Boq

The document provides a detailed cost summary for a construction project, including total costs for construction and other associated expenses. The grand total amounts to Tk 245,975,766.55, with a breakdown of costs per square foot and various construction categories. Additionally, it outlines specific costs for materials, labor, and other miscellaneous expenses related to the project.

Uploaded by

engrnazim07.opl
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
4 views

Boq

The document provides a detailed cost summary for a construction project, including total costs for construction and other associated expenses. The grand total amounts to Tk 245,975,766.55, with a breakdown of costs per square foot and various construction categories. Additionally, it outlines specific costs for materials, labor, and other miscellaneous expenses related to the project.

Uploaded by

engrnazim07.opl
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 969

Cost summary

Cost per sft (Tk)


Sl Description Total Cost (Tk.) Construction Area
70129 SFT.
1 Construction Cost 220,937,510.55 3,150.44
2 PD Cost 25,038,256.00 357.03
Grand Total (Tk) 245,975,766.55 3,507.48
Remarks
Total Residential Floor : 08 Nos., Commercial : & Parking: 14 nos.
20 katha land 2B+G+8
Other Costs

Sl. No. Description Unit Quantity Rate


1 GAS Bill during Construction sft
2 WASA Bill during Construction sft
Electric Bill during Construction&
3 sft
Connection Cost

4 Consultancy Fees(All) sft 70129 64.00

5 Site Preparation Cost (Fencing,office,etc) sft 1 650,000.00

6 Temporary work and Mobilization work L.S. 1 0


7 Plantation Cost L.S. 1
8 Laboratory Test Exp. L.S. 1 300,000.00
9 Ceremonial Cost (Milad & Handover) L.S. 1 200,000.00
Logo, Address Plate, , Car Parking No.
10 L.S. 1 500,000.00
Plate
Plan Approval Cost (High rise NOC, Estate
11 clearance,Fire NOC, Civil Aviation,LUP and lot
plan )

12 PABX, Vedio Intercom lot 1 500,000.00

13 Fire Fighting and solar lot 1 7,000,000.00


14 CC TV System lot 1 350,000.00
15 Car Park Barriers /Ramp gate barrier lot 2 200,000.00
16 Access Control Lot -
17 Generator Ducting Lot 1 200,000.00
18 Voltage Stabilizer = 2nos lot 2 175,000.00
Safety (safety tray total 12000 sft approx
19 (for 2 levels) fitting & opening @ Tk.125/- sft 12000 125.00
per sft), rubbish shifting, etc.
20 Water Body/Fountain lot 1 -
21 Basement Ventilation System lot 1 600,000.00
22 Brochure 1 -
23 Road work L.S. -
24 Unforseen cost L.S.
Grand Total (Tk.)

Cost Per sft Tk. 357.03


s.

Amount Remarks
450,000.00
1,500,000.00 Collect from
Logistics
1,500,000.00

Collect from D
4,488,256.00
&D
Collect from
650,000.00
B.D
-
1,000,000.00
300,000.00
200,000.00
Collect from
500,000.00
B.D

Collect from
2,500,000.00
Logistics

Collect from
500,000.00
Electrical dept.

7,000,000.00
350,000.00
400,000.00
-
200,000.00
350,000.00

1,500,000.00 9552 95 907440 339,620.00

-
650,000.00
-
-
1,000,000.00
25,038,256.00
Compiled cost
S.L No Name of Item
A Pile Works (Materials) & bracing (mat+lab)
B Pile Works (Labour)
C Civil Works (Material Cost)
D Civil Works (Labour Cost)
E (Material & Labour Cost),MS Items, Aluminium etc. Civil Work,Wood
F Paint(Material)
G Paint(Labor)
H Sanitary & Plumbing (Material)
I Sanitary & Plumbing (Labour)
J Deep Tube Well /Water pump
K Internal Electrification
L Passenger Lift (10 Person)(Mitsubishi)=2nos
M Generator & Others (330KVA ) ( kohler)
N Sub-Station& Others (750 KVA Appx) Navana Interlink

Grand Total
Amount in Tk.
10,092,187.00
2,136,257.44
128,731,613.00
19,718,295.00
26,787,367.00
875,216.00
766,587.81
3,089,464.98
494,628.32
-
12,345,894.00
9,000,000.00
3,800,000.00
3,100,000.00

220,937,510.55
Sl.No Description (RCC) Unit Quantity Remarks Sl No

1 Cement Bag 20119.14

2 Local Sand cft 39148.92

3 Sylhet Sand cft 21738.96 1

4 1st Class Bricks Nos 586260.00 2

5 Picket Nos 30479.40 3

6 40 grade Rod Kg 0.00 4


993,267 15.93

7 60 grade Rod Kg 993267.00 5

8 Stone Chips(3/4") cft 29098.12 6

29625.86
9 Stone Chips(1/2") cft 527.74 7

10

11
12

13

14

15

16

17

18

19

20
Enamel
Paint on Out Side
Enamel
Plastic Wooden / Paint
Prime Paint on French
Items (paint) Unit Putty Paint Plaster (Master/
Coat Grill Polish
(2-Coat) /Steel Weather
Surface
Surface(2 Coat)
-Coat)

Unit sft sft sft sft sft sft sft

Quantity 88803.00 84003.00 84003.00 4733.46 0 22740.00 0

Plastic Paint Lit 0 1235.34

Enamel Paint Lit 0 63.11 0.00

Distemper gal

Snowcem kg

Durocem kg

Sealer In side lit 579.33 0.00 0.00

Sealer Out side lit 156.83

Seacem kg

Readymade/
Cement Based kg 3500.125 0.00
Putty

Readymade/
Cement Based kg 0.00
Putty Out side

Water Repel Paint ltr


Chalk Powder bag 0

Weather Coat Lit 413.45

Master Coat gal

G.P. Thinner ltr 22.09 0.00

French Powder kg

Aica kg

Alkarim Aster
ltr 37.87 0
(Primer)

Yacht Varnish ltr

Matt Varnish ltr


Wood Fair
Lift core
Varnish Face/Faci Total Sl.No.
paint area
(Matt) ng Bricks

sft sft sft 1

4800 0 15,285 2

48.00 1283.34 3

63.11 4

0.00 5

0.00 6

0.00 7

33.10 612.43 8

156.83 9

0.00 10

3500.13 11

0.00 12

305.70 305.70 13
0.00 14

413.45

15

0.00

22.09

0.00

0.00

37.87
16

0.00

0.00

SHUTTERING MATERIA

17
18

19

20

21

22

23

24

25

26

27

28

29
30

31

32

33

34

35

36

TILES & MARBLES

37

38

39

40

40

41

42
43

43

44

45

46
47

48

49

50

51

52

53

54

55

56

57

58

59

60

61

62

63

64
65

66

67

68

69

70

71

72

73

74

WOOD WORKS

75

76

77

78

79

80

81
82

83

84

85

86

87

88

89

90

91
92

93

94

95

96

97

98

99

100

101

102

103

104

105

106

107

108

PAINTINGS MATERIAL
109

110

111

112

113

114

115

116

117

118

119
120

121

122

123

124

125

126

127

128

129

130

131

132

133

134

135

GRILLS AND M.S. WOR

136
137

138

139

140

141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157

158

159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175

176

177
178

179

180

181

182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197

198

199
200
201
202
203

204

205
205
206

207

208
ALUMINIUM & GLASS WO
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
Materials Name (Civil) Unit Quantity Rate

1st Class Brick/Auto Brick nos 586,260

Facing Bricks sft -

Picket nos 30,479

Use any one

Brick Chips cft 3,192

Stone Chips 3/4" cft 29,098 220.00

Stone Chips 1/2" cft 528 200.00

Shingles cft 13,917

Pea Gravel cft -

Pie Chips(Stone/Bricks) cft -

Sylhet Sand cft 21,739 60

Medium Sand cft 39,149 35.00

Filling Sand cft 42,600 18.00

Grey Cement bag 20,119 520.00


White cement bag 9

Ready Mix (Concrete) RMC. cft 129,360 280.00

Fair Face Casting cft

60/72.5 Grade M.SRod

8 mm dia kg -

10 mm dia kg 178,848

12 mm dia kg 184,506

16 mm dia kg 57,548

20 mm dia kg 211,120

for spacer bar &


25 mm dia kg 138,235
Main Bar

32 mm dia kg -

SHUTTERING MATERIALS

M.S. Sheet sft 1,600


Angle shutter sft -

old & new


Slab Shutter sft 17,450
shutter

Beam Shutter sft 10,160

old & new


Vertical Member Shutter sft 12,070
shutter

Steel Props pcs 3,132

Mango Wood(Batten) cft


400

Mango Wood(Plank) cft

Bamboo(Full Size) pcs 175

Bamboo(Cut pices) pcs 120

Shutter Foam Nos 848

Shutter clip nos -

Tie Bolt/Tie Rod pcs 120


Trun bolt nos 300

Nut Bolt kg 667

Rubber Gasket nos

Washer kg 278

7'' Diamond Disk nos 40

4'' Diamond Disk nos 30

Cock Sheet sft 320

TILES & MARBLES

Glazed Tiles (Toilet & Kitchen Wall) sft 4,571

Border Tiles rft -

Lift Lobby Floor -Marble sft 4,861

Main Stair sft 14,389

Ornamental Stair Rustic Tiles sft

Fire Stair with lobby sft 1,706

Lift Wall sft -


Reception+ loung Back Wall-Marble sft -
Apartment Floor-Tiles Without Skirting sft 68,371
Apartment Floor-Marble With Skirting sft 546
Glazed Tiles (Toilet & Kitchen Floor) sft 4,547

G.Room, Dri.wait. Sitting & EMR room step up all are Tiles -

Gym Floor Tiles sft


Pavement Tiles sft 9,778

Roof Tiles above L.C.C sft 3,850

Terrace Tiles(G.F Roof) sft 1,247

Planter Tiles/Marble sft 503

Skirting Tiles rft 11,254

Marble (cabinet basin top) sft 515

Granite (kitchen work top) sft -

Mosaic Chips bag -

Glass Strip rft -

Yellow Stone pcs 410.00

Brass Nozing rft -

Oxalic Acid kg -

Yellow Oxide kg -

Vixol nos 150

Column Protection Tiles sft -

Water Body Floor & Wall Tiles sft -

Swimming Pool Floor, Wall & Top area Tiles sft -

Swim.Pool (Change/Shower/Toilet) Floor sft -


Swimming pool Deck Amber-Rhnio ( 4" x2" Size) rft -

Swimming _Pool Deck Amber Crook rft -

Swimming Pool Deck Amber- Angular rft -

Water Body Wall Tiles sft -

Swimming Pool Drain Tiles sft -

Swim.Pool (Change/Shower/Toilet )Wall sft -

Rustic Tiles sft -

Slate Stone/ Cladding Tiles sft 1,182

Wooden Floor sft -

Boundary Dado Tiles sft 3,745

WOOD WORKS

Main Door frame rft -

Internal Door frame rft 892

Stair Case Door frame rft -

Main Door shutter sft -

Folding Door Shutter With Frame Sft

Internal Door shutter sft 822

Stair Case Door Shutter sft -


Bathroom door shutter sft -

Kitchen & Store door shutter sft -

Verandah door shutter sft -

Ser.Bed door shutter sft 16

Servent Bed Door Shutter sft -

Cat Door nos 27

Mirror Frame rft -

Meter Box sft -

Stair Hand Rail Work Rft -

Stair King Post Each -


Stair Curved Edge Hand Rail nos -

Reception Table nos 1

Reception Chair nos 1

Reception Sofa set

Centre Table Set -

Waiting & Lounge painting nos -

Moulding Bead(2.75" Wide Teak Wood) rft -

Moulding Bead(1.75" Wide Teak Wood) rft -

Moulding Bead(1.75" Wide Shilkarai) rft -

Moulding Bead(1/2" Finished Wide) rft -

Wooden Louver Work sft -

Wooden Wall Panneling sft -

Decorative false Ceiling wooden sft -

Reception & Duct area Wooden False Ceiling sft -

Wooden Bench At GF Water Body Nos -

Wooden Bench At Roof Top Seating Area, under teflon Nos -

Wood Cladding work below veranda Slab sft -

PAINTINGS MATERIALS
Plastic Paint (Internal) lit 1,283

Sealer lit 612

with temporary
Enamel Paint lit 123
work

Readymade/Cement Based Putty kg 3,500

Docu Paint sft 212

with temporary
Aica kg 60
work

120 # Paper pcs 50

220 # Paper pcs 25

320 # Paper pcs 20

Scrap pcs 60

2'' Paint Brush pcs 15


3'' Paint Brush pcs 15

4'' Paint Brush pcs 15

Marking Cloth yrd 110

Iron Paper pcs 20

80# Stone pcs 15

with temporary
Thinner ltr 62
work

N.C Thinner (Docu paint) ltr 15

T-6 Thinner ltr 67

Chalk Powder bag -

Yacth Varnish ltr -

Water Repel Paint ltr 306

with temporary
Alkarim Aster (Primer) ltr 78
work

Seacem/White Cement kg -

Snowcem (Outside) Drum -

Weather Coat/Master Coat (Outside) lit 413

Durocem (Outside/RW) kg -

GRILLS AND M.S. WORKS

GRILL sft
Window Grill sft 1,965

Sliding Grill sft -

Kitchen Verandah Safety Grill sft -

Basement Ventilation Grill sft -

Parking Grill sft -


Safety Grill Over Boundary sft -
Boundary Grill sft -
RAILING sft -
Main Stair Railing sft 1,234
Fire Stair Railing sft 1,234
Basement Stair Railing sft 400
Ornamental Stair Railing sft -
Ramp Railing sft -
Front Verandah Railing sft 1,779
Back Verandah Railing sft -
Kitchen Verandah Railing sft -
Voide & Punch Railing sft 147
Lift Lobby Railing sft -
Parapet/Terrace/OHWT Railing sft 730
Planter/Garden Area Railing sft -
Parking/Boundary Railing sft 400
Electro Mechinical Room (EME)& Pump Room( Sliding Grill
sft -
Door)
Generator Room( Sliding Grill Door) sft -
Transformer Room( Sliding Grill Door) sft -
Substation Room( Sliding Grill DooR) sft 62
Machine Room ( Sliding Grill Door) sft -
Stair Case Door( Slidin Grill Door) sft -
Other's Location (Pump etc)( Sliding Grill Door) sft 35
EME Room Door sft -
Generator Room Door sft 35
Transformer Room Door sft 62
Substation Room Door sft 83
Machine Room Door Including Maintanance Door sft 24
Stair Case Door sft -
Fire Stair Door sft 474
Other's Location basement + Roof Pump etc) sft
Main Gate sft 106
Fire Stair Door sft 474
b). MS. Louver (at side of entry ramp) (Considered 10" X 5"
sft 105
Box)
b). MS. Louver (over change room slab)(2" X2" Box
sft -
Louver)With Hand Rail
MS. Box (Roof Rib beam) (5" X2") sft
Truss Work ( GF Generator Shade+ Community) sft 312

Fiber Sheet Fitting work (Com.Roof+ generator Shed+ GAS


sft -
Meter Area)Steel Frame& Sheet Fixing including Gutter
Planter Area Guard/ Spike(GF Front) rft -
b). MS. Louver (Guard Room Front)(2" X2" Box Louver)Without
sft 18
Hand Rail
Safety Canopy During Construction sft 9,552
Net Shed Over Footpath (Fitting & Opening) sft 1,440
Electrical Cable Tray sft -
Column Guard (Double Layer-SS-Periferi) RFT 180.00
M.S Gratings for Gully Pit 2.00
30"x30" nos 12.00
10"x10" nos -
12" X12" nos -
15" X15" nos -
18" X18" nos -
24" X24" nos -
MS Grating ( Rain Water) nos 5.00
Fire Bucket Stand nos 1
GAS Riser Grill sft. -
MS. Surface/Scupper Drain (Roof) & ramp front sft. 32
MS Checker Plate on Footpath sft -
MS Checker Plate Manhole Cover (On Drive Way) (2'-6" X2'-
6")
sft -

Cloth Drying Stand set -


Roof Ladder (OHWT & UGWR) rft 35
Swimming Pool Ladder nos
Lift Machine Room Slab Level Entry MS Ladder (cat ladder) rft -
Lift Machine Room Entry Checker Plater Stair sft 70
Swimming Pool Machine Room Entry Ladder rft -
Swimming Pool Drain Cover sft
MS Pipe Clamp nos 60
GAS Pipe Clamp nos -
MS Pipe Hanger nos 100
MS manhole cover for Meter Pit & Sanitary master Pit at Drive
nos -
way
Shop Rolling Shutter sft 548
ALUMINIUM & GLASS WORK
4" Single glazzing (Door & Window) sft -
4" Double glazzing (Door & Window) sft -
3" Fixed with Sliding (Door & Window) sft 210
Fixed Glass sft 1,720
Glass Door sft 1,660
Fly Proof Net sft -
Curtain Wall sft
ACP work sft
Canopy Glass work sft 1,550
Aluminium Louver ( South Side) sft -
Aluminium Louver ( A/C Out Door Unit) sft 6,695
Out Side aluminium Design work sft 19,866
Curtain/Blind( Community Space+ GYM+LOUNGE) sft
I-Joist Louver sft
GYM Room Mirror panneling sft
Froster Mirror Panneling at 1st Floor Lounge sft
Boundary Wall Glass Railing sft
Main
Items Main Main Internal Ver Toilet
Door Ser. Bed
Sl. No. (Hardwar Door Door Door Door Door
(Double Door
e) (D-45) (D-40) (Partex) (Plastic) (Plastic)
Leaf)

Unit Nos Nos Nos Nos Nos Nos Nos

Quantity 0 - 0 53 -

Lock:

a) Handle
Lock 0 - - - - - -
(nos)

b)
1
Mortice/Cy
lindrical - - 0 53 - - -
Lock
(nos)

c) Security
Lock - - 0 - - - -
(nos)

Hinge:

a) 4" S.S
Hinge - - - 212 - - -
(nos)
b) 4"
Brass
0 - 0 - - - -
Hinge
2 (nos)
c)
4"Antique
- - - - - - -
Hinge
(nos)
d) 3"
Antique
- - - - - -
Hinge
(nos)

e) 2.5"
M.S Hinge - - - - - - -
(China)

Tower
Bolt:
a) 6"
Brass
0 - 0 - - - -
Tower Bolt
(nos)

b) 8"
Brass
- - - - - - -
Tower Bolt
(nos)

c) 6"S.S
Tower Bolt - - - 53 - - -
(nos)

3
d) 8"S.S
Tower Bolt - - - - - - -
(nos)

e) 10"S.S
Tower Bolt - - - - - - -
(nos)

f)
6"Antique
- - - - - - -
Tower
Bolt(nos)

g)
8"Antique
- - - - - - -
Tower Bolt
(nos)

a) Door
Chain 0 - - - - - -
(nos)

b) Door
Viwer 0 - - - - - -
(nos)
4
c) Door
Knocker 0 - - - - - -
(nos)

d) Knob
- - - - - - -
(nos)

a)
Magnetic
0 - 0 - - - -
Stopper
5 (nos)
b) Plstic
Stopper - - - 53 - - -
(nos)
M.S.
Clamp
6 0 - 0 424 - - -
5"/2"
(nos)

Screw:

a) 1/2"
- - - - - - -
(nos)

b) 3/4"
- - - - - - -
(nos)

c) 1"
- - - - - - -
(nos)

d) 1-1/4"
Wood
0 - 0 1,431 - - -
Screw
(nos)
7 e) 1-1/2"
- - - - - - -
(nos)
f) 2"
- - - - - - -
(nos)
g) 1/2"
Brass
0 - 0 - - - -
Screw
(nos)
g) 1-1/4"
Brass
0 - 0 - - - -
Screw
(nos)

g) 1-1/4"
Wood
Screw - - - 1,696 - - -
(China)
(nos)
i) Antique
Screw - - - - - - -
(nos)
Roller
8 - - - - - - -
Case
Cat
Total Remarks
Door

Nos Nos

27 53

- -

- 53

- -

- 212

- -

- -

- -

108 108

-
- -

- -

- 53

- -

- -

- -

- -

- -

- -

- -

27 27

- -

- 53
108 532

- -

- -

- -

- 1,431

- -

- -

- -

- 1,696

- -
- -

-
Sl Items (Wooden) Parameter Rate Qty
A-i) Door Frame fitting (5" B/W)-i/c manually carrying & lifting
4th Basement Floor each
3rd basement floor each 252.00
2nd basement floor each 243.00
1st basement/semi-basement floor each 234.00
a. Up to Gr. Floor each 225.00 1
b. For 1st floor each 234.00 4
c. For 2nd floor each 243.00 4
d. For 3rd floor each 252.00 4
e. For 4th floor each 261.00 4
f. For 5th floor each 270.00 4
g. For 6th floor each 279.00 4
h. For 7th floor each 288.00 4
i. For 8th floor each 297.00 4
j. For 9th floor each 306.00 4
k. For 10th floor each 315.00 4
l. For 11th floor each 324.00 4
m. For 12th floor each 333.00 4
n. For 13th floor each 342.00 4
o. For 14th floor each 351.00
p. For 15th floor each 360.00
q. For 16th floor each 369.00
r. For 17th floor each 378.00
s. For 18th floor each 387.00
t. For 19th floor each 396.00
u. For 20th floor each 405.00
A-ii) Door Frame fitting (5" B/W)-i/c lifting with roof hoist
4th Basement Floor each 200
3rd basement floor each 180.00
2nd basement floor each 180.00
1st basement/semi-basement floor each 180.00
a. Up to Gr. Floor each 180.00
b. For 1st floor each 180.00
c. For 2nd floor each 180.00
d. For 3rd floor each 180.00
e. For 4th floor each 180.00
f. For 5th floor each 180.00
g. For 6th floor each 180.00
h. For 7th floor each 200.00
i. For 8th floor each 200.00
j. For 9th floor each 200.00
k. For 10th floor each 200.00
l. For 11th floor each 220.00
m. For 12th floor each 220.00
n. For 13th floor each 220.00
o. For 14th floor each 220.00
p. For 15th floor each 220.00
q. For 16th floor each 240.00
r. For 17th floor each 240.00
s. For 18th floor each 240.00
t. For 19th floor each 240.00
u. For 20th floor each 240.00
11" wide Door Frame fitting (10" B/W) in/c. manually carrying & lifting: upto 45" wide opening
4th Basement Floor each 250.00
3rd basement floor each 230.00
2nd basement floor each 230.00
1st basement/semi-basement floor each 230.00
a. Up to Gr. Floor each 230.00
b. For 1st floor each 230.00
c. For 2nd floor each 230.00
d. For 3rd floor each 230.00
e. For 4th floor each 230.00
f. For 5th floor each 230.00
g. For 6th floor each 250.00
h. For 7th floor each 250.00
i. For 8th floor each 250.00
j. For 9th floor each 250.00
k. For 10th floor each 250.00
l. For 11th floor each 270.00
m. For 12th floor each 270.00
n. For 13th floor each 270.00
o. For 14th floor each 270.00
p. For 15th floor each 270.00
q. For 16th floor each 270.00
r. For 17th floor each 290.00
s. For 18th floor each 290.00
t. For 19th floor each 290.00
u. For 20th floor each 290.00
-ii) 11" wide Door Frame fitting (10" B/W) in/c. lifting by roof hoist: upto 45" wide opening
4th Basement Floor each 220.00
3rd basement floor each 200.00
2nd basement floor each 200.00
1st basement/semi-basement floor each 200.00
a. Up to Gr. Floor each 200.00
b. For 1st floor each 200.00
c. For 2nd floor each 200.00
d. For 3rd floor each 200.00
e. For 4th floor each 200.00
f. For 5th floor each 200.00
g. For 6th floor each 200.00
h. For 7th floor each 220.00
i. For 8th floor each 220.00
j. For 9th floor each 220.00
k. For 10th floor each 220.00
l. For 11th floor each 240.00
m. For 12th floor each 240.00
n. For 13th floor each 240.00
o. For 14th floor each 240.00
p. For 15th floor each 240.00
q. For 16th floor each 240.00
r. For 17th floor each 260.00
s. For 18th floor each 260.00
t. For 19th floor each 260.00
u. For 20th floor each 260.00
wide Door Frame fitting (10" B/W) in/c. manually carrying & lifting: above 45" wide to 60" opening
4th Basement Floor each 270.00
3rd basement floor each 250.00
2nd basement floor each 250.00
1st basement/semi-basement floor each 250.00
a. Up to Gr. Floor each 250.00
b. For 1st floor each 250.00
c. For 2nd floor each 250.00
d. For 3rd floor each 250.00
e. For 4th floor each 250.00
f. For 5th floor each 250.00
g. For 6th floor each 250.00
h. For 7th floor each 270.00
i. For 8th floor each 270.00
j. For 9th floor each 270.00
k. For 10th floor each 270.00
l. For 11th floor each 290.00
m. For 12th floor each 290.00
n. For 13th floor each 290.00
o. For 14th floor each 290.00
p. For 15th floor each 290.00
q. For 16th floor each 290.00
r. For 17th floor each 310.00
s. For 18th floor each 310.00
t. For 19th floor each 310.00
u. For 20th floor each 310.00
11" wide Door Frame fitting (10" B/W) in/c. lifting by roof hoist: above 45" wide to 60" opening
4th Basement Floor each 240.00
3rd basement floor each 220.00
2nd basement floor each 220.00
1st basement/semi-basement floor each 220.00
a. Up to Gr. Floor each 220.00
b. For 1st floor each 220.00
c. For 2nd floor each 220.00
d. For 3rd floor each 220.00
e. For 4th floor each 220.00
f. For 5th floor each 220.00
g. For 6th floor each 220.00
h. For 7th floor each 240.00
i. For 8th floor each 240.00
j. For 9th floor each 240.00
k. For 10th floor each 240.00
l. For 11th floor each 260.00
m. For 12th floor each 260.00
n. For 13th floor each 260.00
o. For 14th floor each 260.00
p. For 15th floor each 260.00
q. For 16th floor each 260.00
r. For 17th floor each 280.00
s. For 18th floor each 280.00
t. For 19th floor each 280.00
u. For 20th floor each 280.00
a. Door Frame Removing (5" B/W) & stacking in safe place each at any floor60.00
b. Door Frame Removing (above 5" B/W) & stacking in safe place each at any floor
70.00
c. Plastic Door (any size) fitting-fixing at any flooreach 150.00
d. Plastic Door (any size) romoving at any floor each 50.00
ting groove in walls/ RCC surface & mending good the damages. All frames each should 320.00
be fixed vertically and in same level includin
rame with Shutter fixing above toilet ceiling. all complete as per direction each
of Engineer-in-Charge.(for
100.00 0 all floor)
b. Cat Door removal as per direction of Engr-in-Charge. (for each
all floor) 50.00
oor (any size of single shutter door) fitting-fixing with CC casting in dooreach
frame i/c 500.00
lifting at any floor level
WOOD WORK FOR DOOR SHUTTER -
Main Door -
Door Shutter Fitting ( Double Leaf)( GF) 600
Door Shutter Fitting ( Double Leaf)(1st Floor) 600
Door Shutter Fitting ( Double Leaf)(2nd Floor) 600
Door Shutter Fitting ( Double Leaf)(3rd Floor) 600
Door Shutter Fitting ( Double Leaf)(4th Floor) 600
Door Shutter Fitting ( Double Leaf)(5th Floor) 600
Door Shutter Fitting ( Double Leaf)(6th Floor) 600
Door Shutter Fitting ( Double Leaf)(7th Floor) 600
Door Shutter Fitting ( Double Leaf)(8th Floor) 630
Door Shutter Fitting ( Double Leaf)(9th Floor) 630
Door Shutter Fitting ( Double Leaf)(10th Floor) 630
Door Shutter Fitting ( Double Leaf)(11th Floor) 630
Door Shutter Fitting ( Double Leaf)(12th Floor) 630
Door Shutter Fitting ( Double Leaf)(13th Floor) 630
Door Shutter Fitting ( Double Leaf)(14th Floor) 630
Door Shutter Fitting ( Double Leaf)(15th Floor) 630
Door Shutter Fitting ( Double Leaf)(16th Floor) 630
Door Shutter Fitting ( Double Leaf)(17th Floor) 630
Door Shutter Fitting ( Double Leaf)(18th Floor) 630
Door Shutter Fitting ( Double Leaf)(19th Floor) 630
Door Shutter Fitting ( Double Leaf)(20th Floor) 630
Handle Lock Fitting 0.00 nos. 120.00
Security Lock Fitting 0.00 nos. 65.00
Door Knocker fitting 0.00 nos. 20.00
View Checker fitting 0.00 nos. 20.00

4
Security Chain fitting 0.00 nos. 20.00
Magnetic Stopper fitting nos. 20.00
Tower Bolt Fitting 0.00 nos. 15.00
4 Door Hinge Fitting 0.00 nos. 8.00
Clamp Fitting For Door Frame Fixing - piece 4.50
All Bedroom Door -
Door Shutter Fitting (GF) 1.00 nos. 300.00
Door Shutter Fitting (1st) 4.00 nos. 300.00
Door Shutter Fitting (2nd) 4.00 nos. 300.00
Door Shutter Fitting (3rd) 4.00 nos. 300.00
Door Shutter Fitting (4th) 4.00 nos. 300.00
Door Shutter Fitting (5th) 4.00 nos. 300.00
Door Shutter Fitting (6th) 4.00 nos. 300.00
Door Shutter Fitting (7th) 4.00 nos. 320.00
Door Shutter Fitting (8th) 4.00 nos. 320.00
Door Shutter Fitting (9th) 4.00 nos. 320.00
Door Shutter Fitting (10th) 4.00 nos. 320.00
Door Shutter Fitting (11th) 4.00 nos. 320.00
Door Shutter Fitting (12th) 4.00 nos. 320.00
Door Shutter Fitting (13th) 4.00 nos. 320.00
Door Shutter Fitting (14th) - nos. 320.00
Door Shutter Fitting (15th) - nos. 320.00
Door Shutter Fitting (16th) - nos. 320.00
Door Shutter Fitting (17th) - nos. 320.00
Door Shutter Fitting (18th) - nos. 320.00
Door Shutter Fitting (19th) - nos. 320.00
Door Shutter Fitting (20th) - nos. 320.00
Internal Door Lock fitting 53.00 nos. 70.00
Magnetic Stopper fitting - nos. 20.00
PVC door Stopper fitting 53.00 nos. 8.00
Door Hinge Fitting 212.00 nos. 8.00
Clamp Fitting For Door Frame Fixing 424.00 piece 4.50
Driver, Caretaker & S. Toilet Door (PVC)+ All internal toilet P.V.C
Door 0 nos. 300.00

Sl Description (paint) Quantity Unit Rate (Tk.)


