2 Storey Approved Dormitory Residential
2 Storey Approved Dormitory Residential
A-03
· GF-REFLECTED CEILING PLAN
2F-REFLECTED CEILING PLAN
·
· LONGITUDINAL SECTION
LINE & GRADE
· CROSS SECTION
· STAIR DESIGN DETAILS APPROVED BY:
· SCHEDULE OF DOORS & WINDOWS
HEAD DATE
STRUCTURAL
S-01
· SCHEDULE OF FOOTING,SLAB
SCHEDULE OF REINFORCED BEAMS
PROPOSED 2 - STOREY DORMITORY PROPOSED 2 - STOREY DORMITORY
·
· FOOTING & COLUMN DETAILS
LAND USE & ZONING
A-01 VISUALIZATION - A
SCALE NA METERS
A-01 VISUALIZATION - B
SCALE NA METERS
· FOUNDATION PLAN
01 04 02 04 · GF-BEAM LAYOUT PLAN APPROVED BY:
· 2F-BEAM LAYOUT PLAN
· ROOF BEAM LAYOUT PLAN
· SB-1 / STEEL BEAM - 1 DETAILS HEAD DATE
TRUE BEARINGS
11 LOT 906 TAGB.CAD.
TECHNICAL DESCRIPTIONS S-02
· SCHEDULE OF REINFORCED
LINES BEARINGS DISTANCES CONCRETE BEAMS
ARCHITECTURAL
· ROOF FRAMING PLAN - A
A = 65.52 SQM 1 ROOF FRAMING PLAN - B
0
·
35
ROOF PLAN
65
1 2 N 31° 07' E 8.61 M · APPROVED BY:
-0
10 · ROOF TRUSS DETAILS - A
07
2 3 S 46° 16' E 8.69 M 2 · ROOF TRUSS DETAILS - B
D
PS
3 4 S 47° 55'W 9.15 M · TYPICAL STAIR DETAIL HEAD DATE
4 1 N 39° 35'W 6.19 M
-B
LOT BB4-B-3-A 8 ELECTRICAL
-3
-B
9
-6
E-01
-B
STRUCTURAL
4
BB
· ELECTRICAL SPECIFICATIONS · 2F-ELECTRICAL SWITCH LAYOUT
T
· LEGEND
LO
PROPOSED 2 STOREY · VICINITY MAP
TRUE BEARINGS APARTMENT BUILDING · GF-ELECTRICAL LIGHTING LAYOUT
APPROVED BY:
78
6 7 N 30° 30' E 8.47 M HEAD DATE
48
· ELECTRICAL DISTRIBUTION
7 8 N 25° 52' E 4.42 M
06
5 1 DIAGRAM
-
07
8 9 S 66° 08' E 1.24 M
D
PS
9 10 N 38° 12' E 4.06 M
10 11 N 31° 32' E 4.70 M ELECTRICAL
PLUMBING
B
3-
11 1 S 74° 58' E 10.17 M
B-
R
4-
LOT BB4-B-3-A P-01
O
CE
APPROVED BY:
BB
4
NT
A
PLUMBING NOTES
T
·
LO
ER
D
LEGEND
NORTH
·
CARAOAN - CATUGASAN ROAD
OF 0 M
(1
· GF-PLUMBING LAYOUT HEAD DATE
TAGBILARAN CITY, BOHOL TH ETE · 2F-PLUMBING LAYOUT
E · ISOMETRIC PLUMBING LAYOUT
RO S W
AD ID · SEPTIC VAULT DETAILS
R
MECHANICAL
E
SITUATED IN
)
PROJECT TITLE: PREPARED BY: PRC NO: CONFORMED BY: SHEET CONTENTS: SHEET NO:
TABLE OF CONTENTS
PTR NO: VISUALIZATION - A
VISUALIZATION - B
PROPOSED TWO-STOREY DORMITORY VICINITY MAP A-01
ISSUED ON: SITE DEVELOPMENT PLAN 01 10
-
-
ADDRESS: BARANGAY DAMPAS, TAGBILARAN CITY ARCHITECT ISSUED AT: OWNER -
1 2 3 4 5 6 7 8 9
ELEV. ±9.27MTS
FIRE WALL
0.90 0.75
ELEV. ±8.57 MTS ELEV. ±8.52 MTS
A B C D E A B C D E
FIRE WALL FIRE WALL
0.78
2.87
ELEV. ±7.79 MTS
FIRE WALL ELEV. ±7.62 MTS
2.17
FIRE WALL
0.30 1.39
1.22
10.79 10.79
2.63 2.30 3.40 2.46 2.63 2.30 3.40 2.46 ELEV. ±6.40 MTS ELEV. ±6.40 MTS
0.30
TOP BEAM LINE TOP BEAM LINE
1.38 1.25 1.30 1.00 1.10 2.30 0.90 0.89 0.68 1.38 1.25 1.30 1.00 1.10 2.30 0.90 0.89 0.68
ELEV. ±6.10 MTS ELEV. ±6.10 MTS
2F - FCL 2F - FCL
3.00
3.00
2.70
2.70
9.27
0.12 1.63 0.12 1.63
8.57
1 1
0.47
0.47
5 5
4.6 4.6
ROOF LINE
ELEV. ±3.40 MTS ELEV. ±3.40 MTS
0.30
0.30
2F - FFL 2F - FFL
PROPERTY LINE
2.00
2.00
ELEV. ±3.10 MTS ELEV. ±3.10 MTS
2.10
2.10
GF - FCL GF - FCL
STAIRS DN
0 0
2.5 2.5
4.07
4.07
2.70
2.70
3.40
3.40
0.10 1.30 0.45 0.57 1.05
5.47
7 7
1.3 1.3 ELEV. ±0.40MTS ELEV. ±0.40MTS
GF - FFL GF - FFL
2 UTILITY AREA 2 UTILITY AREA
1.60
1.60
1.5 W 1.5 W
2 02
2 02
0.40
0.40
BEDROOM 10 BEDROOM 20 ELEV. ±0.0 MTS ELEV. ±0.0 MTS
ROOF LINE
D D NGL NGL
02 02
D D D D
W W
T & BD T & BD
1.40
1.40
02 02
1.30
1.30
03 W 03 W
T&B T&B
Y LINE
05 D 05 05 D 05
03 02 03 02 PROPOSED 2 - STOREY DORMITORY
Y
1.60
1.60
1.60
1.60
W W W W
02 02 02 02
BEDROOM 09 BEDROOM 19
2.90
2.90
2.90
2.90
A
A
9 8 7 6 5 4 3 2 1
W
W
D D D D
1.30
1.30
1.30
1.30
W 03 W W 03 W
05 T & BD 02 D
02
T&B 05 05 T & BD 02 T&B 05
03 03
4 4
L
L
ELEV. ±9.27MTS
BEDROOM 04 BEDROOM 14 FIRE WALL
L
0.92 0.75
1.60
1.60
1.70
1.70
W W W W ELEV. ±8.52 MTS ELEV. ±8.57 MTS
02 02 02 02 FIRE WALL
A
A
APEX ROOF LINE
2.90
2.90
2.90
2.87
ELEV. ±7.79 MTS
H
H
ELEV. ±7.60 MTS FIRE WALL
2.17
D D ROOF LINE
1.30
1.30
D 03 W D 03 W ELEV. ±7.20 MTS
T&B T&B
0.10 1.20
0.10 1.20
W W
T & BD 02 D 05 T & BD 02 D 05
0.30 1.20
05 02 05 02 ROOF LINE
03 03
5 5
22.72
22.72
ELEV. ±6.40 MTS ELEV. ±6.40 MTS
