Group 9 Laboratory No. 12
Group 9 Laboratory No. 12
1
CONCRETE AND MASONRY WORKS
Submitted by:
Group 9
BSCE - 3201
CONCRETE WORKS
FOUNDATION PLAN
I. Footings
1. F1
VF1 = (1.5m) (1.5m) (0.25m) (13) = 7.3125 m3
2. F2
3. F3
II. Columns
GROUND FLOOR
AREA:
ATOTAL = (54m)(9.5m) = 513 m2
ARAMP = 2 x [(1.7m)(0.3m) + (0.5)(3.6m)(0.3m)] = 2.1 m2
ACOLUMN = (0.35m)(0.35m)(39) = 4.7775 m2
I. SLAB
II. BEAM
VBEAM(TOTAL) = 40.845 m3
III. SUNBREAK
I. SLAB
VSLAB = (417.07 m2)(0.1m) = 41.707 m3
II. BEAM
VBEAM(G1-3) = (29.88 m2)(0.4m) = 11.952 m3
VBEAM(G4&6) = (5.59 m2)(0.4m) = 2.236 m3
VBEAM(G5&7) = (21.6125 m2)(0.5m) = 10.80625 m3
VBEAM(CG1) = (0.3 m2)(0.4m) = 0.12 m3
VBEAM(B1-2) = (10.2 m2)(0.4m) = 4.08 m3
VBEAM(B3) = (1.45 m2)(0.4m) = 0.58 m3
VBEAM(TOTAL) = 29.77425 m3
III. SUNBREAK
I. SLAB
VSLAB = (417.07 m2)(0.1m) = 41.707 m3
II. BEAM
VBEAM(G1-3) = (29.88 m2)(0.4m) = 11.952 m3
VBEAM(G4&6) = (5.59 m2)(0.4m) = 2.236 m3
VBEAM(G5&7) = (21.6125 m2)(0.5m) = 10.80625 m3
VBEAM(CG1) = (0.3 m2)(0.4m) = 0.12 m3
VBEAM(B1-2) = (10.2 m2)(0.4m) = 4.08 m3
VBEAM(B3) = (1.45 m2)(0.4m) = 0.58 m3
VBEAM(TOTAL) = 29.77425 m3
STAIRS
AWF = 48.645 m2
II. MORTAR
AWF = 48.645 m2
Schedule of
Beam/Slab Beam/Slab Column Column Column Window Window Window Window Door
Width Height Door Mark Door Width Door Height Total Area Finishes
Mark Height Quantity Mark Width Quantity Mark Width Height Quantity
( Walls)
Ground Floor to Second Floor
Railings Front 41.6 1.225 10 C-1 0.35 46.73375 WF2
Railings Side 2.5 1.225 2 C-1, C-2 0.375 5.20625 WF2
Classroom
Front 45 3.525 G-2 0.4 11 C-2 0.35 10 W-2 2 1 10 D-1 0.9 2.4 88.0875 WF1
Rear 45 3.525 G-3 0.4 11 C-3 0.35 10 W-1 4 1.5 69.6875 WF1
Side 7 3.525 G-7 0.5 2 C-2, C-3 0.4 119.79 WF1
Exterior Side 7 3.525 G-5 0.5 2 C-2, C-3 0.4 0 19.965 WF1
Storage
Front 1.36 3.525 G-2 0.4 1 D-3a 0.8 2.1 2.57 WF1
Right 3.85 3.525 B-3 0.4 12.03125 WF1
SHE Toilet
Front 3 3.525 B-2 0.4 9.375 WF1
Rear 4.5 3.525 G-3 0.4 2 C-3 0.35 1 W-3,W-4 2.95 0.6 11.19875 WF1
Right 1.15 3.525 S-1 0.1 1 D-2 0.8 2.1 2.25875 WF1
Cubicle Front 1.7 1.95 2 D-4 0.6 1.625 1.365 WF1
Cubicle Side 2.8 1.95 5.46 WF1
Pipe Chase 1.825 3.525 S-1 0.1 6.250625 WF1
HCR Toilet
Front 1.75 3.525 S-1 0.1 1 D-3 0.9 2.1 4.10375 WF1
Side 2 3.525 S-1 0.1 6.85 WF1
HE Toilet
Front 3 3.525 B-2 0.4 9.375 WF1
Rear 4.5 3.525 G-3 0.4 2 C-3 0.35 1 W-3, W-4 2.95 0.6 11.19875 WF1
Left 1.15 3.525 S-1 0.1 1 D-2 0.8 2.1 2.25875 WF1
Cubicle Front 0.85 1.95 1 D-4 0.6 1.625 0.6825 WF1
Cubicle Side 1.4 1.95 2.73 WF1
Pipe Chase 1.825 3.525 S-1 0.1 6.250625 WF1
NCR Toilet
Front 1.75 3.525 S-1 0.1 1 D-3 0.9 2.1 4.10375 WF1
