seamless connection between new


and existing lines is crucial for reducing congestion and improving commuter
experience.
Environmental Sustainability KPIs
KPI 1:
KPI Name: Reduction in Carbon Emissions
Definition (What it measures): Measures the decrease in greenhouse gas
emissions due to the expanded rail system.
Measurement Method (How data will be gathered and calculated): Pre- and
post-expansion emission levels will be recorded through environmental
monitoring stations.

Rationale (Why this KPI is important): Aligns with Metroville’s environmental


goals by tracking improvements in air quality.

KPI 2:
KPI Name: Increase in Green Spaces

Definition (What it measures): Tracks the number of new green areas


developed as part of the rail expansion project.

Measurement Method (How data will be gathered and calculated): Satellite


imaging and urban planning reports will quantify green space additions.

Rationale (Why this KPI is important): Supports the city’s goal of enhancing
sustainability and livability by creating more eco-friendly zones.

Community Acceptance KPIs


KPI 1:
KPI Name: Public Satisfaction Index

Definition (What it measures): Measures the community’s perception and


satisfaction with the rail expansion project.

Measurement Method (How data will be gathered and calculated): Surveys


and feedback forms collected quarterly from commuters and residents.

Rationale (Why this KPI is important): Ensures that the project meets public
expectations and addresses concerns effectively.
KPI 2:
KPI Name: Accessibility Improvement Rate

Definition (What it measures): Evaluates the increase in rail coverage to


underserved areas, improving mobility.

Measurement Method (How data will be gathered and calculated):


Comparison of pre- and post-expansion data on the number of people within
a 10-minute walk of a rail station.

Rationale (Why this KPI is important): Expanding rail access is key to


reducing transportation inequalities and improving urban mobility.

You might also like