TOP BEAM LINE TOP BEAM LINE
BEDROOM 03 BEDROOM 13
1.60
1.60
W W
1.70
1.70
W 02 W 02 ELEV. ±6.10 MTS ELEV. ±6.10 MTS
02 02 2F - FCL 2F - FCL
BEDROOM 07 BEDROOM 17
2.90
2.90
2.90
2.90
3.00
3.00
2.70
2.70
Y
9.27
D D
1.30
1.30
8.57
03 W 03 W
D T&B D T&B
0.20 1.10
0.20 1.10
D D
A
A
W 05 W 05
05 T & BD 02 02 05 T & BD 02 02
PROPERTY LINE
6 6
03 03
W
W
ELEV. ±3.40 MTS ELEV. ±3.40 MTS
0.30
0.30
ROOF LINE
2F - FFL 2F - FFL
BEDROOM 02 BEDROOM 12
1.60
1.60
W W
L
L
1.70
1.70
W 02 W 02 ELEV. ±3.10 MTS ELEV. ±3.10 MTS
02 02 GF - FCL GF - FCL
BEDROOM 06 BEDROOM 16
2.90
2.90
2.90
2.90
L
2.70
2.70
3.40
3.40
D D
A
A
1.30
1.30
03 W 03 W
W D T&B W D T&B
0.30 1.00
0.30 1.00
D 05 D 05
05 02 05 02
T & BD 02 T & BD 02
7 7
ELEV. ±0.40MTS ELEV. ±0.40MTS
H
H
03 03 GF - FFL GF - FFL
ROOF LINE
0.40
0.40
1.07
1.07
BEDROOM 01 BEDROOM 11 ELEV. ±0.0 MTS ELEV. ±0.0 MTS
2.00
2.00
NGL NGL
1.70
1.70
W W
1.66
1.66
02 02
COMMON
8 W
01 CARPORT 8 LIVING AREA A-02
PROPOSED 2 - STOREY DORMITORY
2.93
2.96
2.96
STAIRS DN
5.65
5.65
SCALE 1:100 METERS
05 06
2.00
2.00
9 10 11 12 13 14 15 9 10 11 12 13 14 15
LOBBY
2.03
2.03
STAIRS UP
3.64
3.64
RAMP UP
9 9
8 7 6 5 4 3 2 1 8 7 6 5 4 3 2 1
D
01
A B C D E E D C B A
W W W W W W W W W W
04 04 04 03 03 03 03 03 03 03
1.65
1.65
1.64
1.64
1.66
1.66
1.66
1.66
0.78 0.70
FIRE WALL
0.61
ELEV. ±8.57 MTS
1.48
ELEV. ±8.52 MTS
APEX ROOF LINE FIRE WALL
2.72
ELEV. ±7.79 MTS
FIRE WALL
2.12
3.19
4.52
1.00
PROPE
R TY LIN
4.39
E
ELEV. ±5.40 MTS
WINDOW SILL
3.00
PROPE
RTY LIN
9.27
E
9.12
2.00
7.79
ELEV. ±3.40 MTS ELEV. ±3.40 MTS
0.33 1.25 3.40 2.30 1.34 0.33 1.25 3.40 2.30 1.34
0.30
0.30
0.44 0.44 2F - FFL 2F - FFL
1.58 5.70 1.79 1.58 5.70 1.79 ELEV. ±3.10 MTS ELEV. ±3.10 MTS
GF - FCL GF - FCL
9.06 9.06
2.00
2.70
3.40
ELEV. ±1.10 MTS
WINDOW SILL
0.40 0.70
GF - FFL GF - FFL
0.40
ELEV. ±0.0 MTS ELEV. ±0.0 MTS
NGL NGL
REAR ELEVATION
01 06 02 06 SCALE 1:100 METERS SCALE 1:100 METERS
03 06 04 06
PROJECT TITLE: PREPARED BY: PRC NO: CONFORMED BY: SHEET CONTENTS: SHEET NO:
GROUND FLOOR PLAN
PTR NO: SECOND FLOOR PLAN
FRONT ELEVATION
PROPOSED TWO - STOREY DORMITORY REAR ELEVATION A-02
ISSUED ON: RIGHT SIDE ELEVATION 02 10
LEFT SIDE ELEVATION
-
ADDRESS: BARANGAY DAMPAS, TAGBILARAN CITY ARCHITECT ISSUED AT: OWNER -
LEGEND FOR REFLECTED CEILING PLANS LEGEND FOR REFLECTED CEILING PLANS
9 8 7 6 5 4 3 2
INTERIOR DL ( DOWN LIGHT ) EXTERIOR DL ( DOWN LIGHT ) CH=2.70M CEILING HEIGHT FROM FINISH FLR. LINE INTERIOR DL ( DOWN LIGHT ) EXTERIOR DL ( DOWN LIGHT ) CH=2.70M CEILING HEIGHT FROM FINISH FLR. LINE
ELEV. ±9.13MTS
FIRE WALL
0.61
ELEV. ±8.52 MTS
2.73
ELEV. ±7.79 MTS
FIRE WALL
2.12
1.39
10.79 10.79
2.63 2.30 3.40 2.46 2.63 2.30 3.40 2.46 ELEV. ±6.40 MTS
SEE TRUSS DETAILS ELEV. ±6.40 MTS
0.30
0.30
TOP BEAM LINE TOP BEAM LINE
1.38 1.25 1.30 1.00 1.10 2.30 0.90 0.89 0.68 1.38 1.25 1.30 1.00 1.10 2.30 0.90 0.89 0.68
4.39
ELEV. ±6.10 MTS ELEV. ±6.10 MTS
2F - FCL 2F - FCL
3.00
2.70
2.70
9.13
0.12 1.63 0.12 1.63
1 1
7.79
0.47
0.47
5 5 LOBBY ROOM 11 ROOM 12 ROOM 13 ROOM 14 ROOM 15 UTILITY AREA
OVERHANG SLAB
OVERHANG SLAB
4.6 4.6
ROOF LINE
ELEV. ±3.40 MTS ELEV. ±3.40 MTS
0.30
0.30
2F - FFL 2F - FFL
PROPERTY LINE
2.00
2.00
ELEV. ±3.10 MTS ELEV. ±3.10 MTS
2.10
2.10
GF - FCL GF - FCL
STAIRS DN
0 0 8
2.5 2.5
4.07
4.07
2.70
2.70
7
3.40
3.40
6
0.10 1.30 0.45 0.57 1.05
5.47
5.47
7 7 4
1.3 CH=2.70M 1.3 CH=2.70M
ELEV. ±0.40MTS 3 ELEV. ±0.40MTS
CH=2.70M CH=2.70M 2
GF - FFL GF - FFL
2 2 1
1.60
1.60
1.5 1.5 STAIRS ROOM 01 ROOM 02 ROOM 03 ROOM 04 ROOM 05 UTILITY AREA
2 2
0.40
0.40
ELEV. ±0.0 MTS SEE FOUNDATION PLAN ELEV. ±0.0 MTS
ROOF LINE
OVERHANG SLAB
OVERHANG SLAB
NGL NGL
CH=2.70M CH=2.70M
1.40
1.40
1.30
1.30
0.75
Y LINE
LONGITUDINAL SECTION
CH=2.70M CH=2.70M
3 3 A-03
PROPERT
1.60
1.60
1.60
OVERHANG SLAB
OVERHANG SLAB
2.90
2.90
2.90
2.90
E D C B A
CH=2.70M CH=2.70M
1.30
1.30
1.30
1.30
CH=2.70M CH=2.70M
2.96
4 4 1.21 1.75
CH=2.70M CH=2.70M CH=2.70M CH=2.70M
9 8 0.33 0.78 0.10 1.50 0.25
1.60
1.60
1.70
1.70
ELEV. ±6.40 MTS
TOP BEAM LINE
2.90