Side 2 3.525 S-1 0.1 6.85 WF1
TOTAL AREA 454.3825
I. NUMBER OF CONCRETE HOLLOW BLOCKS
II. MORTAR
10 x 20 x 40 CHB (WF2):
15 x 20 x 40 CHB (WF1):
III. PLASTERING
Awall = 908.765 m2
Aw/d = 46.1025 m2
Beam/Slab Beam/Slab Column Column Column Window Window Window Window Door Door Door Door Schedule of
Width Height Mark Height Quantity Mark Width Quantity Mark Width Height Quantity Mark Width Height Total Area Finishes ( Walls)
Second Floor to
Ground Floor
Railings Front 54 0.9 10 C-1 0.35 45.495 WF2
Railings Side 2.5 0.9 2 C-1, C-2 0.375 3.825 WF2
Classroom
Front 45 3.2 G-2 0.4 11 C-2 0.35 10 W2 2 1 10 D1 0.9 2.4 74.6 WF1
Rear 45 3.2 G-3 0.4 11 C-3 0.35 10 W1 4 1.5 56.2 WF1
Side 7 3.2 G-7 0.5 2 C-2, C-3 0.35 107.73 WF1
Exterior Side 7 3.2 G-5 0.5 2 C-2, C-3 0.35 17.955 WF1
Storage
Front 1.5 3.2 B2 0.4 1 D2 0.8 2.1 2.52 WF1
Side 2 3.2 G7 0.5 5.4 WF1
SHE Toilet
Front 3 3.2 B2 0.4 8.4 WF1
Rear 4.5 3.2 G3 0.4 2 C3 0.35 1 W3,W4 2.95 0.6 9.85 WF1
Right 1.09 3.2 S1 0.1 1 D2 0.8 2.1 1.699 WF1
Cubicle Front 2.875 1.625 3 D4 0.6 1.625 1.746875 WF1
Cubicle Side 2.8 1.625 4.55 WF1
Pipe Chase 1.825 3.2 S1 0.1 5.6575 WF1
HE Toilet
Front 4.5 3.2 B2 0.4 12.6 WF1
Rear 4.5 3.2 G3 0.4 2 C3 0.35 1 W3 2 0.6 10.42 WF1
Left 1.65 3.2 S1 0.1 1 D2 0.8 2.1 3.435 WF1
Cubicle Front 1.875 1.6 2 D4 0.6 1.6 1.08 WF1
Cubicle Side 2.8 1.6 4.48 WF1
Pipe Chase 1.825 3.2 S1 0.1 5.6575 WF1
TOTAL AREA 383.3009
I. No. of Concrete Hollow Blocks
II. Mortar
III. Plaster
2
𝐴𝑇 = 383. 3009 𝑚 (2 𝑠𝑢𝑟𝑓𝑎𝑐𝑒𝑠)
2
𝐴𝑇 = 766. 6018 𝑚
𝐴𝑤/𝑑 = [((2. 1 × 2) + 0. 9)(10) + ((2. 1 × 2) + 0. 8)(3) + (1. 625 × 2)(5) + ((4 × 2) + (1. 5 × 2))(10)
((2 × 4) + (0. 6 × 2) + (0. 4 × 2))(10) + ((2 × 2) + (0. 6 × 2))(2) + ((0. 95 × 2) + (0. 6 × 2))] × 0. 15
2
𝐴𝑤/𝑑 = 45. 8625 𝑚
2 2
𝐴 = 766. 6018 𝑚 + 45. 8625 𝑚
2
𝐴 = 812. 4643 𝑚
Using Class A Mixture
2
Cement : 812. 4643 𝑚 (0. 216) = 175. 4923 ≈ 176 𝑏𝑎𝑔𝑠
2 3
Sand : 812. 4643 𝑚 (0. 012) = 9. 7496 ≈ 10 𝑚
THIRD FLOOR
Beam/Slab Beam/Slab Column Column Column Window Window Window Window Door Door Door Door Schedule of
Width Height Mark Height Quantity Mark Width Quantity Mark Width Height Quantity Mark Width Height Total Area Finishes ( Walls)
Third Floor to
Second Floor
Railings Front 54 0.9 10 C-1 0.35 45.495 WF2
Railings Side 2.5 0.9 2 C-1, C-2 0.375 3.825 W2
Classroom
Front 45 3.2 G-2 0.4 11 C-2 0.35 10 W2 2 1 10 D1 0.9 2.4 74.6 WF1
Rear 45 3.2 G-3 0.4 11 C-3 0.35 10 W1 4 1.5 56.2 WF1
Side 7 3.2 G-7 0.5 2 C-2, C-3 0.35 107.73 WF1
Exterior Side 7 3.2 G-5 0.5 2 C-2, C-3 0.35 17.955 WF1
Storage
Front 1.5 3.2 B2 0.4 1 D2 0.8 2.1 2.52 WF1