Weather Coat Painting Works (Two
1.0
Coats) at Exernal Surface
Steps: (a) Surface rubbing by using
pumic stone #60 / #80 and cleaning with
flower broom, brush, etc. (b) Wetting the
surface using clean water, (c) Applying
one coat snowcem / durocem / white
cement as a primer (Durocem:Water
=1:1), (d) After 12 hrs from applying of
durocem, wetting the surface two times,
(e) Sand papering using # 120 paper, (f)
1st coat weather coat paint using (g)
Touch putty work if required, (g) Sand
papering (h) final coating of weather
coat using roller / brush. (All painting
materials supplied by company)

Basement-4 0 Sft 4.25


Basement-3 0 Sft 4.25
Basement-2 3250 Sft 4.25
Basement-1 3240 Sft 4.25
GF 6650 Sft 4.25
1st Floor 0 Sft 4.25
2nd Floor 0 Sft 4.25
3rd Floor 0 Sft 4.25
4th Floor 0 Sft 4.25
5th Floor 0 Sft 4.25
6th Floor 0 Sft 4.25
7th Floor - Sft 4.35
8th Floor - Sft 4.35
9th Floor - Sft 4.35
10th Floor - Sft 4.45
11th Floor - Sft 4.45
12th Floor - Sft 4.45
13th Floor - Sft 4.45
14th Floor - Sft 4.45
15th Floor - Sft 4.45
16th Floor 0 Sft 4.55
17th Floor 0 Sft 4.55
18th Floor 0 Sft 4.55
19th Floor 0 Sft 4.55
20th Floor 9600 Sft 4.55
Weather Coat Painting works at
2.0 External Surface in/c. Outer Putty
Work (02 Coats)
Steps: (a) Surface rubbing by using
pumice stone # 60/#80 cleaning with
flower broom, brush, etc. (b) Wetting the
surface using water, (c) Applying one
coat outer wall putty, (d) Sand papering,
using # 120 water paper, (e) Applying
one coat weather coat paint, (f) Applying
touch putty, (g) Sand papering, using #
120 water paper, (h) 2nd coat or final
coat weather coat painting using roller /
brush. (All painting materials supplied
by company)

i) Upto 6th floor sft 5.20


ii) 7th floor to 9th floor sft 5.40
iii) 10th floor to 15th floor sft 5.60
iv) 16th floor to above sft 5.80
Snowcem Painting Works (2-Coats)
3.0
at External Surface

Steps: (a) Surface rubbing by using


pumic stone # 60/#80 and cleaning with
flower broom, brush, etc. (b) Wetting the
surface using water, (c) Applying one
coat snowcem as a primer
(Snowcem:Water =1:1), (d) Apply touch
putty if required, (e) Sand papering
using # 120 paper, (f) 2nd or final coat
snowcem painting using brush. (All
painting materials supplied by company)

i) Upto 6th floor sft 1.50


ii) 7th floor to 9th floor sft 1.75
iii) 10th floor to 15th floor sft 2.00
iv) 16th floor to above sft 2.25
Distemper Painting Work on Wall and
4.0 Ceiling (Internal Painting Works at
Any Levels):
Steps: (a) Surface rubbing by using
pumic stone # 60/#80 and cleaning with
flower broom, brush, etc. (b) Applying
one coat primer (Water based sealer),
(c) Lime putty work- two coats, (d) Sand
papering using # 120 paper, (e) One
coat distemper, (f) Apply touch Putty,
(g) Sand papering, (h) Final coat
distemper painting.
(All painting materials supplied by
company)
i) 2 coats sft 1.75
ii) 1 coats Paint for Lift core 4800 sft 1.20
Plastic Emulsion Paint on Wall &
5.0 Ceiling (Internal Painting Works at
Any levels): [2-Coats]

Steps: (a) Surface rubbing by using


pumic stone # 60/#80 and cleaning with
flower broom, brush, etc. (b) Applying
one coat water based sealer (coverage
area 525 sft /galon) (c) Apply two coats
of interior readymade wall putty / hand
mix putty (chalkpowder, enamel paint
and plastic paint, etc.) (d) Sand
papering using # 120 paper and
cleaning by flower broom, (f) apply 1st
coat plastic emulsion paint (g) Apply
touch putty at night by using 100w /
200w Bulb, (g) Sand papering (h)
Applying 2nd or final coat paniting.
(All painting materials supplied by
company)

[1 coat primer (1.21)+ putty in/c. 1st


sft 4.25
coat (1.21)+ 2nd or Final Coat (1.83)]
Basement-4 0 sft 4.25
Basement-3 0 sft 4.25
Basement-2 8374 sft 4.25
Basement-1 8554 sft 4.25
GF 5935.00 sft 4.25
1st Floor 4650 sft 4.25
2nd Floor 4650 sft 4.25
3rd Floor 4650 sft 4.25
4th Floor 4650 sft 4.25
5th Floor 4650 sft 4.25
6th Floor 4650 sft 4.25
7th Floor 4650 sft 4.35
8th Floor 4650 sft 4.35
9th Floor 4650 sft 4.35
10th Floor 4650 sft 4.35
11th Floor 4650 sft 4.35
12th Floor 4650 sft 4.35
13th Floor 4650 sft 4.45
14th Floor 0 sft 4.45
15th Floor 0 sft 4.45
16th Floor 0 sft 4.45
17th Floor 0 sft 4.45
18th Floor 0 sft 4.45
19th Floor 0 sft 4.45
20th Floor 5490 sft 4.45
N.B: For additional 01 (one) coat
plastic painting labor charge (if sft 1.00
required or applied)
Polishing Work on Wooden Surface
6.0
(Material+Labor)

(a) The surface of wood work to be


painted or polished should be rubbed
down perfectly smooth with using sand
paper medium and fine grade. (b) Work
timber should be primed as soon as
possible practically as astor. (c) Sand
papering, using # 120 water paper /
zero paper, (d) Applying spirit vernish
which is made by ¼ kg of gala in ½ liter
of methylated spirit and straining the
solution through double thickness of
coarse muslin. (e) Sand papering, using
zero paper, (f) Several coats will be
neseccary until the desired shineness
and finishing smoothness acheived. (All
painting materials supplied by
contractor)

(i) Design Wooden Surface / Main


sft 30.00
Door (Material+Labor)
(ii) Solid Wooden Surface
sft 26.00
(Material+Labor)
GF 125.00 sft 26.00
1st Floor 194.02 sft 26.00
2nd Floor 194.02 sft 26.00
3rd Floor 194.02 sft 26.00
4th Floor 194.02 sft 26.00
5th Floor 194.02 sft 26.00
6th Floor 194.02 sft 26.00
7th Floor 194.02 sft 26.00
8th Floor 194.02 sft 26.00
9th Floor 194.02 sft 26.00
10th Floor 194.02 sft 26.00
11th Floor 194.02 sft 26.00
12th Floor 194.02 sft 26.00
13th Floor 194.02 sft 26.00
14th Floor 0.00 sft 26.00
15th Floor sft 26.00
16th Floor sft 26.00
17th Floor sft 26.00
18th Floor sft 26.00
19th Floor sft 26.00
20th Floor sft 26.00
(iii) Partex plain door surface
sft 22.00
(Material+Labor)
(iv) Louver Door (Material+Labor) sft 30.00
Wooden Bead Polishing Works
7.0
(Material+Labor)

The surface of wood work to be painted


or polished should be rubbed down
perfectly smooth with using sand paper
medium and fine grade. (b) Work timber
should be primed as soon as possible
practically as astor. (c) Sand papering,
using # 120 water paper / zero paper,
(d) Applying spirit vernish which is made
by ¼ kg of gala in ½ liter of methylated
spirit and straining the solution through
double thickness of coarse muslin. (e)
Sand papering, using # 120 water paper
/ zero paper, (f) Several coats will be
neseccary until the desired shineness
and finishing smoothness acheived. (All
painting materials supplied by
Contractor)

i) Upto 11/4" size rft 6.00


ii) Above 11/4" and within 3" size. rft 8.00
Enamel Painting Works Over Solid
8.0
Surface at Any Where. (Two Coats)
a. Plaster surface -
i) Upto 6th floor sft 4.25
ii) 7th floor to 12th floor sft 4.35
iii) 13th floor to above floor sft 4.45
b. Wood / Metal surface (2-coats
(All painting materials supplied by
company)
i) Upto 6th floor sft 4.25
ii) 7th floor to 12th floor sft 4.35
iii) 13th floor to above floor sft 4.45
Enamel Painting Work at M.S Grill,
Stair Railing, Verandah Railing
9.0
(Measurement will be taken for single
face only).
For 02 (Two) Coats, (All painting
materials supplied by company)
Basement-4 0.00 Sft 4.50
Basement-3 0.00 Sft 4.50
Basement-2 100.00 Sft 4.50
Basement-1 300.00 Sft 4.50
GF 260.00 Sft 4.50
1st Floor 311.00 Sft 4.50
2nd Floor 311.00 Sft 4.50
3rd Floor 477.00 Sft 4.50
4th Floor 311.00 Sft 4.50
5th Floor 477.00 Sft 4.50
6th Floor 668.00 Sft 4.50
7th Floor 451.00 Sft 4.60
8th Floor 419.50 Sft 4.60
9th Floor 479.00 Sft 4.60
10th Floor 608.50 Sft 4.60
11th Floor 501.75 Sft 4.60
12th Floor 311.00 Sft 4.60
13th Floor 496.5 Sft 4.70
14th Floor 0 Sft 4.70
15th Floor 0 Sft 4.70
16th Floor 0 Sft 4.70
17th Floor 0 Sft 4.70
18th Floor 0 Sft 4.70
19th Floor 0 Sft 4.70
20th Floor (roof top) 800 Sft 4.70
Enamel Painting Work at new pipe
10.0
(scaffolding pipe/other pipes) surface

Steps: (a) Surface cleaning by using


Emery paper (b) Apply Single coat
primer (Alkarim Astor)- [mixing ratio- Al
karim astor : T6 thinner= 4:1], (c) Sand
papering using # 120 paper and
cleaning the surface, (d) 1st coat
enamel paint (e) Apply touch putty at
night if required, (f) Sand papering (g)
Applying 2nd or final coat paniting. (All
painting materials supplied by company)

i) Dia of pipe from 2.01”~3” rft 2.50


ii) Dia of Pipe from 1½”~2” 0 rft 2.25
11.0 Lacquer Painting Work
i) Crystal clear Lacquer painting works
on solid wooden surface at any levels
sft 60.00
by spray machine. ((All painting
materials supplied by company))
ii) Crystal clear Lacquer painting works
at Wooden verandah / stair top rail. (all
rft 35.00
painting materials supplied by
company)- Steps as stated above.

iii) Crystal clear Lacquer painting works


at Wooden door Chowkat / Frame with
rft 35.00
bead. (all painting materials supplied by
company)- Steps as stated above.

Lacquer painting / polishing works


(Material + Labor) on solid wooden
surface (say door shutter, door frame,
stair/verandah hand rail, wood at main
sft 110.00
gate, wooden wall paneling, false
ceiling, etc.) at any levels by spray
machine including supplying of all
paintng materials & accessories.
GF 110.00
1st Floor 97.01 110.00
2nd Floor 97.01 110.00
3rd Floor 97.01 110.00
4th Floor 97.01 110.00
5th Floor 97.01 110.00
12.0 6th Floor 97.01 110.00
7th Floor 97.01 110.00
8th Floor 97.01 110.00
9th Floor 97.01 110.00
10th Floor 97.01 110.00
11th Floor 97.01 110.00
12th Floor 97.01 110.00
13th Floor 97.01 110.00
14th Floor - 110.00
15th Floor 110.00
16th Floor 110.00
17th Floor 110.00
18th Floor 110.00
19th Floor 110.00
20th Floor 110.00
13.0 Ducco Paint Work
i) 03-Coats of Duco paint (kangaroo)
spraying work using compressor. (Paint sft 35.00
materials supplied by company)
ii) 03-Coats of Duco paint work at Stair /
Verandah hand Rail (steel or wooden
surface) rft 25.00
(all painting materials supplied by
company)

iii) 03-Coats of Duco paint (kangaroo)


spraying work using compressor over a
prime coat (alkarim) & one coat of
hardener. (all painting materials &
accessories supplied by the contractors)

a) For metal surface (Material with labor


sft 100.00
by sparay machine, kangaroo finish)

b) For wooden surface (Material with


labor by sparay machine, kangaroo sft 70.00
finish)
Enamel paint spraying work using
compressor in all respect complete as
14.0 per direction of the Engineer-in-Charge. sft 12.00
(All painting materials supplied by
company)
Two coats of bitumenous emulsion paint
15.0 over the surface of wooden frame. sft 1.50
(Material+Labor)
Three coats of white washing work on
16.0 sft 0.80
plaster surface.

02-coats of border line painting work in


17.0 car parking area (3" to 3.5" wide) with rft 4.50
road marking paint. (Material+ Labor)

02-coats of reflective painting on column


18.0 edge guard over priming coat (Indian rft 6.00
V2). -(Material +Labor)
02-coats of groove painting (With sharp
19.0 & straight edge finishing) -different rft 0.85
colors (labour rate)
02-coats Extra rate for ceiling edge
20.0 plastic painting works. (all painting rft 1.00
materials supplied by company)

Applying of anticorrosive liquid red oxide


primer (BERGER) at new steel/wooden
surface including rubbing & cleaning the
21.0 sft 3.30
surface and contractor supplying of all
painting materials & equipments, etc. all
complete
Enamel Painting Works at the
Surface of Old Shutter / Pipes /
22.0
Scaffolding / Channel / etc.
i) Re painting on Deck, Beam &
sft 4.25
columan shutter surface (only labor)
ii) Re painting on pipe & props (from
2.01”~3” dia) surface in/c. base plate rft 3.00
(only labor) avg. Rate
iii) Re painting on Pipe scaffolding &
Props (1½”~2” dia) surface in/c. base rft 2.80
plate (only labor) avg. Rate
d) Re painting on scaffolding (vertical,
set 210.00
horizontal & cross bar) (only labor)
iv) Re painting on U-channel surface
sft 4.25
(only labor)
i) Labour charge for applying of two
coats of silicon water repellent paint at
fair face/RCC surface including cleaning
the surface by using flower
broom/brush/markin cloth/etc.
23.0 15,285 sft 2.50
(excluding rubbing & rendaring work)
and supplying of all necessary
accessories & equipments, jhool-
matcha, etc. (paint supplied by
company)

ii) Labour charge for applying of two


coats of silicone water repellent paint at
out side cladding or other surface
except fair face / RCC surface including
rubbing & cleaning the surface with
using pumice stone/abbrasive
- sft 3.50
paper/flower broom/brush/markin
cloth/etc. (without make any scrach at
surface) and supplying of all necessary
accessories & equipments, jhool-
matcha, etc. (paint supplied by
company)
24.0 Labour Rate for daily basis
a). Painter for weather coat painting at
no. 800.00
ouside work
b). Painter for plastic painting no. 550.00
c). Paint Helper no. 450.00
d). Polish Mistry no. 650.00
e). Polish Helper no. 450.00
TOTAL

Sl Description (tiles/ marble) Quantity Unit Rate (TK.)


Cast-in-situ mosaic work in floor &
skirting over minimum 1” thick artificial
1.0 patent stone using glass divider, cutting
with pumic stone (No. 40, No. 80, No.
120) and finishing with oxalic acid.

(a) From Basement-1&2 to 6th floor sft 14.00

(b) From 7th floor to 9th floor & Basement-3 sft 14.35

(c) From 10th floor to 12th floor & Basement


sft 14.70
-4
(d) From 13th floor to 15th floor sft 15.05
(e) From 16th floor to above floor sft 15.40
Mosaic work in any proportion at stair
2.0
including skirting work complete.
(a) From Basement-1&2 to 6th floor sft 16.00

(b) From 7th floor to 9th floor & Basement-3 sft 16.40

(c) From 10th floor to 12th floor & Basement


sft 16.80
-4
(d) From 13th floor to 15th floor sft 17.20
(e) From 16th floor to above floor sft 17.60
Mosaic Tiles making, laying and
3.0
finishing complete.
(a) From Basement-1&2 to 6th floor sft 16.00

(b) From 7th floor to 9th floor & Basement-3 sft 16.40

(c) From 10th floor to 12th floor & Basement


sft 16.80
-4
(d) From 13th floor to 15th floor sft 17.20
(e) From 16th floor to above floor sft 17.60

4.0 Mirror polishing work on mosaic surface.

(a) From Basement-1&2 to 6th floor sft 5.00

(b) From 7th floor to 9th floor & Basement-3 sft 5.13

(c) From 10th floor to 12th floor & Basement


sft 5.25
-4
(d) From 13th floor to 15th floor sft 5.38
(e) From 16th floor to above floor sft 5.50
Existing mosaic floor re-cutting and
5.0
finishing work etc. complete.
(a) From Basement-1&2 to 6th floor sft 4.00

(b) From 7th floor to 9th floor & Basement-3 sft 4.10

(c) From 10th floor to 12th floor & Basement


sft 4.20
-4
(d) From 13th floor to 15th floor sft 4.30
(e) From 16th floor to above floor sft 4.40
Fitting-fixing of ceramic glazed tiles,
rustic tiles having following different
sizes on wall (with lift lobby wall) with
boarder tiles including cutting & laying
6.0 the tiles. etc. all complete as per
direction of Engr-in-charge.
(Tk.02.00 per sft to be add incase of any
desing / groove making / strip fitting etc. at
lift lobby wall)

i. Wall tiles having size: up to 8"x12",


10"x13", 10"x16", 12"x12", etc.
2.Drivers toilet

3.Guard Toilet

Caretaker Kitchen Wall


Bathrooms 7 Kitchen
Basement-4 - sft 17.85
Basement-3 - sft 17.43
Basement-2 - sft 17.00
Basement-1 485 sft 17.00
GF 150 sft 17.00
1st Floor 783 sft 17.00
2nd Floor 783 sft 17.00
3rd Floor 783 sft 17.00
4th Floor 783 sft 17.00
5th Floor 783 sft 17.00
6th Floor 783 sft 17.00
7th Floor 783 sft 17.43
8th Floor 783 sft 17.43
9th Floor 783 sft 17.43
10th Floor 783 sft 17.85
11th Floor 783 sft 17.85
12th Floor 783 sft 17.85
13th Floor 783 sft 18.28
14th Floor - sft 18.28
15th Floor - sft 18.28
16th Floor - sft 18.70
17th Floor - sft 18.70
18th Floor - sft 18.70
19th Floor - sft 18.70
20th Floor - sft 18.70
ii. Wall tiles having size: above 12"x24"
to 12"x32" (say 12"x18", 12"x20",
13"x20", 12"x24", 10"x32", 12"x30",
13"x18", 13"x24", 16"x16", 12"x18",
24"x24", etc.)
Main Toilet Tiles
2nd & 3rd Toilet Tiles
Main Kitchen Wall
Down wash Wall Tiles
Reception wall Tiles
Lift Wall Tiles
Basement-4 - sft 21.00
Basement-3 - sft 20.50
Basement-2 sft 20.00
Basement-1 sft 20.00
GF sft 20.00
1st Floor sft 20.00
2nd Floor sft 20.00
3rd Floor sft 20.00
4th Floor sft 20.00
5th Floor sft 20.00
6th Floor sft 20.00
7th Floor sft 20.50
8th Floor sft 20.50
9th Floor sft 20.50
10th Floor sft 21.00
11th Floor sft 21.00
12th Floor sft 21.00
13th Floor sft 21.50
14th Floor sft 21.50
15th Floor - sft 21.50
16th Floor - sft 22.00
17th Floor - sft 22.00
18th Floor - sft 22.00
19th Floor - sft 22.00
20th Floor - sft 22.00
iii. Wall tiles having size: 12"x36" or above
(say 13"x36", etc.)
(a) From Basement-1&2 to 6th floor sft 21.00

(b) From 7th floor to 9th floor & Basement-3 sft 21.53

(c) From 10th floor to 12th floor & Basement


sft 22.05
-4
(d) From 13th floor to 15th floor sft 22.58
(e) From 16th floor to above floor sft 23.10
iv. Wall tiles having size: above 12"x36" &
13"x36" (say 13"x39", 12"x48", 13"x48",
12"x56", etc)
(a) From Basement-1&2 to 6th floor sft 25.00

(b) From 7th floor to 9th floor & Basement-3 sft 25.63

(c) From 10th floor to 12th floor & Basement


sft 26.25
-4
(d) From 13th floor to 15th floor sft 26.88
(e) From 16th floor to above floor sft 27.50
Fitting-fixing of glazed/non-glazed tiles at
7.0 sft
floor
i. Floor tiles having size: up to 12"x12" sft

3.
Driver Waiting

4. EMR Room

5.
Pump Room
Main Toilet Floor
2nd & 3rd Toilet Floor
Main Kitchen Floor with Kitchen Verandah
Basement-4 - sft 15.75
Basement-3 - sft 15.38
Basement-2 160.00 sft 15.00
Basement-1 160.00 sft 15.00
GF 119.00 sft 15.00
1st Floor 120.00 sft 15.00
2nd Floor 120.00 sft 15.00
3rd Floor 120.00 sft 15.00
4th Floor 120.00 sft 15.00
5th Floor 120.00 sft 15.00
6th Floor 120.00 sft 15.00
7th Floor 120.00 sft 15.38
8th Floor 120.00 sft 15.38
9th Floor 120.00 sft 15.38
10th Floor 120.00 sft 15.75
11th Floor 120.00 sft 15.75
12th Floor 120.00 sft 15.75
13th Floor 120.00 sft 16.13
14th Floor - sft 16.13
15th Floor - sft 16.13
16th Floor - sft 16.50
17th Floor - sft 16.50
18th Floor - sft 16.50
19th Floor - sft 16.50
20th Floor - sft 16.50
ii. Floor tiles having size: above 12"x12"
to 13"x25" (say 16"x16", 6"x24", 20"x20",
24"x24", 12"x24", etc.)
(a) From Basement-1&2 to 6th floor 21415.00 sft 18.00

(b) From 7th floor to 9th floor & Basement-3 10430.00 sft 18.45

(c) From 10th floor to 12th floor & Basement


-4
10255.00 sft 18.90

(d) From 13th floor to 15th floor 3,570.00 sft 19.35


(e) From 16th floor to above floor sft 19.80
iii. Floor tiles having size: above 24"x24" to
36"x36" (say 6"x36", 24"x36", 32"x32", etc.)

Apartment(wait.Comu. etc.) -Tiles


Water Body & Swimming Pool Deck Tiles
Basement-4 - sft 24.15
Basement-3 - sft 23.58
Basement-2 - sft 23.00
Basement-1 - sft 23.00
GF 1,050.00 sft 23.00
1st Floor 2,660.00 sft 23.00
2nd Floor 3,335.00 sft 23.00
3rd Floor 3,250.00 sft 23.00
4th Floor 3,200.00 sft 23.00
5th Floor 3,350.00 sft 23.00
6th Floor 3,100.00 sft 23.00
7th Floor 3,090.00 sft 23.58
8th Floor 3,380.00 sft 23.58
9th Floor 3,300.00 sft 23.58
10th Floor 3,630.00 sft 24.15
11th Floor 3,050.00 sft 24.15
12th Floor 3,451.00 sft 24.15
13th Floor 3,350.00 sft 24.73
14th Floor - sft 24.73
15th Floor sft 24.73
16th Floor sft 25.30
17th Floor sft 25.30
18th Floor sft 25.30
19th Floor sft 25.30
20th Floor - sft 25.30
iv. Floor tiles having size: above 36"x36"
(say 24"x48", 10"x52", 24"x60", 12"x48",
18"x48", 42"x42", 48"x48", etc.)
(a) From Basement-1&2 to 6th floor sft 25.00

(b) From 7th floor to 9th floor & Basement-3 sft 25.63

(c) From 10th floor to 12th floor & Basement


sft 26.25
-4
(d) From 13th floor to 15th floor sft 26.88
(e) From 16th floor to above floor sft 27.50
Fitting-fixing of any size of glazed/non-
glazed/rustic tiles at stair tread, riser,
mid-landing, i/c groove cutting to insert
of vertical post at stair treads, etc. all
complete
Main Stair -Tiles( Trade, Riser, Skirting, Landing)
Main Stair & Lift -Tiles(Lobby)
2.Basement-GF
Stair

3.Out Side Level Up Stair ( Tiles)


Basement-4 - sft 19.95
Basement-3 - sft 19.48
Basement-2 352.00 sft 19.00
Basement-1 342.00 sft 19.00
GF 560.00 sft 19.00
1st Floor 760.00 sft 19.00
2nd Floor 760.00 sft 19.00
8.0 3rd Floor 760.00 sft 19.00
4th Floor 760.00 sft 19.00
5th Floor 760.00 sft 19.00
6th Floor 760.00 sft 19.00
7th Floor 760.00 sft 19.48
8th Floor 760.00 sft 19.48
9th Floor 760.00 sft 19.48
10th Floor 760.00 sft 19.95
11th Floor 760.00 sft 19.95
12th Floor 760.00 sft 19.95
13th Floor 760.00 sft 20.43
14th Floor - sft 20.43
15th Floor - sft 20.43
16th Floor - sft 20.90
17th Floor - sft 20.90
18th Floor - sft 20.90
19th Floor - sft 20.90
20th Floor - sft 20.90
Glass tiles fixing work
i. Fitting-fixing & pointing of glass mosaic
tiles at swimming pool, water body or any
other places
(a) From Basement-1&2 to 6th floor sft 50.00

(b) From 7th floor to 9th floor & Basement-3 sft 51.25

(c) From 10th floor to 12th floor & Basement


sft 52.50
-4
(d) From 13th floor to 15th floor sft 53.75
(e) From 16th floor to above floor sft 55.00
ii. Fitting-fixing & pointing of design glass
tiles at swimming pool, water body or any sft
other places
Water Body & Swimming Pool Floor Tiles
Swimming Pool & Water Body Wall Tiles
Basement-4 - sft 57.75
Basement-3 - sft 56.38
Basement-2 - sft 55.00
Basement-1 - sft 55.00

9.0
9.0
GF 0.00 sft 55.00
1st Floor 0.00 sft 55.00
2nd Floor 0.00 sft 55.00
3rd Floor 0.00 sft 55.00
4th Floor 0.00 sft 55.00
5th Floor 0.00 sft 55.00
6th Floor 0.00 sft 55.00
7th Floor 0.00 sft 56.38
8th Floor 0.00 sft 56.38
9th Floor 0.00 sft 56.38
10th Floor 0.00 sft 57.75
11th Floor 0.00 sft 57.75
12th Floor 0.00 sft 57.75
13th Floor 0.00 sft 59.13
14th Floor 0.00 sft 59.13
15th Floor 0.00 sft 59.13
16th Floor 0.00 sft 60.50
17th Floor 0.00 sft 60.50
18th Floor 0.00 sft 60.50
19th Floor 0.00 sft 60.50
20th Floor 0.00 sft 60.50
Fitting-fixing of polished marble/granite
stone on inside any wall including sft
removing of net
Reception wall Marble
Basement-4 - sft 44.10
Basement-3 - sft 43.05
Basement-2 - sft 42.00
Basement-1 - sft 42.00
GF - sft 42.00
1st Floor - sft 42.00
2nd Floor - sft 42.00
3rd Floor - sft 42.00
4th Floor - sft 42.00
5th Floor - sft 42.00
10.0 6th Floor - sft 42.00
7th Floor - sft 43.05
8th Floor - sft 43.05
9th Floor - sft 43.05
10th Floor - sft 44.10
11th Floor - sft 44.10
12th Floor - sft 44.10
13th Floor - sft 45.15
14th Floor - sft 45.15
15th Floor - sft 45.15
16th Floor - sft 46.20
17th Floor - sft 46.20
18th Floor - sft 46.20
19th Floor - sft 46.20
20th Floor - sft 46.20
Fitting-fixing of polished marble/granite
stone only lift lobby wall incase of any
sft
desing, groove making, strip fitting, etc.
all complete
Basement-4 - sft 45.15
Basement-3 - sft 44.08
Basement-2 - sft 43.00
Basement-1 - sft 43.00
GF 200.00 sft 43.00
1st Floor 0.00 sft 43.00
2nd Floor 0.00 sft 43.00
3rd Floor 0.00 sft 43.00
4th Floor 0.00 sft 43.00
5th Floor 0.00 sft 43.00
11.0 6th Floor 0.00 sft 43.00
7th Floor 0.00 sft 44.08
8th Floor 0.00 sft 44.08
9th Floor 0.00 sft 44.08
10th Floor 0.00 sft 45.15
11th Floor 0.00 sft 45.15
12th Floor 0.00 sft 45.15
13th Floor 0.00 sft 46.23
14th Floor 0.00 sft 46.23
15th Floor 0.00 sft 46.23
16th Floor 0.00 sft 47.30
17th Floor 0.00 sft 47.30
18th Floor 0.00 sft 47.30
19th Floor 0.00 sft 47.30
20th Floor 0.00 sft 47.30
Fitting-fixing of polished & unpolished
marble/granite stone in floor, cement
sft
slurry below the stone, i/c net removing,
etc. all complete
Apartment(wait.Comu. etc.) -Marble
Gym/ Reception/Community Wooden
Texture MARBLE
Main Stair ( Trade, Riser, Skirting, Landing)-
MARBLE
Main Stair & Lift Lobby-MARBLE

2.Out Side Level Up


Stair (Marble)
3.
Kitchen Counter Top
Toilet Counter Top
Reception Table Counter Top
Garden/Planter Marble
Basement-4 - sft 36.75

12.0
Basement-3 - sft 35.88
Basement-2 - sft 35.00
Basement-1 - sft 35.00
12.0 GF 995.00 sft 35.00
1st Floor 36.00 sft 35.00
2nd Floor 36.00 sft 35.00
3rd Floor 36.00 sft 35.00
4th Floor 36.00 sft 35.00
5th Floor 36.00 sft 35.00
6th Floor 36.00 sft 35.00
7th Floor 36.00 sft 35.88
8th Floor 36.00 sft 35.88
9th Floor 36.00 sft 35.88
10th Floor 36.00 sft 36.75
11th Floor 36.00 sft 36.75
12th Floor 36.00 sft 36.75
13th Floor 36.00 sft 37.63
14th Floor 0.00 sft 37.63
15th Floor 0.00 sft 37.63
16th Floor 0.00 sft 38.50
17th Floor 0.00 sft 38.50
18th Floor 0.00 sft 38.50
19th Floor 0.00 sft 38.50
20th Floor 0.00 sft 38.50
Fitting-fixing of skirting
Tiles/Marble/Granite on wall i/c chasing
the brick wall/RCC wall (for skirting tiles
with plaster flush and also for
marble/granite if required) etc. all
complete

i. For skirting tiles including wall chasing

Apt. Floor Tiles Skt


Gym/Com Wooden Texture Tiles Skt
Stair Tiles- Skt
Stair & Lift Lobby Tiles Skt
Fire/Basement/Ornamental Stair Tiles Skt
Care Taket/Servent/Guard/Others Room
Tiles Skt
Kit. Ver Tiles Skt
Care Taker Kit Floor Skt.
Basement-4 - 12.60
Basement-3 - Rft 12.30
Basement-2 100.00 Rft 12.00
Basement-1 185.00 Rft 12.00
GF 309.00 Rft 12.00
1st Floor 682.00 Rft 12.00
2nd Floor 732.00 Rft 12.00
3rd Floor 712.00 Rft 12.00
4th Floor 712.00 Rft 12.00
5th Floor 712.00 Rft 12.00
6th Floor 662.00 Rft 12.00
7th Floor 662.00 Rft 12.30
8th Floor 712.00 Rft 12.30
9th Floor 712.00 Rft 12.30
10th Floor 712.00 Rft 12.60
11th Floor 712.00 Rft 12.60
12th Floor 727.00 Rft 12.60
13th Floor 621.00 Rft 12.90
14th Floor 0.00 Rft 12.90
15th Floor 0.00 Rft 12.90
13.0 16th Floor 0.00 Rft 13.20
17th Floor 0.00 Rft 13.20
18th Floor 0.00 Rft 13.20
19th Floor 0.00 Rft 13.20
20th Floor 100.00 Rft 13.20
ii. For Marble / Granite Works (cutting may
Rft
required by the contractor’s)
Apt. Marble Skt
Main Stair Marble Skt
Stair & Lift Lobby marble Skt
Basement/Level Up/Ornamental Stair
Marble Skt
Basement-4 0.00 Rft 31.50
Basement-3 0.00 Rft 30.75
Basement-2 0.00 Rft 30.00
Basement-1 0.00 Rft 30.00
GF 170.00 Rft 30.00
1st Floor 0.00 Rft 30.00
2nd Floor 0.00 Rft 30.00
3rd Floor 0.00 Rft 30.00
4th Floor 0.00 Rft 30.00
5th Floor 0.00 Rft 30.00
6th Floor 0.00 Rft 30.00
7th Floor 0.00 Rft 30.75
8th Floor 0.00 Rft 30.75
9th Floor 0.00 Rft 30.75
10th Floor 0.00 Rft 31.50
11th Floor 0.00 Rft 31.50
12th Floor 0.00 Rft 31.50
13th Floor 0.00 Rft 32.25
14th Floor 0.00 Rft 32.25
15th Floor 0.00 Rft 32.25
16th Floor 0.00 Rft 33.00
17th Floor 0.00 Rft 33.00
18th Floor 0.00 Rft 33.00
19th Floor 0.00 Rft 33.00
20th Floor 0.00 Rft 33.00
Unpolished marble polishing works on
14.0
wall
(a) From Basement-1&2 to 6th floor sft 25.00