2.90
2.90
2.90
CH=2.70M
CH=2.70M
OVERHANG SLAB
OVERHANG SLAB
1.85
0.25
2.22
CH=2.70M CH=2.70M
1.30
1.30
0.925 0.925
0.10 1.20
0.10 1.20
0.90
CH=2.70M CH=2.70M SEE TRUSS DETAILS 0.05 0.875 0.875 0.05
0.65
5 5
22.72
22.72
ELEV. ±6.40 MTS
0.30
TOP BEAM LINE
LANDING
5.22
CH=2.70M CH=2.70M 15
CH=2.70M CH=2.70M
1.60
1.60
0.27
1.70
1.70
ELEV. ±6.10 MTS 14
0.60
2F - FCL
LANDING
2.90
2.90
2.90
2.90
13
9.00 0.90 9.00 0.90
2.70
12
1.40
0.94
1.46
11
8.62
CH=2.70M CH=2.70M
1.30
1.30
0.75 0.75 0.75
0.20 1.10
10
3.90
PROPERTY LINE
CH=2.70M CH=2.70M
6 6 9
OVERHANG SLAB
OVERHANG SLAB
ELEV. ±3.40 MTS 15 8 8
ROOF LINE
CH=2.70M CH=2.70M 2F - FFL 14 8
2.96
13 7 9
1.60
1.60
CH=2.70M CH=2.70M 12 7
1.70
1.70
ELEV. ±3.10 MTS 11
10 6 10 6
GF - FCL
2.90
2.90
2.90
2.90
9
CH=2.70M
CH=2.70M
8 5 11 5
2.70
3.40
1.60
4
1.50
4 12
1.30
1.30
CH=2.70M CH=2.70M
0.30 1.00
0.30 1.00
ROOF LINE
CH=2.70M CH=2.70M 3 13
7 7
OVERHANG SLAB
OVERHANG SLAB
ELEV. ±0.40MTS
2
GF - FFL
2 14 1
0.40
1.07
1.07
ELEV. ±0.0 MTS SEE FOUNDATION PLAN 1 15 GROUND FLOOR FINISH FLOOR LINE
CH=2.70M CH=2.70M
2.00
2.00
NGL
1.70
1.70
STAIRS UP
1.66
1.66
CH=2.70M CH=2.70M
8 8 A-03
PROPOSED 2 - STOREY DORMITORY
2.93
2.96
2.96
STAIRS DN
5.65
5.65
CH=2.70M SCALE 1:100 METERS SCALE 1:100 METERS
04 06 05 06
2.00
2.00
9 10 11 12 13 14 15 9 10 11 12 13 14 15
2.03
2.03
STAIRS UP
3.64
3.64
RAMP UP
9 9
8 7 6 5 4 3 2 1 8 7 6 5 4 3 2 1
0.90
0.90
0.45
1.65
1.65
1.64
1.64
1.66
1.66
1.66
1.66
ELEV. ±2.70MTS
OVERHANG SLAB ROOF LINE OVERHANG SLAB ROOF LINE FCL
0.60
1.00 0.80 0.70 1.20 1.20 1.20 0.60
0.45
1.00
ELEV. ±2.10MTS
0.20
HEADER
0.60
3.19
3.19
1.10
1.10
1.10
1.20
1.20
1.00
0.90
2.70
4.52
4.52
1.00
2.10
1.50
R TY LIN
E
1.00
1.00
1.00
1.00
0.90
0.90
0.70
PROPE
RTY LIN
E
ELEV. ±0.0MTS
FFL
0.33 1.25 3.40 2.30 1.34 0.44 0.33 1.25 3.40 2.30 1.34 0.44
MARK LOCATION MARK LOCATION MARK LOCATION MARK LOCATION MARK LOCATION MARK LOCATION MARK LOCATION MARK LOCATION
1.58 5.70 1.79 1.58 5.70 1.79 ENTRANCE ROOMS 01,02,03,04 TOILET & BATHS ENTRANCE ROOMS 01,02,03,04 STAIRS STAIRS TOILET & BATHS
PROJECT TITLE: PREPARED BY: PRC NO: CONFORMED BY: SHEET CONTENTS: SHEET NO:
GF - REFLECTED CEILING PLAN
PTR NO: 2F - REFLECTED CEILING PLAN
LONGITUDINAL SECTION
PROPOSED TWO-STOREY DORMITORY CROSS SECTION A-03
ISSUED ON: STAIR DESIGN DETAILS 03 10
SCHEDULE OF DOORS & WINDOWS
-
ADDRESS: BARANGAY DAMPAS, TAGBILARAN CITY ARCHITECT ISSUED AT: OWNER -
B
EMBEDMENT DEPTH
SEE COLUMN SCHEDULE BOTTOM BARS 12mmØ @200mm 12mmØ @200mm 12mmØ @200mm 12mmØ @300mm 12mmØ @300mm 12mmØ @300mm
VARIES
TOP BARS 12mmØ @150mm NONE 12mmØ @150mm 12mmØ @150mm NONE 12mmØ @150mm
FILL FILL SLAB-3 100mm TWO - WAY
2.50 M
50mm LEAN THK. CONCRETE 0.50 0.50 0.50 0.50 0.50 0.50
LENGTH(L) SECTION
1.15
Y-DIRECTION FILL GROUND FLOOR TO SECOND FLOOR SECOND FLOOR TO GROUND FLOOR SECOND FLOOR TO ROOF AB 2 x 2 (TOP)
C1 C1 C1
BARS
0.30
0.30
AB 1-1/2 x 1-1/2 (WEBBING)
A SEE
0.35
COLUMN A B A B A B
SIZE SIZE SIZE
WIDTH(W)
SCHEDULE AB 2 x 2 (BOTTOM)
50mm LEAN THK. CONCRETE 300mm 300mm 300mm 300mm 300mm 300mm
B
VERT. BARS 8 PCS - 20mmØ VERT. BARS 8 PCS - 20mmØ VERT. BARS 4 PCS - 20mmØ & 4PCS - 16mmØ PROPOSED 2 - STOREY DORMITORY
X-DIRECTION
1.025 0.30 1.475 0.30 1.025 0.30 1.475 0.30
CONF. REINF. 2 SETS - 8 PCS - 12mmØ @75mm CONF. REINF. 2 SETS - 8 PCS - 12mmØ @75mm CONF. REINF. 2 SETS - 8 PCS - 12mmØ @75mm S-01 SB-1 / STEEL BEAM - 1 DETAILS
SCALE 1:20 METERS
BARS 1.325 1.775 1.325 1.775
JOINT REINF. 2 SETS - 10mmØ @100mm JOINT REINF. 2 SETS - 10mmØ @100mm JOINT REINF. 2 SETS - 10mmØ @100mm 05 05
PLAN 3.10 3.10
TIES / SPIRAL 2 SETS - 12mmØ @100mm TIES / SPIRAL 2 SETS - 12mmØ @100mm TIES / SPIRAL 2 SETS - 12mmØ @100mm
A B C D E A B C D E A B C D E A B C D E
9.07 9.07 9.07 9.07
1.59 5.70 1.79 1.59 5.70 1.79 1.59 5.70 1.79 1.59 5.70 1.79
0.33 1.26 2.30 3.40 0.82 0.96 0.33 1.26 2.30 3.40 0.82 0.96 0.33 1.26 2.30 3.40 0.82 0.96 0.33 1.26 2.30 3.40 0.82 0.96
1.71 1.71 1.71
C1 CB-1 CB-1 CB-2
1 4.6
5
1 4.6
5
1 4.6
5
1 4.6
5
-1 -1 -1
TB AM AM