Side 2 3.2 G7 0.5 5.4 WF1
SHE Toilet
Front 3 3.2 B2 0.4 8.4 WF1
Rear 4.5 3.2 G3 0.4 2 C3 0.35 1 W3,W4 2.95 0.6 9.85 WF1
Right 1.09 3.2 S1 0.1 1 D2 0.8 2.1 1.699 WF1
Cubicle Front 2.875 1.625 3 D4 0.6 1.625 1.746875 WF1
Cubicle Side 2.8 1.625 4.55 WF1
Pipe Chase 1.825 3.2 S1 0.1 5.6575 WF1
HE Toilet
Front 4.5 3.2 B2 0.4 12.6 WF1
Rear 4.5 3.2 G3 0.4 2 C3 0.35 1 W3 2 0.6 10.42 WF1
Left 1.65 3.2 S1 0.1 1 D2 0.8 2.1 3.435 WF1
Cubicle Front 1.875 1.6 2 D4 0.6 1.6 1.08 WF1
Cubicle Side 2.8 1.6 4.48 WF1
Pipe Chase 1.825 3.2 S1 0.1 5.6575 WF1
TOTAL AREA 383.3009
I. No. of Concrete Hollow Blocks
II. Mortar
III. Plaster
2
𝐴𝑇 = 383. 3009 𝑚 (2 𝑠𝑢𝑟𝑓𝑎𝑐𝑒𝑠)
2
𝐴𝑇 = 766. 6018 𝑚
𝐴𝑤/𝑑 = [((2. 1 × 2) + 0. 9)(10) + ((2. 1 × 2) + 0. 8)(3) + (1. 625 × 2)(5) + ((4 × 2) + (1. 5 × 2))(10)
((2 × 4) + (0. 6 × 2) + (0. 4 × 2))(10) + ((2 × 2) + (0. 6 × 2))(2) + ((0. 95 × 2) + (0. 6 × 2))] × 0. 15
2
𝐴𝑤/𝑑 = 45. 8625 𝑚
2 2
𝐴 = 766. 6018 𝑚 + 45. 8625 𝑚
2
𝐴 = 812. 4643 𝑚
Using Class A Mixture
2
Cement : 812. 4643 𝑚 (0. 216) = 175. 4923 ≈ 176 𝑏𝑎𝑔𝑠
2 3
Sand : 812. 4643 𝑚 (0. 012) = 9. 7496 ≈ 10 𝑚
SUMMARY OF DATA
STAIRS 43 3 5
CHB
CEMENT SAND
10x20x40 15x20x40
LABORATORY NO. 2
STEEL WORKS
Submitted by:
Group 9
BSCE - 3201
FOUNDATION
FOOTING REINFORCEMENTS
FOOTINGS
● F1 (13 Footings)
X = 8 bars
Y = 8 bars
● F2 (13 Footings)
X = 11 bars
Y = 11 bars
● F2 (13 Footings)
X = 11 bars
Y = 11 bars
𝐹1𝐼𝑛𝑡𝑒𝑟𝑠𝑒𝑐𝑡𝑖𝑜𝑛 = 8𝑚 𝑥 8𝑚
= 64 𝑖𝑛𝑡𝑒𝑟𝑠𝑒𝑐𝑡𝑖𝑜𝑛𝑠
𝐹1𝑇𝑜𝑡𝑎𝑙 = 64 𝑖𝑛𝑡𝑒𝑟𝑠𝑒𝑐𝑡𝑖𝑜𝑛𝑠 𝑥 13 𝑓𝑜𝑜𝑡𝑖𝑛𝑔𝑠
= 832 𝑡𝑖𝑒𝑠
Using 30 cm of Long Ties
𝑇𝐹1 = 832 𝑡𝑖𝑒𝑠 𝑥 0. 3𝑚
= 249. 6𝑚
Convert to kg (1kg ≈ 50m)
𝑇𝐹1 = 249. 6𝑚 / 50𝑚
= 4. 992𝑘𝑔
● F2 (13 Footings)
● F3 (13 Footings)
𝐹3𝐼𝑛𝑡𝑒𝑟𝑠𝑒𝑐𝑡𝑖𝑜𝑛 = 11𝑚 𝑥 11𝑚
= 121 𝑖𝑛𝑡𝑒𝑟𝑠𝑒𝑐𝑡𝑖𝑜𝑛𝑠
𝐹3𝑇𝑜𝑡𝑎𝑙 = 121 𝑖𝑛𝑡𝑒𝑟𝑠𝑒𝑐𝑡𝑖𝑜𝑛𝑠 𝑥 13 𝑓𝑜𝑜𝑡𝑖𝑛𝑔𝑠
= 832 𝑡𝑖𝑒𝑠
Using 30 cm of Long Ties per Intersection
𝑇𝐹3 = 1573 𝑡𝑖𝑒𝑠 𝑥 0. 3𝑚
= 471. 9𝑚
Convert to kg (1kg ≈ 50m)
𝑇𝐹3 = 471. 9𝑚 / 50𝑚
= 9. 438𝑘𝑔
𝐵𝑇 = 𝐵𝑉 × 𝐵𝐻
𝐵𝑇 = 727. 012𝑚 + 976. 922𝑚
𝐵𝑇 = 1703. 934𝑚
SPACING DISTANCE:
1. 16 × 𝐿𝑂𝑁𝐺𝐼𝑇𝑈𝐷𝐼𝑁𝐴𝐿 = 16 × 16 = 256𝑚𝑚 ≈ 25. 6𝑐𝑚
2. 48 × 𝐿𝐴𝑇𝐸𝑅𝐴𝐿 𝑇𝐼𝐸 𝐵𝐴𝑅 = 48 × 10 = 480𝑚𝑚 ≈ 48𝑐𝑚
3. 𝐿𝐸𝐴𝑆𝑇 𝐷𝐼𝑀𝐸𝑁𝑆𝐼𝑂𝑁 𝑂𝐹 𝑇𝐻𝐸 𝐶𝑂𝐿𝑈𝑀𝑁 = 350𝑚𝑚 ≈ 35𝑐𝑚
CHOOSE THE SMALLEST: 25.6 cm
𝐿
𝑆𝑃𝐴𝐶𝐼𝑁𝐺 = 0.256𝑚
7.5𝑚
𝑆𝑃𝐴𝐶𝐼𝑁𝐺 = 0.256𝑚
𝑆𝑃𝐴𝐶𝐼𝑁𝐺 = 29. 2969 ≈ 30𝑝𝑐𝑠
𝐿𝑇𝐼𝐸𝑆 = 30 + 1
𝐿𝑇𝐼𝐸𝑆 = 31 𝑝𝑐𝑠
𝑁𝑂. 𝑂𝐹 𝐿𝐴𝑇𝐸𝑅𝐴𝐿 𝑇𝐼𝐸𝑆 = 31𝑝𝑐𝑠 × 13𝑝𝑐𝑠 = 403 𝑡𝑖𝑒𝑠
SHAPE 1:
PERIMETER OF TIES
𝑃𝑇𝐼𝐸𝑆 = 2(𝐿𝑇𝐼𝐸𝑆 + 𝑊𝑇𝐼𝐸𝑆)
𝑃𝑇𝐼𝐸𝑆 = 2(260𝑚𝑚 + 260𝑚𝑚)
𝑃𝑇𝐼𝐸𝑆 = 1040𝑚𝑚
BENT DEDUCTION:
𝐹𝑂𝑅 90° 𝐵𝐸𝑁𝐷 = 3(2𝑑) 𝐹𝑂𝑅 135° 𝐵𝐸𝑁𝐷 = 2(3𝑑)
𝐹𝑂𝑅 90° 𝐵𝐸𝑁𝐷 = 3(2 × 10) 𝐹𝑂𝑅 135° 𝐵𝐸𝑁𝐷 = 2(3 × 10)
𝐹𝑂𝑅 90° 𝐵𝐸𝑁𝐷 = 60𝑚𝑚 𝐹𝑂𝑅 135° 𝐵𝐸𝑁𝐷 = 60𝑚𝑚
CHOOSE 9m LENGTH:
403 𝑡𝑖𝑒𝑠
𝐿𝑇𝐼𝐸𝑆 = 8
𝐿𝑇𝐼𝐸𝑆 = 50. 375
