The document contains templates for planning and executing levelling operations, including safety requirements, equipment checks, and communication protocols. It outlines procedures for setting up and testing levelling instruments, performing rise and fall calculations, and conducting two-peg tests. Each template is designed to ensure compliance with Australian standards and WHS regulations while facilitating effective levelling practices.

Uploaded by

cbig52159
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
11 views12 pages

Levelling operation 1 Templates (1)

The document contains templates for planning and executing levelling operations, including safety requirements, equipment checks, and communication protocols. It outlines procedures for setting up and testing levelling instruments, performing rise and fall calculations, and conducting two-peg tests. Each template is designed to ensure compliance with Australian standards and WHS regulations while facilitating effective levelling practices.

Uploaded by

cbig52159
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 12

RTO-45881 I CRICOS: 04035A

Templates: Levelling operations

Template 1: Plan and prepare for levelling operations.

Plan and prepare for levelling operations.

Client Name: Student to fill Job Details:


Address: Student to fill Plan and prepare for levelling operations.
Phone Number: Student to fill Worker signature:
Date(dd/mm/yyyy) Student to fill
Worker name:
Work instructions and
operational details

Sequence of work

Safety requirements
based on WHS laws and
regulations.

Australian standards for


Levelling operations

Environmental

WARATAH POLYTECHNIC PTY LTD Version: 2.1


ABN: 72 643 576 765 RTO: 45881 CRICOS: 04035A Release Date: NOV 2022
Level 16, 7 Deane St, Sydney NSW www.waratah.edu.au Page No: 1
2000, Australia [email protected] 1300 139 283
RTO-45881 I CRICOS: 04035A

requirements according
to site environmental
plan.

Communication, Signage
and barricade
requirements

PPE required

Tools and equipment selected

Tools and equipment Checked for serviceability Any faults (if any)

Faults reported to:

Material quantity requirements

Materials Quantity

WARATAH POLYTECHNIC PTY LTD Version: 2.1


ABN: 72 643 576 765 RTO: 45881 CRICOS: 04035A Release Date: NOV 2022
Level 16, 7 Deane St, Sydney NSW www.waratah.edu.au Page No: 2
2000, Australia [email protected] 1300 139 283
RTO-45881 I CRICOS: 04035A

Position of material on site:

Safe material handling procedures followed

Team roles

Verbal and non-verbal


communication signals to be
used during the levelling
operations. (Any five)

Sign off:
Date:

WARATAH POLYTECHNIC PTY LTD Version: 2.1


ABN: 72 643 576 765 RTO: 45881 CRICOS: 04035A Release Date: NOV 2022
Level 16, 7 Deane St, Sydney NSW www.waratah.edu.au Page No: 3
2000, Australia [email protected] 1300 139 283
RTO-45881 I CRICOS: 04035A

Template 2: Setting up levelling instrument

Setting up and testing levelling instrument

Procedures to set up levelling instrument. (50-100 words)

Procedures to test levelling instrument. (50-100 words)

Location of datum point.

WARATAH POLYTECHNIC PTY LTD Version: 2.1


ABN: 72 643 576 765 RTO: 45881 CRICOS: 04035A Release Date: NOV 2022
Level 16, 7 Deane St, Sydney NSW www.waratah.edu.au Page No: 4
2000, Australia [email protected] 1300 139 283
RTO-45881 I CRICOS: 04035A

Template 3: Rise and fall calculations

Rise and fall method

Station Backsight Intermediate Foresight Rise Fall Reduced Distance Remarks


number sight level

WARATAH POLYTECHNIC PTY LTD Version: 2.1


ABN: 72 643 576 765 RTO: 45881 CRICOS: 04035A Release Date: NOV 2022
Level 16, 7 Deane St, Sydney NSW www.waratah.edu.au Page No: 5
2000, Australia [email protected] 1300 139 283
RTO-45881 I CRICOS: 04035A

Template 4: Three-wire readings

Three-wire readings

Stations Readings Calculations

Station number: ___ To stadia line Cross-hair accurate:


Cross-hair  Yes
Bottom stadia line
 No

Station number: ___ To stadia line Cross-hair accurate:


Cross-hair  Yes
Bottom stadia line
 No

Station number: ___ To stadia line Cross-hair accurate:


Cross-hair  Yes
Bottom stadia line
 No

WARATAH POLYTECHNIC PTY LTD Version: 2.1


ABN: 72 643 576 765 RTO: 45881 CRICOS: 04035A Release Date: NOV 2022
Level 16, 7 Deane St, Sydney NSW www.waratah.edu.au Page No: 6
2000, Australia [email protected] 1300 139 283
RTO-45881 I CRICOS: 04035A