(b) From 7th floor to 9th floor & Basement-3 sft 25.63

(c) From 10th floor to 12th floor & Basement


sft 26.25
-4
(d) From 13th floor to 15th floor sft 26.88
(e) From 16th floor to above floor sft 27.50
Unpolished marble polishing works in
sft
floor
Basement-4 - sft 21.00
Basement-3 - sft 20.50
Basement-2 - sft 20.00
Basement-1 - sft 20.00
GF sft 20.00
1st Floor sft 20.00
2nd Floor sft 20.00
3rd Floor sft 20.00
4th Floor sft 20.00
5th Floor sft 20.00
6th Floor sft 20.00
15.0 7th Floor sft 20.50
8th Floor sft 20.50
9th Floor sft 20.50
10th Floor sft 21.00
11th Floor sft 21.00
12th Floor sft 21.00
13th Floor sft 21.50
14th Floor - sft 21.50
15th Floor - sft 21.50
16th Floor - sft 22.00
17th Floor - sft 22.00
18th Floor - sft 22.00
19th Floor - sft 22.00
20th Floor - sft 22.00
Marble flooring re-polishing works
16.0
complete
(a) From Basement-1&2 to 6th floor sft 8.00

(b) From 7th floor to 9th floor & Basement-3 sft 8.20

(c) From 10th floor to 12th floor & Basement


sft 8.40
-4
(d) From 13th floor to 15th floor sft 8.60
(e) From 16th floor to above floor sft 8.80
Marble & Granite Molding works
i. Marble / Granite molding works at stair or
any other places (half moulding /angular)
wihtout step
(a) From Basement-1&2 to 6th floor Rft 25.00

(b) From 7th floor to 9th floor & Basement-3 Rft 25.63

(c) From 10th floor to 12th floor & Basement


Rft 26.25
-4
(d) From 13th floor to 15th floor Rft 26.88
(e) From 16th floor to above floor Rft 27.50
ii. Marble/Granite molding works at stair or
any other places (half moulding / angular) Rft
with single step
Basement-4 Rft 28.35
Basement-3 Rft 27.68
Basement-2 Rft 27.00
Basement-1 0 Rft 27.00
GF 126.00 Rft 27.00
1st Floor 126.00 Rft 27.00
17.0
2nd Floor 126.00 Rft 27.00
3rd Floor 126.00 Rft 27.00
4th Floor 126.00 Rft 27.00
5th Floor 126.00 Rft 27.00
6th Floor 126.00 Rft 27.00
7th Floor 126.00 Rft 27.68
8th Floor 126.00 Rft 27.68
9th Floor 126.00 Rft 27.68
10th Floor 126.00 Rft 28.35
11th Floor 126.00 Rft 28.35
12th Floor 126.00 Rft 28.35
13th Floor 126.00 Rft 29.03
14th Floor Rft 29.03
15th Floor Rft 29.03
16th Floor Rft 29.70
17th Floor Rft 29.70
18th Floor Rft 29.70
19th Floor Rft 29.70
20th Floor Rft 29.70
Hole cutting of Marble/Granite for any
size of cabinet basin
Basement-4 Each 210.00
Basement-3 Each 205.00
Basement-2 Each 200.00
Basement-1 Each 200.00
GF 1.00 Each 200.00
1st Floor 4.00 Each 200.00
2nd Floor 4.00 Each 200.00
3rd Floor 4.00 Each 200.00
4th Floor 4.00 Each 200.00

18.0
5th Floor 4.00 Each 200.00
6th Floor 4.00 Each 200.00
18.0 7th Floor 4.00 Each 205.00
8th Floor 4.00 Each 205.00
9th Floor 4.00 Each 205.00
10th Floor 4.00 Each 210.00
11th Floor 4.00 Each 210.00
12th Floor 4.00 Each 210.00
13th Floor 4.00 Each 215.00
14th Floor 0.00 Each 215.00
15th Floor Each 215.00
16th Floor Each 220.00
17th Floor Each 220.00
18th Floor Each 220.00
19th Floor Each 220.00
20th Floor Each 220.00
Hole cutting in granite/marble slab for
installation of any size of sink
Basement-4 Each 210.00
Basement-3 Each 205.00
Basement-2 Each 200.00
Basement-1 Each 200.00
GF 0.00 Each 200.00
1st Floor 0.00 Each 200.00
2nd Floor 0.00 Each 200.00
3rd Floor 0.00 Each 200.00
4th Floor 0.00 Each 200.00
5th Floor 0.00 Each 200.00
6th Floor 0.00 Each 200.00
19.0 7th Floor 0.00 Each 205.00
8th Floor 0.00 Each 205.00
9th Floor 0.00 Each 205.00
10th Floor 0.00 Each 210.00
11th Floor 0.00 Each 210.00
12th Floor 0.00 Each 210.00
13th Floor 0.00 Each 215.00
14th Floor Each 215.00
15th Floor Each 215.00
16th Floor Each 220.00
17th Floor Each 220.00
18th Floor Each 220.00
19th Floor Each 220.00
20th Floor Each 220.00
Additional labour rate for making hole at
each corner of marble/granite/rustic tiles
20.0 and fitting-fixing of expansion bolt/knob
(bolt & knob supplied by company) i/c
supplying of drill machine, drill bit, etc.

(a) From Basement-1&2 to 6th floor Each 20.00

(b) From 7th floor to 9th floor & Basement-3 Each 20.50

(c) From 10th floor to 12th floor & Basement


Each 21.00
-4
(d) From 13th floor to 15th floor Each 21.50
(e) From 16th floor to above floor Each 22.00
i. Sand stone fitting-fixing on inside wall for
any size of stone (with fitting-fixing of
scaffolding)
Slate Stone /Cladding Tiles
Column protection Tiles(Height=3'-0")
Basement-4 - 26.25
Basement-3 - 25.63
Basement-2 350.00 25.00
Basement-1 345.00 25.00
GF - sft 25.00
1st Floor - sft 25.00
2nd Floor - sft 25.00
3rd Floor - sft 25.00
4th Floor - sft 25.00
5th Floor - sft 25.00
21.0 6th Floor - sft 25.00
7th Floor - sft 25.63
8th Floor - sft 25.63
9th Floor - sft 25.63
10th Floor - sft 26.25
11th Floor - sft 26.25
12th Floor - sft 26.25
13th Floor - sft 26.88
14th Floor - sft 26.88
15th Floor - sft 26.88
16th Floor - sft 27.50
17th Floor - sft 27.50
18th Floor - sft 27.50
19th Floor - sft 27.50
20th Floor - sft 27.50
ii. Sand stone fitting-fixing on outside wall
for any size of stone (without fitting-fixing
of scaffolding)
(a) From Basement-1&2 to 6th floor sft 42.00

(b) From 7th floor to 9th floor & Basement-3 sft 43.05
(c) From 10th floor to 12th floor & Basement
sft 44.10
-4
(d) From 13th floor to 15th floor sft 45.15
(e) From 16th floor to above floor sft 46.20
Carrying/lifting of all types of Tiles
(ceramic glazed/non-glazed tiles only
for inside work) by head load/by
hoist from ground floor to above
floors.
Basement-4 - sft 0.37
Basement-3 - sft 0.36
Basement-2 512.00 sft 0.35
Basement-1 1,101.51 sft 0.35
GF - sft 0.35
1st Floor 4,548.06 sft 0.35
2nd Floor 5,239.56 sft 0.35
3rd Floor 5,147.96 sft 0.35
4th Floor 5,097.96 sft 0.35
5th Floor 5,247.96 sft 0.35
22.0
6th Floor 4,981.46 sft 0.35
7th Floor 4,971.46 sft 0.36
8th Floor 5,277.96 sft 0.36
9th Floor 5,197.96 sft 0.36
10th Floor 5,527.96 sft 0.37
11th Floor 4,947.96 sft 0.37
12th Floor 5,353.91 sft 0.37
13th Floor 5,217.93 sft 0.38
14th Floor - sft 0.38
15th Floor - sft 0.38
16th Floor - sft 0.39
17th Floor - sft 0.39
18th Floor - sft 0.39
19th Floor - sft 0.39
20th Floor - sft 0.39

Carrying/lifting of all types of marble


& granite by head load/by hoist from
ground floor to above floors.
Basement-4 - sft 2.10
Basement-3 - sft 2.05
Basement-2 - sft 2.00
Basement-1 - sft 2.00
GF - sft 0.00
1st Floor 36.00 sft 2.00
2nd Floor 36.00 sft 2.00
3rd Floor 36.00 sft 2.00
4th Floor 36.00 sft 2.00
5th Floor 36.00 sft 2.00
23.0
23.0 6th Floor 36.00 sft 2.00
7th Floor 36.00 sft 2.05
8th Floor 36.00 sft 2.05
9th Floor 36.00 sft 2.05
10th Floor 36.00 sft 2.10
11th Floor 36.00 sft 2.10
12th Floor 36.00 sft 2.10
13th Floor 36.00 sft 2.15
14th Floor - sft 2.15
15th Floor - sft 2.15
16th Floor - sft 2.20
17th Floor - sft 2.20
18th Floor - sft 2.20
19th Floor - sft 2.20
20th Floor - sft 2.20
Upto 2” size SS strip/U-channel fitting-
fixing in tiles / marble / grinite groove
24.0 with supply of equipments, etc. (SS strip, sft
screw & adhesive supplied by company),
etc.
(a) From Basement-1&2 to 6th floor Rft 15.00

(b) From 7th floor to 9th floor & Basement-3 Rft 15.38

(c) From 10th floor to 12th floor & Basement


Rft 15.75
-4
(d) From 13th floor to 15th floor Rft 16.13
(e) From 16th floor to above floor Rft 16.50

Cutting charge of random marble/granite


as per required size & to avoid
unnecessary wastage and actual usuable
25.0 sft 17.00
quantity to be considered the contractor
payment (extra matum cutting charge not
to be allowed) For any location.

Fitting-fixing of any size of rustic


tiles/clading tiles at outer surface of
building without fitting-fixing & removing
of scaffolding
Boundary Dado Tiles
Outside Wall Cladding(Tiles)
Basement-4 - Sft 44.10
Basement-3 - Sft 43.05
Basement-2 - Sft 42.00
Basement-1 - Sft 42.00
GF - Sft 42.00
1st Floor - Sft 42.00
2nd Floor - Sft 42.00
3rd Floor - Sft 42.00
4th Floor - Sft 42.00
26.0
26.0 5th Floor - Sft 42.00
6th Floor - Sft 42.00
7th Floor - Sft 43.05
8th Floor - Sft 43.05
9th Floor - Sft 43.05
10th Floor - Sft 44.10
11th Floor - Sft 44.10
12th Floor - Sft 44.10
13th Floor - Sft 45.15
14th Floor - Sft 45.15
15th Floor - Sft 45.15
16th Floor - Sft 46.20
17th Floor - Sft 46.20
18th Floor - Sft 46.20
19th Floor - Sft 46.20
20th Floor - Sft 46.20
Fitting-fixing of plaza tiles at floor/wall
27.0 i/c. supply of all consumables &
equipments
i. 6"x6" tiles at floor
(a) From Basement-1&2 to 6th floor sft 22.00

(b) From 7th floor to 9th floor & Basement-3 sft 22.55

(c) From 10th floor to 12th floor & Basement


sft 23.10
-4
(d) From 13th floor to 15th floor sft 23.65
(e) From 16th floor to above floor sft 24.20
ii. 6"x6" tiles at wall
(a) From Basement-1&2 to 6th floor sft 24.00

(b) From 7th floor to 9th floor & Basement-3 sft 24.60

(c) From 10th floor to 12th floor & Basement


sft 25.20
-4
(d) From 13th floor to 15th floor sft 25.80
(e) From 16th floor to above floor sft 26.40
iii. 4"x4" tiles at floor
(a) From Basement-1&2 to 6th floor sft 25.00

(b) From 7th floor to 9th floor & Basement-3 sft 25.63

(c) From 10th floor to 12th floor & Basement


sft 26.25
-4
(d) From 13th floor to 15th floor sft 26.88
(e) From 16th floor to above floor sft 27.50
iv. 4"x4" tiles at wall
(a) From Basement-1&2 to 6th floor sft 27.00

(b) From 7th floor to 9th floor & Basement-3 sft 27.68

(c) From 10th floor to 12th floor & Basement


sft 28.35
-4
(d) From 13th floor to 15th floor sft 29.03
(e) From 16th floor to above floor sft 29.70
Fitting-fixing of 6"x6" and 4"x4" plaza
28.0 tiles at skirting in/c. wall chasing (if
required)
i. 6"x6" tiles at skirting (ht. up to 6")
(a) From Basement-1&2 to 6th floor Rft 12.00

(b) From 7th floor to 9th floor & Basement-3 Rft 12.30

(c) From 10th floor to 12th floor & Basement


Rft 12.60
-4
(d) From 13th floor to 15th floor Rft 12.90
(e) From 16th floor to above floor Rft 13.20
ii. 4"x4" tiles at skirting (ht. up to 4")
(a) From Basement-1&2 to 6th floor Rft 12.00

(b) From 7th floor to 9th floor & Basement-3 Rft 12.30

(c) From 10th floor to 12th floor & Basement


Rft 12.60
-4
(d) From 13th floor to 15th floor Rft 12.90
(e) From 16th floor to above floor Rft 13.20
Fitting-fixing of following pavement tiles
29.0
at floor & wall
i. Up to 6"x6"
(a) From Basement-1&2 to 6th floor sft 18.00

(b) From 7th floor to 9th floor & Basement-3 sft 18.45

(c) From 10th floor to 12th floor & Basement


sft 18.90
-4
(d) From 13th floor to 15th floor sft 19.35
(e) From 16th floor to above floor sft 19.80
ii. Above 6"x6" sft
Pavement Tiles
Roof Tiles
Terrace Tiles
Garden/Planter Tiles
Basement-4 - sft 15.75
Basement-3 - sft 15.38
Basement-2 4,600.00 sft 15.00
Basement-1 6,000.00 sft 15.00
GF (Garden/Planter Tiles) 3,155.00 sft 15.00
1st Floor - sft 15.00
2nd Floor - sft 15.00
3rd Floor - sft 15.00
4th Floor - sft 15.00
5th Floor - sft 15.00
6th Floor - sft 15.00
7th Floor - sft 15.38
8th Floor - sft 15.38
9th Floor - sft 15.38
10th Floor - sft 15.75
11th Floor - sft 15.75
12th Floor - sft 15.75
13th Floor - sft 16.13
14th Floor - sft 16.13
15th Floor - sft 16.13
16th Floor - sft 16.50
17th Floor - sft 16.50
18th Floor - sft 16.50
19th Floor - sft 16.50
20th Floor/ Roof 14th floor 3,900 sft 16.13
iii. Pavement tiles at skirting
Pavement Tiles Skt
Roof Tiles Skt
Terrace Tiles Skt
Garden/Planter Tiles Skt
Basement-4 - Rft 12.60
Basement-3 - Rft 12.30
Basement-2 350.00 Rft 12.00
Basement-1 370.00 Rft 12.00
GF 320.00 Rft 12.00
1st Floor 0.00 Rft 12.00
2nd Floor 0.00 Rft 12.00
3rd Floor 0.00 Rft 12.00
4th Floor 0.00 Rft 12.00
5th Floor 0.00 Rft 12.00
6th Floor 0.00 Rft 12.00
7th Floor - Rft 12.30
8th Floor - Rft 13.30
9th Floor - Rft 14.30
10th Floor - Rft 12.60
11th Floor - Rft 13.60
12th Floor - Rft 14.60
13th Floor - Rft 12.90
14th Floor - Rft 13.90
15th Floor - Rft 14.90
16th Floor - Rft 13.20
17th Floor - Rft 14.20
18th Floor - Rft 15.20
19th Floor - Rft 16.20
20th Floor - Rft 17.20

Lifting / Carrying of sand per floor by


head carrying as per direction of project
30.0 engineer incharge where electric hoist
not available (except ground floor, semi-
basement floor or Basement-1 )
(i) From GF to 1st Floor & GF to Basement-
2 (Among floor of GF to Base.#2, no charge - cft 1.50
will be applicable
(ii) Add. Each additional floor from 1st floor
to above floor & from Basement-2 to - cft 1.50
downword floor

Lifting / Carrying of cement bag per floor


by head carrying as per dorection of
31.0 project engineer incharge where electric
hoist not available (except ground &
semi-basement floor)

(i) From GF to 1st Floor & GF to Basement-


2 (Among floor of GF to Base.#2, no charge - Bag 1.80
will be applicable
(ii) Add. Each additional floor from 1st floor
to above floor & from Basement-2 to - Bag 1.80
downword floor
Fitting-fixing of bamboo scaffolding at
32.0 out side of building (all materials Sft 4.00
supplied by company)
Fitting-fixing of MS pipe/steel scaffolding
33.0 at out side of building (all materials Sft 4.50
supplied by company)
Removing of bamboo scaffolding and
34.0 Sft 3.00
stacking at safe places
Removing of MS pipe/steel scaffolding
35.0 Sft 3.50
and stacking at safe places

Dismantling of existing floor & wall tiles /


marble / granite including removing &
36.0
surface cleaning of cement mortar and
debris stacking at GF / other safe places.

i. Inside of building & up to GF at out side


of building & boundary wall (in/c. sft 15.00
scaffolding work)
ii. Outside of building: 1st floor to above
(excluding scaffolding work)
(a) From Basement-1&2 to 6th floor sft 25.00

(b) From 7th floor to 9th floor & Basement-3 sft 25.63

(c) From 10th floor to 12th floor & Basement


sft 26.25
-4
(d) From 13th floor to 15th floor sft 26.88
(e) From 16th floor to above floor sft 27.50
Dismantling of existing floor & wall
paster & surface cleaning and debris
37.0
stacking at GF/other safe places (both
internal & outer surface)
(a) From Basement-1&2 to 6th floor sft 2.25

(b) From 7th floor to 9th floor & Basement-3 sft 2.31
(c) From 10th floor to 12th floor & Basement
sft 2.36
-4
(d) From 13th floor to 15th floor sft 2.42
(e) From 16th floor to above floor sft 2.48

Extra rate for providing male-female


anchoring at back side of tiles / marble /
granite for working at verticial surface (if per pcs of
38.0 3.00
required) with using cut pieces of tiles / key
marble / granite & necessary adhesive
(adhesive supplied by company)

pointing of slate stone


39.0 (6"x12" or above size) at outer surface of building without fitting-fixing & removing of scaffolding.
(a) From Basement-1&2 to 6th floor sft 42.00

(b) From 7th floor to 9th floor & Basement-3 sft 43.05

(c) From 10th floor to 12th floor & Basement


sft 44.10
-4
(d) From 13th floor to 15th floor sft 45.15
(e) From 16th floor to above floor sft 46.20

ii. Fitting-fixing and pointing of slate stone


(3"x12" i/c cutting to size from 6"x12" size)
at outer surface of building without fitting-
fixing & removing of scaffolding.

(a) From Basement-1&2 to 6th floor sft 55.00

(b) From 7th floor to 9th floor & Basement-3 sft 56.38

(c) From 10th floor to 12th floor & Basement


sft 57.75
-4
(d) From 13th floor to 15th floor sft 59.13
(e) From 16th floor to above floor sft 60.50

Supply of daily basis worker (contractor


40.0 must be deploy following workers as per
requirements of company).

a. Mason for tiles/mosaic/marble/granite


per day 650.00
work (i/c supply of cutting machine)
b. Helper for tiles/mosaic/marble/granite
per day 450.00
work
Additional rate may approve if tiles /
marble / granite is laying considering
41.0 sft 2.00
brick joint as per direction of Engineer-
in-charge (EIC).
a. Sand Screening for tiles work in/c
71.0 11,242 cft 2.50
stacking in safe places

PLASTER WORK

Rate
Sl Description Unit Quantity
(Tk.)
Inside Plaster (¼" to ¾" Thk.) work
(Hoist & Electricity supplied by
company): ¼" to ¾" thick cement
plaster on RCC & brick surface in/c.
proper leveling & alignment with apply
of D-salt (if required). Plastered
surface should be leveled. Corners and
edges should be sharp, straight &
uniform, etc. all complete in/c. making
scaffolding etc. sand & cement should
be mixed in dry condition so that sand-
cement should be mixed thoroughly &
properly. (Level will be checked by
spirit level or aluminium patta and by
light. No dry sand cement mixture will
be allowed)

Inside Plaster on RCC surface (like


Ceiling, Stair case, inside drop wall,
railing, cornice, lift core) and Inside
Brick Work.
4th Basement Level Sft -
a. in 3rd Basement level sft 11.45 -
b. in 2nd Basement level sft 11.10 15,079
18.0
c. in 1st Basement level sft 10.75 13,530
d. Up to Gr. Floor sft 10.40 8094.00
e. For 1st floor sft 10.75 4350.00
f. For 2nd floor sft 11.10 4150.00
g. For 3rd floor sft 11.45 4100.00
h. For 4th floor sft 11.80 4100.00
i. For 5th floor sft 12.15 4100.00
j. For 6th floor sft 12.50 4100.00
k. For 7th floor sft 12.85 4100.00
l. For 8th floor sft 13.20 4100.00
m. For 9th floor sft 13.55 4100.00
n. For 10th floor sft 13.90 4100.00
o. For 11th floor sft 14.25 4100.00
p. For 12th floor sft 14.60 4100.00
q. For 13th floor sft 14.95 4100.00
r. For 14th floor sft 15.30 -
s. For 15th floor sft 15.65 -
t. For 16th floor sft 16.00 -
u. For 17th floor sft 16.35 -
v. For 18th floor sft 16.70 -
w. For 19th floor sft 17.05 -
x. For 20th floor (Roof at 14th floor) sft 15.30 10690
Out Side Plaster work (½" to ¾" thick)
(Hoist & Electricity supplied by
company) ½" to ¾" thick cement
plaster on RCC and brick surface
including proper leveling & alignment.
Plastered surface should be leveled.
Corners and edges should be sharp,
straight & uniform, etc. all complete.
Sand & cement should be mixed in dry
condition so that sand-cement should
be mixed thoroughly & properly. (Level
will be checked by spirit level or
aluminium patta and by light. No dry
sand cement mixture will be allowed)

Out side Plastering work (Hoist


&Electricity supplied by company) on
R.C.C. and Brick surface
a. Up to Gr. Floor sft 12.50 6,650
b. For 1st floor sft 12.90 -
19.0 c. For 2nd floor sft 13.30 -
d. For 3rd floor sft 13.70 -
e. For 4th floor sft 14.10 -
f. For 5th floor sft 14.50 -
g. For 6th floor sft 14.90 -
h. For 7th floor sft 15.30 -
i. For 8th floor sft 15.70 -
j. For 9th floor sft 16.10 -
k. For 10th floor sft 16.50 -
l. For 11th floor sft 16.90 -
m. For 12th floor sft 17.30 -
n. For 13th floor sft 17.70 -
o. For 14th floor sft 18.10 -
p. For 15th floor sft 18.50 -
q. For 16th floor sft 18.90 -
r. For 17th floor sft 19.30 -
s. For 18th floor sft 19.70 -
t. For 19th floor sft 20.10 -
u. For 20th floor (Roof top at 14th
sft 18.10 6,000
floor)
i) Scaffolding (Bamboo) making for
sft 4.00
External Plaster: Any floor level
ii) Scaffolding opening for External
Plaster (Bamboo) & stacking at safe sft 3.00
place: Any floor level
iii) Outside MS Pipe/Steel Scaffolding
Fitting-fixing: Any floor level (with R- sft 4.50 63700
20.0
wall for RMC)
20.0
iv) Outside MS Pipe /Steel Scaffolding
Removing and staking at a safe place: sft 3.50 63700
Any floor level
v) Jhool macha including required
staging (all materials supplied by sft 3.40
company:Any floor level

Neat Cement Finishing work of any


proportion to dado/skirting or any
other places as required on Brick/RCC
plaster surface all complete as per
direction of Engineer-in-Charge.

Basement-4 sft 3.00 -


Basement-3 sft 3.00 -
Basement-2 sft 3.00 5,500
Basement-1 sft 3.00 250
GF sft 3.00 1,834
1st Floor sft 3.00 288
2nd Floor sft 3.00 150
3rd Floor sft 3.00 350
e. For 4th floor sft 3.00 350
f. For 5th floor sft 3.00 350
23.0 g. For 6th floor sft 3.00 350
h. For 7th floor sft 3.00 300
i. For 8th floor sft 3.00 270
j. For 9th floor sft 3.00 250
k. For 10th floor sft 3.00 475
l. For 11th floor sft 3.00 450
m. For 12th floor sft 3.00 450
n. For 13th floor sft 3.00 1,025
o. For 14th floor sft 3.00 -
p. For 15th floor sft 3.00 -
q. For 16th floor sft 3.00 -
r. For 17th floor sft 3.00 -
s. For 18th floor sft 3.00 -
t. For 19th floor sft 3.00 -
u. For 20th floor(Roof top at 14th floor) sft 3.00 5,905

Chipping on RCC surface upto required


level (max. clear spacing 1" from each
24.0 sft 1.75 43,789
other) and satisfaction of the EIC (Avg.
for all floors).

1" to 4" wide or any size and ½" deep


groove making on plaster works both
external and internal wall at any level
in/c. finishing as that, the groove
25.0 should be uniform & straight, etc. all
complete as per dir. of EIC.

a. External Surface (All floors) rft 8.00 1515


25.0

b. Internal Surface (All floors) rft 7.50

4" to 8" wide or any size and ½" deep


groove making on plaster works both
external and internal wall at any level
26.0 rft 8.00
including finishing as that, the groove
should be uniform & straight, etc. all
complete as per dir. of EIC.

6mm wide & 8mm deep groove


making in plaster around door frame,
27.0 rft 5.50 280.5
window type A/C or any other places
as per dir. of Eng-in-Charge

Decorative ceiling edge plastering


28.0 (Average for all floors) as per direction rft 40.00
of Engineer-in-Charge.

Special plaster for jam, cobla, reveals


door & window sill etc. of 6" to 8"
29.0 rft 9.00 2660
width complete as per direction of
Engr-in-Charge. (All floors)

Drip course / nosing in sunshade, drop


wall, cornice in/c. groove cutting etc.
30.0 rft 10.00 210
all complete as per direction of Engr-
in-Charge. (All floors)

Special plaster for water barrier inside


aluminium window of required width
31.0 rft 12.00 670
and depth etc. all complete as per
direction of E.I.C. (All floors)

Wall skirting plaster of 6" to 9" height


6 mm wide and 8 mm deep groove
32.0 rft 9.00 11274
making in/c. all complete as per
direction of Engr-in-charge. (All floors)

Rule pointing on internal B/W with


cement mortar of approved proportion
i/c raking out of the joints, cleaning the
33.0 sft 7.00
brick surface immediately after the
work etc. all complete as per direction
of Engr-in-Charge. (All floors)

Flush pointing/Joint plaster on internal


Brick wall with cement mortar of
approved proportion i/c raking out of
34.0 the joints, cleaning the brick surface rft 6.00
immediately after the work etc. all
complete as per direction of Engineer-
in-Charge. (Avg.for all floors)
Making masonry ghundi (cove
concrete) work (rounding the corners)
35.0 with cement sand mortar including rft 6.00
NCF at any level complete as per
direction of Engineer-in-Charge.

Rough Plaster work (using CONMIX, if


required. CONMIX supplied by
company) on Brick/RCC surface inside
36.0 sft 12.00
& out side at any floor level of Building
complete as per decision and direction
of Engineer-in-Charge.

Rough Plaster For Fair Face Plaster


GF 12.00 -
1st Floor 12.00 -
2nd Floor 12.00 -
3rd Floor 12.00 -
4th Floor 12.00 -
5th Floor 12.00 -
6th Floor 12.00 -
7th Floor 12.00 -
8th Floor 12.00 -
9th Floor 12.00 -
10th Floor 12.00 -
11th Floor 12.00 -
12th Floor 12.00 -
13th Floor 12.00 -
14th Floor 12.00 -
15th Floor 12.00 -
16th Floor 12.00 -
17th Floor 12.00 -
18th Floor 12.00 -
19th Floor 12.00 -
20th Floor 12.00 -

Hunch making over sunshade.


37.0 Complete as per direction of Engineer rft 7.50 0
In Charge.(Average for all floors)

Gutter making at GF etc. all complete


38.0 rft 10.00
as per direction of Engr In Charge.

6" to 8" wide window seal making with


sand-cement mortar (1: 1½: 3)
including C.C. casting, cement plaster
39.0 rft 10.00 230
on groove making etc. all complete as
per direction of Engineer-in-Charge.
(All floors)
Floor Cleaning work of site (To be paid
at end of the project final bill -one time
68.0 only) and broken brick bats, collect & sft 0.50
dump into ground floor in proper way
in proper place.

Carrying of materials from unloading


point to work site and stacking in safe
places (inside the Boundary wall) as
per direction of the Engineer-in-
Charge. This item will applicable only if
the carrying distance is within 100'-0"
from stacking place. (Special note: All
type of materials carrying manpower
should be supplied by awarding
contractor. Otherwise, work will be
done by other agency & those extra
payment (if required) to be adjusted
from awarded contractor's company
69.0 accounts/payable bills. Also, payable
amount of awarded contractor should
be freezed up to the completion of the
project.)