LTIES = 51 pcs of 9m x 10mm ⌀ rebar
SHAPE 2:
260 2 260 2
𝐻= ( 2
) +( 2
)
𝐻 = 183. 8478𝑚𝑚
PERIMETER OF TIES
𝑃𝑇𝐼𝐸𝑆 = 4𝐻
𝑃𝑇𝐼𝐸𝑆 = 4(183. 8478𝑚𝑚)
𝑃𝑇𝐼𝐸𝑆 = 735. 3912𝑚𝑚
BENT DEDUCTION:
𝐹𝑂𝑅 90° 𝐵𝐸𝑁𝐷 = 3(2𝑑) 𝐹𝑂𝑅 135° 𝐵𝐸𝑁𝐷 = 2(3𝑑)
𝐹𝑂𝑅 90° 𝐵𝐸𝑁𝐷 = 3(2 × 10) 𝐹𝑂𝑅 135° 𝐵𝐸𝑁𝐷 = 2(3 × 10)
𝐹𝑂𝑅 90° 𝐵𝐸𝑁𝐷 = 60𝑚𝑚 𝐹𝑂𝑅 135° 𝐵𝐸𝑁𝐷 = 60𝑚𝑚
CHOOSE 9m LENGTH:
403 𝑡𝑖𝑒𝑠
𝐿𝑇𝐼𝐸𝑆 = 11
𝐿𝑇𝐼𝐸𝑆 = 36. 6363
LTIES = 37 pcs of 9m x 10mm ⌀ rebar
SPACING DISTANCE:
1. 16 × 𝐿𝑂𝑁𝐺𝐼𝑇𝑈𝐷𝐼𝑁𝐴𝐿 = 16 × 20 = 320𝑚𝑚 ≈ 32𝑐𝑚
2. 48 × 𝐿𝐴𝑇𝐸𝑅𝐴𝐿 𝑇𝐼𝐸 𝐵𝐴𝑅 = 48 × 10 = 480𝑚𝑚 ≈ 48𝑐𝑚
3. 𝐿𝐸𝐴𝑆𝑇 𝐷𝐼𝑀𝐸𝑁𝑆𝐼𝑂𝑁 𝑂𝐹 𝑇𝐻𝐸 𝐶𝑂𝐿𝑈𝑀𝑁 = 350𝑚𝑚 ≈ 35𝑐𝑚
CHOOSE THE SMALLEST: 32 cm
𝐿
𝑆𝑃𝐴𝐶𝐼𝑁𝐺 = 0.32𝑚
7.5𝑚
𝑆𝑃𝐴𝐶𝐼𝑁𝐺 = 0.32𝑚
𝑆𝑃𝐴𝐶𝐼𝑁𝐺 = 23. 4375 ≈ 24 𝑝𝑐𝑠
𝐿𝑇𝐼𝐸𝑆 = 24 + 1
𝐿𝑇𝐼𝐸𝑆 = 25 𝑝𝑐𝑠
𝑁𝑂. 𝑂𝐹 𝐿𝐴𝑇𝐸𝑅𝐴𝐿 𝑇𝐼𝐸𝑆 = 25 𝑝𝑐𝑠 × 13 𝑝𝑐𝑠 = 325 𝑡𝑖𝑒𝑠
SHAPE 1:
PERIMETER OF TIES
𝑃𝑇𝐼𝐸𝑆 = 2(𝐿𝑇𝐼𝐸𝑆 + 𝑊𝑇𝐼𝐸𝑆)
𝑃𝑇𝐼𝐸𝑆 = 2(310𝑚𝑚 + 260𝑚𝑚)
𝑃𝑇𝐼𝐸𝑆 = 1140 𝑚𝑚
BENT DEDUCTION:
𝐹𝑂𝑅 90° 𝐵𝐸𝑁𝐷 = 3(2𝑑) 𝐹𝑂𝑅 135° 𝐵𝐸𝑁𝐷 = 2(3𝑑)
𝐹𝑂𝑅 90° 𝐵𝐸𝑁𝐷 = 3(2 × 10) 𝐹𝑂𝑅 135° 𝐵𝐸𝑁𝐷 = 2(3 × 10)
𝐹𝑂𝑅 90° 𝐵𝐸𝑁𝐷 = 60𝑚𝑚 𝐹𝑂𝑅 135° 𝐵𝐸𝑁𝐷 = 60𝑚𝑚
SHAPE 2:
PERIMETER OF TIES
𝑃𝑇𝐼𝐸𝑆 = 2(𝐿𝑇𝐼𝐸𝑆 + 𝑊𝑇𝐼𝐸𝑆)
𝑃𝑇𝐼𝐸𝑆 = 2(310𝑚𝑚 + 202. 5𝑚𝑚)
𝑃𝑇𝐼𝐸𝑆 = 1025 𝑚𝑚
BENT DEDUCTION:
𝐹𝑂𝑅 90° 𝐵𝐸𝑁𝐷 = 3(2𝑑) 𝐹𝑂𝑅 135° 𝐵𝐸𝑁𝐷 = 2(3𝑑)
𝐹𝑂𝑅 90° 𝐵𝐸𝑁𝐷 = 3(2 × 10) 𝐹𝑂𝑅 135° 𝐵𝐸𝑁𝐷 = 2(3 × 10)
𝐹𝑂𝑅 90° 𝐵𝐸𝑁𝐷 = 60𝑚𝑚 𝐹𝑂𝑅 135° 𝐵𝐸𝑁𝐷 = 60𝑚𝑚
CHOOSE 9m LENGTH:
325 𝑡𝑖𝑒𝑠
𝐿𝑇𝐼𝐸𝑆 = 8
𝐿𝑇𝐼𝐸𝑆 = 40. 625
LTIES = 41 pcs of 9m x 10mm ⌀ rebar
SHAPE 3:
LENGTH OF THE COLUMN : 400mm
ϕ𝐵𝐴𝑅
400 − (2 × 𝐶𝐶) − (2 × ϕ𝑆𝑇𝐼𝑅𝑅𝑈𝑃) − (2 × 2
) ϕ𝐵𝐴𝑅 ϕ𝑆𝑇𝐼𝑅𝑅𝑈𝑃
𝐿𝑇𝐼𝐸𝑆 = [( 𝑁𝑂. 𝑂𝐹 𝐺𝐴𝑃𝑆
) × 3] + (2 × 2
) + (2 × 2
)
20
400 − (2 × 40) − (2 ×10) − (2 × ) 20 10
𝐿𝑇𝐼𝐸𝑆 = [( 3
2
) × 3] + (2 × 2
) + (2 × 2
)
𝐿𝑇𝐼𝐸𝑆 = 320𝑚𝑚
PERIMETER OF TIES
𝑃𝑇𝐼𝐸𝑆 = 2(𝐿𝑇𝐼𝐸𝑆 + 𝑊𝑇𝐼𝐸𝑆)
𝑃𝑇𝐼𝐸𝑆 = 2(320𝑚𝑚 + 260𝑚𝑚)
𝑃𝑇𝐼𝐸𝑆 = 1160𝑚𝑚
BENT DEDUCTION:
𝐹𝑂𝑅 90° 𝐵𝐸𝑁𝐷 = 3(2𝑑) 𝐹𝑂𝑅 135° 𝐵𝐸𝑁𝐷 = 2(3𝑑)
𝐹𝑂𝑅 90° 𝐵𝐸𝑁𝐷 = 3(2 × 10) 𝐹𝑂𝑅 135° 𝐵𝐸𝑁𝐷 = 2(3 × 10)
𝐹𝑂𝑅 90° 𝐵𝐸𝑁𝐷 = 60𝑚𝑚 𝐹𝑂𝑅 135° 𝐵𝐸𝑁𝐷 = 60𝑚𝑚
𝐿𝑇𝐼𝐸𝑆 = 24 + 1
𝐿𝑇𝐼𝐸𝑆 = 25 𝑝𝑐𝑠
𝑁𝑂. 𝑂𝐹 𝐿𝐴𝑇𝐸𝑅𝐴𝐿 𝑇𝐼𝐸𝑆 = 25 𝑝𝑐𝑠 × 13 𝑝𝑐𝑠 = 325 𝑡𝑖𝑒𝑠
SHAPE 1:
PERIMETER OF TIES
𝑃𝑇𝐼𝐸𝑆 = 2(𝐿𝑇𝐼𝐸𝑆 + 𝑊𝑇𝐼𝐸𝑆)
𝑃𝑇𝐼𝐸𝑆 = 2(310𝑚𝑚 + 260𝑚𝑚)
𝑃𝑇𝐼𝐸𝑆 = 1140 𝑚𝑚
BENT DEDUCTION:
𝐹𝑂𝑅 90° 𝐵𝐸𝑁𝐷 = 3(2𝑑) 𝐹𝑂𝑅 135° 𝐵𝐸𝑁𝐷 = 2(3𝑑)
𝐹𝑂𝑅 90° 𝐵𝐸𝑁𝐷 = 3(2 × 10) 𝐹𝑂𝑅 135° 𝐵𝐸𝑁𝐷 = 2(3 × 10)
𝐹𝑂𝑅 90° 𝐵𝐸𝑁𝐷 = 60𝑚𝑚 𝐹𝑂𝑅 135° 𝐵𝐸𝑁𝐷 = 60𝑚𝑚
PERIMETER OF TIES
𝑃𝑇𝐼𝐸𝑆 = 2(𝐿𝑇𝐼𝐸𝑆 + 𝑊𝑇𝐼𝐸𝑆)
𝑃𝑇𝐼𝐸𝑆 = 2(310𝑚𝑚 + 260𝑚𝑚)
𝑃𝑇𝐼𝐸𝑆 = 1140 𝑚𝑚
BENT DEDUCTION:
𝐹𝑂𝑅 90° 𝐵𝐸𝑁𝐷 = 3(2𝑑) 𝐹𝑂𝑅 135° 𝐵𝐸𝑁𝐷 = 2(3𝑑)
𝐹𝑂𝑅 90° 𝐵𝐸𝑁𝐷 = 3(2 × 10) 𝐹𝑂𝑅 135° 𝐵𝐸𝑁𝐷 = 2(3 × 10)
𝐹𝑂𝑅 90° 𝐵𝐸𝑁𝐷 = 60𝑚𝑚 𝐹𝑂𝑅 135° 𝐵𝐸𝑁𝐷 = 60𝑚𝑚
SHAPE 3:
PERIMETER OF TIES
𝑃𝑇𝐼𝐸𝑆 = 2(𝐿𝑇𝐼𝐸𝑆 + 𝑊𝑇𝐼𝐸𝑆)
𝑃𝑇𝐼𝐸𝑆 = 2(320𝑚𝑚 + 260𝑚𝑚)
𝑃𝑇𝐼𝐸𝑆 = 1160𝑚𝑚
BENT DEDUCTION:
𝐹𝑂𝑅 90° 𝐵𝐸𝑁𝐷 = 3(2𝑑) 𝐹𝑂𝑅 135° 𝐵𝐸𝑁𝐷 = 2(3𝑑)
𝐹𝑂𝑅 90° 𝐵𝐸𝑁𝐷 = 3(2 × 10) 𝐹𝑂𝑅 135° 𝐵𝐸𝑁𝐷 = 2(3 × 10)
