Start Me
Start Me
TECHNICAL DOCUMENTATION
FOR
LO TREATMENT PLANT
Westfalia Separator
Mineraloil Systems GmbH
Werner-Habig-Strasse 1
D-59302 Oelde (Alemania)
Phone: +49 (0) 2522 / 77-0
Fax: +49 (0) 2522 / 77-2488 Telex: 89474
Westfalia Separator
Mineraloil Systems GmbH
Mechanical Separation
Division
IMPORTANT !
this manual.
TECHNICAL DOCUMENTATION
LO TREATMENT PLANT
MAN B&W DIESEL AG PROJECT: TAIZ
11.63010-0147
FILE 1
1 INSTALLATION GUIDELINES 2058-9601-010
2 SAFETY PRECAUTIONS
HEALTH HAZARDS INVOLVED WHEN DEALING WITH OIL
3 PROCESS CONDITIONS - DATA SHEET P402424519-9937-PDS001
4 DESCRIPTION AND OPERATING FOR OIL-PURIFICATION PLANT
5 LAYOUT DRAWING P402424519-9937-LAY001
6 P&ID – PROCESS & INSTALLATION DIAGRAM P402424519-9937-PID001
EXPLANATION OF GRAPHICAL SYMBOLS
7 DEVICE LIST P402424519-9937-DVL001
8 START AND STOP INSTRUCTIONS
9 INSTRUCTION MANUAL AND PARTS LIST FOR OIL-SEPARATOR 2058-9001-000
OSD 6-0196-067
10 INSTRUCTION MANUAL FOR CONTROL UNIT D10 8555-9001-000
11 ARRANGEMENT-, TERMINAL-, CIRCUIT DIAGRAM & PARTS LIST 8105-2007-038
12 OPERATING INSTRUCTION FOR ELECTRIC FLOW HEATER 4624 V
13 OPERATING AND MAINTENANCE INSTRUCTION FOR GEAR PUMP
14 ENGINEERING, OPERATION & MAINTENANCE INSTRUCTION FOR SLUDGE PUMP
15 INSTRUCTION AND TECHNICAL DATA FOR LEVEL SWITCH FTL 260
16 MAINTENANCE UNIT COMBINATION
17 TEMPERATURE SENSORS
18 OPERATING AND INSTALLATION INSTRUCTION FOR VALVES
19 INSTRUCTIONS FOR PRESSURE SWITCH
20 OPERATING AND INSTALLATION INSTRUCTION FOR STRAINER