(Rate for carrying of materials will be


decided as Zone/Location wise and
also depends of Materials type,
carrying time etc and Project have to
taken pre/post approval from
management as per requirement.)

c. Sand (Medium sand, Sylhet sand,


cft 3.50 11,739
Mymensing sand, etc.)
d. Cement bag 3.50 -
a. Sand washing & drying for
70.0 plastering work in/c stacking in safe cft 2.50 10,603
places

Screening for the following materials


(for normal castingif required) &
71.0 stacking in safe places:

b. Sand cft 2.50 11,739

Cement concrete in coping in parapet,


boundary wall and in verandah railing
74.0 etc, with plaster and NCF etc. all rft 9.00
complete as per direction of the
Engineer In-Charge.
Making of Bamboo Macha (if
necessary) of size 7'-0" x 2'-0" after
cutting bamboos in required size and
shape including supplying of all
75.0 each 85.00
necessary accessories and
consumable (i.e. other than bamboos).
all complete as per direction of
Engineer In Charge.
Wire mesh fitting at the joint of brick
work and RCC member at any floor
79.0 (wire mesh supplied by company. sft 8.00
Equipments & nail supplied by the
contractor)

Hire charge of manpower from


contractor for non-schedule works with
maintaning company MB (This rate is
applicable, when prior approval is
81.0 given by the authority). This bill will be
adjusted / submitted with running bills)

a) Mason each 600.00


b) Helper each 450.00
82.0 Rough Plaster For Shore Pile( including W sft 25.00 8800.00
NON Schedule Item
FAIR FACE PLASTER (1mm skim coat, conmix chemical)
GF sft 45.00 1,805
1st Floor sft 45.00 950
2nd Floor sft 45.00 950
3rd Floor sft 45.00 880
4th Floor sft 45.00 880
5th Floor sft 45.00 880
6th Floor sft 45.00 880
7th Floor sft 45.00 880
8th Floor sft 45.00 880
9th Floor sft 45.00 880
10th Floor sft 45.00 880
11th Floor sft 45.00 880
12th Floor sft 45.00 880
13th Floor sft 45.00 880
14th Floor sft 45.00 -
15th Floor sft 45.00 -
16th Floor sft 45.00 -
17th Floor sft 45.00 -
18th Floor sft 45.00 -
19th Floor sft 45.00 -
20th Floor sft 45.00 1900

Scaffolding, Stage making, removing,


etc. for retaining wall, shear wall/lift wall sft 6.00 4464
& water reservoir wall casting by RMC
TOTAl Plaster Labor Cost

BRICK WORK
Sch. Rate
Description Unit Quantity
It. (Tk.)
14.0
BRICK WORK with 1st class bricks
Bangla bricks/Machine made bricks/1st
class Hollow bricks with cement mortar
in sub-structure & super structure in/c
racking out joints, and bricks carrying
from soaked brick stacking place to
working place & making scaffolding
(rope & nail to be supplied by
company), etc. all complete as per
direction of the Engineer-in-charge.

i) Brick Work (from 10" to above)


In Foundation:
Basement-4 Cft -
Basement-3 cft 15.85 -
Basement-2 cft 15.40 5,025
Basement-1 cft 14.95 2,900
Shallow Foundation cft 14.50

ii) 10" Brick Work (straight) in


superstructure (Hoist & Electricity
supplied by company).

a. Gr. Floor cft 14.50 1,360


b. For 1st floor cft 14.95 775
c. For 2nd floor cft 15.40 690
d. For 3rd floor cft 15.85 690
e. For 4th floor cft 16.30 690
f. For 5th floor cft 16.75 690
g. For 6th floor cft 17.20 690
h. For 7th. floor cft 17.65 690
i. For 8th floor cft 18.10 690
j. For 9th floor cft 18.55 690
k. For 10th Floor cft 19.00 690
l. For 11th floor cft 19.45 690
m. For 12th floor cft 19.90 690
n. For 13th floor cft 20.35 690
o. For 14th floor cft 20.80 -
p. For 15th floor cft 21.25 -
q. For 16th floor cft 21.70 -
r. For 17th floor cft 22.15 -
s. For 18th floor cft 22.60 -
t. For 19th floor cft 23.05 -
u. For 20th floor (Roof top at 14th
cft 20.80
floor) 775
iii) 8" Brick Work in Foundation
Basement-4 15.05
Basement-3 cft 14.70
Basement-2 cft 14.35
Basement-1 cft 14.25
d. In Shallow Foundation or any type of
cft 14.00
foundation
iv) 8" Brick Work in superstructure
(Hoist & Electricity supplied by
company).

a. Up to Gr. Floor cft 14.00


b. For 1st floor cft 14.35
c. For 2nd floor cft 14.70
d. For 3rd floor cft 15.05
e. For 4th floor cft 15.40
f. For 5th floor cft 15.75
g. For 6th floor cft 16.10
h. For 7th floor cft 16.50
i. For 8th floor cft 16.90
j. For 9th floor cft 17.30
k. For 10th floor cft 17.70
l. For 11th floor cft 18.15
m. For 12th floor cft 18.60
n. For 13th floor cft 19.05
o. For 14th floor cft 19.50
p. For 15th floor cft 20.00
q. For 16th floor cft 20.50
r. For 17th floor cft 21.00
s. For 18th floor cft 21.50
t. For 19th floor cft 22.00
u. For 20th floor cft 22.50
14
v) 5"/3" Brick Work in Foundation
contd
Basement-4 Sft 11.80 -
Basement-3 sft 11.60 -
Basement-2 sft 11.40 1,985
Basement-1 sft 11.20 380
d. In Shallow Foundation or any type of
sft 11.00
foundation
vi) 5"/3" Brick Work in
superstructure (Hoist & Electricity
supplied by company).

a. Up to Gr. Floor sft 11.25 7,250


b. For 1st floor sft 11.65 900
c. For 2nd floor sft 12.05 1,050
d. For 3rd floor sft 12.45 1,050
e. For 4th floor sft 12.85 1,050
f. For 5th floor sft 13.25 1,050
g. For 6th floor sft 13.65 1,050
h. For 7th floor sft 14.05 1,050
i. For 8th floor sft 14.45 1,050
j. For 9th floor sft 14.85 1,050
k. For 10th floor sft 15.25 1,050
l. For 11th floor sft 15.65 1,050
m. For 12th floor sft 16.05 1,050
n. For 13th floor sft 16.45 1,050
o. For 14th floor sft 16.85 -
p. For 15th floor sft 17.25 -
q. For 16th floor sft 17.65 -
r. For 17th floor sft 18.05 -
s. For 18th floor sft 18.45 -
t. For 19th floor sft 18.85 -
u. For 20th floor sft 16.85 1020

vii) 8" Hollow Brick Work in


superstructure (Hoist & Electricity
supplied by company).

a. Up to Gr. Floor sft 10.00


b. For 1st floor sft 10.40
c. For 2nd floor sft 10.80
d. For 3rd floor sft 11.20
e. For 4th floor sft 11.60
f. For 5th floor sft 12.00
g. For 6th floor sft 12.40
h. For 7th floor sft 12.80
i. For 8th floor sft 13.20
j. For 9th floor sft 13.60
k. For 10th floor sft 14.00
l. For 11th floor sft 14.40
m. For 12th floor sft 14.80
n. For 13th floor sft 15.20
o. For 14th floor sft 15.60
p. For 15th floor sft 16.00
q. For 16th floor sft 16.40
r. For 17th floor sft 16.80
s. For 18th floor sft 17.20
t. For 19th floor sft 17.60
u. For 20th floor sft 18.00
Mortar scrapping from bricks & proper
15.0 each 0.90
stacking
16.0
Outside pointing Brick works of Bangla
/Machine made Bricks/Mirpur Ceramic
Brick, Klinker bricks or any other forms
of brick works with cement mortar in
super structure in/c, racking out joints
bricks stacking, bricks carrying from
soaked brick stacking place to working
place & making scaffolding (rope &
nail etc.will be supplied by company)
etc. all complete as per direction of
the Engineer-in-charge.

i) 10" Pointing Brick Wall


a. Up to Gr. Floor cft 40.00
b. For 1st floor cft 41.50
c. For 2nd floor cft 43.00
d. For 3rd floor cft 44.50
e. For 4th floor cft 46.00
f. For 5th floor cft 47.50
g. For 6th floor cft 49.00
h. For 7th floor cft 50.50
i. For 8th floor cft 52.00
j. For 9th floor cft 53.50
16 k. For 10th floor cft 55.00
contd l. For 11th floor cft 56.50
m. For 12th floor cft 58.00
n. For 13th floor cft 59.50
o. For 14th floor cft 61.00
p. For 15th floor cft 62.50
q. For 16th floor cft 64.00
r. For 17th floor cft 65.50
s. For 18th floor cft 67.00
t. For 19th floor cft 68.50
u. For 20th floor cft 70.00
ii) 5" Pointing Brick Wall
a. Up to Gr. Floor sft 30.00
b. For 1st floor sft 31.25
c. For 2nd floor sft 32.50
d. For 3rd floor sft 33.75
e. For 4th floor sft 35.00
f. For 5th floor sft 36.25
g. For 6th floor sft 37.50
h. For 7th floor sft 38.75
i. For 8th floor sft 40.00
j. For 9th floor sft 41.25
k. For 10th floor sft 42.50
l. For 11th floor sft 43.75
m. For 12th floor sft 45.00
n. For 13th floor sft 46.25
o. For 14th floor sft 47.50
p. For 15th floor sft 48.75
q. For 16th floor sft 50.00
r. For 17th floor sft 51.25
s. For 18th floor sft 52.50
t. For 19th floor sft 53.75
u. For 20th floor sft 55.00

iii) Pointing and groove grouting


including cleaning before starting
sft 7.00
and after completing the works.
(all floors)

Outside Facing/Cladding works by CT-


5/CT-3/CT-6/any other cladding tiles
type bricks: Outside Facing/Cladding
Brick works with cement mortar in
super structure in/c, racking out joints
socking bricks for 12 hours including
stacking, carrying to and from water
tank, scaffolding & macha work (Rope
& nail etc. will be supplied by
company), etc. all complete as per
direction of Engineer-in-Charge. (in/c.
pointing, except cladding bricks)

i). Facing/cladding work with


cement mortar
a. Up to Gr. Floor sft 43.00
b. For 1st floor sft 43.40
c. For 2nd floor sft 43.80
d. For 3rd floor sft 44.20
e. For 4th floor sft 44.80
f. For 5th floor sft 45.40
g. For 6th floor sft 46.00
h. For 7th floor sft 46.80
i. For 8th floor sft 47.60
j. For 9th floor sft 48.40
k. For 10th floor sft 49.20
l. For 11th floor sft 50.20
m. For 12th floor sft 51.20
n. For 13th floor sft 52.20
17.0 o. For 14th floor sft 53.20
p. For 15th floor sft 54.40
q. For 16th floor sft 55.60
r. For 17th floor sft 56.80
s. For 18th floor sft 58.00
t. For 19th floor sft 59.20
u. For 20th floor sft 60.40
ii). Facing/cladding work with
adhesive
a. Up to Gr. Floor sft 43.00 -
b. For 1st floor sft 43.40 -
c. For 2nd floor sft 43.80 -
d. For 3rd floor sft 44.20 -
e. For 4th floor sft 44.80 -
f. For 5th floor sft 45.40 -
g. For 6th floor sft 46.00 -
h. For 7th floor sft 46.80 -
i. For 8th floor sft 47.60 -
j. For 9th floor sft 48.40 -
k. For 10th floor sft 49.20 -
l. For 11th floor sft 50.20 -
m. For 12th floor sft 51.20 -
n. For 13th floor sft 52.20 -
o. For 14th floor sft 53.20 -
p. For 15th floor sft 54.40 -
q. For 16th floor sft 55.60 -
r. For 17th floor sft 56.80 -
s. For 18th floor sft 58.00 -
t. For 19th floor sft 59.20 -
u. For 20th floor sft 60.40 -
68.0 Floor Cleaning work of site (To be paid
at end of the project final bill -one time
only) and broken brick bats, collect & sft 0.50
dump into ground floor in proper way
in proper place.
69.0
Carrying of materials from unloading
point to work site and stacking in safe
places (inside the Boundary wall) as
per direction of the Engineer-in-
Charge. This item will applicable only if
the carrying distance is within 100'-0"
from stacking place. (Special note: All
type of materials carrying manpower
should be supplied by awarding
contractor. Otherwise, work will be
done by other agency & those extra
payment (if required) to be adjusted
from awarded contractor's company
accounts/payable bills. Also, payable
amount of awarded contractor should
be freezed up to the completion of the
project.)
(Rate for carrying of materials will be
decided as Zone/Location wise and
also depends of Materials type,
carrying time etc and Project have to
taken pre/post approval from
management as per requirement.)

a. Bricks Carrying nos 0.50 ###


c. Sand (Medium sand, Sylhet sand,
cft 3.50 11,009.06
Mymensing sand, etc.)
d. Cement bag 3.50 -
71.0 Screening of sand for Brick work &
cft 2.5 -
stacking in safe places:
74.0
Cement concrete in coping in parapet,
boundary wall and in verandah railing
etc, with plaster and NCF etc. all rft 9.00
complete as per direction of the
Engineer In-Charge.

76.0 Construction of Basin Cabinet in/c 3"


thick brick wall, RCC top slab (in/c.
bottom plaster) and necessary
nos. 1000.00
reinforcement in proper position etc.
all complete as per direction of Eng.-
in-Charge.
78.0
10"x10"xrequired height supporting
brick pillers & Plaster with NCF under
the water pressure pipe (@ 1'-6"
nos. 125.00
approx clear distance) at roof top. all
complete as per direction of Engineer
In Charge.

79.0 Wire mesh fitting at the joint of brick


work and RCC member at any floor
(wire mesh supplied by company. sft 8.00
Equipments & nail supplied by the
contractor)
81.0
Hire charge of manpower from
contractor for non-schedule works with
maintaning company MB (This rate is
applicable, when prior approval is
given by the authority). This bill will be
adjusted / submitted with running bills)

a) Mason each 600.00


b) Helper each 450.00
Non schedule item Bricks breaking
each 2.00 46,953
rate
TOTAL BRICK WORK LABOR COST

SUB STRUCTURE
Rate
Sl Description Unit Quantity
(Tk.)
1.0
PREPARATION WORK OF SITE i.e.
layout work, construction of temporary
centre line brick pillar, cleaning the
jungle, bushes, up rooting the root of
small trees, removing debris to a safe
distance etc. all complete as per
direction of the Engineer-in-charge.

a. Lay out of Project w.r.o land area


sft 1.25 8337.6
(without Pile Foundation)
b. Lay out of Project w.r.o land area
sft 1.75
(with Pile Foundation)
2.0 Shade Making (Temporary Site office /
Labour Shade / Store or Godown /
Guard Shade etc.)
a. Bamboo Post each 12.00

b. C.I. sheet roofing/fencing with


sft 2.75
necessary arrangement etc. complete.
c. Door making for Store, office etc.
each 150.00
(Temporary door)

EARTH WORK IN EXCAVATION of


foundation trenches, drain, pits etc. in
all kinds of soil including leveling,
ramming and preparing the base,
removing the soils (clay, slushy soil)
up to maximum distance of 150 ft.,
including supply of spade, shovel,
basket etc. as per direction of the
Engineer-in-charge.
3.0
a. Up to 7' depth ( Pile Mud House) cft 8.00 1600
b. Beyond 7' to 12' depth cft 9.00
c. Beyond 12' to 16' depth cft 10.00
d.Earth Excavation tie beam,boundary wall f cft 10.00 6486.5

e. Leveling & dressing of foundation


bed, parking floor before soiling or CC sft 2.00 8337.6
casting (Only Basement)

PILE HEAD BREAKING: including


4.0 cleaning & carrying at safe distance as
per direction of Engineer-in-Charge.

a.RCC Part cft 100.00 1180


b.CC /false casting (justifying as per
cft 50.00 555
field condition)
c. King Post Pile Beraking (including rod cft 120.00 430.63
d. Debris shifting from 1st basement to cft 8.00 211.70
e. Debris shifting from 2nd basement to cft 16.00 218.93
f. Debris shifting from 3rd basement to cft 24.00
Palaside work for the protection of side
of the excavated land with driving the
bamboo or equivalent, fixing the
5.0 sft 14.00
wooden planks and steel sheets etc.
complete as per decision and direction
of Engr-in-Charge.

6.0
SAND/ EARTH FILLING in 6” layers,
watering and consolidating each layer
upto required level including cleaning
of roots, leveling, dressing and
carrying of earth/ sand within 100 ft.
distance.

a. Earth filling with excavated earth


cft 2.50 2000
(direct filling) only Boundary wall
b. Earth filling with imported earth cft 3.00
c. Sand filling within 100 ft. distance cft 3.00 18500

d. Sand filling (Above 100 ft. distance) cft 4.00 17000


7.0
a. Single Layer Brick Flat Soling work
with 1st class bricks in foundation,
floor, sub-base etc. including
sft 2.00 0
preparation the beds, filling the gap
with sand etc. all complete as per
direction of Engineer-in-Charge.

i) Boundary Wall Foundation sft 2.00 270


b. Herring bone Bond work with 1st
class bricks including providing 1/2"
sand bedover the already laid flat
sft 2.00
soling including filling the gap with
sand etc. all complete as per direction
of Engineer-in-Charge.

c. Brick on edging work with 1st class


bricks in foundation, floor, sub-base
etc. including preparation the base,
rft 1.50
filling the gap with sand etc. all
complete as per direction of Engineer-
in-Charge.

8.0
POLYTHENE SHEET LAYING in
foundation, floor, wall etc. complete as sft 0.50
per direction of Engr-in-Charge.

Mat Bottom sft 0.50 6,818.18


Boundary Wall Foundation Bottom sft 0.50 1,080
CEMENT CONCRETE (CC) works in
foundation & floor including mixing the
concrete, laying in position,
compacting etc. all complete as per
direction of the Engineer-in-Charge.

a. Thickness up to 3" sft 6.00


Basement-4 sft 6.00
Basement-3 sft 6.00
Basement-2 sft 6.00
Basement-1 sft 6.00
b. Above 3" & up to 5" sft 6.00
Basement-4 sft 6.00
Basement-3 sft 6.00
Basement-2 sft 6.00
9.0 Basement-1 sft 6.00
c. CC casting (up to 3" thick) by Ready
Mix concrete without pump at sft 3.50
basement/foundation level
Basement-4 sft 3.50 -
Basement-3 sft 3.50 -
Basement-2 sft 3.50
Basement-1 sft 3.50
d. CC casting (up to 3" thick) by Ready
Mix concrete (pump supplied by
sft 1.75
company) at basement/foundation
level
Basement-4 sft 1.75
Basement-3 sft 1.75
Basement-2 sft 1.75 6,818
Basement-1 sft 1.75
Brick bond concrete (BBC) at Parking
10.0 sft 6.75
floor

Artificial Patent Stone flooring as well


as on seals, shelves in panels (upto
2½" average Thick) laying &
compacting the concrete with neat
cement finishing etc. all complete as
per direction of the EIC. (by roof hoist)
11.0
Basement-4 Sft 6.96 -
Basement-3 Sft 6.72 -
Basement-2 Sft 6.48 455
Basement-1 Sft 6.24 190
a. Up to Gr. Floor sft 6.00 -
D.P.C. Work: D.P.C. Work with cement,
sand & Brick/stone chips mixed
admixture if necessary centering,
shuttering setting chips, mixing,
casting, and finishing with 2 coats of
bituminous, local carrying of all
materials etc. complete as per
direction of Engineer-in-Charge.

a. Width up to 6" rft 6.00


Basement-4 rft 6.00
Basement-3 rft 6.00
12.0 Basement-2 rft 6.00
Basement-1 rft 6.00
b. Width above 6" rft 7.00
Basement-4 rft 7.00
Basement-3 rft 7.00
Basement-2 rft 7.00
Basement-1 rft 7.00
c. Over 1st coat of Bituminous felt sft 2.50
Basement-4 sft 2.50
Basement-3 sft 2.50
Basement-2 sft 2.50
Basement-1 sft 2.50

M.S. FABRICATION (HOIST &


ELECTRICITY SUPPLIED BY company)
work for reinforcement including
bending, cutting, cranking & placing of
rods, straitening, cleaning the rust if
any and binding in position with supply
of G.I wires (24 Gage galvanized wire)
& CC block laying in position etc. all
40.0
complete as per direction of Engr-in-
Charge. Re-bar cutting machine with
disc will be supplied by the contractor.

Ton 0
a. for up to 3rd basement roof ton 5050.00 0
b. for 2nd to 2nd basement roof ton 4900.00 177.32
c. for 1st to 1st basement roof ton 4750.00 46.18
41.0 RE-BAR UNLOADING from truck and
stacking in safe place as per direction
ton 150.00
of the Engineer-in-Charge / company
representative.
42.0 RE-BAR WEIGHING and stacking in safe
place (inside the boundary wall) as per
ton 180.00 223.5
direction of the Engineer-in-charge
(EIC).
43.0
RE-BAR CARRYING from unloading
(Project outside) point to work site and
stacking in safe places (Inside the
boundary wall) as per dir. of the EIC.
ton 225.00 223.50
This item will be applicable only if the
carrying distance within 150’ from
stacking place / from outside to inside
of project

Wooden Form Work (Hoist & Electricity


supplied by company): Form work for
centering & watertight shuttering as
per design, drawing and specification.
Rate in/c. repairing, fitting & fixing,
cleaning & opening of wooden form
(Shutter) as per direction of the
Engineer-in-Charge. Considering unit
rate of form works are 70% for fixing &
30% after removing will be allowed.
44.0

Wooden Shutter including cost of GI


wire, wire nail, rupban sheet, cleaning,
stacking at suitable place etc. all
complete.
a. 3rd Basement to 3rd Basement roof sft 14.60
b. 2nd Basement to 2nd Basement
sft 14.30
roof
c. 1st Basement to 1st Basement roof sft 14.00

WOODEN SHUTTER MAKING for


footing/UGWR/Retaning Wall/
Column/beam/OHWT including supply
of nail, rupban sheet, etc. all complete
as per direction of Engineer-in-Charge.
(One time total unit rate will be
applied for 6 nos. floor)

(a) Upto PL (one time making charge


sft 3.00
to be allowed)
Basement-4 sft 3.00
45.0
Basement-3 sft 3.00
Basement-2 sft 3.00
Basement-1 sft 3.00
(b) For every 06 nos. floor (one time
making charge to be allowed & bill will sft 6.00
be applied on ratio basis)
Basement-4 sft 6.00
Basement-3 sft 6.00
Basement-2 sft 6.00
Basement-1 sft 6.00
46.0
Wooden Shutter of Ancillary Structure
(Lintel, false slab, drop wall, sunshade,
Rib-Beam, etc). For centering &
watertight shuttering as per design,
drawing and specifications. Rate
includes repairing, fitting-fixing, sft
clening & opening of wooden form
(shutter) as per direction of Engineer-
in-Charge. Considering unit rate of
form works are 70% for fixing & 30%
after removing will be allowed.

Basement-4 sft 15.30 0


Basement-3 sft 14.90 0
Basement-2 sft 14.60 30
Basement-1 (1st floor) sft 14.30 85

Steel Form Work (Hoist & Electricity


supplied by company): Form work for
centering & watertight shuttering as
per design, drawing and specifications.
Rate includes fitting-fixing & opening
sft
steel form (Shutter) as per direction of
the Engineer-in-Charge. Considering
unit rate of from works are 70% for
fixing & 30% after removing will be
47.0 allowed.

Steel Shutter for Column, Retaining


wall, Lift Share Wall, Slab, Beam &
Stair, etc. all complete as per direction
of Engineer-in-Charge.

a. for up to 3rd basement roof sft 20.80 0


b. for 2nd to 2nd basement roof sft 20.20 28852
c. for 1st to 1st basement roof sft 19.80 18170
48.0 a. Bracing in both directions for fitting
fixing of shuttering works. (if required). sft 1.50 0
(For all floor)
b. Shutter cleaning & oiling (Shutter oil
will be supplied by company) including sft 1.50 47022
Cup brush
DESIGN SHUTTER: For normal design
formwork for waffle slab & beam,
design sunshade, drop wall, etc.
49.0 (Average for all floors). Any critical sft 17.00
design it will be treated as Non
Schedule Item and rate will be
finalized by analysis.
51.0 Labour charge for formica fixing on
sft 6.00
steel shutter. (all floors)
REINFORCEMENT CEMENT CONCRETE
(Hoist & Electricity supplied by
company) works of any proportion with
cement, local sand, coarse sand &
stone / brick chips, mixing, laying in
position and compacting in/c. soaking
of chips, rod cleaning after casting and
site cleaning after day work etc. all
complete as per specification and
direc. of Engr-In-Charge.(excl. the cost
of shuttering & rod fabrication)

For All Basement Floors, Retaining


wall, foundation footing/Pile cap,
Grade beam, UGWR (at any depth),
Column, Lift core, shear wall upto
Ground floor roof slab.

A1) For 3rd Basement Raft


Foundation & raft beam (if any)
including footing (if any), Retaining
cft 22.00 -
wall, Column, Shear wall, Lift core / Lift
wall, Stair etc. upto 3rd Basement roof
slab beam bottom.
54.0 A2) For 3rd Basement Roof Slab &
cft
Beam
B1) For 2nd Basement, Retaining
wall, Column, Shear wall, Lift core / Lift
cft 21.00 5,130
wall, Stair etc. upto 2nd Basement roof
slab beam bottom.
B2) For 2nd Basement Roof Slab &
cft
Beam
C) For 1st Basement , Retaining
wall, Column, Shear wall, Lift core / Lift
cft 20.00 2,473
wall, Stair etc. upto 1st Basement roof
slab beam bottom.
D) For Shallow Foundation footing,
grade beam etc. up to plinth level or cft 19.00
1st Basement Roof Slab & Beam

E). Additional labor charge for mixing


concrete when there is no concrete cft 1.40
mixture machine. (All floors)
F). RCC casting manually at drop
wall, railing, parapet.
Basement-4 cft 20.00
Basement-3 cft 19.00
Basement-2 cft 18.00
Basement-1 cft 17.00
R.C.C work by Ready mixed concrete
(When pump, hoist & electricity not
supplied by company) When company
will supply ready mix concrete,
vibrator & nozzle and contractor will
provide vibrator operator and other
manpower for laying the green ready
mix concrete in position and
compacting including site cleaning
after day work etc. complete as per
specification and direction of Engineer
55.0 In-Charge. (Excluding the cost of
shuttering and rod fabrication)

a. For Basement, Retaining Wall,


Footing / Pile Cap, Grade Beam, UGWR
cft 13.00
(at any depth), column, lift core, shear
wall upto GF roof
Basement-4 cft 13.60
Basement-3 cft 13.40
Basement-2 cft 13.20
Basement-1 cft 13.00
56.0
R.C.C work done by Ready mixed
concrete: (When Ready Mix Pump
supplied by company): When company
will supply ready mix concrete by
Pump and contractor will provide
vibrator operator and other manpower
for leveling and finishing of ready mix
concrete in position and compacting
including site cleaning after day work
etc. complete as per specification and
direction of Engineer In-Charge.
(Excluding the cost of shuttering and
rod fabrication)

a. For Basement Foundation (any


thickness of footing, raft etc.),
Retaining Wall, Column, Slab, Beam, cft 6.50
Stair for both for day and night works
upto Ground floor roof.
Basement-4 cft 6.90 -
Basement-3 cft 6.80 -
Basement-2 cft 6.70 41,186
Basement-1 cft 6.60 8,850
a. Design casting for waffle slab &
cft 21.00
beam etc.(Average for all flor)
Basement-4 cft 21.00
Basement-3 cft 21.00
Basement-2 cft 21.00
Basement-1 cft 21.00
57.0
57.0
b. Design sunshade, drop wall, railing
sft 18.00
etc. (Average for all floor)
Basement-4 sft 18.00
Basement-3 sft 18.00
Basement-2 sft 18.00
Basement-1 sft 18.00

Casting of Ancillary Structure [Drop


wall, railing, A/C slab, sunshade, Lintel,
False Slab, Rib-Beam (up to 4"
thickness) etc]. Work with cement,
local sand, coarse/sylhet sand(in/c
washing if required) and stone/brick
chips, mixing, laying in position as per
specification and direction of Engineer
In-Charge. (without hoist)

i. Drop wall, railing, A/C slab,


sunshade, Rib-Beam (upto 4"
thickness) etc. (without hoist)
Basement-4 sft 14.60
Basement-3 sft 14.20
Basement-2 sft 13.80
Basement-1 sft 13.40
58.0 ii. Lintel upto 5" Width (without
hoist)
Basement-4 rft 12.75
Basement-3 rft 12.32
Basement-2 rft 11.88
Basement-1 rft 11.44
iii. Lintel above 5" Width (without
hoist)
Basement-4 cft 17.08
Basement-3 cft 16.62
Basement-2 cft 16.17
Basement-1 cft 15.71
iv. False Slab up to 4" thick
(without hoist)
Basement-4 sft 11.45
Basement-3 sft 11.15
Basement-2 sft 10.85
Basement-1 sft 10.55
67.0 Water stopper Fitting: PVC Water
stopper fitting & fixing in position all
rft 6.00 0
complete as per direction of the
Engineer-in-Charge.
68.0 Floor Cleaning work of site (To be paid
at end of the project final bill -one time
only) and broken brick bats, collect & sft 0.50 11500
dump into ground floor in proper way
in proper place.
69.0
Carrying of materials from unloading
point to work site and stacking in safe
places (inside the Boundary wall) as
per direction of the Engineer-in-
Charge. This item will applicable only if
the carrying distance is within 100'-0"
from stacking place. (Special note: All
type of materials carrying manpower
should be supplied by awarding
contractor. Otherwise, work will be
done by other agency & those extra
payment (if required) to be adjusted
from awarded contractor's company
accounts/payable bills. Also, payable
amount of awarded contractor should
be freezed up to the completion of the
project.)