𝐹𝑂𝑅 90° 𝐵𝐸𝑁𝐷 = 60𝑚𝑚 𝐹𝑂𝑅 135° 𝐵𝐸𝑁𝐷 = 60𝑚𝑚
COLUMN 1 - 88 pcs
1. STIRRUPS
LENGTH OF STIRRUPS
𝐿𝑆𝑇𝐼𝑅𝑅𝑈𝑃𝑆 = ((0. 3 − 0. 04) 𝑥 2 ) + ((0. 5 − 0. 04) 𝑥 2) + (0. 6 𝑥 1. 0 𝑥 0. 2)
𝐿𝑆𝑇𝐼𝑅𝑅𝑈𝑃𝑆 = 1. 56𝑚
𝑇𝐿𝑆𝑇𝐼𝑅𝑅𝑈𝑃𝑆 = 1. 56𝑚 × 247𝑝𝑐𝑠
𝑇𝐿𝑆𝑇𝐼𝑅𝑅𝑈𝑃𝑆 = 385. 32 𝑚
𝑆 = 64. 22
𝐿𝑛 = 6. 6 − (0. 05 × 2) − (0. 1 × 8 × 2)
𝐿𝑛 = 4. 9𝑚
4.9𝑚
𝑛= 0.2𝑚
𝑛 = 24. 5 ≈ 25 𝑝𝑐𝑠 @ 200𝑚𝑚 𝑠𝑝𝑎𝑐𝑖𝑛𝑔 𝑜𝑓 𝑠𝑡𝑖𝑟𝑟𝑢𝑝𝑠
LENGTH OF STIRRUPS
𝐿𝑆𝑇𝐼𝑅𝑅𝑈𝑃𝑆 = ((0. 3 − 0. 04) 𝑥 2 ) + ((0. 5 − 0. 04) 𝑥 2) + (0. 6 𝑥 1. 0 𝑥 0. 2)
𝐿𝑆𝑇𝐼𝑅𝑅𝑈𝑃𝑆 = 1. 56𝑚
𝑇𝐿𝑆𝑇𝐼𝑅𝑅𝑈𝑃𝑆 = 1. 56𝑚 × 520 𝑝𝑐𝑠
𝑇𝐿𝑆𝑇𝐼𝑅𝑅𝑈𝑃𝑆 = 811. 2 𝑚
𝑆 = 135. 2
𝐿𝑛 = 2. 85𝑚
2.85𝑚
𝑛= 0.2𝑚
𝑛 = 14. 25 ≈ 14 𝑝𝑐𝑠 @ 200𝑚𝑚 𝑠𝑝𝑎𝑐𝑖𝑛𝑔 𝑜𝑓 𝑠𝑡𝑖𝑟𝑟𝑢𝑝𝑠
LENGTH OF STIRRUPS
𝐿𝑆𝑇𝐼𝑅𝑅𝑈𝑃𝑆 = ((0. 3 − 0. 04) 𝑥 2 ) + ((0. 5 − 0. 04) 𝑥 2) + (0. 6 𝑥 1. 0 𝑥 0. 2)
𝐿𝑆𝑇𝐼𝑅𝑅𝑈𝑃𝑆 = 1. 56𝑚
𝑇𝐿𝑆𝑇𝐼𝑅𝑅𝑈𝑃𝑆 = 1. 56𝑚 × 1102𝑝𝑐𝑠
𝑇𝐿𝑆𝑇𝐼𝑅𝑅𝑈𝑃𝑆 = 1719. 12 𝑚
𝑆 = 286. 52
𝑇𝐿𝐵𝐴𝑅𝑆 = 772. 2 𝑚
𝑇𝐿𝐵𝐴𝑅𝑆 = 788. 5 𝑚
ASLAB = 54 m x 9.5 m
ASLAB = 513 m2
Twire(S-3) = 67.716 kg
2
AT = 383. 300875 𝑚
Bv = 613. 2814 𝑚
Bv = 824. 0968813 𝑚
BT = BV + BH
BT = 1437. 378281 𝑚
1437.378281 𝑚
= 6𝑚
L = (3.2 m + 0.64m)
L = (3.2 m + 0.80m)
L = (3.2 m + 0.80m)
FOR C-1:
SPACING DISTANCE:
1. 16 × 𝐿𝑂𝑁𝐺𝐼𝑇𝑈𝐷𝐼𝑁𝐴𝐿 = 16 × 16 = 256𝑚𝑚 ≈ 25. 6𝑐𝑚
2. 48 × 𝐿𝐴𝑇𝐸𝑅𝐴𝐿 𝑇𝐼𝐸 𝐵𝐴𝑅 = 48 × 10 = 480𝑚𝑚 ≈ 48𝑐𝑚
3. 𝐿𝐸𝐴𝑆𝑇 𝐷𝐼𝑀𝐸𝑁𝑆𝐼𝑂𝑁 𝑂𝐹 𝑇𝐻𝐸 𝐶𝑂𝐿𝑈𝑀𝑁 = 350𝑚𝑚 ≈ 35𝑐𝑚
CHOOSE THE SMALLEST: 25.6 cm
𝐿
𝑆𝑃𝐴𝐶𝐼𝑁𝐺 = 0.256𝑚
6𝑚
𝑆𝑃𝐴𝐶𝐼𝑁𝐺 = 0.256𝑚
𝑆𝑃𝐴𝐶𝐼𝑁𝐺 = 23. 4375 ≈ 24
𝐿𝑇𝐼𝐸𝑆 = 24 + 1
𝐿𝑇𝐼𝐸𝑆 = 25𝑝𝑐𝑠
𝑁𝑂. 𝑂𝐹 𝐿𝐴𝑇𝐸𝑅𝐴𝐿 𝑇𝐼𝐸𝑆 = 25𝑝𝑐𝑠 × 13 𝑐𝑜𝑙𝑢𝑚𝑛𝑠 = 325 𝑡𝑖𝑒𝑠
SHAPE 1:
PERIMETER OF TIES
𝑃𝑇𝐼𝐸𝑆 = 2(𝐿𝑇𝐼𝐸𝑆 + 𝑊𝑇𝐼𝐸𝑆)
𝑃𝑇𝐼𝐸𝑆 = 2(260𝑚𝑚 + 260𝑚𝑚)
𝑃𝑇𝐼𝐸𝑆 = 1040𝑚𝑚
BENT DEDUCTION:
𝐹𝑂𝑅 90° 𝐵𝐸𝑁𝐷 = 3(2𝑑) 𝐹𝑂𝑅 135° 𝐵𝐸𝑁𝐷 = 2(3𝑑)
𝐹𝑂𝑅 90° 𝐵𝐸𝑁𝐷 = 3(2 × 10) 𝐹𝑂𝑅 135° 𝐵𝐸𝑁𝐷 = 2(3 × 10)
𝐹𝑂𝑅 90° 𝐵𝐸𝑁𝐷 = 60𝑚𝑚 𝐹𝑂𝑅 135° 𝐵𝐸𝑁𝐷 = 60𝑚𝑚
𝐵𝐷𝐸𝐷𝑈𝐶𝑇𝐼𝑂𝑁 = 60𝑚𝑚 + 60𝑚𝑚
𝐵𝐷𝐸𝐷𝑈𝐶𝑇𝐼𝑂𝑁 = 120𝑚𝑚
CHOOSE 9m LENGTH:
325 𝑡𝑖𝑒𝑠
𝐿𝑇𝐼𝐸𝑆 = 8
𝐿𝑇𝐼𝐸𝑆 = 40. 625 ≈ 41 𝑝𝑐𝑠 9𝑚 𝑥 10𝑚𝑚 ϕ 𝑟𝑒𝑏𝑎𝑟
SHAPE 2:
BENT DEDUCTION:
𝐹𝑂𝑅 90° 𝐵𝐸𝑁𝐷 = 3(2𝑑) 𝐹𝑂𝑅 135° 𝐵𝐸𝑁𝐷 = 2(3𝑑)
𝐹𝑂𝑅 90° 𝐵𝐸𝑁𝐷 = 3(2 × 10) 𝐹𝑂𝑅 135° 𝐵𝐸𝑁𝐷 = 2(3 × 10)
𝐹𝑂𝑅 90° 𝐵𝐸𝑁𝐷 = 60𝑚𝑚 𝐹𝑂𝑅 135° 𝐵𝐸𝑁𝐷 = 60𝑚𝑚
SPACING DISTANCE:
1. 16 × 𝐿𝑂𝑁𝐺𝐼𝑇𝑈𝐷𝐼𝑁𝐴𝐿 = 16 × 20 = 320𝑚𝑚 ≈ 32𝑐𝑚
2. 48 × 𝐿𝐴𝑇𝐸𝑅𝐴𝐿 𝑇𝐼𝐸 𝐵𝐴𝑅 = 48 × 10 = 480𝑚𝑚 ≈ 48𝑐𝑚
3. 𝐿𝐸𝐴𝑆𝑇 𝐷𝐼𝑀𝐸𝑁𝑆𝐼𝑂𝑁 𝑂𝐹 𝑇𝐻𝐸 𝐶𝑂𝐿𝑈𝑀𝑁 = 350𝑚𝑚 ≈ 35𝑐𝑚
CHOOSE THE SMALLEST: 32 cm
𝐿
𝑆𝑃𝐴𝐶𝐼𝑁𝐺 = 0.32𝑚
6𝑚
𝑆𝑃𝐴𝐶𝐼𝑁𝐺 = 0.32𝑚
𝑆𝑃𝐴𝐶𝐼𝑁𝐺 = 18. 75 ≈ 19
𝐿𝑇𝐼𝐸𝑆 = 19 + 1
𝐿𝑇𝐼𝐸𝑆 = 20𝑝𝑐𝑠
𝑁𝑂. 𝑂𝐹 𝐿𝐴𝑇𝐸𝑅𝐴𝐿 𝑇𝐼𝐸𝑆 = 20𝑝𝑐𝑠 × 13 𝑐𝑜𝑙𝑢𝑚𝑛𝑠 = 260 𝑡𝑖𝑒𝑠
SHAPE 1:
PERIMETER OF TIES
𝑃𝑇𝐼𝐸𝑆 = 2(𝐿𝑇𝐼𝐸𝑆 + 𝑊𝑇𝐼𝐸𝑆)
𝑃𝑇𝐼𝐸𝑆 = 2(260𝑚𝑚 + 260𝑚𝑚)
𝑃𝑇𝐼𝐸𝑆 = 1040𝑚𝑚
BENT DEDUCTION:
𝐹𝑂𝑅 90° 𝐵𝐸𝑁𝐷 = 3(2𝑑) 𝐹𝑂𝑅 135° 𝐵𝐸𝑁𝐷 = 2(3𝑑)
𝐹𝑂𝑅 90° 𝐵𝐸𝑁𝐷 = 3(2 × 10) 𝐹𝑂𝑅 135° 𝐵𝐸𝑁𝐷 = 2(3 × 10)
𝐹𝑂𝑅 90° 𝐵𝐸𝑁𝐷 = 60𝑚𝑚 𝐹𝑂𝑅 135° 𝐵𝐸𝑁𝐷 = 60𝑚𝑚
CHOOSE 9m LENGTH:
260𝑡𝑖𝑒𝑠
𝐿𝑇𝐼𝐸𝑆 = 8