BE CB-2 BE
1.95
1.95
1.95
1.95
BEAM-2
F2
BEAM-2
RB-2
2.46
2.46
2.46
2.46
TB-2
C1 SLAB-2
2 2 2 2
3.9 3.9 3.9 3.9
WF-1 BEAM-2 CB-2
0.51
0.51
0.51
0.51
-1 -1 -1
TB AM AM
5.36
5.36
5.36
5.36
F2 C1 1 WF-1 5
BE 1 BE
1.5 0.1 1.5
1.14
1.14
1.14
1.14
C1
2 2 2 2
BEAM-2
BEAM-2
-1 -1 -2
BEAM-2
CB WF-1 CB
WF-1 CB
SB-1
WF-1
TB-2
RB-2
2.90
2.90
2.90
2.90
BEAM-2
SLAB-1 SLAB-1
TB-2
RB-2
WF-1
1.76
1.76
1.76
1.76
F2 WF-1
WF-1
F1 F1
3 C1 C1
3 TB-1
3 BEAM-1A BEAM-1A
3 RB-1 RB-1
BEAM-2
BEAM-2
BEAM-2
BEAM-2
WF-1 WF-1
WF-1
WF-1
SB-1
TB-2
TB-2
RB-2
RB-2
2.90
2.90
2.90
2.90
2.90
2.90
2.90
2.90
SLAB-1 SLAB-1
WF-1 WF-1
F1 F1
4 4 4 4
5.80
5.80
5.80
5.80
C1 C1 TB-1 BEAM-1A BEAM-1A RB-1 RB-1
BEAM-2
BEAM-2
BEAM-2
BEAM-2
WF-1
WF-1
WF-1
WF-1
SB-1
TB-2
TB-2
RB-2
RB-2
2.90
2.90
2.90
2.90
2.90
2.90
2.90
2.90
SLAB-1 SLAB-1
WF-1
20.96
20.96
20.96
20.96
20.96
20.96
20.96
20.96
WF-1
F1 F1
5 C1 C1
5 TB-1
5 BEAM-1A BEAM-1A
5 RB-1 RB-1
BEAM-2
BEAM-2
BEAM-2
BEAM-2
WF-1 WF-1
WF-1
SB-1
TB-2
TB-2
RB-2
RB-2
2.90
2.90
2.90
2.90
2.90
2.90
2.90
2.90
WF-1 SLAB-1 SLAB-1
WF-1
F1 F1 WF-1
6 6 6 6
5.80
5.80
5.80
5.80
C1 C1 TB-1 BEAM-1A BEAM-1A RB-1 RB-1
WF-1
BEAM-2
BEAM-2
BEAM-2
BEAM-2
WF-1
WF-1
WF-1
SB-1
TB-2
TB-2
RB-2
RB-2
2.90
2.90
2.90
2.90
2.90
2.90
2.90
2.90
WF-1 SLAB-1 SLAB-1
CF-1 WF-1
F1 WF-1
7 C1 C1 C1
7 TB-1 TB-1
7 BEAM-1A BEAM-1A
7 RB-1 RB-1
BEAM-2
WF-1
RB-2
RB-2
2.00
2.00
2.00
2.00
TB-1
WF-1
CB-2
CB-2
SLAB-1
CB-1
1.68
1.68
1.68
F2
BEAM-2A
BEAM-2A
TB-2 WF-1 BEAM-1 SB-1 SB-1
8 8 8 8
RB-2
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
TB-1
TB-1
4.01
4.01
4.01
4.01
C1 SLAB-3
BEAM-2
BEAM-2
RB-2
TB-1
RB-2
SLAB-1
RB-2
2.00
2.00
2.00
2.00
TB-1
STAIRS
2.03
2.03
2.03
F2 F2
9 C1
C1
C1 9 TB-1 TB-1
9 BEAM-2 BEAM-2
9 RB-2 RB-2
CB-2
CB-2
CB-1
CB-2
CB-2
1.66
1.66
1.66
CB-1
1.65
1.65
1.65
0.33 4.66 3.65 0.43 0.33 4.66 3.65 0.43 0.33 4.66 3.65 0.43 0.33 4.66 3.65 0.43
PROPOSED 2 - STOREY DORMITORY PROPOSED 2 - STOREY DORMITORY PROPOSED 2 - STOREY DORMITORY PROPOSED 2 - STOREY DORMITORY
PROJECT TITLE: PREPARED BY: PRC NO: CONFORMED BY: SHEET CONTENTS: SHEET NO:
SCHEDULE OF FOOTING, SLAB,
PTR NO: SCHEDULE OF REINFORCED BEAMS
FOOTING & COLUMN DETAILS
PROPOSED TWO-STOREY DORMITORY FOUNDATION PLAN S-01
ISSUED ON: GF - BEAM LAYOUT PLAN 04 10
2F - BEAM LAYOUT PLAN
ROOF BEAM LAYOUT PLAN
ADDRESS: BARANGAY DAMPAS, TAGBILARAN CITY ARCHITECT ISSUED AT: OWNER SB-1 / STEEL BEAM - 1 DETAILS
DEPTH
DEPTH
DEPTH
DEPTH
DEPTH
DEPTH
250mm 380mm 10mm : 1@50mm 10@100mm 8@150mm REST @250mm O.C. TO C.L.
(D)
(D)
(D)
(D)
(D)
(D)
BOTTOM BARS 3 - 20mmØ 3 - 20mmØ 3 - 20mmØ
TOP BARS 2 - 16mmØ 2 - 16mmØ 2 - 16mmØ
BEAM-2 200mm 300mm 10mm : 1@50mm 10@100mm 8@150mm REST @250mm O.C. TO C.L. 0.30
BOTTOM BARS 2 - 16mmØ 2 - 16mmØ 2 - 16mmØ
TOP BARS 2 - 16mmØ 2 - 16mmØ 2 - 16mmØ
RB-1 200mm 350mm 10mm : 1@50mm 10@100mm 8@150mm REST @250mm O.C. TO C.L. LEFT SUPPORT MIDSPAN RIGHT SUPPORT LEFT SUPPORT MIDSPAN LEFT SUPPORT
BOTTOM BARS 2 - 16mmØ 2 - 16mmØ 2 - 16mmØ
TOP = 5 - 20mmØ TOP = 2 - 20mmØ TOP = 5 - 20mmØ TOP = 5 - 16mmØ TOP = 2 - 16mmØ TOP = 5 - 16mmØ
TOP BARS 2 - 16mmØ 2 - 16mmØ 2 - 16mmØ
0.50
RB-2 200mm 300mm 10mm : 1@50mm 10@100mm 8@150mm REST @250mm O.C. TO C.L. BOTTOM = 3 - 20mmØ BOTTOM = 3 - 20mmØ BOTTOM = 3 - 20mmØ BOTTOM = 3 - 16mmØ BOTTOM = 3 - 16mmØ BOTTOM = 3 - 16mmØ
0.625
BOTTOM BARS 2 - 16mmØ 2 - 16mmØ 2 - 16mmØ
10mm : 1@50mm 10@100mm 8@150mm REST @250mm O.C. TO C.L. 10mm : 1@50mm 10@100mm 8@150mm REST @250mm O.C. TO C.L.
TOP BARS 5 - 16mmØ 5 - 16mmØ 5 - 16mmØ
CB-1 250mm 380mm 10mm : 1@50mm 10@100mm 8@150mm REST @250mm O.C. TO C.L. BEAM-2, RB-1, RB-2, CB-1, CB-3, TB-2 DETAILS TB-1 DETAIL
BOTTOM BARS 3 - 16mmØ 3 - 16mmØ 3 - 16mmØ
0.125
TOP BARS 2 - 16mmØ 2 - 16mmØ 2 - 16mmØ WIDTH WIDTH WIDTH WIDTH WIDTH WIDTH
CB-2 200mm 300mm 10mm : 1@50mm 10@100mm 8@150mm REST @250mm O.C. TO C.L. (W) (W) (W)
BOTTOM BARS 2 - 16mmØ 2 - 16mmØ 2 - 16mmØ (W) (W) (W)
TOP BARS 2 - 16mmØ 2 - 16mmØ 2 - 16mmØ SEE RB-2 DETAILS
CB-3 200mm 350mm 10mm : 1@50mm 10@100mm 8@150mm REST @250mm O.C. TO C.L.
