METHOD FOR LIFT (2)
METHOD FOR LIFT (2)
Date -
PTW No :-
Job Title - Trial , Setting and Programming of new lift cage ,tightning where ever necessary
Job Location - Old TSP new lift area
Tools & Equipment
Sr. No. Sequence of Basic Job Steps Existing or Potental Hazards PPE Used Control measures
Used