𝐿𝑇𝐼𝐸𝑆 = 32. 5 ≈ 33 𝑝𝑐𝑠 9𝑚 𝑥 10𝑚𝑚 ϕ 𝑟𝑒𝑏𝑎𝑟
SHAPE 2:
PERIMETER OF TIES
𝑃𝑇𝐼𝐸𝑆 = 2(𝐿𝑇𝐼𝐸𝑆 + 𝑊𝑇𝐼𝐸𝑆)
𝑃𝑇𝐼𝐸𝑆 = 2(260𝑚𝑚 + 86. 67𝑚𝑚)
𝑃𝑇𝐼𝐸𝑆 = 693. 34 𝑚𝑚
BENT DEDUCTION:
𝐹𝑂𝑅 90° 𝐵𝐸𝑁𝐷 = 3(2𝑑) 𝐹𝑂𝑅 135° 𝐵𝐸𝑁𝐷 = 2(3𝑑)
𝐹𝑂𝑅 90° 𝐵𝐸𝑁𝐷 = 3(2 × 10) 𝐹𝑂𝑅 135° 𝐵𝐸𝑁𝐷 = 2(3 × 10)
𝐹𝑂𝑅 90° 𝐵𝐸𝑁𝐷 = 60𝑚𝑚 𝐹𝑂𝑅 135° 𝐵𝐸𝑁𝐷 = 60𝑚𝑚
CHOOSE 9m LENGTH:
260 𝑡𝑖𝑒𝑠
𝐿𝑇𝐼𝐸𝑆 = 9
𝐿𝑇𝐼𝐸𝑆 = 28. 8889 ≈ 29 𝑝𝑐𝑠 9𝑚 𝑥 10𝑚𝑚 ϕ 𝑟𝑒𝑏𝑎𝑟
SHAPE 3:
PERIMETER OF TIES
𝑃𝑇𝐼𝐸𝑆 = 2(𝐿𝑇𝐼𝐸𝑆 + 𝑊𝑇𝐼𝐸𝑆)
𝑃𝑇𝐼𝐸𝑆 = 2(86. 67𝑚𝑚 + 260𝑚𝑚)
𝑃𝑇𝐼𝐸𝑆 = 693. 34𝑚𝑚
BENT DEDUCTION:
𝐹𝑂𝑅 90° 𝐵𝐸𝑁𝐷 = 3(2𝑑) 𝐹𝑂𝑅 135° 𝐵𝐸𝑁𝐷 = 2(3𝑑)
𝐹𝑂𝑅 90° 𝐵𝐸𝑁𝐷 = 3(2 × 10) 𝐹𝑂𝑅 135° 𝐵𝐸𝑁𝐷 = 2(3 × 10)
𝐹𝑂𝑅 90° 𝐵𝐸𝑁𝐷 = 60𝑚𝑚 𝐹𝑂𝑅 135° 𝐵𝐸𝑁𝐷 = 60𝑚𝑚
CHOOSE 9m LENGTH:
260 𝑡𝑖𝑒𝑠
𝐿𝑇𝐼𝐸𝑆 = 9
𝐿𝑇𝐼𝐸𝑆 = 28. 8889 ≈ 29 𝑝𝑐𝑠 9𝑚 𝑥 10𝑚𝑚 ϕ 𝑟𝑒𝑏𝑎𝑟
FOR C-3:
SPACING DISTANCE:
1. 16 × 𝐿𝑂𝑁𝐺𝐼𝑇𝑈𝐷𝐼𝑁𝐴𝐿 = 16 × 20 = 320𝑚𝑚 ≈ 32𝑐𝑚
2. 48 × 𝐿𝐴𝑇𝐸𝑅𝐴𝐿 𝑇𝐼𝐸 𝐵𝐴𝑅 = 48 × 10 = 480𝑚𝑚 ≈ 48𝑐𝑚
3. 𝐿𝐸𝐴𝑆𝑇 𝐷𝐼𝑀𝐸𝑁𝑆𝐼𝑂𝑁 𝑂𝐹 𝑇𝐻𝐸 𝐶𝑂𝐿𝑈𝑀𝑁 = 350𝑚𝑚 ≈ 35𝑐𝑚
CHOOSE THE SMALLEST: 32 cm
𝐿
𝑆𝑃𝐴𝐶𝐼𝑁𝐺 = 0.32𝑚
6𝑚
𝑆𝑃𝐴𝐶𝐼𝑁𝐺 = 0.32𝑚
𝑆𝑃𝐴𝐶𝐼𝑁𝐺 = 18. 75 ≈ 19
𝐿𝑇𝐼𝐸𝑆 = 19 + 1
𝐿𝑇𝐼𝐸𝑆 = 20𝑝𝑐𝑠
𝑁𝑂. 𝑂𝐹 𝐿𝐴𝑇𝐸𝑅𝐴𝐿 𝑇𝐼𝐸𝑆 = 20𝑝𝑐𝑠 × 13 𝑐𝑜𝑙𝑢𝑚𝑛𝑠 = 260 𝑡𝑖𝑒𝑠
SHAPE 1:
PERIMETER OF TIES
𝑃𝑇𝐼𝐸𝑆 = 2(𝐿𝑇𝐼𝐸𝑆 + 𝑊𝑇𝐼𝐸𝑆)
𝑃𝑇𝐼𝐸𝑆 = 2(260𝑚𝑚 + 260𝑚𝑚)
𝑃𝑇𝐼𝐸𝑆 = 1040𝑚𝑚
BENT DEDUCTION:
𝐹𝑂𝑅 90° 𝐵𝐸𝑁𝐷 = 3(2𝑑) 𝐹𝑂𝑅 135° 𝐵𝐸𝑁𝐷 = 2(3𝑑)
𝐹𝑂𝑅 90° 𝐵𝐸𝑁𝐷 = 3(2 × 10) 𝐹𝑂𝑅 135° 𝐵𝐸𝑁𝐷 = 2(3 × 10)
𝐹𝑂𝑅 90° 𝐵𝐸𝑁𝐷 = 60𝑚𝑚 𝐹𝑂𝑅 135° 𝐵𝐸𝑁𝐷 = 60𝑚𝑚
CHOOSE 9m LENGTH:
260 𝑡𝑖𝑒𝑠
𝐿𝑇𝐼𝐸𝑆 = 8
𝐿𝑇𝐼𝐸𝑆 = 32. 5 ≈ 33 𝑝𝑐𝑠 9𝑚 𝑥 10𝑚𝑚 ϕ 𝑟𝑒𝑏𝑎𝑟
SHAPE 2:
PERIMETER OF TIES
𝑃𝑇𝐼𝐸𝑆 = 2(𝐿𝑇𝐼𝐸𝑆 + 𝑊𝑇𝐼𝐸𝑆)
𝑃𝑇𝐼𝐸𝑆 = 2(260𝑚𝑚 + 86. 67𝑚𝑚)
𝑃𝑇𝐼𝐸𝑆 = 693. 34 𝑚𝑚
BENT DEDUCTION:
𝐹𝑂𝑅 90° 𝐵𝐸𝑁𝐷 = 3(2𝑑) 𝐹𝑂𝑅 135° 𝐵𝐸𝑁𝐷 = 2(3𝑑)
𝐹𝑂𝑅 90° 𝐵𝐸𝑁𝐷 = 3(2 × 10) 𝐹𝑂𝑅 135° 𝐵𝐸𝑁𝐷 = 2(3 × 10)
𝐹𝑂𝑅 90° 𝐵𝐸𝑁𝐷 = 60𝑚𝑚 𝐹𝑂𝑅 135° 𝐵𝐸𝑁𝐷 = 60𝑚𝑚
CHOOSE 9m LENGTH:
260 𝑡𝑖𝑒𝑠
𝐿𝑇𝐼𝐸𝑆 = 9
𝐿𝑇𝐼𝐸𝑆 = 28. 8889 ≈ 29 𝑝𝑐𝑠 9𝑚 𝑥 10𝑚𝑚 ϕ 𝑟𝑒𝑏𝑎𝑟
SHAPE 3:
PERIMETER OF TIES
𝑃𝑇𝐼𝐸𝑆 = 2(𝐿𝑇𝐼𝐸𝑆 + 𝑊𝑇𝐼𝐸𝑆)
𝑃𝑇𝐼𝐸𝑆 = 2(86. 67𝑚𝑚 + 260𝑚𝑚)
𝑃𝑇𝐼𝐸𝑆 = 693. 34𝑚𝑚
HOOK LENGTH ; d=10mm
𝐻𝐿𝐸𝑁𝐺𝑇𝐻 = 2(10𝑑)
𝐻𝐿𝐸𝑁𝐺𝑇𝐻 = 200𝑚𝑚
BENT DEDUCTION:
𝐹𝑂𝑅 90° 𝐵𝐸𝑁𝐷 = 3(2𝑑) 𝐹𝑂𝑅 135° 𝐵𝐸𝑁𝐷 = 2(3𝑑)
𝐹𝑂𝑅 90° 𝐵𝐸𝑁𝐷 = 3(2 × 10) 𝐹𝑂𝑅 135° 𝐵𝐸𝑁𝐷 = 2(3 × 10)
𝐹𝑂𝑅 90° 𝐵𝐸𝑁𝐷 = 60𝑚𝑚 𝐹𝑂𝑅 135° 𝐵𝐸𝑁𝐷 = 60𝑚𝑚
CHOOSE 9m LENGTH:
260 𝑡𝑖𝑒𝑠
𝐿𝑇𝐼𝐸𝑆 = 9
𝐿𝑇𝐼𝐸𝑆 = 28. 8889 ≈ 29 𝑝𝑐𝑠 9𝑚 𝑥 10𝑚𝑚 ϕ 𝑟𝑒𝑏𝑎𝑟
1. STIRRUPS
Ln = 2.85 m
n = 2.85m / 0.2m
S = 403.68m / 6m
Ln = 0.85 m
n = 0.85m / 0.2m
S = 44.08m / 6m
Ln = 4.95 m
n = 4.95m / 0.2m
S = 128.48m / 6m
Ln = 0.85 m
n = 0.85m / 0.2m
S = 242.44m / 6m
Ln = 4.95 m
n = 4.95m / 0.2m
S = 706.64m / 6m
Ln = 3.2 m
n = 3.2m / 0.2m
S = 359.6m / 6m
Ln = 3.2 m
n = 3.2m / 0.2m
S = 71.92m / 6m
Ln = 2. 5m
n = 2.5m / 0.2m
S = 64.96m / 6m
MB = 249m / 6m
MB = 298.8m / 6m
Total Length of Bars = ((5 pcs x 2.15 m) + (3 pcs x 0.7167 m)) x 2 beams
MB = 25.8002m / 6m