BOTTOM BARS 2 - 16mmØ 2 - 16mmØ 2 - 16mmØ
DEPTH
DEPTH
DEPTH
DEPTH
DEPTH
DEPTH
CEILING LINE
(D)
(D)
(D)
(D)
(D)
(D)
TOP BARS 3 - 16mmØ 2 - 16mmØ 3 - 16mmØ 1.15 METERS ( ROOF EAVE )
TB-1 200mm 380mm 10mm : 1@50mm 10@100mm 8@150mm REST @250mm O.C. TO C.L.
BOTTOM BARS 2 - 16mmØ 3 - 16mmØ 2 - 16mmØ
TOP BARS 2 - 16mmØ 2 - 16mmØ 2 - 16mmØ
TB-2 200mm 300mm 10mm : 1@50mm 10@100mm 8@150mm REST @250mm O.C. TO C.L.
BOTTOM BARS 2 - 16mmØ 2 - 16mmØ 2 - 16mmØ LEFT SUPPORT MIDSPAN LEFT SUPPORT LEFT SUPPORT MIDSPAN LEFT SUPPORT PROPOSED 2 - STOREY DORMITORY
TOP = 2 - 16mmØ TOP = 2 - 16mmØ TOP = 2 - 16mmØ TOP = 3 - 16mmØ TOP = 2 - 16mmØ TOP = 3 - 16mmØ S-02 ROOF TRUSS DETAILS-A
SCALE 1:20 METERS
THE SCHEDULE OF REINFORCED CONCRETE BEAMS IS FOR THE GROUND FLOOR BEAM LAYOUT PLAN, SECOND BOTTOM = 2 - 16mmØ BOTTOM = 2 - 16mmØ BOTTOM = 2 - 16mmØ BOTTOM = 2 - 16mmØ BOTTOM = 3 - 16mmØ BOTTOM = 2 - 16mmØ 04 06
FLOOR BEAM LAYOUT PLAN, AND ROOF BEAM LAYOUT PLAN LOCATED ON STRUCTURAL PLANS PAGE 1 ( S-01 )
10mm : 1@50mm 10@100mm 8@150mm REST @250mm O.C. TO C.L. 10mm : 1@50mm 10@100mm 8@150mm REST @250mm O.C. TO C.L.
0.30
0 . 3
0.30 A
0.35
0.57
B
9.07 9.07
2.08
1.59 5.70 1.79 1.59 5.70 1.79 A
A
0.33 1.26 2.30 3.40 0.82 0.96 0.33 1.26 2.30 3.40 0.82 0.96 75mmØ PVC PIPE 0.49
2.03
ROOF BRACING
DOWNSPOUT . 30 0.30
1.71 1.71 0 A
0.44
1.45
0 .30 A B
0.30 B
1 4.6
5
1 4.6
5
1 A A
0.61
B A
A
0.30
A LL ALL ALL B
1.95
1.95
EW EW EW A
FIR FIR FIR
2.46
2.46
3.9
2
3.9
2
RT-3 1.00 1.05 1.00 1.00 1.00 1.00
0.51
0.51
6.05
-1
RT
5.36
5.36
0.38 0.30 0.30
L L L
AL AL AL
1.5
1 EW
1.5
1 EW EW 0.38 0.30 0.33
1.14
1.14
FIR FIR FIR
4.02
0.30
2 2 2 0.30 0.45
B A
2.90
2.90
0.30 0.30 0.40 A A
1.20
1.76
1.76
1.11
A A
B B B
0.30
0.59
A A
RT-2 A
3 3 3 B
A
2.90
2.90
2.90
7.75
RT-2 5.02
0.30
4 4 4
5.80
5.80
B A
3mm THK X 25 X 25mm
0.30 0.24
0.30 0.30 0.40 A
1.12
A A
B B B
0.58
2.90
2.90
2.90
2.90
A A A
B
20.96
20.96
20.96
20.96
A
RT-2 1.00 0.54 1.00 1.00 1.00 1.00 1.00 1.00 1.00
5 5 5 8.53
RT-1 S-02
PROPOSED 2 - STOREY DORMITORY
2.90
2.90
2.90
SCALE 1:50 METERS
05 06
5.80
2.90
2.90
2.90
BEAM-2 detail to be supported by CB-2
ROOF - B ( SEE ROOF FRAMING PLAN - B )
RT-2 12mmØ DEFORMED BARS
VARIES
SPACED @0.15M
7 7 7 AS STEP BARS
25
FIRE WALL
FIRE WALL
FIRE WALL
0.1
3mm THK X 25 X 25mm 12mmØ DEFORMED BARS
SEE ELEVATION
ANGLE BAR - FASCIA FRAMING SPACED @0.15M
2.00
2.00
AS CUT BARS
SEE SLAB DETAIL
1.68
1.68
4.00
4.00
4.00
SPACED @0.15M
4.01
4.01
RT-3
RT-3
RT-3
VARIES
ALL
ALL
ALL
FIRE W
FIRE W
FIRE W
2.00
2.00
2.03
2.03
0.1
12mmØ LONGITUDINAL BARS
9 9 9
25
SPACED @0.15M O.C
VARIES
2" X 4" C PURLINS 0.20
0.625
1.66
1.66
1.65
0.20
ROOF - B ( SEE ROOF FRAMING PLAN - B ) 2" X 4" C PURLINS 3mm THK X 25 X 25mm
SPACED @ 0.70 M 0.C ANGLE BAR - FASCIA FRAMING G.I. GA30 GUTTER
0.33 4.66 3.65 0.43 0.33 4.66 3.65 0.43 LONG SPAN 75mmØ PVC PIPE 0.65
ROOF BRACING ROOFING DOWNSPOUT
PROPOSED 2 - STOREY DORMITORY PROPOSED 2 - STOREY DORMITORY PROPOSED 2 - STOREY DORMITORY PROPOSED 2 - STOREY DORMITORY
PROJECT TITLE: PREPARED BY: PRC NO: CONFORMED BY: SHEET CONTENTS: SHEET NO:
SCHEDULE OF REINF.CONC. BEAMS
PTR NO: ROOF FRAMING PLAN - A
ROOF FRAMING PLAN - B
PROPOSED TWO-STOREY DORMITORY ROOF PLAN S-02
ISSUED ON: ROOF TRUSS DETAILS - A 05 10
ROOF TRUSS DETAILS - B
TYPICAL STAIR DETAIL
ADDRESS: BARANGAY DAMPAS, TAGBILARAN CITY ARCHITECT ISSUED AT: OWNER -
ALL ELECTRICAL WORKS HEREIN SHALL COMPLY WITH THE PERTINENT PROVISIONS OF THE LATEST APPROVED ELECTRICAL LIGHTING LINE ACU / AC AIR CONDITIONER
EDITION OF THE PHILIPPINE ELECTRICAL CODE, WITH THE RULES AND REGULATIONS OF THE NATIONAL AND LOCAL
AUTHORITIES CONCERNED IN THE ENFORCEMENT OF ELECTRICAL LAWS AND ORDINANCES OF THE UTILITY COMPANY'S
CONCERNED. ELECTRICAL POWER LINE CB CIRCUIT BREAKER
THERE SHALL BE ONLY ONE SERVICE DROP INTO THE BUILDING AND IT SHALL BE 220 / 230 VOLTS, SINGLE PHASE,
1Ø, 2 WIRE SYSTEM, 60 HZ. ELECTRICAL SWITCH LINE CO CONVENIENCE OUTLET CARAOAN - CATUGASAN ROAD
UNLESS OTHERWISE SPECIFIED ON PLANS, OTHER WIRING SHALL BE INSTALLED IN STANDARD POLYVINYL CHLORIDE TAGBILARAN CITY, BOHOL
(PVC) RIGID CONDUITS, RUN EMBEDDED INSIDE HOLLOW BLOCKS, CONCRETE STRUCTURES AND INSIDE THE CEILING 50W - 100W INTERIOR LIGHTING LO LIGHTING OUTLET
SURFACES.