Template 5: Two-Peg test

Two-Peg test

Instructions:
1. Use pegs to mark the area on the worksite.
2. The points should be set up at a distance of 30m apart.
3. Depending on the exercise area, use pegs or a spray can to mark two points.
4. Set up the level instrument midway between the points.
5. Perform adjustment tests to ensure that the instrument is level.
6. Take and record the staff reading at each peg and record the level measurements in the
table provided below.
7. Calculate the difference between the two readings and record it in the table.
8. Move the optical level so that it is 5 m outside one of the pegs.
9. Take the staff another reading and record them in the table.
10. Again calculate the difference between the two readings and record it in the table.
11. Check whether the readings are the same or not.
Calculations

Two peg test Station A Station B

Peg A
Peg B
Calculations
Results

WARATAH POLYTECHNIC PTY LTD Version: 2.1


ABN: 72 643 576 765 RTO: 45881 CRICOS: 04035A Release Date: NOV 2022
Level 16, 7 Deane St, Sydney NSW www.waratah.edu.au Page No: 7
2000, Australia [email protected] 1300 139 283
RTO-45881 I CRICOS: 04035A

Template 6: Setting up levelling instrument.

Setting up and testing levelling instrument

Procedures to set up levelling instrument. (50-100 words)

Procedures to test levelling instrument for operational effectiveness and accuracy. (50-100
words)

WARATAH POLYTECHNIC PTY LTD Version: 2.1


ABN: 72 643 576 765 RTO: 45881 CRICOS: 04035A Release Date: NOV 2022
Level 16, 7 Deane St, Sydney NSW www.waratah.edu.au Page No: 8
2000, Australia [email protected] 1300 139 283
RTO-45881 I CRICOS: 04035A

Procedures to check tolerances. (50-100 words)

Location of datum point.

WARATAH POLYTECHNIC PTY LTD Version: 2.1


ABN: 72 643 576 765 RTO: 45881 CRICOS: 04035A Release Date: NOV 2022
Level 16, 7 Deane St, Sydney NSW www.waratah.edu.au Page No: 9
2000, Australia [email protected] 1300 139 283
RTO-45881 I CRICOS: 04035A

Template 7: Height of collimation method

Height of collimation method

Station Backsight Intermediate Foresight Height of Distance Remarks


number sight collimation

WARATAH POLYTECHNIC PTY LTD Version: 2.1


ABN: 72 643 576 765 RTO: 45881 CRICOS: 04035A Release Date: NOV 2022
Level 16, 7 Deane St, Sydney NSW www.waratah.edu.au Page No: 10
2000, Australia [email protected] 1300 139 283
RTO-45881 I CRICOS: 04035A

Template 8: Three-wire readings

Three-wire readings

Stations Readings Calculations

Station number: ___ To stadia line Cross-hair accurate:


Cross-hair  Yes
Bottom stadia line
 No

Station number: ___ To stadia line Cross-hair accurate:


Cross-hair  Yes
Bottom stadia line
 No

Station number: ___ To stadia line Cross-hair accurate:


Cross-hair  Yes
Bottom stadia line
 No

WARATAH POLYTECHNIC PTY LTD Version: 2.1


ABN: 72 643 576 765 RTO: 45881 CRICOS: 04035A Release Date: NOV 2022
Level 16, 7 Deane St, Sydney NSW www.waratah.edu.au Page No: 11
2000, Australia [email protected] 1300 139 283
RTO-45881 I CRICOS: 04035A

Template 9: Two-Peg test

Two-Peg test

Instructions:
1. Use pegs to mark the area on the worksite.
2. The points should be set up at a distance of 30m apart.
3. Depending on the exercise area, use pegs or a spray can to mark two points.
4. Set up the level instrument midway between the points.
5. Perform adjustment tests to ensure that the instrument is level.
6. Take and record the staff reading at each peg and record the level measurements in the
table provided below.
7. Calculate the difference between the two readings and record it in the table.
8. Move the optical level so that it is 5 m outside one of the pegs.
9. Take the staff another reading and record them in the table.
10. Again calculate the difference between the two readings and record it in the table.
11. Check whether the readings are the same or not.
Calculations

Two peg test Station A Station B

Peg A

Peg B

Calculations

Results

WARATAH POLYTECHNIC PTY LTD Version: 2.1


ABN: 72 643 576 765 RTO: 45881 CRICOS: 04035A Release Date: NOV 2022
Level 16, 7 Deane St, Sydney NSW www.waratah.edu.au Page No: 12
2000, Australia [email protected] 1300 139 283

You might also like