0% found this document useful (0 votes)
7 views

Paint quotation

Shamenek Investments Ltd provided a quotation to Powermax International Ltd for paint works in a warehouse, totaling 267,000.00 after a discount. The quotation includes costs for materials, labor, equipment, and logistics, with a validity period of 30 days from the date issued. The document outlines specific quantities and unit costs for undercoat and finishing coat paints, along with applicable VAT.

Uploaded by

lucbrouillard381
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
7 views

Paint quotation

Shamenek Investments Ltd provided a quotation to Powermax International Ltd for paint works in a warehouse, totaling 267,000.00 after a discount. The quotation includes costs for materials, labor, equipment, and logistics, with a validity period of 30 days from the date issued. The document outlines specific quantities and unit costs for undercoat and finishing coat paints, along with applicable VAT.

Uploaded by

lucbrouillard381
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

General Construction and Property Development

Building Renovation Interior works Demolishion Specialised works


Shamenek Investments Ltd
pin: p052174433s

Quotation
As requested, below is the quotation. kindly contact us for more details
Issued to Powermax international ltd Date 25th May 2024
Validity period 30 days Draw check to Shamenek investiments ltd
Delivery to Mombasa rd Nairobi Terms 50:50

Item Particulars Qty Unit Unit cost Amount

Quotation for: Paint works

1. Supply and Apply paint on the wa;ls for the upper flr and lower flr office space in the
warehouse

Materials
1. Supply undercoat paint 240 Sqr mtrs 267.6 64,224.00
2. Supply silk vinyl matt as finishing coat 240 Sqr mtrs 447.3 107,352.00

Total for materials 171,576.00

Add 16% VAT 27,452.00

Sub Total 199,028.16

4. Add Labor charges, equipment & logistics 68,630.40

This total 267,568.00


Discount 568.00

Prepared by :
s.i .l marketimg team Grand Total 267,000.00

Shamenek Investments Limited


[email protected] cell: +254 799 473308