MB = 133m / 6m
Total Length of Bars = ((6 pcs x 2.15 m) + (2 pcs x 0.7167 m)) x 11 beams
MB = 157.6674m / 6m
MB = 270 m / 6m
MB = 63m / 6m
MB = 45.6m / 6m
ASLAB(S-1) = 343.8 m2
ASLAB(S-2) = 135 m2
ASLAB(S-3) = 5.89 m2
Twire(S-3) = 0.77748 kg
Twire(total) = 60 + 20 + 1
2
AT = 383. 300875 𝑚
Bv = 613. 2814 𝑚
Bv = 824. 0968813 𝑚
BT = BV + BH
BT = 1437. 378281 𝑚
1437.378281 𝑚
= 6𝑚
L = (3.2 m + 0.64m)
L = (3.2 m + 0.80m)
L = (3.2 m + 0.80m)
FOR C-1:
SPACING DISTANCE:
1. 16 × 𝐿𝑂𝑁𝐺𝐼𝑇𝑈𝐷𝐼𝑁𝐴𝐿 = 16 × 16 = 256𝑚𝑚 ≈ 25. 6𝑐𝑚
2. 48 × 𝐿𝐴𝑇𝐸𝑅𝐴𝐿 𝑇𝐼𝐸 𝐵𝐴𝑅 = 48 × 10 = 480𝑚𝑚 ≈ 48𝑐𝑚
3. 𝐿𝐸𝐴𝑆𝑇 𝐷𝐼𝑀𝐸𝑁𝑆𝐼𝑂𝑁 𝑂𝐹 𝑇𝐻𝐸 𝐶𝑂𝐿𝑈𝑀𝑁 = 350𝑚𝑚 ≈ 35𝑐𝑚
CHOOSE THE SMALLEST: 25.6 cm
𝐿
𝑆𝑃𝐴𝐶𝐼𝑁𝐺 = 0.256𝑚
6𝑚
𝑆𝑃𝐴𝐶𝐼𝑁𝐺 = 0.256𝑚
𝑆𝑃𝐴𝐶𝐼𝑁𝐺 = 23. 4375 ≈ 24
𝐿𝑇𝐼𝐸𝑆 = 24 + 1
𝐿𝑇𝐼𝐸𝑆 = 25𝑝𝑐𝑠
𝑁𝑂. 𝑂𝐹 𝐿𝐴𝑇𝐸𝑅𝐴𝐿 𝑇𝐼𝐸𝑆 = 25𝑝𝑐𝑠 × 13 𝑐𝑜𝑙𝑢𝑚𝑛𝑠 = 325 𝑡𝑖𝑒𝑠
SHAPE 1:
PERIMETER OF TIES
𝑃𝑇𝐼𝐸𝑆 = 2(𝐿𝑇𝐼𝐸𝑆 + 𝑊𝑇𝐼𝐸𝑆)
𝑃𝑇𝐼𝐸𝑆 = 2(260𝑚𝑚 + 260𝑚𝑚)
𝑃𝑇𝐼𝐸𝑆 = 1040𝑚𝑚
BENT DEDUCTION:
𝐹𝑂𝑅 90° 𝐵𝐸𝑁𝐷 = 3(2𝑑) 𝐹𝑂𝑅 135° 𝐵𝐸𝑁𝐷 = 2(3𝑑)
𝐹𝑂𝑅 90° 𝐵𝐸𝑁𝐷 = 3(2 × 10) 𝐹𝑂𝑅 135° 𝐵𝐸𝑁𝐷 = 2(3 × 10)
𝐹𝑂𝑅 90° 𝐵𝐸𝑁𝐷 = 60𝑚𝑚 𝐹𝑂𝑅 135° 𝐵𝐸𝑁𝐷 = 60𝑚𝑚
𝐵𝐷𝐸𝐷𝑈𝐶𝑇𝐼𝑂𝑁 = 60𝑚𝑚 + 60𝑚𝑚
𝐵𝐷𝐸𝐷𝑈𝐶𝑇𝐼𝑂𝑁 = 120𝑚𝑚
CHOOSE 9m LENGTH:
325 𝑡𝑖𝑒𝑠
𝐿𝑇𝐼𝐸𝑆 = 8
𝐿𝑇𝐼𝐸𝑆 = 40. 625 ≈ 41 𝑝𝑐𝑠 9𝑚 𝑥 10𝑚𝑚 ϕ 𝑟𝑒𝑏𝑎𝑟
SHAPE 2:
BENT DEDUCTION:
𝐹𝑂𝑅 90° 𝐵𝐸𝑁𝐷 = 3(2𝑑) 𝐹𝑂𝑅 135° 𝐵𝐸𝑁𝐷 = 2(3𝑑)
𝐹𝑂𝑅 90° 𝐵𝐸𝑁𝐷 = 3(2 × 10) 𝐹𝑂𝑅 135° 𝐵𝐸𝑁𝐷 = 2(3 × 10)
𝐹𝑂𝑅 90° 𝐵𝐸𝑁𝐷 = 60𝑚𝑚 𝐹𝑂𝑅 135° 𝐵𝐸𝑁𝐷 = 60𝑚𝑚
SPACING DISTANCE:
1. 16 × 𝐿𝑂𝑁𝐺𝐼𝑇𝑈𝐷𝐼𝑁𝐴𝐿 = 16 × 20 = 320𝑚𝑚 ≈ 32𝑐𝑚
2. 48 × 𝐿𝐴𝑇𝐸𝑅𝐴𝐿 𝑇𝐼𝐸 𝐵𝐴𝑅 = 48 × 10 = 480𝑚𝑚 ≈ 48𝑐𝑚
3. 𝐿𝐸𝐴𝑆𝑇 𝐷𝐼𝑀𝐸𝑁𝑆𝐼𝑂𝑁 𝑂𝐹 𝑇𝐻𝐸 𝐶𝑂𝐿𝑈𝑀𝑁 = 350𝑚𝑚 ≈ 35𝑐𝑚
CHOOSE THE SMALLEST: 32 cm
𝐿
𝑆𝑃𝐴𝐶𝐼𝑁𝐺 = 0.32𝑚
6𝑚
𝑆𝑃𝐴𝐶𝐼𝑁𝐺 = 0.35𝑚
𝑆𝑃𝐴𝐶𝐼𝑁𝐺 = 18. 75 ≈ 19
𝐿𝑇𝐼𝐸𝑆 = 19 + 1
𝐿𝑇𝐼𝐸𝑆 = 20𝑝𝑐𝑠
𝑁𝑂. 𝑂𝐹 𝐿𝐴𝑇𝐸𝑅𝐴𝐿 𝑇𝐼𝐸𝑆 = 20𝑝𝑐𝑠 × 13 𝑐𝑜𝑙𝑢𝑚𝑛𝑠 = 260 𝑡𝑖𝑒𝑠
SHAPE 1:
PERIMETER OF TIES
𝑃𝑇𝐼𝐸𝑆 = 2(𝐿𝑇𝐼𝐸𝑆 + 𝑊𝑇𝐼𝐸𝑆)
𝑃𝑇𝐼𝐸𝑆 = 2(260𝑚𝑚 + 260𝑚𝑚)
𝑃𝑇𝐼𝐸𝑆 = 1040𝑚𝑚
BENT DEDUCTION:
𝐹𝑂𝑅 90° 𝐵𝐸𝑁𝐷 = 3(2𝑑) 𝐹𝑂𝑅 135° 𝐵𝐸𝑁𝐷 = 2(3𝑑)
𝐹𝑂𝑅 90° 𝐵𝐸𝑁𝐷 = 3(2 × 10) 𝐹𝑂𝑅 135° 𝐵𝐸𝑁𝐷 = 2(3 × 10)
𝐹𝑂𝑅 90° 𝐵𝐸𝑁𝐷 = 60𝑚𝑚 𝐹𝑂𝑅 135° 𝐵𝐸𝑁𝐷 = 60𝑚𝑚
CHOOSE 9m LENGTH:
260 𝑡𝑖𝑒𝑠
𝐿𝑇𝐼𝐸𝑆 = 8
𝐿𝑇𝐼𝐸𝑆 = 32. 5 ≈ 33 𝑝𝑐𝑠 9𝑚 𝑥 10𝑚𝑚 ϕ 𝑟𝑒𝑏𝑎𝑟
SHAPE 2:
260 2 260 2
𝐻= ( 2
) +( 2
)
𝐻 = 183. 8478𝑚𝑚
PERIMETER OF TIES
𝑃𝑇𝐼𝐸𝑆 = 4𝐻
𝑃𝑇𝐼𝐸𝑆 = 4(183. 8478𝑚𝑚)
𝑃𝑇𝐼𝐸𝑆 = 735. 3912𝑚𝑚
BENT DEDUCTION:
𝐹𝑂𝑅 90° 𝐵𝐸𝑁𝐷 = 3(2𝑑) 𝐹𝑂𝑅 135° 𝐵𝐸𝑁𝐷 = 2(3𝑑)
𝐹𝑂𝑅 90° 𝐵𝐸𝑁𝐷 = 3(2 × 10) 𝐹𝑂𝑅 135° 𝐵𝐸𝑁𝐷 = 2(3 × 10)
𝐹𝑂𝑅 90° 𝐵𝐸𝑁𝐷 = 60𝑚𝑚 𝐹𝑂𝑅 135° 𝐵𝐸𝑁𝐷 = 60𝑚𝑚
CHOOSE 9m LENGTH:
260 𝑡𝑖𝑒𝑠
𝐿𝑇𝐼𝐸𝑆 = 11
𝐿𝑇𝐼𝐸𝑆 = 23. 6364 ≈ 24 𝑝𝑐𝑠 9𝑚 𝑥 10𝑚𝑚 ϕ 𝑟𝑒𝑏𝑎𝑟
FOR C-3:
SPACING DISTANCE:
1. 16 × 𝐿𝑂𝑁𝐺𝐼𝑇𝑈𝐷𝐼𝑁𝐴𝐿 = 16 × 20 = 320𝑚𝑚 ≈ 32𝑐𝑚
2. 48 × 𝐿𝐴𝑇𝐸𝑅𝐴𝐿 𝑇𝐼𝐸 𝐵𝐴𝑅 = 48 × 10 = 480𝑚𝑚 ≈ 48𝑐𝑚
3. 𝐿𝐸𝐴𝑆𝑇 𝐷𝐼𝑀𝐸𝑁𝑆𝐼𝑂𝑁 𝑂𝐹 𝑇𝐻𝐸 𝐶𝑂𝐿𝑈𝑀𝑁 = 350𝑚𝑚 ≈ 35𝑐𝑚
CHOOSE THE SMALLEST: 32 cm
𝐿
𝑆𝑃𝐴𝐶𝐼𝑁𝐺 = 0.32𝑚
6𝑚
𝑆𝑃𝐴𝐶𝐼𝑁𝐺 = 0.35𝑚