INTERMEDIATE METALLIC TUBING (IMT) UNLESS OTHERWISE INDICATED. 50W - 100W EXTERIOR LIGHTING S1 1 GANG SWITCH
WHENEVER REQUIRED AND NECESSARY PULL BOX OF PROPER SIZE SHALL BE INSTALLED AT CONVENIENT AND SWITCH - S1 - S2 - S3 S2 2 GANG SWITCH
INCONSPICUOUS LOCATION TO FACILITATE WIRE FILLING EVEN THIS ITEM ARE NOT SHOWN IN PLANS.
A B C D E A B C D E A B C D E A B C D E
S1 - 10 SWITCHES S1 - 10 SWITCHES
S2 - 11 SWITCHES S2 - 11 SWITCHES
S3 - 2 SWITCHES S3 - 2 SWITCHES
1 1 1 1
ROOF LINE
ROOF LINE
PROPERTY LINE
PROPERTY LINE
C6 C6
PB-1 PB-2
B B
A A
2 2 2
A
2
A
A B A B
ROOF LINE
ROOF LINE
S2-A,B S2-A,B
S1-C S2-A,B S1-C S2-A,B
C5 C5
PB-1 PB-2
Y LINE
Y LINE
C7 C7 C C
C A A S1-C C A A S1-C
PB-1 PB-2
3 3 3 S2-A,B
3 S2-A,B
PROPERT
PROPERT
C C
B A A B B A A B
4 4 4 S2-A,B
B
4 S2-A,B
B A A B B A A B
S2-A,B S2-A,B
S1-C S1-C
C3 C3
PB-1 C9 PB-2 C9 C C
A S1-C A S1-C
PB-1 PB-2 C C
5 5 5 5
A A
S2-A,B S2-A,B
B B
A B A B
B A B A
S2-A,B S2-A,B
S1-C S1-C
C2 C2 C C
PB-1 C10 PB-2 C10 A S1-C A S1-C
PROPERTY LINE
PROPERTY LINE
PB-1 PB-2
6 6 6 6
C A C A
S2-A,B S2-A,B
ROOF LINE
ROOF LINE
A B
A B A B
B A B A
S2-A,B S2-A,B
S1-C S1-C
C1 C11 C1 C11 C C
PB-1 PB-2 A S1-C A S1-C
PB-1 PB-2
7 7 7 C A
7 C A
ROOF LINE
ROOF LINE
S2-A,B S2-A,B
A A
B A B A
8 PB-1
8 PB-2
8 PB-1
C
8 PB-2
B B
A A A
S3-A,B,C S3-A,B,C
9 9 9 S3-A,B,C 9 S3-A,B
B
B
ROOF LINE ROOF LINE ROOF LINE ROOF LINE
PROPOSED 2 - STOREY DORMITORY PROPOSED 2 - STOREY DORMITORY PROPOSED 2 - STOREY DORMITORY PROPOSED 2 - STOREY DORMITORY
PROJECT TITLE: PREPARED BY: PRC NO: CONFORMED BY: SHEET CONTENTS: SHEET NO:
ELECTRICAL SPECIFICATIONS
PTR NO: LEGEND
VICINITY MAP
PROPOSED TWO-STOREY DORMITORY GF - ELECTRICAL LIGHTING LAYOUT E-01
ISSUED ON: 2F - ELECTRICAL LIGHTING LAYOUT 06 10
GF - ELECTRICAL SWITCH LAYOUT
2F - ELECTRICAL SWITCH LAYOUT
ADDRESS: BARANGAY DAMPAS, TAGBILARAN CITY ARCHITECT ISSUED AT: OWNER -
LEGEND
COMPUTATION FOR MAIN BREAKER SCHEDULE OF LOADS & COMPUTATIONS
ROOF LINE
26 ACU 1 1380 230 2P 6.00 30 60 10 2 - 5.5mm² 1 - 5.5mm² 20mmØ
27 ACU 1 1380 230 2P 6.00 30 60 10 2 - 5.5mm² 1 - 5.5mm² 20mmØ
28 ACU 1 1380 230 2P 6.00 30 60 10 2 - 5.5mm² 1 - 5.5mm² 20mmØ
29 ACU 1 1380 230 2P 6.00 30 60 10 2 - 5.5mm² 1 - 5.5mm² 20mmØ
C28 C28 30 ACU 1 1380 230 2P 6.00 30 60 10 2 - 5.5mm² 1 - 5.5mm² 20mmØ
PB-1 PB-2
31 ACU 1 1380 230 2P 6.00 30 60 10 2 - 5.5mm² 1 - 5.5mm² 20mmØ
2 2 32 ACU 1 1380 230 2P 6.00 30 60 10 2 - 5.5mm² 1 - 5.5mm² 20mmØ
ROOF LINE
C17 C17
PB-1 PB-2 33 SPARE 1 1380 230 2P 6.00 30 60 10 2 - 5.5mm² 1 - 5.5mm² 20mmØ
MDP-A MAIN 87 29,020 230 2P 126.18 60 60 10 2 - 14.0mm² 1 - 8.0mm² 32mmØ
C16 C16
3 PB-1
C29
3 PB-2
C29
THE MAIN DISTRIBUTION PANELS ARE SEPARATED PER FLOOR AS SHOWN ON THE SCHEDULE OF LOADS NAMELY PB-1 AND PB-2
PB-1 PB-2
C27 C27
PB-1 PB-2
C18
PB-1
C18
PB-1 PB-2 ( PANEL BOARD - 2 ) MDP
O C P D WIRE GROUNDING
CIRCUIT # DESCRIPTION OUTLET V.A (W) VOLTS POLE AMPERE CONDUIT
4 C15
PB-1
C30
4 C15
PB-2
C30
AT AF KAIC mm² THW mm² TW
PB-1 PB-2 1 50W - 100W L.O. 4 400 230 2P 1.74 15 60 10 2 - 3.5mm² 1 - 3.5mm² 20mmØ
C26 C26 2 50W - 100W L.O. 4 400 230 2P 1.74 15 60 10 2 - 3.5mm² 1 - 3.5mm² 20mmØ
PB-1 PB-2
C19
PB-1
C19
PB-2
3 50W - 100W L.O. 4 400 230 2P 1.74 15 60 10 2 - 3.5mm² 1 - 3.5mm² 20mmØ
4 50W - 100W L.O. 4 400 230 2P 1.74 15 60 10 2 - 3.5mm² 1 - 3.5mm² 20mmØ
5 50W - 100W L.O. 4 400 230 2P 1.74 15 60 10 2 - 3.5mm² 1 - 3.5mm² 20mmØ
5 C14
PB-1
C31
5 C14
PB-2
C31
6 50W - 100W L.O. 12 1200 230 2P 5.22 15 60 10 2 - 3.5mm² 1 - 3.5mm² 20mmØ
PB-1 PB-2 7 50W - 100W L.O. 4 400 230 2P 1.74 15 60 10 2 - 3.5mm² 1 - 3.5mm² 20mmØ
C25 C25 8 50W - 100W L.O. 4 400 230 2P 1.74 15 60 10 2 - 3.5mm² 1 - 3.5mm² 20mmØ
