Estimate of Electricity
Estimate of Electricity
Scheme Title : Cost Estimate of 11 KV HT Line Construction at Jinabang Jhayam - Kukurgade- Mungrakhola- Nauli -Bade
Mela- Ramai and Nauli to Ghareli danda- Burti-Ooat Meldaari -Vittabang and Ghar veer and Kalo veer area of Rolpa.
लागत अनुमान
of]hgfsf] gfdM ljß't lj:tf/
of]hgf :ynM j*f g+= 1
(1) 0.4/0.23 KV LT Line Construction
1 8m. long Steel Tubular F/T Pole Set. 34 -
2 0.03 sq.inch ACSR "Weasel" Conductor wire Km. 3.4 -
3 D Iron with Shackle Insulator Set Set. 74 -
4 Stay Set LT(plate, laltern bow, eye bolt etc.) Complete Set. 20 -
5 Stay Wire (7/12 SWG) Kg. 100 -
6 NutBolts (4" 5" 7" & 8" Half & Full Thread) sizes as requi Kg. 68 -
Sub Total -
Contingency@5% -
Vat @13% -
Total -
(3) Transformer Stations
Distribution Transformers (11/0.4 KV,25 KVA) @
1 Nos. 1 -
Jinabang and Oat
2 Transformer Mounting Set Set. 1 -
3 Channel(6*50*50*100*2250 mm) Nos. 2 -
4 11 KV DO Fuse Set (3nos. 1Set) Set. 1 -
5 11 KV Lightning Arreter Set(3nos. 1Set) Set. 1 -
6 MCCB 200A Nos. 1 -
7 MCCB Box Metal Nos. 1 -
8 Earthing Chemical Kg. 25 -
9 Earthing Rod Nos. 3 -
10 Copper wire 8 SWG(5 kg for each tfr.) Kg. 5 -
11 ABC Cable 95 mm2 Mtr. 15 -
12 Pole Clamps sizes as required Nos. 2 -
13 Cable Shoes Copper 95 mm Nos. 3 -
14 Cable Shoes Copper 70 mm Nos. 3 -
15 NutBolts (4" 5" 7" & 8" Half & Full Thread) sizes as requi Kg. 1 -
Sub Total -
Contingency@5% -
Vat @ 13% -
Total -
Total Material Cost with VAT -
(B) Labour Cost & Transportation Cost
1 Erection of 8 m. long Steel Tubular F/T Pole for LT Line Set. 34 -
Stringing of 0.03 sq.inch ACSR conductor 2 wire for LT
3 Km. 3.40
Line -
4 Stay Set (LT) Installation Complete Work Set. 20 -
5 Installation of Distribution Transformer(25 to 250kVA) Nos. 10 -
6 Transportation cost/km/quintal Km. 15 -
Sub Total -
Vat @ 13% -
Total Labour & Transportaton Cost with VAT -
Grand Total Cost A & B with VAT -