𝑆𝑃𝐴𝐶𝐼𝑁𝐺 = 18. 75 ≈ 19
𝐿𝑇𝐼𝐸𝑆 = 19 + 1
𝐿𝑇𝐼𝐸𝑆 = 20𝑝𝑐𝑠
𝑁𝑂. 𝑂𝐹 𝐿𝐴𝑇𝐸𝑅𝐴𝐿 𝑇𝐼𝐸𝑆 = 20𝑝𝑐𝑠 × 13 𝑐𝑜𝑙𝑢𝑚𝑛𝑠 = 260 𝑡𝑖𝑒𝑠
SHAPE 1:
PERIMETER OF TIES
𝑃𝑇𝐼𝐸𝑆 = 2(𝐿𝑇𝐼𝐸𝑆 + 𝑊𝑇𝐼𝐸𝑆)
𝑃𝑇𝐼𝐸𝑆 = 2(260𝑚𝑚 + 260𝑚𝑚)
𝑃𝑇𝐼𝐸𝑆 = 1040𝑚𝑚
BENT DEDUCTION:
𝐹𝑂𝑅 90° 𝐵𝐸𝑁𝐷 = 3(2𝑑) 𝐹𝑂𝑅 135° 𝐵𝐸𝑁𝐷 = 2(3𝑑)
𝐹𝑂𝑅 90° 𝐵𝐸𝑁𝐷 = 3(2 × 10) 𝐹𝑂𝑅 135° 𝐵𝐸𝑁𝐷 = 2(3 × 10)
𝐹𝑂𝑅 90° 𝐵𝐸𝑁𝐷 = 60𝑚𝑚 𝐹𝑂𝑅 135° 𝐵𝐸𝑁𝐷 = 60𝑚𝑚
CHOOSE 9m LENGTH:
260 𝑡𝑖𝑒𝑠
𝐿𝑇𝐼𝐸𝑆 = 8
𝐿𝑇𝐼𝐸𝑆 = 32. 5 ≈ 33 𝑝𝑐𝑠 9𝑚 𝑥 10𝑚𝑚 ϕ 𝑟𝑒𝑏𝑎𝑟
SHAPE 2:
260 2 260 2
𝐻= ( 2
) +( 2
)
𝐻 = 183. 8478𝑚𝑚
PERIMETER OF TIES
𝑃𝑇𝐼𝐸𝑆 = 4𝐻
𝑃𝑇𝐼𝐸𝑆 = 4(183. 8478𝑚𝑚)
𝑃𝑇𝐼𝐸𝑆 = 735. 3912𝑚𝑚
BENT DEDUCTION:
𝐹𝑂𝑅 90° 𝐵𝐸𝑁𝐷 = 3(2𝑑) 𝐹𝑂𝑅 135° 𝐵𝐸𝑁𝐷 = 2(3𝑑)
𝐹𝑂𝑅 90° 𝐵𝐸𝑁𝐷 = 3(2 × 10) 𝐹𝑂𝑅 135° 𝐵𝐸𝑁𝐷 = 2(3 × 10)
𝐹𝑂𝑅 90° 𝐵𝐸𝑁𝐷 = 60𝑚𝑚 𝐹𝑂𝑅 135° 𝐵𝐸𝑁𝐷 = 60𝑚𝑚
CHOOSE 9m LENGTH:
260 𝑡𝑖𝑒𝑠
𝐿𝑇𝐼𝐸𝑆 = 11
𝐿𝑇𝐼𝐸𝑆 = 23. 6364 ≈ 24 𝑝𝑐𝑠 9𝑚 𝑥 10𝑚𝑚 ϕ 𝑟𝑒𝑏𝑎𝑟
1. STIRRUPS
Ln = 2.85 m
n = 2.85m / 0.2m
S = 403.68m / 6m
Ln = 0.85 m
n = 0.85m / 0.2m
S = 44.08m / 6m
Ln = 4.95 m
n = 4.95m / 0.2m
S = 73m / 6m
Ln = 0.85 m
n = 0.85m / 0.2m
S = 242.44m / 6m
S = 40.4067 pcs of 10 mm ∅ 6.0 m rebars
Ln = 4.95 m
n = 4.95m / 0.2m
S = 401.5m / 6m
Ln = 3.2 m
n = 3.2m / 0.2m
S = 359.6m / 6m
Ln = 3.2 m
n = 3.2m / 0.2m
S = 71.92m / 6m
Ln = 2. 5m
n = 2.5m / 0.2m
S = 64.96m / 6m
MB = 199.2m / 6m
MB = 249m / 6m
MB = 249m / 6m
Total Length of Bars = ((5 pcs x 2.15 m) + (2 pcs x 0.7167 m)) x 2 beams
MB = 24.3668m / 6m
MB = 119.7m / 6m
Total Length of Bars = ((5 pcs x 2.15 m) + (3 pcs x 0.7167 m)) x 11 beams
MB = 141.9011m / 6m
MB = 877.8m / 6m
MB = 270 m / 6m
MB = 72m / 6m
MB = 38m / 6m
MBTotal = 33.2 + 41.5 + 41.5 + 4.0611 + 19.95 + 23.6502 + 146.3 + 45 +12 + 6.3333
ASLAB(S-1) = 343.8 m2
ASLAB(S-2) = 135 m2
ASLAB(S-3) = 5.89 m2
Twire(S-3) = 0.77748 kg
Twire(total) = 60 + 20 + 1
1. Stirrups
Ln = 2.85 m
n = 2.85m / 0.2m
S = 1211.04m / 6m
Ln = 0.85 m
n = 0.85m / 0.2m
S = 9.28m / 6m
Ln = 4.95 m
n = 4.95m / 0.2m
S = 777.92m / 6m
Ln = 6.724 m
n = 6.724m / 0.2m
S = 61.48m / 6m
MB = 597.6m / 6m
MB = 17.2m / 6m
MB = 518.7m / 6m
MB = 50.544m / 6m
Flights 1 & 3
= 3.438371708m
= 1.037m
LANCHORED = 0.336m
= 4.811371708m
No. of Bars
No. of 6m Bars
L = 1.36
No. of Bars
No. of 6m Bars
L = 0.55m
No. of Bars
1360m/0.30m = 4.53333333 ≈ 5 + 1 = 6 bars
No. of 6m Bars
L = 1.36
No. of Bars
No. of 6m Bars
Flights 2 & 4
= 3.438371708m
LLANDING = 1.337m
LANCHORED = 0.336m
= 5.111371708m
No. of Bars
No. of 6m Bars
L = 1.36
No. of Bars
No. of 6m Bars
L = 0.55m
No. of Bars
No. of 6m Bars
L = 1.36
No. of Bars
No. of 6m Bars
L = 2.72m
No. of Bars
No. of 6m Bars
For 2 Landings
3 pieces x 2 = 6 pieces of 6m x Ø10mm
= 38 steps
No. of 6m Bars
L = 1.36m
● Flight 2 & 4