PB-1 PB-2
C20
PB-1
C20
PB-2 9 50W - 100W L.O. 4 400 230 2P 1.74 15 60 10 2 - 3.5mm² 1 - 3.5mm² 20mmØ
10 50W - 100W L.O. 4 400 230 2P 1.74 15 60 10 2 - 3.5mm² 1 - 3.5mm² 20mmØ
11 50W - 100W L.O. 4 400 230 2P 1.74 15 60 10 2 - 3.5mm² 1 - 3.5mm² 20mmØ
6 C13
PB-1
6 C13
PB-2 12 2 GANG C.O. 2 720 230 2P 3.13 20 60 10 2 - 3.5mm² 1 - 3.5mm² 20mmØ
ROOF LINE
C32 C32
PB-1 PB-2 13 2 GANG C.O. 2 720 230 2P 3.13 20 60 10 2 - 3.5mm² 1 - 3.5mm² 20mmØ
C24 C24 14 2 GANG C.O. 2 720 230 2P 3.13 20 60 10 2 - 3.5mm² 1 - 3.5mm² 20mmØ
PB-1 C21 PB-2 C21
PB-1 PB-2 15 2 GANG C.O. 2 720 230 2P 3.13 20 60 10 2 - 3.5mm² 1 - 3.5mm² 20mmØ
16 2 GANG C.O. 2 720 230 2P 3.13 20 60 10 2 - 3.5mm² 1 - 3.5mm² 20mmØ
17 2 GANG C.O. 2 720 230 2P 3.13 20 60 10 2 - 3.5mm² 1 - 3.5mm² 20mmØ
7 7
ROOF LINE
C12 C12
PB-1
C22 PB-2
C22
PB-2
18 2 GANG C.O. 2 720 230 2P 3.13 20 60 10 2 - 3.5mm² 1 - 3.5mm² 20mmØ
PB-1 19 2 GANG C.O. 2 720 230 2P 3.13 20 60 10 2 - 3.5mm² 1 - 3.5mm² 20mmØ
C23 C23 20 2 GANG C.O. 2 720 230 2P 3.13 20 60 10 2 - 3.5mm² 1 - 3.5mm² 20mmØ
PB-1 PB-2
21 2 GANG C.O. 2 720 230 2P 3.13 20 60 10 2 - 3.5mm² 1 - 3.5mm² 20mmØ
8 PB-1
8 PB-2 22 2 GANG C.O. 4 1440 230 2P 6.26 20 60 10 2 - 3.5mm² 1 - 3.5mm² 20mmØ
23 ACU 1 1380 230 2P 6.00 30 60 10 2 - 5.5mm² 1 - 5.5mm² 20mmØ
24 ACU 1 1380 230 2P 6.00 30 60 10 2 - 5.5mm² 1 - 5.5mm² 20mmØ
25 ACU 1 1380 230 2P 6.00 30 60 10 2 - 5.5mm² 1 - 5.5mm² 20mmØ
9 9 26 ACU 1 1380 230 2P 6.00 30 60 10 2 - 5.5mm² 1 - 5.5mm² 20mmØ
27 ACU 1 1380 230 2P 6.00 30 60 10 2 - 5.5mm² 1 - 5.5mm² 20mmØ
ROOF LINE ROOF LINE
28 ACU 1 1380 230 2P 6.00 30 60 10 2 - 5.5mm² 1 - 5.5mm² 20mmØ
29 ACU 1 1380 230 2P 6.00 30 60 10 2 - 5.5mm² 1 - 5.5mm² 20mmØ
30 ACU 1 1380 230 2P 6.00 30 60 10 2 - 5.5mm² 1 - 5.5mm² 20mmØ
31 ACU 1 1380 230 2P 6.00 30 60 10 2 - 5.5mm² 1 - 5.5mm² 20mmØ
32 ACU 1 1380 230 2P 6.00 30 60 10 2 - 5.5mm² 1 - 5.5mm² 20mmØ
PROPOSED 2 - STOREY DORMITORY PROPOSED 2 - STOREY DORMITORY
33 SPARE 1 1380 230 2P 6.00 30 60 10 2 - 5.5mm² 1 - 5.5mm² 20mmØ
E-02 GF-ELECTRICAL LIGHTING LAYOUT
SCALE 1:100 METERS
E-02 2F-ELECTRICAL LIGHTING LAYOUT
SCALE 1:100 METERS
MDP-A MAIN 87 29,020 230 2P 126.18 60 60 10 2 - 14.0mm² 1 - 8.0mm² 32mmØ
01 02 02 02
THE MAIN DISTRIBUTION PANELS ARE SEPARATED PER FLOOR AS SHOWN ON THE SCHEDULE OF LOADS NAMELY PB-1 AND PB-2
PROJECT TITLE: PREPARED BY: PRC NO: CONFORMED BY: SHEET CONTENTS: SHEET NO:
LEGEND
PTR NO: GF-ELECTRICAL POWER LAYOUT
2F-ELECTRICAL POWER LAYOUT
PROPOSED TWO-STOREY DORMITORY SCHEDULE OF LOADS E-02
ISSUED ON: COMPUTATION OF LOADS 07 10
-
-
ADDRESS: BARANGAY DAMPAS, TAGBILARAN CITY ARCHITECT ISSUED AT: OWNER -
MAIN 2-8.0mm2 THW CU. WIRE STRANDED 2-8.0mm2 THW CU. WIRE STRANDED
WH CIRCUIT
32mmØ PVC CONDUIT 32mmØ PVC CONDUIT
BREAKER
KW-HR METER
CLASS 200
PANEL BOARD - 1 PANEL BOARD - 2
FROM MAIN GROUND FLOOR SECOND FLOOR
ELECTRIC SOURCE 60AT 2P 20AT 2P 60AT 2P 20AT 2P
C17 C.O. C17 C.O.
1-14.0mm2 THW CU. WIRE (GROUNDING) 1-14.0mm2 THW CU. WIRE (GROUNDING)
WH WH WH WH WH WH WH WH WH WH WH WH WH WH WH WH WH WH WH WH
CB-1 CB-2 CB-3 CB-4 CB-5 CB-6 CB-7 CB-8 CB-9 CB-10 CB-11 CB-12 CB-13 CB-14 CB-15 CB-16 CB-17 CB-18 CB-19 CB-20
BEDROOM 01 BEDROOM 02 BEDROOM 03 BEDROOM 04 BEDROOM 05 BEDROOM 06 BEDROOM 07 BEDROOM 08 BEDROOM 09 BEDROOM 01 BEDROOM 11 BEDROOM 12 BEDROOM 13 BEDROOM 14 BEDROOM 15 BEDROOM 16 BEDROOM 17 BEDROOM 18 BEDROOM 19 BEDROOM 20
PROJECT TITLE: PREPARED BY: PRC NO: CONFORMED BY: SHEET CONTENTS: SHEET NO:
RISER DIAGRAM
PTR NO: ELECTRICAL DISTRIBUTION DIAGRAM
-
PROPOSED TWO-STOREY DORMITORY - E-03
ISSUED ON: - 08 10
-
-
ADDRESS: BARANGAY DAMPAS, TAGBILARAN CITY ARCHITECT ISSUED AT: OWNER -
0.15
0.15
CONCERNED.
