OSH HAZARD
Point)
OSH HAZARD
the area
Environmental Health and Safety (EHS)
Rev.
Date:
No:
ERTOP, LEDGES) & GRANITE (THRESHOLD) 27-Apr-24
ROA Number: 1
Elimination:
1. Remove sharp
and protruding objects to
Physical Injury (Cut, Bruises and Puncture)
minimize the hazard -
MRHDI Ops Substitution:
2. Provide safety
caps for protuding objects
that can't be yet removed
in the area - MRHDI Ops
Engineering:
3. Storage/staging
area with proper 2 1 2
enclosure or barricade -
MDC and MRHDI Ops
Admin:
5. Provision of
signages at site
PPE:
6.Use of appropriate
PPEs: hand gloves, safety
shoes (PPE) - MRHDI HR,
Ops, SO
2. Signages are
visble at working area
Elimination:
1. Conduct
housekeeping prior to
start of work or end of
work to avoid
accummulation of dust
in
Revision Code:
Effectivity : 31-Jul-23
Approved by:
JOEL PABICO
Opportunity
FR-01-EHS-034-rev.0
Environmental Health and Safety (EHS)
Revision Code: 1
FORM : EHS Risk and Opportunity Register Effectivity : 31-Jul-23
Rev.
Title of Risk and Opportunity Assessment: Date: Prepared by: Reviewed by: Approved by:
No:
DRY PACKING SYNTHETIC STONE (COUNTERTOP, LEDGES) & GRANITE (THRESHOLD) 1-Aug-24
RUSTAN G. MOLINA/
MICHAEL POLINIO SALVADOR PINEDA
Context and Scope of Risk Assessment: ROA Number: MIKE ANGELO RAFON
1
MDC -Project in
PARK CENTRAL TOWER/ROUNDING ACTIVITY/DAY AND NIGHT SHIFT ROA-PCTSD-MRHDI-AR-01 MRHDI - S.0./P.I.C MDC - Safety Superi ntendent
Charge
No. Steps in Activity Environmental aspects/OSH RISK/IMPACT EXISTING CONTROLS C L R ADDITIONAL CONTROL C L R OPPORTUNITY
HAZARDS
Site Survey
1.1 take breaks
Implement a site
Hazards: Injury from layout plan to
1 identify and mitigate
improper use of Injury from tools could lead to Engineering: Use a buddy system for potential hazards;
Site Measurement:
measuring tools, cuts or bruises. Tripping hazards assistance. use laser measuring
tripping hazards. might result in falls, causing Administrative: Mark uneven surfaces to tools to reduce
sprains or fractures. Strain from prevent tripping. physical strain.
reaching could lead to muscle PPE: Use stable ladder or stool for elevated
1.2 strains or back injuries. measurements. 1 2 2 1 1 1
Hazards: Injuries from Injuries from cutting tools can Engineering: Use dust extraction systems.
cause severe lacerations or Use automated cutting
cutting tools, dust Administrative: Implement regular tool
amputations. Dust inhalation tools to minimize manual
Cutting the Countertop: inhalation, noise- maintenance.
may lead to respiratory handling; conduct regular
induced hearing PPE: Wear safety goggles, gloves, dust mask,
conditions such as asthma. air quality monitoring
damage. ear protection.
Noise-induced hearing damage
can result in permanent hearing
2.1 loss. 3 2 6 3 1 3
2
Burns from welding can cause Use robotic welding
serious skin injuries or burns. systems to reduce
Engineering: Use welding curtains, install
Hazards: Burns from Cuts from sharp metal can human exposure;
2 fume extraction systems.
welding, cuts from sharp
Fabricating the Metal Frame: result in severe lacerations or implement a
PPE: Use welding gloves, helmet, protective
metal, inhaling fumes. infections. Inhaling fumes may ventilation system
clothing.
lead to respiratory issues or with continuous air
poisoning. quality monitoring.
2.2 3 2 6 3 1 3
3.1 2 2 4 2 1 2
3
Engineering: Use dust extraction systems.
Reinforce Support Structure: Use tools with integrated safety Administrative: Implement a clear Use tools with integrated
Hazards: Injuries from features; conduct regular safety reinforcement plan and checklist. safety features; conduct
tools, falling objects, audits of reinforcement PPE: Wear safety goggles, gloves, and a dust regular safety audits of
3.2 dust/debris exposure practices. mask. 2 2 4 reinforcement practices. 2 1 2
Implement a
Hazards: Sharp edges, Sharp edges can cause cuts or chemical safety plan;
Prep Countertop: chemical exposure, abrasions. Chemical exposure use ergonomic tools
strain from handling. may result in skin irritation or Substitution: Use safer chemical alternatives. to reduce physical
burns. Physical strain from Administrative: Provide training on safe strain.
handling may lead to handling and chemical use.
3.3 musculoskeletal injuries. PPE: Wear gloves and protective clothing. 2 2 4 2 1 2
Installation
5.1 1 1 1 1 1 1
1. Dry Fit:
2. Reinforce Support Structure:
1. Prep Countertop:
1. Position Countertop:
2. Secure Metal Frame:
3. Adjust Level:
1. Seal Joints:
2. Clean Up:
3. Final Inspection: