Eco -Friendly Handling Process for Raw Materials in Integrated Steel Mill
Host Country Presentation
List of Contents
Status
Energy Saving
Closed -type Handling Process for Raw Materials in Integrated Steel Mill
Facilities
- 4.01 million tons of products
Qingdao Wor ks
- Assembly of T/ASSY for excavators and rollers
Br anches (Over seas Network) Singapore, Frankfurt, Dubai, Hanoi, L.A., Beijing, Hong Kong, Tokyo
% Project Schedule
CY2006-CY2009 Early 2010 Early 2011 Plant site civil-engineering works and steel mill set-up Start of commercial operation of the 1st BF Start of commercial operation of the 2nd BF
Product Assembly
Auto Scrap Auto Scrap
6.7 GJ/t-steel
52 Million GJ
2004
2005
1GJ refers to 109J and one ton of crude oil is equivalent to 42GJ
Closed-Type Storage
Downstream Process
Iron Ore
Circular Storage
Linear Storage
Sinter plant
Coke oven
Sector C