SEWER LINE CV CHECK VALVE
2. THE LOCATION OF PIPES MAYBE TRANSFERRED WHENEVER REQUIRED FOR THE PROPER EXECUTION OF OTHER co
TRADES PROVIDED, THAT SUCH CHANGES CONFORMS WITH THE RULES AND REQUIREMENTS OF THE ARCHITECT. in co in
MAIN WATER METER FC FAUCET out
3. ALL PIPE JOINTS SHALL BE MADE WATER TIGHT AND PROPERLY SEALED USING THE FOLLOWING: charcoal
out
1.30
1.00
1.00
PVC PIPES SOLVENT CEMENT - FOR PVC PIPES & FITTINGS
CEMENT MORTAR - FOR CONCRETE PIPES (CULVERT) SUB - WATER METER FD FLOOR DRAIN sand
man-hole man-hole
1.75
GASKET CEMENT - FOR GALVANIZED IRON PIPES & FITTINGS
TEFLON TAPE - FOR GALVANIZED IRON PIPES & FITTINGS gravel
OAKUM & PEG LEAD - FOR CAST IRON PIPES & FITTINGS. GATE VALVE / CHECK VALVE GV GATE VALVE
leaching chamber digestion
0.15
VSTR VSTR
A B C D E A B C D E WC
FC
CO
WC
VSTR
FD
WC 4"
FC Ø
PV
C
PIP CO
E E
CO PIP
1 1
1/2
WC "Ø PVC
VSTR PP Ø
6"
ROOF LINE
RP VSTR
IPE
FD
WC 4"
FC Ø
PV
C E 6"
PIP Ø
E PIP FC PV
CO C C
1/2 PV PIP
WC Ø E
VSTR "Ø 6" 1/2
CO 6"Ø PVC PIPE CO CO 6"Ø PVC PIPE CO PP "Ø
RP VSTR
IPE PP
RP
FD IPE
6"Ø PVC PIPE
WC 4"
FC Ø 4"
SS PV
SS C E Ø
2 2 PIP
PIP FC PV
E C C
CO PV PIP
ROOF LINE
CO 4"Ø PVC PIPE CO 4"Ø PVC PIPE 1/2 Ø E
1/2"Ø PPR PIPE 1/2"Ø PPR PIPE WC "Ø 6" WC
CV RISER 1/2 CO
WC 1/2"Ø PPR PIPE WC 1/2"Ø PPR PIPE PP "Ø FD
FD FD RP VSTR
IPE PP
FC FC RP
FD IPE WC
6"Ø PVC PIPE
3 3
RISER RISER PV 4"
CV C Ø
PIP E WC PV
4"Ø PVC PIPE CO 4"Ø PVC PIPE CO E PIP FC
FC C
PIP
CO C
WC 1/2 PV E WC
"Ø Ø
PP 6"
SV RP FD CO
IP E VSTR WC
SOIL STACK
CO 4"Ø PVC PIPE CO 4"Ø PVC PIPE FD WC
1/2"Ø PPR PIPE 1/2"Ø PPR PIPE 4"
CV RISER Ø
WC 1/2"Ø PPR PIPE WC 1/2"Ø PPR PIPE PV FD
FD FD C
PIP E WC FC WC
FC FC E PIP FC
FC FC C
FD WC FD WC 1/2 PV
"Ø Ø
WC WC
FC
SOIL STACK
C FD Ø "Ø PV
CO 4"Ø PVC PIPE CO 4"Ø PVC PIPE PIP 6" C FD CO
1/2"Ø PPR PIPE 1/2"Ø PPR PIPE E PP PIP
RISER RISER RP E
WC 1/2"Ø PPR PIPE WC 1/2"Ø PPR PIPE IP E
FD WC
RISER
FD FD WC 4"
FC FC FC FC FC Ø
FD WC FD WC PV
C
6 6
RISER RISER
6"Ø PVC PIPE
RISER
1/2" Ø PPR PIPE
CV E FC
E
4"Ø PVC PIPE CO 4"Ø PVC PIPE CO 1/2 PIP 4" CO
1/2"Ø PPR PIPE
ROOF LINE
WC C 1/2 Ø WC
"Ø PV "Ø PV 1/2
PP Ø C FD "Ø
RP 6" PP
RP PIP
IPE E E PP
IPE PIP RP
FD WC C 1/2 IPE
RISER
4" PV "Ø
Ø Ø PP
CO 4"Ø PVC PIPE CO 4"Ø PVC PIPE PV 6" RP
1/2"Ø PPR PIPE 1/2"Ø PPR PIPE C 1/2 IPE CHECK VALVE
PIP
RISER
E
RISER
1/2 CHECK VALVE
RISER
FC "Ø
CO PP SEPTIC VAULT
4" CO RP
1/2 Ø WC 1/2 IPE CHECK VALVE
"Ø PV "Ø
C
8 8 PP PIP FD PP
RP E RP
IPE IPE
R PIPE
WC
RISER
1/2"Ø PP
RISER
"Ø
PP
CO RP
WC 1/2 IPE CHECK VALVE
4" "Ø
9 9 Ø FD PP
PV RP
C IPE
PIP
E WC
RISER
1/2 CHECK VALVE
RISER
"Ø
ROOF LINE ROOF LINE PP
CO RP
CV 1/2 IPE CHECK VALVE
WATER METER "Ø
PP
GV RP
IPE
CHECK VALVE
FROM WATER SOURCE
CHECK VALVE
CHECK VALVE SUB-METERS
PROPOSED 2 - STOREY DORMITORY PROPOSED 2 - STOREY DORMITORY PROPOSED 2 - STOREY DORMITORY
PROJECT TITLE: PREPARED BY: PRC NO: CONFORMED BY: SHEET CONTENTS: SHEET NO:
PLUMBING NOTES
PTR NO: LEGEND
GF - PLUMBING LAYOUT
PROPOSED TWO-STOREY DORMITORY 2F - PLUMBING LAYOUT P-01
ISSUED ON: ISOMETRIC PLUMBING LAYOUT 09 10
SEPTIC VAULT DETAILS
-
ADDRESS: BARANGAY DAMPAS, TAGBILARAN CITY ARCHITECT ISSUED AT: OWNER -
FIRE AND SAFETY GRAPHIC STANDARS ( (ISO 6790 : 1986, BS 1635 : 1990, BS 23601 : 2009 )
REPUBLIC OF THE PHILIPPINES
MUNICIPALITY OF DAMPAS
APPROVED BY:
ASSEMBLY POINT ( BS 23601 / BS1365 ) FIRE EXTINGUISHER, ABC DRY POWDER TYPE ( ISO 6790 )
RECOMMENDING APPROVAL:
EVACUATION AREA ( BS 23601 / BS1365 ) ELECTRICAL PANEL BOARD
A B C D E A B C D E
1 1
ROOF LINE
S 2 S 2
2 2
ROOF LINE
DOWN DOWN
3 3
2 2 2 2 PROPOSED 2 STOREY
APARTMENT BUILDING
S S
4 4
2 2 2 2
APPROVED BY:
5 5
2 2
2 2
6 6
ROOF LINE
S S
NORTH
2 2
2 2
7 7
ROOF LINE
2 2
8 8 S
DOWN DOWN
9 9
ROOF LINE ROOF LINE
PROJECT TITLE: PREPARED BY: PRC NO: CONFORMED BY: SHEET CONTENTS: SHEET NO:
FIRE AND SAFETY GRAPHIC
PTR NO: STANDARDS
GF-FIRE & LIFE SAFETY MASTER PLAN
PROPOSED TWO-STOREY DORMITORY 2F-FIRE & LIFE SAFETY MASTER PLAN F-01
ISSUED ON: SITE OVERVIEW 01 00
FIRE AND LIFE SAFETY MASTER PLAN
VICINITY MAP
ADDRESS: BARANGAY DAMPAS, TAGBILARAN CITY ARCHITECT ISSUED AT: OWNER -