(Rate for carrying of materials will be


decided as Zone/Location wise and
also depends of Materials type,
carrying time etc and Project have to
taken pre/post approval from
management as per requirement.)

a. Bricks Carrying nos 0.50


b. Brick Chips/Stone Chips carrying cft 4.00 3,925.28
c. Sand (Medium sand, Sylhet sand,
cft 3.50 2,640.63
Mymensing sand, etc.)
d. Cement bag 3.50 -
71.0
Screening for the following materials
(for normal casting if required) &
stacking in safe places:

a. Stone Chips/ Bricks Chips cft 2.50


b. Sand cft 2.50
73.0 Block making:
a. Big size concrete block making
each 1.50 1500
(2"/4" x 2" x 2") to above size.
b. Small size concrete block making (1
each 0.75 3500
1/2" x1 1/2") to lower size
77.0 Making Mortar Barrier for ponding of
water with sand cement mortar for
curing after slab casting all complete rft 1.25
as per requirement and direction of
Engineer In-Charge.
Basement-4 rft 1.25
Basement-3 rft 1.25
Basement-2 rft 1.25 5800
Basement-1 rft 1.25 7000
81.0
Hire charge of manpower from
contractor for non-schedule works with
maintaning company MB (This rate is
applicable, when prior approval is
given by the authority). This bill will be
adjusted / submitted with running bills)

a) Mason each 600.00


b) Helper each 450.00
NON SCHEDULE
Excavation By -Excavator cft 4.25 205535.00
Excavation by manuall actual quantity cft 6.75
C.C Casting for tiles levelling sft 4.75

TOTAL COST(SUB STRUCTURE)

SUPER STRUCTURE
Sch. Rate
Description Unit Quantity
It. (Tk.)
Shade Making (Temporary Site office /
Labour Shade / Store or Godown /
Guard Shade etc.)
a. Bamboo Post each 12.00
2.0
b. C.I. sheet roofing/fencing with
sft 2.75
necessary arrangement etc. complete.
c. Door making for Store, office etc.
each 150.00
(Temporary door)

CEMENT CONCRETE (CC) works in


foundation & floor including mixing the
concrete, laying in position,
compacting etc. all complete as per
direction of the Engineer-in-Charge.

a. Thickness up to 3" sft


GF sft 6.00
1st Floor sft 6.00
2nd Floor sft 6.00
3rd Floor sft 6.00
4th Floor sft 6.00
5th Floor sft 6.00
6th Floor sft 6.00
7th Floor sft 6.00
8th Floor sft 6.00
9th Floor sft 6.00
10th Floor sft 6.00
11th Floor sft 6.00
12th Floor sft 6.00
13th Floor sft 6.00
14th Floor sft 6.00
15th Floor sft 6.00
16th Floor sft 6.00
17th Floor sft 6.00
18th Floor sft 6.00
19th Floor sft 6.00
20th Floor sft 6.00
Roof sft 6.00
b. Above 3" & up to 5" sft
GF sft 6.25
1st Floor sft 6.25
2nd Floor sft 6.25
3rd Floor sft 6.25
4th Floor sft 6.25
5th Floor sft 6.25
6th Floor sft 6.25
7th Floor sft 6.25
8th Floor sft 6.25
9th Floor sft 6.25
10th Floor sft 6.25
11th Floor sft 6.25
12th Floor sft 6.25
13th Floor sft 6.25
14th Floor sft 6.25
15th Floor sft 6.25
16th Floor sft 6.25
17th Floor sft 6.25
18th Floor sft 6.25
19th Floor sft 6.25
20th Floor sft 6.25
Roof sft
9.0
c. CC casting (up to 3" thick) by
Ready Mix concrete without pump sft
at basement/foundation level

GF sft 3.50
1st Floor sft 3.50
2nd Floor sft 3.50
3rd Floor sft 3.50
4th Floor sft 3.50
5th Floor sft 3.50
6th Floor sft 3.50
7th Floor sft 3.50
8th Floor sft 3.50
9th Floor sft 3.50
10th Floor sft 3.50
11th Floor sft 3.50
12th Floor sft 3.50
13th Floor sft 3.50
14th Floor sft 3.50
15th Floor sft 3.50
16th Floor sft 3.50
17th Floor sft 3.50
18th Floor sft 3.50
19th Floor sft 3.50
20th Floor sft 3.50
Roof sft 3.50
d. CC casting (up to 3" thick)
by Ready Mix concrete (pump
sft
supplied by company) at
basement/foundation level
GF sft 1.75
1st Floor sft 1.75
2nd Floor sft 1.75
3rd Floor sft 1.75
4th Floor sft 1.75
5th Floor sft 1.75
6th Floor sft 1.75
7th Floor sft 1.75
8th Floor sft 1.75
9th Floor sft 1.75
10th Floor sft 1.75
11th Floor sft 1.75
12th Floor sft 1.75
13th Floor sft 1.75
14th Floor sft 1.75
15th Floor sft 1.75
16th Floor sft 1.75
17th Floor sft 1.75
18th Floor sft 1.75
19th Floor sft 1.75
20th Floor sft 1.75
Roof sft 1.75
Brick bond concrete (BBC) at Parking
sft 6.75
10.0 floor & Other False Slab
GF sft 6.75
11.0
Artificial Patent Stone flooring as well
as on seals, shelves in panels (upto
2½" average Thick) laying &
compacting the concrete with neat
cement finishing etc. all complete as
per direction of the EIC. (by roof hoist)

a. Up to Gr. Floor sft 6.00


b. For 1st floor sft 6.24
c. For 2nd floor sft 6.48
d. For 3rd floor sft 6.72
e. For 4th floor sft 6.96
f. For 5th floor sft 7.20
g. For 6th floor sft 7.44
h. For 7th Floor sft 7.68
i. For 8th Floor sft 7.92
j. For 9th Floor sft 8.16
k. For 10th Floor sft 8.40
l. For 11th. Floor sft 8.64
m. For 12th Floor sft 8.88
n. For 13th Floor sft 9.12
o. For 14th Floor sft 9.36
p. For 15th. Floor sft 9.60
q. For 16th. Floor sft 9.84
r. For 17th. Floor sft 10.08
s. For 18th. Floor sft 10.32
t. For 19th. Floor sft 10.56
u. For 20th Floor sft 10.80

D.P.C. Work: D.P.C. Work with cement,


sand & Brick/stone chips mixed
admixture if necessary centering,
shuttering setting chips, mixing,
casting, and finishing with 2 coats of
bituminous, local carrying of all
materials etc. complete as per
direction of Engineer-in-Charge.
12.0
a. Width up to 6"
a. Up to Gr. Floor rft 6.00
b. Width above 6"
a. Up to Gr. Floor rft 7.00
c. Over 1st coat of Bituminous felt
a. Up to Gr. Floor sft 2.50
Staging for double height (for outside
of Verandah, inside of Lift, Ground
floor Sunshade, above rooftop or any
22.0 irregular height) sft 8.00 5380
Staging work (every stage top surface
area to be considered for contractor
bill)
40.0
M.S. FABRICATION (HOIST &
ELECTRICITY SUPPLIED BY company)
work for reinforcement including
bending, cutting, cranking & placing of
rods, straitening, cleaning the rust if
any and binding in position with supply
of G.I wires (24 Gage galvanized wire)
& CC block laying in position etc. all
complete as per direction of Engr-in-
Charge. Re-bar cutting machine with
disc will be supplied by the contractor.

d. Up to Gr. Floor roof ton 4600.00 42.24


e. For 1st floor ton 4750.00 34.17
f. For 2nd floor ton 4900.00 34.02
g. For 3rd floor ton 5050.00 33.33
h. For 4th floor ton 5200.00 32.07
i. For 5th floor ton 5350.00 32.54
j. For 6th floor ton 5500.00 33.19
k. For 7th floor ton 5650.00 29.63
l. For 8th floor ton 5800.00 30.61
m. For 9th floor ton 5950.00 30.61
n. For 10th floor ton 6100.00 29.78
o. For 11th floor ton 6250.00 28.81
p. For 12th floor ton 6400.00 29.09
q. For 13th floor ton 6550.00 29.82
r. For 14th floor ton 6700.00 0
s. For 15th floor ton 6850.00 0
t. For 16th floor ton 7000.00 0
u. For 17th floor ton 7150.00 0
v. For 18th floor ton 7300.00 0
w. For 19th floor ton 7450.00 0
x. For 20th floor (roof top 14th floor) ton 6700.00 23
41.0 RE-BAR UNLOADING from truck and
stacking in safe place as per direction
ton 150.00
of the Engineer-in-Charge / company
representative.
42.0 RE-BAR WEIGHING and stacking in safe
place (inside the boundary wall) as per
ton 180.00 473.03
direction of the Engineer-in-charge
(EIC).
43.0
RE-BAR CARRYING from unloading
(Project outside) point to work site and
stacking in safe places (Inside the
boundary wall) as per dir. of the EIC.
ton 225.00 473.03
This item will be applicable only if the
carrying distance within 150’ from
stacking place / from outside to inside
of project

44.0

Wooden Form Work (Hoist & Electricity


supplied by company): Form work for
centering & watertight shuttering as
per design, drawing and specification.
Rate in/c. repairing, fitting & fixing,
cleaning & opening of wooden form
(Shutter) as per direction of the
Engineer-in-Charge. Considering unit
rate of form works are 70% for fixing &
30% after removing will be allowed.

Wooden Shutter including cost of GI


wire, wire nail, rupban sheet, cleaning,
stacking at suitable place etc. all
complete.
a. For Gr. Floor and Up to Gr. Floor
sft 14.00 0
roof
b. For 1st floor sft 14.30 0
c. For 2nd floor sft 14.60
d. For 3rd floor sft 14.90
e. For 4th floor sft 15.35
f. For 5th floor sft 15.80
g. For 6th floor sft 16.25
h. For 7th floor sft 17.05
i. For 8th floor sft 17.85
j. For 9th floor sft 18.65
k. For 10th floor sft 19.45
l. For 11th floor sft 20.30
m. For 12th floor sft 21.15
n. For 13th floor sft 22.00
o. For 14th floor sft 22.85
p. For 15th floor sft 23.75
q. For 16th floor sft 24.65
r. For 17th floor sft 25.55
s. For 18th floor sft 26.45
t. For 19th floor sft 27.35
u. For 20th floor sft 28.25
45.0
WOODEN SHUTTER MAKING for
footing/UGWR/Retaning Wall/
Column/beam/OHWT including supply
of nail, rupban sheet, etc. all complete
as per direction of Engineer-in-Charge.
(One time total unit rate will be
applied for 6 nos. floor)

(a) Upto PL (one time making charge


sft 3.00
to be allowed)
(b) For every 06 nos. floor (one time
making charge to be allowed & bill will sft 6.00
be applied on ratio basis)
46.0
Wooden Shutter of Ancillary Structure
(Lintel, false slab, drop wall, sunshade,
Rib-Beam, etc). For centering &
watertight shuttering as per design,
drawing and specifications. Rate
includes repairing, fitting-fixing,
clening & opening of wooden form
(shutter) as per direction of Engineer-
in-Charge. Considering unit rate of
form works are 70% for fixing & 30%
after removing will be allowed.

a. Up to Gr. Floor roof sft 14.00 130


b. For 1st floor sft 14.30 130
c. For 2nd floor sft 14.60 130
d. For 3rd floor sft 14.90 130
e. For 4th floor sft 15.30 130
f. For 5th floor sft 15.70 130
g. For 6th floor sft 16.10 130
h. For 7th floor sft 16.70 130
i. For 8th floor sft 17.30 130
j. For 9th floor sft 17.90 130
k. For 10th floor sft 18.50 130
l. For 11th floor sft 19.20 130
m. For 12th floor sft 19.90 130
n. For 13th floor sft 20.60 130
o. For 14th floor sft 21.30 0
p. For 15th floor sft 22.10 0
q. For 16th floor sft 22.90 0
r. For 17th floor sft 23.70 0
s. For 18th floor sft 24.50 0
t. For 19th floor sft 25.30 0
u. For 20th floor (roof top 14th floor) sft 21.30 1289
47.0
Steel Form Work (Hoist & Electricity
supplied by company): Form work for
centering & watertight shuttering as
per design, drawing and specifications.
Rate includes fitting-fixing & opening
steel form (Shutter) as per direction of
the Engineer-in-Charge. Considering
unit rate of from works are 70% for
fixing & 30% after removing will be
allowed.

Steel Shutter for Column, Retaining


wall, Lift Share Wall, Slab, Beam &
Stair, etc. all complete as per direction
of Engineer-in-Charge.

d. Up to Gr. Floor roof sft 19.00 15680


e. For 1st floor sft 19.60 9155
f. For 2nd floor sft 20.20 9255
g. For 3rd floor sft 20.80 9255
h. For 4th floor sft 21.40 9005
i. For 5th floor sft 22.00 9205
j. For 6th floor sft 22.60 9205
k. For 7th floor sft 23.20 9205
l. For 8th floor sft 23.80 9455
m. For 9th floor sft 24.40 9455
n. For 10th floor sft 25.00 9655
o. For 11th floor sft 25.60 9000
p. For 12th floor sft 26.20 9170
q. For 13th floor sft 26.80 9250
r. For 14th floor sft 27.40 0
s. For 15th floor sft 28.00 0
t. For 16th floor sft 28.60 0
u. For 17th floor sft 29.20 0
v. For 18th floor sft 29.80 0
w. For 19th floor sft 30.40 0
x. For 20th floor (roof top 14th floor) sft 27.40 10986
a. Bracing in both directions for fitting
fixing of shuttering works. (if required). sft 1.50 58300
(For all floor)
48.0
b. Shutter cleaning & oiling (Shutter oil
will be supplied by company) including sft 1.50 146936
Cup brush
DESIGN SHUTTER: For normal design
formwork for waffle slab & beam,
design sunshade, drop wall, etc.
49.0 (Average for all floors). Any critical sft 17.00
design it will be treated as Non
Schedule Item and rate will be
finalized by analysis.
50.0
Fair Face Shuttering / as cast
shuttering: Fitting fixing of Steel
shutter with P-con set including
supply of necessary hardware
materials i.e. nail, wire, oil and labour
in Floor slab and superstructure, any
other R.C.C. work including washing,
oiling, cleaning, removing, opening, re-
opening, centering, scaffolding,
levelling, staging, fixing of jute tape or
putty in the joint of steel shutter etc.
all complete as per direction of
Engineer-in-Charge.

In column, beam, pannel wall, share


wall, Slab, Sunshade, drop wall, fins or
in any other ornamental items in/c
welding Rod.

a. Up to Gr. Floor sft 48.00 0


b. For 1st floor sft 50.00 0
c. For 2nd floor sft 52.00 0
d. For 3rd floor sft 54.00 0
e. For 4th floor sft 56.00 0
f. For 5th floor sft 58.00 0
g. For 6th floor sft 60.00 0
h. For 7th floor sft 62.00 0
i. For 8th floor sft 64.00 0
j. For 9th floor sft 66.00 0
k. For 10th floor sft 68.00 0
l. For 11th floor sft 70.00 0
m. For 12th floor sft 72.00 0
n. For 13th floor sft 74.00 0
o. For 14th floor sft 76.00 0
p. For 15th floor sft 78.00 0
q. For 16th floor sft 80.00 0
r. For 17th floor sft 82.00 0
s. For 18th floor sft 84.00 0
t. For 19th floor sft 86.00 0
u. For 20th floor sft 88.00 0
51.0 Labour charge for formica fixing on
sft 6.00
steel shutter. (all floors)
52.0
Celluloid paper cutting to size, fitting-
fixing on shutter surface for fair face
casting & removing after opening the
sft 9.00 -
shutter i/c properly cleaning, etc.
(paper, adhesive & brush supplied by
company): All floors

53.0
Fair Face Casting: Fair Face R.C.C. in
any proportion with cement, coarse
sand, medium sand, stone chips
including screening, washing & mixing
of all materials etc. (excluding cost of
shuttering, centering and
reinforcement fabrication) in
superstructure i/c rod cleaning after
casting, etc. all complete as per
direction of Engineer-in-Charge. (20%
rate against fair face casting will be
retained if rectification is required. The
retained will be released after properly
rectified & full satisfaction of EIC.)

In column, beam, slab, pannel wall,


share wall, Sunshade, drop wall, fins or
in any other ornamental areas.

a. Up to Gr. Floor cft 40.00 -


b. For 1st floor cft 41.60 -
c. For 2nd floor cft 43.20 -
d. For 3rd floor cft 44.80 -
e. For 4th floor cft 46.40 -
f. For 5th floor cft 48.00 -
g. For 6th floor cft 49.60 -
h. For 7th floor cft 51.20 -
i. For 8th floor cft 52.80 -
j. For 9th floor cft 54.40 -
k. For 10th floor cft 56.00 -
l. For 11th floor cft 57.60 -
m. For 12th floor cft 59.20 -
n. For 13th floor cft 60.80 -
o. For 14th floor cft 62.40 -
p. For 15th floor cft 64.00 -
q. For 16th floor cft 65.60 -
r. For 17th floor cft 67.20 -
s. For 18th floor cft 68.80 -
t. For 19th floor cft 70.40 -
u. For 20th floor cft 72.00 -
54.0
REINFORCEMENT CEMENT CONCRETE
(Hoist & Electricity supplied by
company) works of any proportion with
cement, local sand, coarse sand &
stone / brick chips, mixing, laying in
position and compacting in/c. soaking
of chips, rod cleaning after casting and
site cleaning after day work etc. all
complete as per specification and
direc. of Engr-In-Charge.(excl. the cost
of shuttering & rod fabrication)

a. Up to Gr. Floor roof cft 19.00 4,380


b. For 1st floor cft 20.00 1,780
c. For 2nd floor cft 21.00 1,780
d. For 3rd floor cft 22.00 1,780
e. For 4th floor cft 23.00 1,780
f. For 5th floor cft 24.00 1,780
g. For 6th floor cft 25.00 1,780
h. For 7th floor cft 26.25 1,780
i. For 8th floor cft 27.50 1,780
j. For 9th floor cft 28.75 1,780
k. For 10th floor cft 30.25 1,780
l. For 11th floor cft 31.75 1,780
m. For 12th floor cft 33.25 1,780
n. For 13th floor cft 34.75 1,780
o. For 14th floor cft 36.25 -
p. For 15th floor cft 37.75 -
q. For 16th floor cft 39.25 -
r. For 17th floor cft 40.75 -
s. For 18th floor cft 42.25 -
t. For 19th floor cft 43.75 -
u. For 20th floor (roof top 14th floor) cft 36.25 5,600

E). Additional labor charge for mixing


concrete when there is no concrete cft 1.40
mixture machine. (All floors)

F). RCC casting manually at


drop wall, railing, parapet.
a. Up to Ground floor cft 16.00
b. For 1st floor cft 17.00
c. For 2nd floor cft 18.00
d. For 3rd floor cft 19.00
e. For 4th floor cft 20.00
f. For 5th floor cft 21.00
g. For 6th floor cft 22.00
h. For 7th floor cft 23.00
i. For 8th floor cft 24.00
j. For 9th floor cft 25.00
k. For 10th floor cft 26.00
l. For 11th floor cft 27.00
m. For 12th floor cft 28.00
n. For 13th floor cft 29.00
o. For 14th floor cft 30.00
p. For 15th floor cft 31.00
q. For 16th floor cft 32.00
r. For 17th floor cft 33.00
s. For 18th floor cft 34.00
t. For 19th floor cft 35.00
u. For 20th floor cft 36.00
55.0
R.C.C work by Ready mixed concrete
(When pump, hoist & electricity not
supplied by company) When company
will supply ready mix concrete,
vibrator & nozzle and contractor will
provide vibrator operator and other
manpower for laying the green ready
mix concrete in position and
compacting including site cleaning
after day work etc. complete as per
specification and direction of Engineer
In-Charge. (Excluding the cost of
shuttering and rod fabrication)

a. For Basement, Retaining Wall,


Footing / Pile Cap, Grade Beam, UGWR
cft 13.00
(at any depth), column, lift core, shear
wall upto GF roof
b. Up to 1st floor roof cft 13.52
c. Up to 2nd floor roof cft 14.04
d. Up to 3rd floor roof cft 14.56
e. Up to 4th floor roof cft 15.08
f. Up to 5th floor roof cft 15.60
g. Up to 6th floor roof cft 16.12
h. Up to 7th floor roof cft 16.64
i. Up to 8th floor roof cft 17.16
j. Up to 9th floor roof cft 17.68
k. Up to 10th floor roof cft 18.20
l. Up to 11th floor roof cft 18.72
m. Up to 12th floor roof cft 19.24
n. Up to 13th floor roof cft 19.76
o. Up to 14th floor roof cft 20.28
p. Up to 15th floor roof cft 20.80
q. Up to 16th floor roof cft 21.32
r. Up to 17th floor roof cft 21.84
s. Up to 18th floor roof cft 22.36
t. Up to 19th floor roof cft 22.88
u. Up to 20th floor roof cft 23.40
56.0
R.C.C work done by Ready mixed
concrete: (When Ready Mix Pump
supplied by company): When company
will supply ready mix concrete by
Pump and contractor will provide
vibrator operator and other manpower
for leveling and finishing of ready mix
concrete in position and compacting
including site cleaning after day work
etc. complete as per specification and
direction of Engineer In-Charge.
(Excluding the cost of shuttering and
rod fabrication)

For Basement Foundation (any


thickness of footing, raft etc.),
Retaining Wall, Column, Slab, Beam,
Stair for both for day and night works .

a)upto Ground floor roof Cft 6.50 3,674


b. Up to 1st floor roof cft 6.60 4,085
c. Up to 2nd floor roof cft 6.70 4,205
d. Up to 3rd floor roof cft 6.80 3,770
e. Up to 4th floor roof cft 6.90 3,520
f. Up to 5th floor roof cft 7.00 3,795
g. Up to 6th floor roof cft 7.10 3,815
h. Up to 7th floor roof cft 7.20 3,560
i. Up to 8th floor roof cft 7.30 3,785
j. Up to 9th floor roof cft 7.40 3,785
k. Up to 10th floor roof cft 7.50 3,795
l. Up to 11th floor roof cft 7.60 3,795
m. Up to 12th floor roof cft 7.70 3,790
n. Up to 13th floor roof cft 7.80 3,820
o. Up to 14th floor roof cft 7.90 -
p. Up to 15th floor roof cft 8.00 -
q. Up to 16th floor roof cft 8.10 -
r. Up to 17th floor roof cft 8.20 -
s. Up to 18th floor roof cft 8.30 -
t. Up to 19th floor roof cft 8.40 -
u. Up to 20th floor roof (roof top 14th
cft 7.90 380
floor)
57.0 a. Design casting for waffle slab &
cft 21.00
beam etc.(Average for all flor)
b. Design sunshade, drop wall, railing
sft 18.00
etc. (Average for all floor)
58.0
Casting of Ancillary Structure [Drop
wall, railing, A/C slab, sunshade, Lintel,
False Slab, Rib-Beam (up to 4"
thickness) etc]. Work with cement,
local sand, coarse/sylhet sand(in/c
washing if required) and stone/brick
chips, mixing, laying in position as per
specification and direction of Engineer
In-Charge. (without hoist)

i. Drop wall, railing, A/C slab,


sunshade, Rib-Beam (upto 4"
thickness) etc. (without hoist)
a. Ground Floor sft 13.00 27
b. 1st Floor sft 13.40 -
c. 2nd Floor sft 13.80 -
d. 3rd Floor sft 14.20 -
e. 4th Floor sft 14.60 -
f. 5th Floor sft 15.00 -
g. 6th Floor sft 15.40 -
h. 7th Floor sft 15.80 -
i. 8th Floor sft 16.20 -
j. 9th Floor sft 16.60 -
k. 10th Floor sft 17.00 -
l. 11th Floor sft 17.40 -
m. 12th Floor sft 17.80 -
n. 13th Floor sft 18.20 -
o. 14th Floor sft 18.60 -
p. 15th Floor sft 19.00 -
q. 16th Floor sft 19.40 -
r. 17th Floor sft 19.80 -
s. 18th Floor sft 20.20 -
t. 19th Floor sft 20.60 -
u. 20th Floor (roof top 14th floor) Rib
sft 18.60 1000
Beam
58.0 ii. Lintel upto 5" Width (without
contd hoist)
a. Ground Floor rft 11.00 25
b. 1st Floor rft 11.44 25
c. 2nd Floor rft 11.88 25
d. 3rd Floor rft 12.32 25
e. 4th Floor rft 12.76 25
f. 5th Floor rft 13.20 25
g. 6th Floor rft 13.64 25
h. 7th Floor rft 14.08 25
i. 8th Floor rft 14.52 25
j. 9th Floor rft 14.96 25
k. 10th Floor rft 15.40 25
l. 11th Floor rft 15.84 25
m. 12th Floor rft 16.28 25
n. 13th Floor rft 16.72 25
o. 14th Floor rft 17.16 -
p. 15th Floor rft 17.60 -
q. 16th Floor rft 18.04 -
r. 17th Floor rft 18.48 -
s. 18th Floor rft 18.92 -
t. 19th Floor rft 19.36 -
u. 20th Floor (roof top 14th floor) rft 17.16 15
iii. Lintel above 5" Width (without
hoist)
a. Ground Floor cft 15.25 20
b. 1st Floor cft 15.71 20
c. 2nd Floor cft 16.17 20
d. 3rd Floor cft 16.62 20
e. 4th Floor cft 17.08 20
f. 5th Floor cft 17.54 20
g. 6th Floor cft 18.00 20
h. 7th Floor cft 18.45 20
i. 8th Floor cft 18.91 20
j. 9th Floor cft 19.37 20
k. 10th Floor cft 19.83 20
l. 11th Floor cft 20.28 20
m. 12th Floor cft 20.74 20
n. 13th Floor cft 21.20 20
o. 14th Floor cft 21.66 -
p. 15th Floor cft 22.11 -
q. 16th Floor cft 22.57 -
r. 17th Floor cft 23.03 -
s. 18th Floor cft 23.49 -
t. 19th Floor cft 23.94 -
u. 20th Floor (roof top 14th floor) cft 21.66 18
iv. False Slab up to 4" thick
(without hoist)
a. Ground Floor sft 10.25 -
b. 1st Floor sft 10.55 -
c. 2nd Floor sft 10.85 -
d. 3rd Floor sft 11.15 -
e. 4th Floor sft 11.45 -
f. 5th Floor sft 11.75 -
g. 6th Floor sft 12.05 -
h. 7th Floor sft 12.35 -
i. 8th Floor sft 12.65 -
j. 9th Floor sft 12.95 -
k. 10th Floor sft 13.25 -
l. 11th Floor sft 13.55 -
m. 12th Floor sft 13.85 -
n. 13th Floor sft 14.15 -
o. 14th Floor sft 14.45 -
p. 15th Floor sft 14.75 -
q. 16th Floor sft 15.05 -
r. 17th Floor sft 15.35 -
s. 18th Floor sft 15.65 -
t. 19th Floor sft 15.95 -
u. 20th Floor sft 16.25 0

Grill Fitting: Verandah grill & window


grill fitting-fixing including necessary
hole cutting in wall and column and
C.C. casting with lifting at different
floors, etc. all complete as per
direction of the Engineer-in-Charge.

4th Basement Floor


3rd basement floor sft 9.00
2nd basement floor sft 8.75
1st basement/semi-basement floor sft 8.50 -
a. Up to Gr. Floor sft 8.50 140
b. For 1st floor sft 8.75 135
c. For 2nd floor sft 9.00 135
d. For 3rd floor sft 9.25 135
e. For 4th floor sft 9.50 135
63.0 f. For 5th floor sft 9.75 135
g. For 6th floor sft 10.00 135
h. For 7th floor sft 10.35 135
i. For 8th floor sft 10.70 135
j. For 9th floor sft 11.05 135
k. For 10th floor sft 11.40 135
l. For 11th floor sft 11.95 135
m. For 12th floor sft 12.50 135
n. For 13th floor sft 13.05
o. For 14th floor sft 13.60
p. For 15th floor sft 14.35
q. For 16th floor sft 15.10
r. For 17th floor sft 15.85
s. For 18th floor sft 16.60
t. For 19th floor sft 17.35
u. For 20th floor sft 18.10
64.0 Verandah & Stair Railing Fitting:
Fitting-fixing of Verandah & Stair
Railing in position in/c necessary hole
cutting and C.C. casting, lifting at sft 8.00
different floors, etc. all complete as
per direction of the Engr-in-Charge (all
floors)
65.0
Collapsible Gate Fitting: Collapsible
gate fitting (complete) including
necessary cutting of wall and column
sft 6.50
& mending goods the damages i/c
lifting at any floors as per direction of
the Engineer-in-Charge.

66.0
Main Gate Fitting: Fitting-fixing of main
gate (Sliding or Folding/Swing) in
position including cutting groove in
sft 18.00
walls/RCC surface & mending goods
the damages, etc. all complete as per
direction of the Engr-in-Charge.

67.0 Water stopper Fitting: PVC Water


stopper fitting & fixing in position all
rft 6.00
complete as per direction of the
Engineer-in-Charge.
68.0 Floor Cleaning work of site (To be paid
at end of the project final bill -one time
only) and broken brick bats, collect & sft 0.50 57400
dump into ground floor in proper way
in proper place.
69.0
Carrying of materials from unloading
point to work site and stacking in safe
places (inside the Boundary wall) as
per direction of the Engineer-in-
Charge. This item will applicable only if
the carrying distance is within 100'-0"
from stacking place. (Special note: All
type of materials carrying manpower
should be supplied by awarding
contractor. Otherwise, work will be
done by other agency & those extra
payment (if required) to be adjusted
from awarded contractor's company
accounts/payable bills. Also, payable
amount of awarded contractor should
be freezed up to the completion of the
project.)

(Rate for carrying of materials will be


decided as Zone/Location wise and
also depends of Materials type,
carrying time etc and Project have to
taken pre/post approval from
management as per requirement.)

a. Bricks Carrying nos 0.50


b. Brick Chips/Stone Chips carrying cft 4.00 25,172.84
c. Sand (Medium sand, Sylhet sand,
cft 3.50 13,461.91
Mymensing sand, etc.)
d. Cement bag 3.50
71.0
Screening for the following materials
(for normal castingif required) &
stacking in safe places:

a. Stone Chips/ Bricks Chips cft 2.50


b. Sand cft 2.50
72.0
Dismantling of Structure with remove
in safe place at any floor as per
direction of the Engineer-in-Charge

a. Brick work 10" thick or above cft 9.00


b. Brick work 5" thick sft 6.00
c. R.C.C. (up to 8" thick) cft 70.00
d. R.C.C. (above 8" thick) cft 120.00
e. C.C cft 25.00
f. Plaster (any thickness both internal
sft 5.00
& outer surface)
g. L.C.C cft 5.00
73.0 Block making:
a. Big size concrete block making
each 1.50 2000
(2"/4" x 2" x 2") to above size.
b. Small size concrete block making (1
each 0.75 10500
1/2" x1 1/2") to lower size
76.0 Construction of Basin Cabinet in/c 3"
thick brick wall, RCC top slab (in/c.
bottom plaster) and necessary
nos. 1000.00 27
reinforcement in proper position etc.
all complete as per direction of Eng.-
in-Charge.
77.0 Making Mortar Barrier for ponding of
water with sand cement mortar for
curing after slab casting all complete rft 1.25 9800
as per requirement and direction of
Engineer In-Charge.
Properly dry mix of grey & white
cement (as per specification given by
designer) in a room with netting and
80.0 kg 0.30 0.00
then repacking in bag and weighing in
measuring scale for fair face
concreting work
81.0
Hire charge of manpower from
contractor for non-schedule works with
maintaning company MB (This rate is
applicable, when prior approval is
given by the authority). This bill will be
adjusted / submitted with running bills)

a) Mason each 600.00 0


b) Helper each 450.00 0
C.C Work for bottom of Kitchen
counter top & Basin counter top
Total c.c work sft 4.75 0.00
TOTAL SUPER STRUCTURE LABOR COST
Price
0
0
0
0
0
225.00
936.00
972.00
1,008.00
1,044.00
1,080.00
1,116.00
1,152.00
1,188.00
1,224.00
1,260.00
1,296.00
1,332.00
1,368.00
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
300.00
1,200.00
1,200.00
1,200.00
1,200.00
1,200.00
1,200.00
1,280.00
1,280.00
1,280.00
1,280.00
1,280.00
1,280.00
1,280.00
-
-
-
-
-
-
-
3,710.00
-
424.00
1,696.00
1,908.00
-
-
39,399.00

Amount (Tk.)
-
-
13,812.50
13,770.00
28,262.50
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
43,680.00

-
-

-
-
-
-
-

-
-
-
-

-
-

-
5,760.00

-
-
-
35,589.50
36,354.50
25,223.75
19,762.50
19,762.50
19,762.50
19,762.50
19,762.50
19,762.50
20,227.50
20,227.50
20,227.50
20,227.50
20,227.50
20,227.50
20,692.50
-
-
-
-
-
-
24,430.50

-
3,250.00
5,044.52
5,044.52
5,044.52
5,044.52
5,044.52
5,044.52
5,044.52
5,044.52
5,044.52
5,044.52
5,044.52
5,044.52
5,044.52
-
-
-
-
-
-
-
-
-
-

-
-

-
-
-
-
-

-
-
-
-

-
-
-
450.00
1,350.00
1,170.00
1,399.50
1,399.50
2,146.50
1,399.50
2,146.50
3,006.00
2,074.60
1,929.70
2,203.40
2,799.10
2,308.05
1,430.60
2,333.55
-
-
-
-
-
-
3,760.00

-
-
-
-

-
10,671.10
10,671.10
10,671.10
10,671.10
10,671.10
10,671.10
10,671.10
10,671.10
10,671.10
10,671.10
10,671.10
10,671.10
10,671.10
-
-
-
-
-
-
-
-

-
-

-
-

38,212.50

-
-
-
-
-
-
766,587.81

Amount (TK.)
-
-

-
-
-
-
-
-

-
-
-
-
-
-

-
-
-
-
-
-

-
-
-
-
-
-

-
-
-
-

-
-
-
8,245.00
2,550.00
13,311.00
13,311.00
13,311.00
13,311.00
13,311.00
13,311.00
13,647.69
13,647.69
13,647.69
13,976.55
13,976.55
13,976.55
14,313.24
-
-
-
-
-
-
-

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-

-
-
-

-
-

-
-
-
-
-

-
-
-
-
-
2,400.00
2,400.00
1,785.00
1,800.00
1,800.00
1,800.00
1,800.00
1,800.00
1,800.00
1,845.60
1,845.60
1,845.60
1,890.00
1,890.00
1,890.00
1,935.60
-
-
-
-
-
-
-

385,470.00
192,433.50

193,819.50
69,079.50
-
-

-
-
-
-
24,150.00
61,180.00
76,705.00
74,750.00
73,600.00
77,050.00
71,300.00
72,862.20
79,700.40
77,814.00
87,664.50
73,657.50
83,341.65
82,845.50
-
-
-
-
-
-
-

-
-

-
-
-

-
-
-

-
-
6,688.00
6,498.00
10,640.00
14,440.00
14,440.00
14,440.00
14,440.00
14,440.00
14,440.00
14,804.80
14,804.80
14,804.80
15,162.00
15,162.00
15,162.00
15,526.80
-
-
-
-
-
-
-
-

-
-

-
-
-

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-

-
-
-
-
8,600.00
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-

-
-

-
-

-
-
-
-
-
-
-
-
34,825.00
1,260.00
1,260.00
1,260.00
1,260.00
1,260.00
1,260.00
1,291.68
1,291.68
1,291.68
1,323.00
1,323.00
1,323.00
1,354.68
-
-
-
-
-
-
-

-
-
1,200.00
2,220.00
3,708.00
8,184.00
8,784.00
8,544.00
8,544.00
8,544.00
7,944.00
8,142.60
8,757.60
8,757.60
8,971.20
8,971.20
9,160.20
8,010.90
-
-
-
-
-
-
1,320.00
-

-
-
-
-
5,100.00
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-

-
-
-
-
-

-
-

-
-
-

-
-
-
-
3,402.00
3,402.00
3,402.00
3,402.00
3,402.00
3,402.00
3,402.00
3,487.68
3,487.68
3,487.68
3,572.10
3,572.10
3,572.10
3,657.78
-
-
-
-
-
-
-
-
-
-
-
-
200.00
800.00
800.00
800.00
800.00
800.00
800.00
820.00
820.00
820.00
840.00
840.00
840.00
860.00
-
-
-
-
-
-
-
-

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-

-
-

-
-
-

-
-
-
-
8,750.00
8,625.00
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-

-
-
-
-
-

-
-
179.20
385.53
-
1,591.82
1,833.85
1,801.79
1,784.29
1,836.79
1,743.51
1,789.73
1,900.07
1,871.27
2,045.35
1,830.75
1,980.95
1,982.81
-
-
-
-
-
-
-

-
-
-
-
-
72.00
72.00
72.00
72.00
72.00
72.00
73.80
73.80
73.80
75.60
75.60
75.60
77.40
-
-
-
-
-
-
-

-
-

-
-
-

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-

-
-
-

-
-
-
-
-
-

-
-
-
-
-
-

-
-
-
-
-
-

-
-
-

-
-
-

-
-
-
-
-
-

-
-
-
-
-
-
-

-
-
-
-
-
-
-
-
-
-
69,000.00
90,000.00
47,325.00
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
62,907.00
-

3,840.00

-
-

-
-
-

-
-
-

-
-
-
-
-

-
-
-

-
-
-

-
-

-
-
-

28,106.21

Amount
0

-
-
167,376.90 8094.00
145,447.50
84,177.60
46,762.50
46,065.00
46,945.00
48,380.00
49,815.00
51,250.00
52,685.00
54,120.00
55,555.00
56,990.00
58,425.00
59,860.00
61,295.00
-
-
-
-
-
-
163,557.00
-

83,125.00
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
108,600.00

286,650.00
222,950.00

-
-
16,500.00
750.00
5,502.00
864.00
450.00
1,050.00
1,050.00
1,050.00
1,050.00
900.00
810.00
750.00
1,425.00
1,350.00
1,350.00
3,075.00
-
-
-
-
-
-
17,715.00

76,630.75

12,120.00
-

1,542.75

23,940.00

2,100.00

8,040.00

101,466.00

-
-

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-

2,300.00
-

41,087.11
-

26,508.56

29,347.93

-
-

-
-
220,000.00
-
-
81,225.00
42,750.00
42,750.00
39,600.00
39,600.00
39,600.00
39,600.00
39,600.00
39,600.00
39,600.00
39,600.00
39,600.00
39,600.00
39,600.00
-
-
-
-
-
-
85,500.00

26,784.00
3,265,364.59

Amount

-
-
-
77,385.00
43,355.00
-

-
19,720.00
11,586.25
10,626.00
10,936.50
11,247.00
11,557.50
11,868.00
12,178.50
12,489.00
12,799.50
13,110.00
13,420.50
13,731.00
14,041.50
-
-
-
-
-
-
16,120.00
-
-
-
-
-

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-

-
-
-
22,629.00
4,256.00

-
81,562.50
10,485.00
12,652.50
13,072.50
13,492.50
13,912.50
14,332.50
14,752.50
15,172.50
15,592.50
16,012.50
16,432.50
16,852.50
17,272.50
-
-
-
-
-
-
17,187.00

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-

-
-
165,470.00
38,531.72
-
-

-
-

93,906.30

1,095,218.77
Amount

10422

12800
0
0
64865

16675.2

118000
27750
51675.92
1693.63
3502.86
0

5000

0
55500

68000

540

3409.09090909
540
0

0
0
0
0
0
0
0
0
0
0

0
0
0
0

0
0
11931.8
0
0

0
0
2948.4
1185.6
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
868848.4
219374

40230
50287.5

0
0
0
0
0

0
0
0
0
0

0
0
438
1215.5

0
582810.4
359766

70533

0
0

107730

49460

0
0
0
0
0
0

0
0
0
0

0
0
275946.2
58410
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

5750
0

0
15701.10

9242.19
0

0
0
0
2250

2625

0
0
7250
8750
0

0
0
0
873523.75
0
0
0
0
4066580.55657

Amount

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0

43040
0

194281
162317
166707.8
168326.6
166774.4
174099.7
182556
167420.8
177561.2
182153.3
181639.7
180075
186188.8
195301.35
0
0
0
0
0
0
154837

0.00

85146.30
106432.88

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

1820
1859
1898
1937
1989
2041
2093
2171
2249
2327
2405
2496
2587
2678
0
0
0
0
0
0
27455.7
0

297920
179438
186951
192504
192707
202510
208033
213556
225029
230702
241375
230400
240254
247900
0
0
0
0
0
0
301016.4

87450

220404
0

0
0
0
0
0
0
0
0
0
0
0 -
0
0
0
0
0
0
0
0
0
0
0
-

0
0
0
0
0
0
0
0
0
0
0
0 -
0
0
0
0
0
0
0
0
0
0

83220
35600
37380
39160
40940
42720
44500
46725
48950
51175
53845
56515
59185
61855
0
0
0
0
0
0
203000

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

23881
26961
28173.5
25636
24288
26565
27086.5
25632
27630.5
28009
28462.5
28842
29183
29796
0
0
0
0
0
0
3002

0
0

351
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
18600

0
275
286
297
308
319
330
341
352
363
374
385
396
407
418
0
0
0
0
0
0
257.4
0
305
314.2
323.4
332.4
341.6
350.8
360
369
378.2
387.4
396.6
405.6
414.8
424
0
0
0
0
0
0
389.88
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0
0
0
0
0
0
0
0
0

0
0
0
0
1190
1181.25
1215
1248.75
1282.5
1316.25
1350
1397.25
1444.5
1491.75
1539
1613.25
1687.5
0
0
0
0
0
0
0
0

0
0

28700

0
100691.37
47116.67
0

0
0

0
0
0
0
0
0
0
0
3000

7875

27000

12250

0
0
0
8,193,074.25
Sl. No. Unit Qty. Mixing Cement Local Sand Local Sand
Ratio (Bag) (cft) (cft)
( Vuapur) (Gabtoli)
Items

SUB STRUCTURE
MISCELLANEOUS
1 cft 2,250 1:3:6 - -
3"C.C. Work
(Only mat RMC)

2 sft 270 13.50


Brick Flat Soling

3 cft 645 1:11/2:3 140.739 264.45


1.5" Patent
Stone
4 cft - 1:3 0 0
Pea Gravel
Concrete at
Parking (Avg.2"
Thick)

5 sft - 1:2:4 0
R.B.C in Parking
Floor
6 cft -

B.B.C ( Brick Bond


Concrete)

NON SCHEDULE
1 cft - 1:11/2:3 -
Shore pile Gap
Filling Casting

MANUAL CASTING
1 cft 0.00 1:1.25:2.5 -
R.C.C in
PileCap
/Footing/(Main
Structure)
(Stone Chips)
2 cft 203 1:2:4 34.79 42.63
R.C.C in
Footing(Boundar
y Wall) (Brick
Chips)

3 cft 1:1.25:2.5 1,256.69


R.C.C in Column
& Shear
4,975
Wall(Stone
Chips)

4 cft 100 1:2:4 17.14 23.00

RCC in Column -
Boundary
Wall(Bricks
Chips)

5 cft - 1:11/2:3 0

RCC in G.B- Main


Structure (Stone
Chips)

6 cft 270 1:2:4 48.6 59.40


RCC in G.B-
Boundary Wall
(Brick Chips)

cft 600 1:2:4 108 132.00

RCC in Tie beam


for pile top
(Brick Chips)

7 cft 0.00 1:2:4 0


R.C.C in
Basement Roof
(Stone Chips)

8 cft 1:1.25:2.5 -
R.C.C in
Retaining 8,590
Wall(RMC)
9 cft

Basement
Additional Floor -
Above Mat

10 cft 2035.00 1:1.25:2.5 0


RCC in U.G.W.R
(RMC)

11 cft - 1:2:4 0 -
RCC in Septic
Tank (Brick
Chips)

12 cft 20.00 1:2:4 3.44

Inspection Pit Top


Slab( Brick Chips)

Cft 12.05 1:6 2.07 15.49


Block Work

READY MIX CONCRETE


1 cft 37440.00 1:1.25:2.5 -

Mat(Stone
Chips)+retaining
wall + others
total upto G.F

2 cft 12,596.00 1:11/2:3 -


c) Stair, Ramp,
Basement-Roof

Sub Total 70,006 1,611 - 550

PILE WORK
cft
1 Shore Pile 16,005 1:11/2:3 3,521.10
cft 1:1.25:2.5
Service Pile
2 - -
precast

3 King Post cft 550 121.00


4 Tie beam Cft 600 1:11/2:3 136.20 252.00
Sub Total 3,778 - 252

1 cft 7,550 1:6 302 2642.5


10" Brick Work
2 sft 250 1:4 6.25 42.5
5" Brick Work
Sub Total 308 2,685 -

SUPER STRUCTURE

RCC WORK MANNUAL

1 cft 30015 1:1.25:2.5 7,593.80


R.C.C in
Column/Shear
Wall(Stone
Chips)

2 cft 1305 1:2:4 234.9 280.58


R.C.C in
Column/Shear
Wall(Boundary
Wall)(Brick
Chips)

3 cft 1800 1:11/2:3 396


R.C.C in Water
Body/Swim.
Pool/OHWT &
Others

RCC WORK RMC 0


4 cft 53574 1:11/2:3 0
R.C.C in
Slab/Beam/Stair
(RMC)

0
ANCILARY STRUCTURE

1 cft 338.91 1:2:4 61.00 145.7

DROP WALL &


SUNSHADE,
RAILING,
PARAPET( Pie
Chjips)

2 cft 76.65 1:2:4 13.797 32.9595


2)Lintel up to 5"
Width

3 cft 298.00 1:2:4 53.64 128.14


3)Lintel above 5"
Width
4 cft 0.00 1:2:4 0 0
4)False Slab up to
4" Thick

5 Cft 1:3:6 0 -

CC Work for
bottom of kitchen
counter top &
Basin counter top

cft 0 1:1.25:2.5 - 0
Fair-face Casting
cft 0 1:1.25:2.5 0.000 0.000
COLUMN
&SHEAR WALL

cft 0 1:1.25:2.5 0.000 0.000


SLAB & BEAM
cft 0 1:1.25:2.5 0.000 0.000
DROP WALL &
SUNSHADE,
RAILING,
PARAPET( Pie
7 Chjips)

cft 0 1:1.25:2.5 0.000 0.000


NON
STRUCTURAl
RCC WALL-1'

cft 0 1:1.25:2.5 0.000 0.000


NON Structural
RCC WALL 5"

8 cft 1:2:4 0 0
Jam Cobla
9 cft 1:6 3.11 23.33
Block Work 18.14
Sub Total 8,356 307 281

BRICK WORK
1 cft 1:4 0 0
10" Brick Work

cft 19,115 1:6 764.6 6690.25


10" Brick Work
2
1:6 0 0
10" Brick Work
sft 24,135 1:4 603.375 4102.95
5" Brick Work
3
1:4 0 0
5" Brick Work
4 sft 0 1:4 0 0
Facing Bricks
Sub Total 1,368 11,009

PLASTER WORK
1 sft 43,789 1:4 656.835 3284.175
1/2"~3/4" Thick
Ceilling Plaster

2 sft 57,204 1:6 686.448 5720.4


3/4" Thick Wall
Plaster

4 sft 13,617 1:6 163.40 1361.7


Outside
Plaster( Normal
Plaster)

5 Rough Plaster(For sft - 1:6 - 0


6 Fair Face Plaster 1:6 - 0
sft 7,700 1:6 137.45 1,135.75

Shore Pile
Rough Plaster
7
Including Wire
Mesh Fitting

8 rft
Decorative
1:4 0 0
Ceilling Edge

9 rft 1:6 - -

Special Plaster
(Jam, Kubla) is
included in
outside plaster

11 rft 670 1:6 0.84 6.97


Rain Water
Protection Sill

12 N.C.F sft 18,547 92.735


Sub Total 1,738 11,739

WALL TILES & MARBLE


1 sft 11702 1:3 292.55125 1170.205
Wall
Tiles(1"Thick
Mortar)

2 sft 200 1:3 8 30


Wall
Marble(1.5"Thic
k Mortar)

Sub Total 301 30 1,194

FLOOR TILES & MARBLE


1 sft 57973 1:3 2318.92 0 8695.95
Floor
Tiles(1.5"Thick
Mortar)

2 rft 9764 80.553 0 322.212


Tiles Skirting
3 sft 965 1:3 38.6 144.75
Floor Marble
4 rft 170 2.244 8.415
Marble Skirting
Sub Total 2,438 145 9,199

MARBLE & GRANITE COUNTER TOP


1 sft 468.00 1:3 18.72 70.2
Marble(1.5"Thic
k Mortar)

2 sft 30 1:3 1.2 3


Granite(1.0"Thic
k Mortar)

Sub Total 20 73

ROOF TILES
Roof Tiles Above LLC 3,500 1:3 140 525.00
Skirting 300 1:3 3.96 14.85
Sub Total 144 - 540

TERRACE ,GARDEN , PLANTER & DESIGN TILES/MARBLE

Terrace & Garden Tiles 1,105 1:3 44.2 165.75

Terrace & Garden & 0.00 1:4 0 0


DESIGN Marble
Skirting 150 1:3 1.98 7.425
Sub Total 44 166

PAVEMENT TILES
Pavement Tiles 13,050 1:3 522 1957.5
Skirting 890 1:3 11.748 44.055
Sub Total 534 2,002

WATER BODY & SWIMMING POOL TILES


1 sft 0 1:3 0 0
Water Body &
Swim. Pool
Floor Tiles

2 sft 0 1:3 0 0
Water Body &
Swim. Pool Wall
Tiles

3 Sft 0 1:3 0 0
Swimming Pool
Deck Tiles

Sub Total - -

ROOF TREATMENT
1 cft 1725 7:2:2
Lime Terracing

2 cft 0.00 1:2:4 0.00 0.00


Roof Treatment
2.5" C/C

Sub Total - -

SHUTTERING WORK
sft
Wooden Shutter
1 (Slab)Using 6
Times

sft
Wooden Shutter
2 (Beam)Using 6
Times

sft 41030
Steel Shutter
3
(Column)

sft
4 Design Shutter

SAND FILLING
1 cft 35500
Sand Filling FM(
0.5)

2 cft 0
Sand Filling FM(
1.2)

Total=
MATERIALS CONVERSION FORMULAE
Sylhet Sand Stone Chips Shingles (cft) Brick Pie Chips 1st Class Bricks 1st Class
(cft) (cft) Chips (cft) (nos.)(Auto Bricks (nos.)
(cft) Bricks) (Bangla
Bricks)

810

527.739

0 0

0 - -

- -

- -
42.63

1,965.13 3,925.28

23

- -

59.40

0 -

- -
- -

- -

- -

2,090 3,925 - - 528 - 810

6,549.25 13,095.29

- -

225.06 450.01
492
6,774 - 13,545 492 - -

86,825.00
1250

- - - - - - 88,075

11,855.93 23,696.84

280.575

738.00 1,476.00

- -
- 0

0.000 0.000

0.000 0.000

0.000 0.000

0.000 0.000

0.000 0.000

12,875 25,173 - - - -

219,822.50 -

- -
277,552.50 -

- - - - - 497,375 -

- - - - - -
- - - - - -

- - - - - -

- - - - - -

- - - - - -

- - - - - -
- - - - - -

- - - - - -

16473.75

0.00

- - - - - 16,474
ON FORMULAE
Picket White Tiles Granite/ Lime Surki Planks Batten Props
(nos.) Cement (sft) Marble (kg) (cft) (cft) (cft) (nos)
(Kg) (sft)

0
1938.65

955

2578.5

5730
0

11,202 - - - - - - - -

- - - - - - - - -
- - - - - - - - -

12462.75

3236.59

732.01

2845.9
0

0.00

0.00

0.00

0.00

0.00

19,277 - - - - - - - -
- - - - - - - - -

- - - - - - - - -
13457.3575

1.00 220

- 1 13,457 - - - - - -

64929.76

4.83 1061.5

0.85

- 6 65,991 - - - - - -

2.34 0 514.80

0.15 0 33.0

- 2 - 548 - - - - -

3,920.00 0

- - 3,920 - - - - - -

1,215.50 0

- - 1,216 - - - - - -

65.25 14,355.0 0
- 65 14,355 - - - - - -

- - - - - - - - -

8625 603.75

0.00

- - - - 8,625 604 - - -

0 0 0

0 0 0

0
Molasses Ceramic Plain Filling Pea Matia Oil Diesel
(kg) Bricks Sheet Sand Gravel (ltr) Oil (itr)
(nos) (sft) (cft) (cft)

0
- - - - - - -

- - - - - - -
- - - - - -
- - - - - - -
0

- - - - - - -

- - - - - - -
- - - - - - -

- - - - - - -

- - - - - - -

- - - - - - -

- - - - - - -
- - - - - - -

- - - - - - -

172.5

173 - - - - - -

0 0

170.685 170.685

0 0
42600

42600
SL. NO Name of Item Quantity Unit Rate (Tk.)

A.Civil Works (Material Cost)

Piling Works

a. Cement (Gray) Lafarge 3,778.30 bags 412.50


b. Sylhet Sand 6,774.31 cft 57.00
c. Local sand 252.00 cft 16.00
d. Shingles (100%) as per ICS 13,545.30 cft 177.50
Stone Chips(3/4" Down Grade)/Vutu
e. - cft 185.00
Vanga
Steel (60/72.5 Grade)
f. 73,232.00 kg 65.00
1
g. Steel (40 Grade) kg

12"x12" MS I-joist/H-beam for


bracing (only materials hiring 900.00 rft 811.00
charge)
10"x10" MS I-joist/H-beam for
h.
bracing (only materials hiring 400.00 rft 623.00
charge)

MATERIAL COST OF PILE & BRACING WORK

WORK UP TO EGL(FOUNDATION)

2 Filling Sand FM( 0.5) 42,600.00 cft 13.00


3 Polythene 281.92 lb 63.00
C.C Work, RCC Work,Pavement, Pea Gravel Work
a. Cement (Gray) Lafarge 1,398.47 bags 412.50
Cement (Gray Fresh) Boundary
213.00 bags 400.00
wall,pit slab & Tie beam

Cement (Gray Fresh) for Brick work 308.25 bags 400.00

b. Local Sand 3,235.47 cft 16.00


c. Sylhet Sand 2,090.16 cft 56.00
RMC (Ready Mix Concrete) 4000
48,065.00 cft 273.00
PSI Mat (with water proofing)

RMC (Ready Mix Concrete) 3500


12,596.00 cft 262.00
PSI Stair, Ramp, Basement-Roof

RMC (Ready Mix Concrete) 2500


2,250.00 cft 250.00
PSI CC
d. Steel (40 Grade) kg -
e. Steel (60/72.5 Grade 223,500.00 kg 65.00
f. Picket Bricks (Bangla) 11,202.15 Nos 9.60
g. Pea Gravel - cft 60.00

h. Stone Chips(Well Grade) volagonj 3,925.28 cft 205.00

Stone Chips(1/2" Down Grade)


i. 527.74 cft 175.00
volagonj
j. 1st Class Bricks( Bangla) 88,885.00 nos. 9.60
k. Bituminus Felt - SFT
l. Water Stopper(6") - rft 45.00
Expanded Metal Mesh( For Shore
8,800.00 SFT 7.00
Pile Rough Plaster)

Steel Shuttering -Vertical member 7,670.00 Sft

Steel Shuttering -Beam 5,500.00 sft


Steel Shuttering -Slab 8,000.00 sft
Tie Rod 120.00 Nos
Clamp 199.21 Nos
Nut-Bolt 395.00 kg 95.00
Washer 164.58 kg 85.00
PVC Pipe - rft
m.
Turn Bolt 150.00 Nos 190.00
Shutter Foam 1/2" thick (3'X6') 255.56 nos 120.00
Masking Tape 383.33 nos. 35.00
Rubber Gasket - 45.00
Aica 18.75 kg 72.00
Cock Sheet(3/4" To 1")
Cock Sheet(3")
Shuttering Bamboo (Full) 125.00 nos. 300.00
5 Shuttering Wood (Mango) 200.00 cft 450.00
n. Hessain Cloth(12'-0" Wide) 958.33 yd 92.00
o. Polythene 469.87 lb 63.00
7" Cutting Disc 440.00 Nos 65.00
4" Cutting Disc 92.00 Nos 20.00
p.
7" Grinding Disc 208.00 Nos 70.00
4" Grinding Disc 156.00 Nos 25.00
Curing Pipe 800.00 rft 12.00
Cloth pipe/Canvas Pipe(4") - rft 50.00
q. Cloth pipe/Canvas Pipe(3") 400.00 rft 36.00
Cloth pipe/Canvas Pipe(2.5") 200.00 rft 29.00
Level Pipe
Jute Tape(Not in use at present) nos. 55.00
Jute Rope 60.00 kg 70.00
r. Cotton Rope 50.00 kg
Nylon Rope (LS.) 58.50 kg 140.00
Sutli(Thin Jute Rope) 60.00 kg 72.00
o. Stone/Khoa Screening Net - rft 75.00
G.I. Wire Nail( 2.5") 10.00 kg 75.00
G.I. Wire Nail( 2") 10.00 kg 75.00
G.I. Wire Nail( 1/2")(3/4")(1") 10.00 kg 75.00
p.
S.S Nail 10.00 kg 180.00
G.I. Wire (24/SWG) 30.00 kg 120.00
G.I. Wire (16/SWG) 40.00 kg 105.00
q. Jute cloth 40 kg 45.00
DRI LL BI T- HAMMER-SI ZE : 10"
X 16 MM- MODEL: N/ A(From 1 pcs 1,010.00
purchase)
DRI LL BI T- HAMMER-SI ZE : 10"
X 12 MM- MODEL: N/ A(From 3 pcs 600.00
purchase)
s.
DRI LL BI T- HAMMER-SI ZE : 8" X
10 MM- MODEL: N/ A(From 1 pcs 520.00
purchase)
DRI LL BI T- HAMMER-SI ZE : 10"
X 20 MM- MODEL: N/ A(Frrom 1 pcs 1,975.00
purchase)
Star Screw 800 pcs 0.49
t.
Royal Plug 10 packet 35.00
Hexo Blade 10 nos 10.00
Steel Brush 24 nos 35.00
u. Cup Brush previously used taken
20 nos 371.00
from purchase
Tal Brush 20 nos 20.00
v. Welding rod 60 packet 730.00
Admixture
Concrete water
a - ltr 145.50
6 proofing(UGWR,R.wall,OHWT)
b. Bonding Agent( Nito Bond) 32.22 ltr 535.00
c Epoxy Grout 5.00 tube 2,850.00

RCC WORK ABOVE FGL

SUPER STRUCTURE CIVIL MATERIALS

Cement (Grey) Insee/Lafarge 8,356.25 bags 412.50


a.
Cement (White) - bags 995.00
Local Sand(Gabtoli Sand) 280.58 cft 16.00
b. Local Sand(Vuapur Sand)( False
306.83 cft 32.00
Slab, Lintel, Sunshed etc)
c. Sylhet Sand 12,874.50 cft 58.00
d. Steel (40 Grade) kg -
Steel (60/72.5 Grade) 696535.00 kg 65.00
e.
e. Steel (60/72.5 Grade)for remainig
kg 65.00
work(BSRM)
f. Picket Bricks (Bangla) 19,277.25 nos. 9.60

Stone Chips.Volagonj (well Grade)


g. 25,172.84 cft 205.00
present rate is considered

h. Stone Chips(1/2" Down Grade) cft 182.00


i. Pie Chips - cft 72.00

j. RMC (Ready Mix Concrete) 3500 psi 53574.00 cft 262.00

k. Bituminus Felt - Sft


M.S Sheet/Steel Shutter-Slab
9,450.00 sft
Shutter( Single Shutter)

Steel Shutter For Vertical Member 4,400.00 sft

Steel Shutter For Beam 4,660.00 sft


Tie Rod Nos
Clamp 1,844.04 Nos
Nut-Bolt 271.75 kg 95.00
Washer 113.00 kg 85.00
Turn Bolt 150.00 Nos 175.00
l.
Shutter Foam(3'*6') size 592.22 Nos 120.00
Masking Tape 888.33 Nos 35.00
YELLOW RUBBER GASKET-22" X
45" 2 MMMODEL
Aica for Shuttering used 325.00 kg 72.00
Cock Sheet(3/4" To 1") 1,001.00 Nos 170.86
1
Cock Sheet(3") Nos 566.56
Bamboo Full Size 50.00 Nos 300.00
Shutering props 1,366.67 Nos
Shuttering wood mango 200.00 cft 450.00
m. Hessain Cloth (12'-0" Wide) 888.60 yd 92.00
n. Polythene 250.31 lb 63.00
7" Cutting Disc 660.00 Nos 65.00
4" Cutting Disc 138.00 Nos 20.00
o.
7" Grinding Disc 227.00 Nos 70.00
4" Grinding Disc 178.00 Nos 25.00
Curing Pipe 3,900.00 rft 12.00
p. Canvas Pipe/Cloth Pipe
Level Pipe 500.00 rft 1.25
Jute Tape - nos. 55.00
Jute Rope 390.00 kg 70.00
q. Cotton Rope 50.00
Nylon Rope (LS.) 65.00 kg 140.00
Sutli(Thin Jute Rope) 390.00 kg 72.00
r. Stone/Khoa Screening Net 290.00 rft 45.00
G.I. Wire Nail( 2.5") 13.00 kg 75.00
G.I. Wire Nail( 2") 19.50 kg 75.00

s
G.I. Wire Nail( 1/2")(3/4")(1") 26.00 kg 90.00
s
S.S Nail 10.00 kg 180.00
G.I. Wire (24/SWG) 39.00 kg 120.00
G.I. Wire (16/SWG) 260.00 kg 105.00
t. Jute Cloth 260.00 kg 45.00
DRI LL BI T- HAMMER-SI ZE : 12"
4.00 pcs 1,010.00
X 16 MM- MODEL: N/ A
DRI LL BI T- HAMMER-SI ZE : 10"
10.00 pcs 600.00
X 12 MM- MODEL: N/ A
u.
DRI LL BI T- HAMMER-SI ZE : 8" X
10.00 pcs 495.00
10 MM- MODEL: N/ A
DRI LL BI T- HAMMER-SI ZE : 8" X
20.00 pcs 250.00
6 MM- MODEL: N/ A
Star Screw 3,250.00 pcs -
v.
Royal Plug 26.00 packet 35.00
Hexo Blade 10.00 nos 10.00
w. Steel Brush 156.00 nos 30.00
Tal Brush 100.00 nos 20.00
x Welding rod /Electrode 65.00 pac 730.00
Admixture
a Concrete water proofing ltr 135.00
6 b. Bonding Agent( Nito Bond) ltr 535.00

c Epoxy Grout (HLTI HY170 500 ml) tube 2,800.00

Fair Face
Work
(Materials)

a. P-Con - nos 15.00


b. Thread Rod For Fair Face - nos 13.75
2 c. C-Clamp(Asset)(20 Times Use) - nos -
d. Foam - sft 6.25
e. Rubber Solution( 15 Lit=1 Tin) - Tin 3,300.00
f Celluloid Paper - roll 3,000.00
g. Cup-brush nos 370.00
h. 4" Foam Disc - nos 40.00
i. 7" Foam Disc - nos 265.00

SAFETY
MATERIAL

a. SAFETY NET 63,700.00 sft 2.88


b FIRST AID BOX 1.00 Nos 350.00
c. SAFETY HELMET 35.00 nos 325.00
d. GUM BOOT-FULL SIZE 15.00 Pair 480.00
e. SAFETY BELT-BODY 20.00 Nos 1,400.00
1
f SAFETY BELT- 80.00 Nos 420.00
g. SAFETY SHOE 12.00 Pair 1,440.00
h. WELDING HAND SCREEN 40.00 Nos 100.00
1

i. WELDING ROD HOLDER 30.00 Nos 440.00


j. WELDING GLASS-WHITE 40.00 Nos 15.00
k. WELDING GLASS-BLACK 50.00 Nos 50.00
m. HAND GLOVES- LEATHER 80.00 Nos 90.00
n HAND GLOVES- CLOTH 50.00 Nos 35.00

OTHERS(CIVIL MATERIAL)
a Terpoline 18,000 Sft 9.5
b Rain Coat 12 Nos 750
e Plastic Mug 18.00 Nos 50.00
f Plastic Belcha 18.00 Nos 25.00
1 g Plastic Bucket 12.00 Nos 220.00
Belaching Powder For
h Cleaning(Purchased From Petty 50.00 Kg
Cash)
Kerosin Oil (Purchased From Petty
i 30.00 Lit
Cash)
FIXED ASSET
MISCELLANEOUS MATERIALS
BURNER -GAS (SI NGLE/
a DOUBLE/ FOUR)-C.I . SHEET 3.00 Nos
MADE- MODEL: NGS-21 GB
C.I . SHEET(Labor Shade & Safety
50.00
Canopy)

b I NDUSTRI AL PROFI LE Nos


SHEET( For Labor Shade & Safety
40.00
tray)
0.47 MM- MODEL: 10'-0"
MEASUREMENT TAPE (STEEL)-
2.00
100 RFT
MEASUREMENT TAPE (STEEL)-50
2.00 Nos
RFT- MODEL: N/ A
c MEASUREMENT TAPE (STEEL)-16
7.00
RFT
GAUGE MEASURER 1.00 Nos
SLI DE CALI PERS-SI ZE : 6" 1.00 Nos
SPRI T LEVEL 3.00 Nos
MATTAM 2.00 Nos
ALUMI NUM STRAI GHT EDGE
1.00 Nos
(PATTA): -SI ZE : 6'-0"
d JUGAN- WOOD-TATUL WOOD-
2.00 Nos
(8"X6"X8'-0")MODEL: N/ A
JUGAN- WOOD-TATUL WOOD-
2.00 Nos
(8"X5"X8'-0")MODEL: N/ A
BELCHA-STEEL (HEAVY) 12.00 Nos

STEEL TAGAR-MEDI UM WEI GHT 12.00 Nos

e STEEL FERA 10.00 Nos


SPADE-HEAVY 5.00 Nos
e

SPADE-HEAVY- MODEL: with but 5.00 Nos

f MAGNIFYING GLASS 1.00 Nos


WHITE BOARD 2.00 Nos
DISPLAY BOARD 2.00 Nos
g
NOTI CE BOARD-N/ A- MODEL: N/
1.00 Nos
A
WATER FILTER 2.00 Nos
h
GERM KIT FOR FILTER 5.00 Nos
TOOLS BOX-N/ A- MODEL: steel 1.00 Nos
PI PE WRENCH-18" LENGTH 1.00 Nos
PI PE WRENCH-24" LENGTH 1.00 Nos
SLY WRENCH-10" 2.00 Nos
SLY WRENCH-12" 2.00 Nos
HAND SAW-SI ZE : 18"- MODEL:
2.00 Nos
HMBR
PLYERS- COMBI NATI ON-SI ZE:
2.00 Nos
10"
PLYERS-CUTTI NG-SI ZE: 10"-
2.00 Nos
MODEL: 8"
HAMMER WITH BATT-8 LBS WEI
GHT- 2.00 Nos
MODEL: without butt
HAMMER WITH BATT-5 LBS WEI
2.00 Nos
GHT
HAMMER WITH BATT-2 LBS WEI
2.00 Nos
GHT- MODEL: N/ A
i
HAMMER WITH BATT-1.5 LBS WEI
3.00 Nos
GHT- MODEL: N/ A
HAMMER WI TH BATT-1 LBS WEI
5.00 Nos
GHT- MODEL: N/ A
HAMMER WI TH BATT-½ LBS WEI
2.00 Nos
GHT- MODEL: 1 lbs
HAMMER WI TH BATT-- MODEL:
Nos
BOSCH
HAMMER (PLASTI C)-HAMMER
2.00 Nos
(PLASTI C)- MODEL: N/ A
HAMMER (RUBBER MALET)-N/ A-
2.00 Nos
MODEL: N/ A
CHISEL (POI NTED)-16"- MODEL:
L= 400MM, D= 16MM, SM-50 3.00
(BOSCH)
SCREW DRI VER-10" FLAT 4.00 Nos
SCREW DRI VER-10" STAR 3.00 Nos
TESTER-N/ A 5.00 Nos
SLUMP CONE-SI ZE : 4" X8" 1.00 Nos
SLUMP CONE-SI ZE : 12"
LENGTH; DI A: 8" X 12"- MODEL: 1.00 Nos
N/ A
j
CYLI NDER MOLD (3 NOS= 1SET)-
2.00 SET
SI ZE : 8" L; DI A : 4"
j

TEMPI NG ROD-16 MM DI A-
2.00 SET
MODEL: N/ A
RECHARGABLE LI GHT - HANDY-
2.00 NOS
k N/ A
TORCH LI GHT-RECHARGABLE 4.00 NOS
PAD LOCK-63 MM- MODEL: T.C 40.00 NOS
PAD LOCK-50 MM- MODEL: T.C 20.00 NOS
KI CO LOCK-- MODEL: 2.5" 5.00 NOS
l
ROD BI NDI NG CHAI N/ STEEL-N/
A- MODEL: 200.00 RFT
(Best Quality, Heavy)
EMPTY DRUM (FULL SI ZE)-
Plastic- MODEL: 5.00 NOS
N/ A
m EMPTY DRUM (HALF SI ZE)-Steel-
MODEL: 3.00 NOS
N/ A
STEEL BUCKET 10.00 NOS
n UMBRELA 10.00 nos
FI RE EXTI NGUI SHER
5.00 nos
(CONSUMABLE)-5 KGS
0
FI RE BUCKET-FI RE BUCKET 2.00 nos
BUCKET STAND-N/ A 2.00 nos

SHUTTERING MATERIALS

STEEL SCAFFOLDI NG - JOI NT PI


N/
COUPLI NG-STEEL SCAFFOLDI 10.00 Set
NG - JOI NT PI N
/ COUPLI NG
a
PI PE SCAFFOLDI NG - COUPLER-
1,800.00 NOS
CLAM- SWI VEL- MODEL: N/ A

M.S. PI PE-1½ " DI A- MODEL: N/ A 950.00 NOS

Joint PIN 200.00 NOS


U-CLAMP (S.S.)-DI A : 25 MM-
b - NOS
MODEL: 1/ 2"
C-CLAMP-3 MM THI CK; 5: LONG-
c NOS
MODEL: N/ A
SHADEL CLAMP-S.S. SHEET - 4"
NOS
DI A
SHADEL CLAMP-3/ 4" DI A NOS
SHADEL CLAMP-1" DI A NOS
SHADEL CLAMP-1 1/ 2" DI A 150.00 NOS
d
SHADEL CLAMP-1" DI A- MODEL:
NOS
PVC Shadle
SHADEL CLAMP-3/ 4" DI A-
MODEL: PVC NOS
Shadle
e PLAIN SHEET 50.00 NOS
STEEL SHUTTER NOS
f
SHUTTER CLIP NOS
g TURN BOLT 858.00 NOS
h STEEL PROPS 1,765.00 NOS

MACHINE, EQUIPMENTS & PARTS OF THEM

VI BRATOR MACHI NE (ELECTRI


CAL)-MOTOR CAP.: 2 HP- MODEL: 2 NOS
ZNG-1 CHI NA
VI BRATOR MACHI NE (DIESEL)-
MOTOR CAP.: 2 HP- MODEL: ZNG- 1 NOS
a 1 CHI NA
VI BRATOR NOZZLE-SI ZE : 2" DI
5 NOS
A
VI BRATOR NOZZLE-SI ZE : 1½ "
8 NOS
DI A
WATER PUMP-DIESEL 1 NOS
WATER PUMP-SUBMERSIBLR 2 NOS
b WATER PUMP-JET PUMP 1 NOS
WATER PUMP-CENTRIFUGAL
1 NOS
PUMP
PRESSURE TEST MACHI NE-N/ A-
c 1 NOS
MODEL: HYDROLI C

CONCRETE BREAKER MACHI NE/


DEMOLI TI ON HAMMER-I MPACT
1 NOS
FORCE : 25 JOULES, HP : 1500 W-
d MODEL: GHS11E,1500w(BOSCH)

CARBON-N/ A- MODEL: CONCRET


10 NOS
BREKER

GRI NDI NG MACHI NE-SI ZE : 4"


1 NOS
DI A; HP : 850 W- MODEL: BOSS
e
CARBON BRUSH (FOR GRANDI
10 NOS
NG MACH)-4"- MODEL: N/ A
GRI NDI NG MACHI NE-SI ZE : 7"
DI A; HP : 2400 W- MODEL:
1 NOS
BOSCH, GWS 24-
f 180H,2400w,180mm
CARBON BRUSH (FOR GRANDI
10 NOS
NG MACH)-7"- MODEL: N/ A
ROOF HOIST MACHINE 1 NOS
TOWER HOIST MACHINE 1 NOS
TOWER CRANE NOS
g STEEL WI RE ROPE-½ " (12 MM)
800 Rft
DI A- MODEL: N/ A
STEEL WI RE ROPE-¾ " (20 MM)
DI A- MODEL: NOS
Steel core
h WELDING MACHINE 1 NOS
MIXTURE MACHINE WITH
1 NOS
HOPPER
i
MIXTURE MACHINE WITHOUT
1 NOS
HOPPER
MOI STURE CONTENT MEASURI
k NG METER- CEM DT - 125B- 1 NOS
MODEL: N/ A
DRI LL MACHI NE(HAND)-DI A : 4-
22 MM; HP : 620 W; FORCE : 2.2
1 NOS
JOULES- MODEL: GBH 2-
l 22E
CARBON BRUSH (FOR DRI LL
MACH)-CARBON BRUSH (FOR 10 NOS
DRI LL MACH)- MODEL: N/ A
BLOWER MACHI NE-N/ A- MODEL:
m 1 NOS
N/ A
n GENERATOR 1 NOS
GAS CUTTER MACHINE 1 NOS
GAS CUTTER SET-OXI GEN CYLI
2 NOS
o NDER
GAS CUTTER SET-L.P. CYLI
2 NOS
NDER
BRICK WORK
a. Cement (Gray) Fresh 1,367.98 bag 400.00
b. Local Sand(Bhuapur) 11,009.06 cft 32.00
1
c. 1st Class Bricks (Auto) 497,375.00 nos 11.30
d. 1st Class Bricks (Bangla) - nos 9.60
e Facing Bricks - sft

PLASTER WORK
Cement (Gray)Fresh 1,737.70 bag 400.00
a.
White Cement - bag 995.00
b. Local Sand(Mymensingh) 11,739.17 cft 32.00
c. Bamboo Macha 121 nos. 165.00
d. Expanded Metal Mesh sft 6.50
e. Sand Screening Net 290.00 rft 45.00
8
f Aica kg 200.00
Plaster Foam (cut pcs foam) 150.00 nos. 45.00
h. Stick Broom 347 nos. 30.00
i. Flower Broom 347.00 nos. 45.00
Polythene 583 lb 63.00
Admixture
a. Salinity Treatment ltr 150.00

TILES MARBLE AND GRANITE WORK


FLOOR TILES/Marble
Appartment Tiles(24"*24") For
24,973.07 sft 102.00
Landowner part RAK

a.
Appartment Tiles(32"*32") For
a. 24,973.07 sft 180.00
N.R.E.L part Imported

Apartment(wait.Comu. etc.) -Marble 546.04 sft 450.00

Gym/ Reception/Community
- sft 160.00
Wooden Texture Tiles(24"*24")
Main stair tiles (12"*24") 4,860.65 sft 95.00
c. Main Stair ( Trade, Riser, Skirting,
325.61 sft 550.00
Landing)-MARBLE
Lift Lobby (24"*24") 4,221.58 sft 132.00
d.
Main Stair & Lift Lobby-MARBLE 267.30 550.00
2.Basement-GF Stair
5,458.61 95.00
3.Out Side Level Up Stair ( Tiles)
e.

2.Out Side Level Up Stair (Marble) -

3.
1 3. Driver Waiting

f 462.84 60.00
4. EMR Room

5.
PumpMain
Room toilet floor (12"*12")
g. - Sft 60.00
R.A.K/equivalent

2nd & 3rd toilet floor (12"*12") For


h. 892.64 Sft 60.00
Landowner part RAK/equivalent

Toilet floor For N.R.E.L part


892.64 Sft 170.00
Imported
Main kitchen floor (12"*12")
i. - sft 60.00
R.A.K/equivalent
j Caretaker Kitchen Floor - sft 58.00
Servent & Driver toilet (8"*12")
k - sft 39.00
R.A.K/Equivalent
l Cement (Gray) 2,438.07 bag 400.00
m Local Sand(Gabtoli Sand) 9,198.53 cft 16.00
Local Sand (Vuapur Sand For
n. 144.75 cft 32.00
Marble Work)
o White Cement 5.68 bag 995.00

WALL TILES/Marble
Main kitchen wall (12"*24") R.A.k
- sft 80.00
/Equivalent ceramic tiles
a. C.Taker kitchen wall (8"*12")
- 39.00
R.A.k /Equivalent ceramic tiles
Down wash Wall Tiles - 80.00
Main toilet wall (10"*16") R.A.k
b. - sft 80.00
/Equivalent ceramic tiles
2nd & 3rd toilet wall For Landowner
c. 4,571.25 sft 65.00
part RAK/equivalent

Toilet wall For N.R.E.L part Imported 4,571.25 sft 170.00

Servent toiilet wall (8"*12") R.A.k


d. - sft 39.00
/Equivalent ceramic tiles
Reception wall Tiles - sft 210.00
e.
Reception wall Marble - sft 450.00
2 Lift Wall Tiles 3,103.85 95.00
f
Lift Wall Marble (G.floor) 220.00 sft 550.00
g. Border for Toilets 1,247.75 rft 62.00
h. Slate Stone /Cladding Tiles -
Column protection Tiles(Height=3'-
j 799.25 sft 95.00
0")
Boundary Dado Tiles - rft 150.00
h. Boundary Wall Cladding-
- sft 540.00
Marble/Granite
Outside Wall Cladding(Tiles) - sft
k Outside Wall Cladding( marble/
- sft 90.00
Granite)
l Cement (Gray) Fresh 300.55 bag 400.00
m.1 Local Sand(Gabtoli Sand) 1,193.61 cft 16.00
Local Sand (Vuapur Sand For
m.2 30.00 cft 32.00
Marble Work)
n. White Cement 1.00 bag 990.00
Marble / Granite Work (Counter Top)

a. Basin Counter Top (16-18mm thick) 514.80 sft 550.00

Kitchen worktop Granite 16-18 mm


b. - sft 650.00
thick.
3
c. Reception Table Counter Top 32.10 sft 570.00
d. Cement (Gray) 19.92 bag 400.00
Local Sand (Vuapur Sand For
e. 73.20 cft 32.00
Marble Work)
f White Cement 2.49 bag 990.00
Roof Tiles - Rustic Tiles (China) 3,850.00 sft 190.00
Roof Tiles - Wooden Texture Tiles sft 270.00
Decorative Marble in Between Roof Tiles sft 450.00
4
a. Cement (Gray)Fresh 143.96 bag 400.00
b. Local Sand(Gabtoli Sand) - cft 16.00
c. White Cement - bag 995.00
Water Body & Swimming Pool Tiles
a Water Body Floor - sft 340
b Swimming Pool Wall - sft 340
Swim. Pool & GF East Side Deck
c. Area (wooden tiles tiles-model DTA- - 270.00
3D18304)
d. Amber-Rhnio ( 4" x2" Size) Rft 300.00
e. Amber Crook Rft 90.00

5
f Amber- Angular Rft 75.00
5
g. Woodplex Installation sft 50.00

h. S.Pool (Change/Shower/Toil.) Floor - sft 200

i. Swimming Pool Drain Tiles - sft 70


Swim.Pool (Change/Shower/Toilet)
j - sft 200
Wall
k Cement (Gray) - bags 400.00
l Local Sand - cft 16.00
m White Cement - bags 990.00
Terrace ,Garden & Decoration Tiles/Marble
Tiles 1,246.86 sft 67.00
Marble - sft 450.00
6
a. Cement (Gray) 44.20 bag 400.00
b. Local Sand 165.75 cft 16.00
c. White Cement - bag 990.00
Pavement Tiles (12"x12"x1") for Parking area 9,777.76 sft 32.00
Pavement Tiles (6" X6" NBPL) for drive way 6000.00 sft 44.00
Decorative Marble in Between Pavement - sft 450.00
7
a. Cement (Gray) 533.75 bag 400.00
b. Local Sand Gabtoli 2,001.56 cft 16.00
c. White Cement bag 990.00
Admixture
c. Tiles Adhesive bags 580.00
b Vixol 293.81 Bottle 50.00
c. Tiles Grout(1kg bag) 1,651.48 kg 105.00
d Yellow Stone Pcs 410.00
Hole Cutter For Grating(5pcs cuttig
e. 10.00 Nos 150.00
8 by each Nozzle)
f Oxalic Acid 85.14 Kg
Yellow Oxide/Black Oxide/Coloring
g. 85.14 Kg
Pigment
h. 120# Stone 70.00 Nos
i. Hessian Cloth 341.67 Yard 85.00
j Polythene 145.78 Lb 30.00
k 120 # Water Paper 50.00 Nos 30.00
l Floor Cleaning Moph 20.00 Nos 260.00
m Glass Cleaner 5.00 Nos 80.00

WOOD WORK
DOOR
1
FRAME
Main Doorframe (Solid ctg. Teak 5.75"*2.25")
Height=7'
a. Wood - rft 488.00
Clamp cost(4"X2")(Vertical, For
b. 5.75" & 7 ft Ht, 5*2 Nos) (4 - kg 75.00
pcs per Kg)

A
Clamp cost(2.5"X1.5")(Horizontal &
c. - kg 75.00
A R.C.C Surface)
ROWEL BOLT-10 NO - 3" LONG
d. (Only For R.C.C Surface Clamp) - nos. 7.50
(2nos for Each Clamp)
1½" to 1¼"Wooden Screw (8 pcs
e. - Gross 60.00
per Clamp)
Bitumen(Applied From
f. - kg 50.00
Manufacturer)
Stair Case Door frame (Solid Chitt.Teak, 5.75"x2.25")

B a. Wood - rft 665.00


b. Clamp cost kg 80.00
c. Bitumen - kg 50.00
All Bedroom Door (Shilkorai)
a. Wood (Shilkorai) (6.25"*2.25") 0.00 rft
Clamp cost(4"X2")(Vertical, For
b. 5.75" & 7 ft Ht, 5*2 Nos) (4 pcs per - kg 75.00
Kg)
Clamp cost(2.5"X1.5")(Horizontal &
c. - kg 75.00
R.C.C Surface)
C
ROWEL BOLT-10 NO - 3" LONG
d. (Only For R.C.C Surface Clamp) - nos. 7.50
(2nos for Each Clamp)
1½" to 1¼"Wooden Screw (8 pcs
e. - Gross 60.00
per Clamp)
Bitumen(Applied From
f. - kg 50.00
Manufacturer)
Bathroom Door

a. Wood (Teak Chamble) (6.25"*2.25") 874.50 rft 515.00

Clamp cost(4"X2")(Vertical, For


b. 5.75" & 7 ft Ht, 5*2 Nos) (4 pcs 79.50 kg 75.00
per Kg)
Clamp cost(2.5"X1.5")(Horizontal &
c. - kg 75.00
D R.C.C Surface)
ROWEL BOLT-10 NO - 3" LONG
d. (Only For R.C.C Surface Clamp) - nos. 7.50
(2nos for Each Clamp)
1½" to 1¼"Wooden Screw (8 pcs
e. 26.50 Gross 65.00
per Clamp)
Bitumen(Applied From
f. - kg 50.00
Manufacturer)
Kitchen (Shilkoroi)
a. Wood (Shilkorai) (6.25"*2.25") 0.00 rft -
Clamp cost(4"X2")(Vertical, For
b. 5.75" & 7 ft Ht, 5*2 Nos) (4 - kg 75.00
pcs per Kg)
Clamp cost(2.5"X1.5")(Horizontal &
c. - kg 75.00
R.C.C Surface)
E
E
ROWEL BOLT-10 NO - 3" LONG
d. (Only For R.C.C Surface Clamp) - nos. 7.50
(2nos for Each Clamp)
1½" to 1¼"Wooden Screw (8 pcs
e. - Gross 60.00
per Clamp)
Bitumen(Applied From
f. - kg 50.00
Manufacturer)
Kitchen Verandah Door (Shilkoroi)
a. Wood (Shilkorai) (6.25"*2.25") 0 rft 285.00
Clamp cost(4"X2")(Vertical, For
b. 5.75" & 7 ft Ht, 5*2 Nos) (4 - kg 75.00
pcs per Kg)
Clamp cost(2.5"X1.5")(Horizontal &
c. - 75.00
R.C.C Surface)
F
ROWEL BOLT-10 NO - 3" LONG
d. (Only For R.C.C Surface Clamp) - 7.50
(2nos for Each Clamp)
1½" to 1¼"Wooden Screw (8 pcs
e. - Gross 60.00
per Clamp)
Bitumen(Applied From
f. - kg 50.00
Manufacturer)
C.Taker+Guard+Utility Room

a. Wood (Teak Chamble) (6.25"*2.25") 17.5 rft 515.00

Clamp cost(4"X2")(Vertical, For


b. 5.75" & 7 ft Ht, 5*2 Nos) (4 1.78 kg 75.00
pcs per Kg)
Clamp cost(2.5"X1.5")(Horizontal &
c. - 75.00
G R.C.C Surface)
ROWEL BOLT-10 NO - 3" LONG
d. (Only For R.C.C Surface Clamp) - 7.50
(2nos for Each Clamp)
1½" to 1¼"Wooden Screw (8 pcs
e. 0.40 60.00
per Clamp)
Bitumen(Applied From
f. - kg 50.00
Manufacturer)
S., C.taker etc Toilet(Solid Chitt.Teak
6.25"x2.25")
H a. Wood - rft 670.00
b. Clamp cost kg 75.00
c. Bitumen - kg 75.00
2 Door Shutter
Main Door (Solid ctg. Teak) non
nfl
a. Shutter - sft 1,200.00
b. Handle Lock 0.00 nos. 2,675.00
c. Security Lock - nos. 645.00
d. Door Chain - 225.00
A e. Hinges(4"*3"*2.9 mm ss 304) - nos. 150.00
f. Door Knocker - nos. 190.00
A

g. Door viewer - nos. 240.00


h. Magnetic Stopper - nos. 200.00
i. Tower bolt 8" - nos. 400.00
j. Tower bolt 6" - nos. 300.00
k. Screws only for tower bolt - Gross 60.00
All Bedroom Door (Teak Chamble
Flush Door) for toilet
a. Shutter 821.5 sft 212.30
B b. Internal Door Lock 53.00 nos. 630.00
c. Hinges 212.00 nos. 150.00

d. Magnetic Stopper/(Buffer stopper) 53.00 nos. 35.00

All Stair Case Door (Solid Chitt.


Teak)
a. Shutter - sft 1,150.00
C
b. Internal Door Lock nos. 980.00
c. Hinges - nos. 280.00
d. Magnetic Stopper - nos. 300.00
Bath Room Door (solid P.V.C)
a. Shutter 0 nos. 4,200.00
b. Internal Door Lock 0.00 nos. 630.00
D
c. Hinges - nos. 150.00
d. Buffer stopper - nos. 35.00
e. Screws doz
Kitchen & Door (Teak Chamble
Flush)
a. Shutter sft 212.30
E
b. Internal Door Lock 0.00 nos. 630.00
c. Hinges - nos. 150.00
d. Buffer stopper - nos. 35.00
Kitchen Verandah Door (Teak
chamble flush)
a. Shutter 0 sft 212.00
F b. Internal Door Lock - nos. 630.00
c. Hinges - nos. 150.00
d. Buffer stopper - nos. 35.00
e. Screws doz 25.00

S. Bed , C.taker etc Toilet Door


(Teak Chamble Flush Door )

a. Shutter 15.5 sft 212.30


G
b. Internal Door Lock 1.00 nos. 630.00
c. Hinges 4.00 nos. 150.00
d. Buffer stopper 1.00 nos. 35.00
e. Screws 2.67 doz 25.00
Servent Toilet Door (PVC door
frame with shutter)
a. Door-Shutter 0 nos. 5,600.00
H b. Handle nos.
H
c. Hinges nos.
d. Buffer stopper nos.
e. Screws doz

B. Civil Works (Labour Cost)

1 PILING WORK

1 WORKS UP TO PARKING LEVEL(FOUNDATION WORK)

2 WORKS ABOVE PARKING LEVEL(SUPER STRUCTURE WORK)

3 Brick Works

4 Plastering Works

5 SAFETY(LABOR)

6 Tiles & Marble Works

7 WOOD WORK

C. (Material & Labour)( Civil, MS, Aluminium, Wood)

Civil Work(Foundation)
1 Pest Control
A
Floor Level area 1,200.00 sft. 3.65

Civil Work(Others)
Wheel Barier Making including
- Rft 167.50
a Painting
2 Imported Wheel Barrier 27.00 nos 1,545.00
Garden Decorative CC Work
b Gravel/Tiles Fixing over CC 302.98 Sft 285.00
Including Outside MS Framing
Civil Work (Safety)
3 Terpoline Fitting & Removing
a (50% Cost Considered, As Material sft 25.00
is Re-usable)

(Civil Works-Structure)
4
Roof Treatment & Other Area Water Treatment
Option-1
(Lime Terracing) including Labour &
4600.00 sft 96.00
material
a. 1st Class Bricks (Bangla) - nos 9.70
b. Stone Lime - kg 11.71
c. Surki - cft 24.00
d. Molasses - KG 19.00
e. Tamarind kg
Option-2
(Roof Treatment instead of LCC (PCCN i/c
waterproofing mixed)Water Proofing)(Open Roof sft 230.00
Area- Including Staircase Roof))
Option-3
Where no roof tiles Provision( Below Deck Area)
2.5" C/C Work+ Wire mesh+ Water Proofing 0 Sft
ii.
a. Cement - Bag 400.00
b. Local Sand - CFT 16.00
c. Sylhet Sand - CFT 58.00
d. Picket Bricks, i/c breaking cost - nos. 9.60
e. Labor-CC Casting - sft 5.25
f. Expanded Metal Sheet - sft 6.50
g. Water Proofing - sft 55.00
Others Area Water Proofing
OHWT+ Water Boddy+Swimming
a. sft 71.00
Pool
b. Gardening on RCC sft 47.00
c. Below GL Lickage Treatment - nos. 342.00
MS
WORK
GRILL WORK
Window Grill (Rate acoording to F.H
a. 1,965.00 sft 107.00
Solaries)
b. Sliding Grill - sft
c. Kitchen Verandah Safety Grill - sft
1
d. Veranda safety Grill - Sft
e. Parking Grill - sft
f. Safety Grill Over Boundary - sft
g. Sub-Station room Grill 120.00 sft 224.00
h. Boundary Grill - sft 240.00
i. Lift Lobby/corridor safety grill - sft 138.00
RAILING
Main Stair Railing (Rate acoording
a. 1,234.00 sft 720.00
to F.H Solaries)
Fire Stair Railing (Rate acoording to
b. 1,234.00 sft 263.00
F.H Solaries)
c. Basement Stair Railing 400.00 sft 243.00
d. Ornamental Stair Railing - sft 200.00
e. Ramp Railing - sft
f. Front Verandah Railing (glass) 1,779.25 sft 680.00
g. Back Verandah Railing - sft
h. Kitchen Verandah Railing - sft 240.00
2 i Voide & Punch Railing 147.00 sft 680.00
Disable Ramp /Back side Entry stair
j 157.50 rft 192.00
Railing GF
Lift Lobby side railing (Coridoor
k - sft 231.00
railing)
l Parapet/Terrace Railing (MS) 730.00 sft 232.00
m Planter/Garden Area Railing -
Parking/Boundary Railing(10 mm
thick clear importd glass*150 mm*15
n mm*150 mm ss U Channel) - sft 626.00
According to F.S Cosmo boundry
wall
Sliding Door
Electro Mechinical Room (EME)
i. sft 212.00
( Grill Door)
ii. Generator Room - sft 592.00
iii. Transformer Room - sft
3 Substation Room
iv. 62.00 sft 604.00
v. Machine Room Stair - sft
vi. Stair Case Door - Rft
Fire pump room + Domestic pump
vii. 35.00 sft 679.00
room
MS. Door / MS Work
a. E.M.E Room - sft 582.00
b. Generator Room 35.00 sft 600.00
Transformer Room /Substation
c. 62.00 sft 820.00
Room

d. Stair Case Door/Chillekotha Door 21.00 sft 698.00

Lift machine room door


(2"x2"x16BWG (48mmx48mm) MS
matte Hollow Box.1"x1"x16BWG
(24mmx24mm) MS matte Hollow
e. 24.00 sft 724.00
Box.48mmx48mmx6mm MS
Angle.24mmx6mm MS Flat
Bar.18mmx6mm MS Flat
Bar.18BWG MS matte Sheet )
Rain water pump room+Fire pump
room + Domestic pump room(Rate - sft 220.00
according to ambience)

Fire control Room - sft 815.00

Other's Location basement + Roof


Pump etc)
4 (2"x2"x16BWG (48mmx48mm) MS
matte Hollow Box,1"x1"x16BWG
f. (24mmx24mm) MS matte Hollow - sft 506.50
Box,48mmx48mmx6mm MS
Angle,24mmx6mm MS Flat
Bar,18mmx3mm MS Flat
Bar,16BWG MS matte Sheet )

Fire Hydrent louver Door fire duct - sft

LPG Plant shed including frame &


- sft 245.00
m.s sheet
Boundary Main Gate (Foulding)
h. 106.00 sft 2,518
Entry Gate
i Fire Stair Door (Size 42"x84") 474.00 sft 1,020.00
Panic bar for Fire Stair Door 14.00 6,500.00
M.S louver 4"*1" @ 5" c/c at G.F
k. rft 177.00
Driver sitting & side of ramp
M.S louver 2"*1" @ 5" c/c at G.F
rft 103.00
Caretaker room
Fiber Sheet Fitting work (GAS
n Meeter Area)Steel Frame& Sheet - sft 255.00
Fixing including Gutter
Transperent profile sheet 335.00
Planter Area Guard/ Spike( GF
o rft 340.00
Front)

a. Electrical Cable Tray - sft


b. Column Guard (1.5''x1.5'' angle) 180.00 Rft 98.00

Column Guard (1.5''x 5mm Flat bar) 130.00 rft 70.00

M.S Gratings for Gully Pit


24"x24" 2.00 nos 3,050.00
10"x10" 12.00 nos 834.00
c. 12" X12" - nos 650.00
15" X15" nos 985.00
18" X18" nos 1,420.00
24" X24" nos 2,520.00
d MS Grating ( Rain Water) 5.00 nos 150.00
e GAS Riser Grill - sft. 150.00
MS. Surface/Scupper Drain at ramp
f 32.00 sft. 944.00
front
g MS Checker Plate on Footpath - sft 769.00
M.S Gutter for parking top at
rft 263.00
boundry wall

MS Checker Plate Manhole Cover


h - sft 700.00
( On Drive Way) (2'-6" X2'-6")

5 i Cloth Drying Stand - set 2,500.00


Roof Ladder (OHWT & UGWR)(Rate
j 35.00 rft 414.00
According to )
Lift Machine Room Slab Level Entry
l rft 375.00
MS Ladder (cat ladder)
Lift Machine Room Entry Checker
m. 70.00 sft 436.00
Plater Stair
Swimming Pool Machine Room
n rft 375.00
Entry Ladder

MS Pipe Clamp U shape Only


p 60.00 nos 50.00
makaing and supply (Sanitary pipe)

q GAS Pipe Clamp - nos 100.00


MS.Electric Cable Hanger(2'-2"x 4'-
r 130.00 nos 698.00
0"x 6'')

s MS Cable Hanger(2'-2"x 2'-0"x 6'') 100.00 nos 447.00

t MS Wall Hanger(4'-6"x 1'-3"x 6'') 64.00 nos 984.00

u Shop Rolling Shutter( Only L/o part) 548.10 sft 963.00

MS manhole cover for Meter Pit &


Nos 1,559.00
Sanitary master Pit at Drive way
v
16" Dia Nos
18" Dia Nos

MS WORK-SAFETY ITEM

a. Safety Canopy During Construction 9,552.00 Sft -

1 Net Shed Over Footpath (Fitting &


b. 1,440.00 Sft 231.00
Opening)
c. Fire Bucket 2.00 nos 1,500.00
d. Fire Bucket Stand 1.00 nos 2,500.00

Aluminium Work

4" Single glazing(EDF, Powder


a. - sft 280.00
Coated)

b. 4" Double glazzing - sft 580.00


c. 3" Fixed with Sliding 210.00 sft 400.00
d. Fly proof Net - sft 115.00
e. Fixed Glass 1,720.00 sft 420.00
f. Glass Door 1,660.00 sft 975.00
Single glazing Curtain Wall with
casement 63.5mmx81mm Silver
g 19,866.00 sft 680.00
colour profile & 6mm thick tempered
glass.
1
Aluminium louver work for duct
covering ( Mechanical duct,Fire duct
i 1,680.00 sft 800.00
& communication duct.)2''x2''
Aluminum box with z Louver @1''c/c.

Aluminium Louver Work ( A/C.duct &


j 5,015.00 sft 320.00
Bath window)
Exhaust Fan Hole Cutting on Toilet
k. - nos. 110.00
Window

l False Ceiling for duct area (PVC) 805.00 sft 110.00

False Ceiling Gypsum board for lift


m 2,100.00 sft 260.00
lobby 20mm thick
n ACP Work clouman 1,550.00 sft 800.00

o False Ceiling for toilet (Mattel sheet) 1,572.00 sft 135.00

p Glass Canopy Work - sft 905.00

Wooden Work
a. Main Stair Hand Rail Work Rft 514.00
Fire Stair Hand Rail Work Rft 514.00

Wodden hand rail for railing around


rft 514.00
main stair and landing side

Wooden louver for main gate rft 230.00


b. Stair King Post - Each
c. Stair Curved Edge Hand Rail - nos
a. Wooden Meter Box - sft. 250.00

e. Wooden Louver - sft. 400.00

Decorative False Ceiling


b. Wooden/Board (Reception)+Lift - sft. 260.00
Lobby G.floor

Decorative False Ceiling


c. sft 550.00
Wooden/Board (Lift Lobby)
Wooden door for duct covring (3 nos
d. - sft 190.00
duct)
1
1 Other's area False ceiling
h. - sft 60.00
(Bathroom)
e. Notice Board - Nos 10,000.00
f Wooden Bench At GF East Side Nos 15,500.00
Wooden Bench At Roof Top Seating
g nos 15,500.00
Area, under teflon
h. Cat Door ( Including Framing) 27 Nos -
i. Key Board - nos 5,000.00
j Mail Box - nos 2,000.00

a. MOULDING BIT (Teak)2.75" Wide - rft. 47.00

b. MOULDING BIT (Teak)1.75" Wide - rft. 39.00

MOULDING BIT (wooden)1.75"


c. - rft. 36.00
Wide

d. Moulding Bit (wooden)1"x1/2" Wide rft. 40.00

e. wood work on water body sft 750.00


f Wooden Wall Panneling - sft 283.00
k Wooden Wall panelling sft 283.00
GYM Room Mirror
l panneling(5mm,Silver Double sft 300.00
Coating)
m Around Mirror (2"x3/4") - rft. 60.00

BRANDING
a. LOGO 1.00 nos. 50,000.00
b. Address Plate 1.00 nos. 35,000.00
c. Floor Number Plate 1.00 nos 16,000.00
d. Pnaflex Plate (Car parking no) 1.00 nos 15,000.00
e. Reception Logo 1.00 nos 30,000.00
f. Reception company Logo 1.00 nos 30,000.00
g Brochure
h Promotional Gift
Press & Other communication
i
system
j Waiting & Lounge painting nos -
k Reception Desk Table 1.00 nos. 35,000.00
l Reception Chair 1.00 nos 5,000.00
m Centre Table - set 18,700.00
n 1st Floor Lounge-2 Seater Sofa set
o Reception Sofa- 2 Seater - set
Sanitary Works

Internal wiring & outside piping & Sanitary Ware Fitting & Fixing Labor cost & Temporary work Labour Ch

Internal wiring & outside piping materials cost :

Total Tk. =

MOBILIZATION & TEMPORARY WORK COST


Total Amount Total Amount
Amount (Tk.)
(Tk.) (Tk.)

l Cost)

1,558,548.75
386,135.44
4,032.00
2,404,290.93

4,760,080.00

- 10,092,187.12 10,092,187.12 Joist - (12"x12")

729,900.00 Joist - (12"x15")

249,200.00 Joist - (10"x10")

- Joist - (6"x12")

Joist - (6"x4")
Total rft
ATION)

35,526,986.32
553,800.00 571,561.09
17,761.09

576,867.40

85,200.00

123,300.00

51,767.52
117,048.68

13,121,745.00

3,300,152.00

562,500.00
-
14,527,500.00
107,540.64
-

804,681.38

92,354.33

853,296.00

61,600.00

-
-
-

37,525.00
13,989.58
-
28,500.00
30,666.67
13,416.67
-
1,350.00
-
-
37,500.00
90,000.00 34,923,936.34
88,166.67
29,601.82
28,600.00
1,840.00
14,560.00
3,900.00
9,600.00
-
14,400.00
5,800.00
-
-
4,200.00
-
8,190.00
4,320.00
-
750.00
750.00
750.00
1,800.00
3,600.00
4,200.00
1,800.00

1,010.00

1,800.00

520.00

1,975.00

392.00
350.00
100.00
840.00

7,420.00

400.00
43,800.00

-
31,488.89
17,238.89
14,250.00

3,446,951.56 69,741,761.47
-
4,489.20

9,818.59

746,721.00
-
45,274,775.00

68,864,637.64
-
68,864,637.64
185,061.58

5,160,432.71

-
-

14,036,388.00

-
-
25,816.25
9,605.00
26,250.00
71,066.67
31,091.67

23,400.00
171,030.86
-
15,000.00
-
90,000.00
81,751.20
15,769.69
42,900.00
2,760.00
15,890.00
4,450.00
46,800.00
-
877,123.84
625.00
-
27,300.00

9,100.00
28,080.00
13,050.00
975.00
1,462.50
2,340.00
1,800.00
4,680.00
27,300.00
11,700.00

4,040.00

6,000.00

4,950.00

5,000.00

-
910.00
100.00
4,680.00
2,000.00
47,450.00

-
- -

-
-
- -
-
-
-
-
-
-

310,511.00

183,456.00
350.00
11,375.00
7,200.00
28,000.00
310,511.00
33,600.00
17,280.00
4,000.00
310,511.00

13,200.00
600.00
2,500.00
7,200.00
1,750.00

183,990.00
171,000.00
9,000.00
900.00
450.00
2,640.00 183,990.00

-
-
-
-
-
6,519,817.55
547,190.00
352,290.05
6,519,817.55
5,620,337.50
-
-

1,173,327.80
695,081.26
-
375,653.53
20,020.00
-
13,050.00
1,173,327.80
-
6,750.00
10,422.00
15,615.00
36,736.00

14,561,924.76

2,547,253.40
4,495,153.05

245,718.00

461,761.56

179,085.22

557,248.88
147,015.82

518,568.06

- 14,561,924.76

10,517,565.82

27,770.40

53,558.40

151,748.80

975,229.20
147,176.40

4,632.00

5,646.63
-
-

-
297,131.25

777,112.50

-
-
294,865.75 1,784,667.00
121,000.00
77,360.50
-

75,928.75

120,220.50
19,097.75

960.00

990.00

283,140.00

-
314,212.50
18,297.00
7,968.00

2,342.40

2,465.10
731,500.00
-
-
789,084.00
57,584.00
-
-

-
-

-
-

-
-
-
-

-
-
-

83,539.62
-
103,871.62
17,680.00
2,652.00
-
312,888.29
264,000.00
-
822,412.37
213,499.20
32,024.88
-

-
14,690.55
173,405.91
-

1,500.00

-
230,111.45
-

-
29,041.67
4,373.33
1,500.00
5,200.00
400.00

467,222.04

-
-
-

25")
- -
-
-

-
-

450,367.50

5,962.50

-
458,052.50

1,722.50

-
-
-

9,012.50

133.33

-
9,169.54

23.70

- -
-
-
246,071.77

-
-
-
-
-
-
-
-

-
-
-
-
-

174,404.45
33,390.00 241,449.45
31,800.00

1,855.00

-
-
-
-
-

-
-
-
-
-
-

-
-
-
-
-

-
- -
-
-
-

3,290.65
4,622.32
630.00
600.00
35.00
66.67

-
- -
-
-
-
-

Total = 128,731,612.70 128,731,612.70 -

Cost)

2,136,257.44 2,136,257.44

ORK) 4,066,580.56 4,066,580.56

E WORK) 8,193,074.25 8,193,074.25

1,095,218.77 1,095,218.77

3,265,364.59 3,265,364.59

178,360.00 178,360.00

2,880,297.43 2,880,297.43
-
39399 39399

Total = 19,718,294.60 19,718,294.60

Aluminium, Wood)

4,380.00 4,380.00 4,380.00

- 128,062.88

41,715.00
128,062.88

86,347.88
- - -

441,600.00

441,600.00

-
-
-
-
-

- 441,600.00
-
-
-
-
-
-
-
-
-

-
-

4,911,334.30

210,255.00

-
-
- 237,135.00
-
-
26,880.00
-
-
888,480.00

324,542.00

97,200.00
-
-
1,209,890.00
-
-
99,960.00 2,819,672.00

30,240.00

169,360.00
-

-
-
61,213.00
37,448.00
-
-

23,765.00

-
-
21,000.00

50,840.00

14,658.00

17,376.00
-

945,262.00

266,908.00

483,480.00
91,000.00

-
17,640.00

9,100.00

-
6,100.00
10,008.00
-
-
-
-
750.00
-

30,208.00
-

- 848,052.30
14,490.00

30,520.00

3,000.00

90,740.00

44,700.00

62,976.00

527,820.30

-
-

332,640.00

332,640.00 332,640.00
-
-

20,969,350.00

Wooden Color
- or Dark Bronze
Color

-
84,000.00
-
722,400.00
1,618,500.00

13,508,880.00

20,969,350.00

1,344,000.00

1,604,800.00

88,550.00

546,000.00

1,240,000.00

212,220.00

-
-
-

-
-
-
-

Complete
- Work
Avg. Rate

Complete
- Work
Avg. Rate

-
-
-
-
-

-
-
-

-
-
-

Total Tk. = 26,787,367.18 26,787,367.18

216,000.00

176,000.00

216,000.00
-

-
35,000.00
5,000.00
-
-
-
rks

r cost & Temporary work Labour Charges 494,628.32


total
als cost : 3,089,464.98
materials
3,584,093.30

ARY WORK COST


Qty M.Rate
875.00 950 831250

391 0

345.00 770 265650

247 0

247 0
1220.00 1096900 899.10 av.rate
FOUNDATION
BASEMENT FLOOR- 04 (B-4) (Only Mat portion.)
Cement in bag/kg. Sand in cft
Description of Ratio of Picket in
Quantity
Work Mixing Grey(bag) white(kg) Local Sylhet Nos.

TEMPORARY
WORK AND
MOBILIZATION
WORK
A) Brick work
10" BW
i) Mud House 500 cft 1:6 20.00 175
ii) Mobilization
cft 1:6 0.00 0
Work

iii) Other's Work 150 cft 1:6 6.00 53

5" BW
i) Mud House 100 sft 1:5
ii) Mobilization
2500 sft
Work

iii) Other's Work sft


1 B) Plaster work sft
i) Mud House 414 sft 1:4 4.97 41.40
ii) Mobilization
1000 sft 1:4 12.00 100.00
Work

iii) Other's Work sft 1:4 0.00 0.00

C) Net Cement
1014 sft 5.07
Finishing (NCF)

D) Sand Filing
(Leveling &
other's work for 1000 cft 550
mobilization
work time)

E) Excavation
for MUD House
2500 cft
or Any Other
House

BASEMENT-4
EARTH
EXCAVATION

a) Footing / Pile
cft
1 Cap/Basement
1

b) U.G.W.R+Pile
cft
Mud House

EARTH BACK
2 cft
FILLING
3 SAND FILLING cft
C.C WORK
(RMC/Manual)
a) Mat / Pile Cap
5 cft 1:3:6 0 0 0
/ Footing
b) U.G.W.R cft 1:3:6 0 0 0
c) Other's Area cft 1:3:6 0 0 0
BRICK FLAT
sft
SOLING

a) Parking Floor sft 0


4
b) UGWR,
Mat/Footing/Pile sft 0
Cap
c) Other's Area sft 0
PATENT
STONE
cft
WORK(U.G.W.R
8 )
a) UGWR cft 1:11/2:3 #REF! #REF!

b) Parking Floor cft 1:11/2:3 0 0


Pea Gravel
Concrete at
Parking (Avg.2"
Thick)
R.B.C
( Reinforce Brick
Bond Concrete)

B.B.C ( Brick
Bond Concrete)

R.C.C WORK
(RMC/Manual)

PILE WORK
Shore Pile cft 1:11/2:3 0 0 0
Service Pile cft 1:11/2:3 0 0 0
King Post cft
Tie beam cft
FOUNDATION
Shore Pile Gap
Casting
Pile Cap/Main
Footing
MAT
Boundary
Footing

Column & Shear


Wall(Casting is
included in mat).

Boundary
Column & Shear
Wall
GB of main
Foundation
GB of Boundary
Wall
6
b) Retaining
wall(Casting is cft 1:11/2:3 0 0 0
included in mat).

Basement
Additional Floor
Above Mat
c) Stair, Ramp,
Basement-4 cft 1:2:4 0 0 0
Roof
f) U.G.W.R
( Wall+Salb) cft 1:11/2:3 0 0 0
(Only steel).

Septic
cft
Tank(Wall+Slab)

Inspection Pit
Top Slab
g)DroD wall.
railinq. Aic slab.
sunshade, sft 1:2:4 0 0 0
Rib.Beam (upto
4" thickness)
h)Lintel up to 5"
rft
Width
i)Lintel above 5"
cft
Width
j)False Slab up
sft
to 4" Thick
SHUTTERING
WORK

WOODEN
SHUTTER FOR
NORMAL RCC

ANCILARY
SHUTTERING
a)Lintel sft
b)False Slab sft
c)Counter Slab sft
d)Septic Tank
Slab
e)Inspection Pit
Slab

STEEL
SHUTTER FOR sft
NORMAL RCC

FOUNDATION
a) Pile
Cap/MainFootin sft
g
b)Mat Shutter
sft
(Only lift core)
c)Boundary Wall
sft
Footing
COLUMN,
SHEAR WALL
& OTHER
VERTICAL
MEMBER
9
d) Column &
sft
Shear Wall
e) Retaining
sft
Wall

f)Boundary Wall-
Column/Shear sft
Wall

h) UGWR Wall sft


g)Boundary-
sft
RCC Wall
m)Water Body &
Swimming Pool sft
Wall
j)Septic Tank
sft
Wall
BEAM, SLAB,
STAIR, RAMP
GB of Main
Foundation
GB of Main
Boundary Wall
i)UGWR Slab sft
n)Water Body &
Swimming Pool sft
Slab
o) Stair sft
p)Ramp sft
q) Roof Beam
sft
Shutter
r)Basement
sft
Roof
ANCILARY
SHUTTERING
s) Drop Wall sft
t)Railing/
Parapet/ sft
Ornamental Wall
u)Sunshed sft
v)Ornamental
Slab
10" BRICK
sft
WORK
10 a) UGWR cft 1:6 0.00 0
b) Internal Wall cft 1:6 0.00 0
c) Other's cft 1:6 0.00 0
5" BRICK
WORK
a) U.G.W.R sft 1:4 0.00 0
b) Retaining
sft 1:4 0.00 0
11 WallI
c) Internal Wall sft 1:4 0.00 0
d) Other's sft 1:4 0.00 0
Ceramic Brick
Cladding
3/4" THICK PLASTER
a) Inside Wall Plaster
b) Outside Wall Plaster(Normal)
12
c) Rough Plaster(For Fair Face Plaster)
d)Outside Fair Face Plaster
Shore Pile Rough Plaster Including Wire Mesh Fitting
1/2" THICK CEMENT PLASTER
a) U.G.W.R (Inside & outside)
13
b) Retaining Wall (Inside
c) Ceiling & Ramp bott.

NEAT CEMENT
FINISHING
14
a) U.G.W.R
b) Retaining Wall & Other's area
FLOOR TILES
Apartment(wait.Comu. etc.) -Tiles
Gym/ Reception/Community Wooden Texture Tiles
Main Stair -Tiles( Trade, Riser, Skirting, Landing)
Main Stair & Lift -Tiles(Lobby)
2.Basement-GF
Stair

3.Out Side
Level Up Stair
( Tiles)
3.
Driver Waiting

4. EMR
Room

Main Toilet Floor


15
2nd & 3rd Toilet Floor
Main Kitchen Floor with Kitchen Verandah
Caretaker Kitchen Floor
2.Drivers toilet

3.Guard
Toilet
Kitchen Counter
Top
Toilet Counter
Top

Reception Table
Counter Top

Pavement Tiles
Roof Tiles
Terrace Tiles
Garden/Planter
Tiles
Water Body &
Swimming Pool
Floor Tiles
Water Body &
Swimming Pool
Deck Tiles
SKIRTING
TILES
Apt. Floor Tiles
Skt
Gym/Com
Wooden Texture
Tiles Skt

Stair Tiles- Skt


Stair & Lift
Lobby Tiles Skt
Fire/
Basement/
Ornamental
Stair Tiles Skt
Care
Taket/Servent/G
uard/Others
Room Tiles Skt

Kit. Ver Tiles Skt

Care Taker Kit


Floor Skt.
Pavement Tiles
Skt
Roof Tiles Skt
Terrace Tiles
Skt
Planter/Garden
0
Tiles Skt
WALL TILE
WORK
Main Toilet Tiles
2nd & 3rd Toilet Tiles
2.Drivers toilet

3.Guard
Toilet
Main Kitchen
Wall
16 Caretaker
Kitchen Wall
Down wash Wall
Tiles
Reception wall Tiles
Lift Wall Tiles
Border for Toilets
Slate Stone /Cladding Tiles
Column protection Tiles(Height=3'-0")
Boundary Dado Tiles
Outside Wall Cladding(Tiles)
Swimming Pool & Water Body Wall Tiles
FLOOR MARBLE
Apartment(wait.Comu. etc.) -Marble
Gym/ Reception/Community Wooden Texture MARBLE
Main Stair ( Trade, Riser, Skirting, Landing)-MARBLE
Main Stair & Lift Lobby-MARBLE

2.Out
Side Level Up
Stair (Marble)
17

Kitchen Counter
Top
Toilet Counter
Top

Reception Table
Counter Top

Garden/Planter
Marble/Design
Marble
MARBLE
SKIRTING
Apt. Marble Skt
Main Stair
Marble Skt
Stair & Lift
Lobby marble
Skt

Basement/Level
Up/Ornamental
Stair Marble Skt

Graden/Planter
Marble Skt

WALL MARBLE
WORK

Reception wall Marble


18
Lift Wall Marble
Skirting Marble
Boundary Wall Cladding- Marble/Granite
Outside Wall Cladding( marble/ Granite)

ALUMINIUM
DOOR AND
WINDOW &
OTHER WORK

4" Single glazzing sft


4" Double glazzing sft
3" Fixed with Sliding sft
21
21 Fly proof Net sft
Fixed Glass sft
Glass Door sft
Curtain Wall sft
Curtain/Blind ( Community S sft
Aluminium Louver Work sft
ACP Work sft
Glass Canopy Work sft
GRILL WORK sft
a) Window Grill sft
b) Sliding Grill sft
c) Kitchen Verandah Safety G sft
22
d) Basement Ventilation Grill sft
e)Parking Grill sft
f)Safety Grill Over Boundary sft
g)Boundary Grill sft
RAILING WORK sft
a) Main Stair
sft
Railing
b) Fire Stair
sft
Railing
c)Basement
sft
Stair Railing
d)Ornamental
sft
Stair Railing
e)) Ramp
sft
Railing
f)Front
Verandah sft
Railing
g)Back
Verandah sft
23 Railing
h)Kitchen
Verandah sft
Railing
i)Voide & Punch
sft
Railing
j)Lift Lobby
sft
Railing

k)
Parapet/Terrace sft
/OHWT Railing

l)
Planter/Garden sft
Area Railing
m)Parking/
Boundary sft
Railing
WOOD WORK
(Door Frame)
a) Main Door Frame rft
b) Community/Bed Room Door(3'-4"*7')
c) S.Bed Door Frame (2'-6"x7'-0")
d) Kit.Ver./Balcony Door Frame(2'-6"x7'-0")
e) Kitchen Door Frame (2'-11"x7'-0")
f) Stair door Frame(3'-4"x8'-0")
g)Toilet Door Frame (2'-6"x7'-0")
Servent Toilet Door Frame
CAT DOOR( 2'-
6" CX 2'-6")

25 PVC DOOR
(S.Toilet Door) rft
shutter

WOOD WORK
(Door Shutter)

a) Main Door Shutter


b) Community/Bed Door Shutter
c) S.Bed Door Shutter/Caretaker/Guard Bed Door Shutter
d) Kit.Ver./Balcony Door Shutter
e) Kitchen Door Shutter
f) Stair Door Shutter
g) Toilet Door Shutter
Servent Toilet Door Shutter
PLASTIC
PAINT
19 a) In Side of False Slab sft
b) In Side Wall 0 sft
c) Ceiling 0 sft
WEATHER
20 0 sft
COAT
ENAMEL PAINT sft
a) All Grill Surfac 0
24 b) On Plaster Surface sft
c) On Wooden
sft
Surface
POLISH FOR
WOODEN sft
SURFACE
28
Polish for Design Door Surf sft
Polish for Internal Door Surf sft
Laquire Polish on Toilet Doo sft
WATER
28 rft
STOPPER
TERMITE
29 sft
PROTECTION
MILD STEEL
30
30
MS Rod 60/72.5 0 kg
Shore
31 Protection I- rft
Joist work
32 Bracing works rft
SUB TOTAL (Basement Level - 4) #REF! 0 #REF! 0 0
Prepared by: Sabit

BASEMENT FLOOR- 03 (B-3)


Ratio of Cement in bag/kg. Sand in cft Picket in
Quantity
Mixing Grey(bag) white(kg) Local Sylhet Nos.
EARTH
EXCAVATION

a) Footing / Pile
1 cft
Cap/Basement

b) U.G.W.R &
cft
Pile Mud House
EARTH BACK
2 cft
FILLING
SAND FILLING-
cft
FM(0.5)
3
SAND FILLING-
cft
FM(1.2)
C.C WORK
(RMC/Manual)
a) Mat/ Pile
sft 1:3:6 0 0 0
6 Cap / Footing
b) U.G.W.R sft 1:3:6 0 0 0
c) Septic Tank 1:3:6 0 0 0
c) Other's Area cft 1:3:6 0 0 0
BRICK FLAT
sft
SOLING

a) Parking Floor sft 0

b)
UGWR,Mat/Foot
sft 0
ing/Pile Cap+ B-
5 3
c) Septic Tank 0
d) Mobilization
0
Labor Shed
e) Mobilization
0
Office & Store
c) Other's Area sft 0

PATENT
cft
STONE WORK

a) Stair & Lift -


9
lobby & cft 1:11/2:3 0
U.G.W.R
9

-
b) Parking Floor cft 1:11/2:3 0
Pea Gravel 1:3 - - -
Concrete at
Parking (Avg.2" Cft
Thick)
R.B.C
( Reinforce Brick
Bond Concrete)

B.B.C ( Brick
Bond Concrete)

R.C.C WORK
(RMC/Manual)

PILE WORK
Shore Pile cft 1:11/2:3 0 0 0
Service Pile cft 1:11/2:3 0 0 0
King Post cft
Tie beam cft 1:11/2:3 0 0 0
FOUNDATION cft 1:11/2:3 0 0 0
Shore Pile Gap
cft 1:11/2:3 0 0 0
Casting
Pile Cap/Main
cft 1:11/2:3 0 0 0
7 Footing
1:1.25:2.
MAT cft 0 0
5
Boundary
Cft 1:2:4 0 0 0
Footing
Column & Shear 1:1.25:2.
Wall +Retaining cft 5 0 0
wall
Boundary
Column & Shear cft 1:2:4 0 0 0
Wall
GB of main
cft 1:2:4 0 0 0
Foundation
GB of Boundary
cft 1:2:4 0 0 0
Wall
1:1.25:2.
b) Retaining wall 0 0
5
Basement 1:11/2:3
Additional Floor 0 0
Above Mat
c) Stair,Slab on 1:11/2:3
sand filling,
Ramp,
0 0
Basement-4
Roof,Beam+U.
G.W.R
f) U.G.W.R 1:1.25:2.
0 0
( Wall+Salb) 5

Septic
1:2:4 0 0 0
Tank(Wall+Slab)

Inspection Pit
1:2:4 0 0 0
Top Slab
g)DroD wall.
railinq. Aic slab.
sunshade,
Rib.Beam (upto
4" thickness)
h)Lintel up to 5"
Width
i)Lintel above 5"
Width
j)False Slab up
to 4" Thick
SHUTTERING
WORK

WOODEN
SHUTTER FOR
NORMAL RCC

ANCILARY
SHUTTERING
a)Lintel
b)False Slab
c)Counter Slab
d)Septic Tank
Slab
e)Inspection Pit
Slab

STEEL
SHUTTER FOR
NORMAL RCC

FOUNDATION
a) Pile
Cap/MainFootin
g
b)Mat Shutter
c)Boundary Wall
Footing
COLUMN,
SHEAR WALL
& OTHER
VERTICAL
MEMBER

13
d) Column &
Shear Wall +
Retaining wal
e) Retaining
Wall
13
f)Boundary Wall-
Column/Shear
Wall

h) UGWR Wall
g)Boundary-
RCC Wall
m)Water Body &
Swimming Pool
Wall
j)Septic Tank
Wall
BEAM, SLAB,
STAIR, RAMP
GB of Main
Foundation
GB of Main
sft
Boundary Wall
i)UGWR Slab
n)Water Body &
Swimming Pool
Slab
o) Stair
p)Ramp
q) Roof Beam
Shutter
r)Basement
Roof
ANCILARY
SHUTTERING
s) Drop Wall
t)Railing/
Parapet/
Ornamental Wall
u)Sunshed
v)Ornamental
Slab
10" BRICK
WORK
14 a) UGWR cft 1:6 0.00 0
b) Internal Wall cft 1:6 0.00 0
c) Other's cft 1:6 0.00 0
5" BRICK
WORK
a) U.G.W.R sft 1:4 0.00 0

15
b) Inspection Pit sft 1:4 0.00 0
15
c) Retaining
WallI & MAT sft 1:4 0.00 0
Shutter
d) Internal Wall sft 1:4 0.00 0
e) Other's sft 1:4 0.00 0
Ceramic/Facing
Brick
3/4" THICK
PLASTER
a) Inside Wall Plaster 1:6 0.00 0
11 b) Outside Wall Plaster(Normal) retainin 1:6 0.00 0
c) Rough Plaster(For Fair Face Plaster)
d)Outside Fair Face Plaster
Shore Pile Rough Plaster I sft - - -
1/2" THICK CEMENT PLASTER
a) U.G.W.R (Inside & outside) 1:4 - -
10 b) Retaining Wall (Inside) 1:4 - -
c)Column & Shear Wall 1:4 - -
d) Ceiling & Ramp bott. 1:4 - -

NEAT CEMENT
FINISHING
12
a) U.G.W.R -
b) Retaining Wall & Other's area -
7 FLOOR TILES
Apartment(wait.Comu. etc.) - sft 1:4 0.00 0.00 0.00
Gym/ Reception/Community Wooden Texture Tiles
Main Stair -Tiles( Trade, Riser, Skirting, Landing)
Main Stair & Lift -Tiles(Lobby)

2.Basement-GF
Stair

3.Out Side
Level Up Stair
( Tiles)
3.
Driver Waiting

4. EMR
Room

Main Toilet Floor


2nd & 3rd Toilet Floor
Main Kitchen Floor with Kitchen Verandah
Caretaker Kitchen Floor
2.Drivers toilet

3.Guard
Toilet
Kitchen Counter
Top
Toilet Counter
Top

Reception Table
Counter Top

Pavement Tiles
Roof Tiles
Terrace Tiles
Garden/Planter
Tiles
Water Body &
Swimming Pool
Floor Tiles
Water Body &
Swimming Pool
Deck Tiles
SKIRTING
TILES
Apt. Floor Tiles
Skt

Gym/Com
Wooden Texture
Tiles Skt

Stair Tiles- Skt


Stair & Lift
Lobby Tiles Skt
Fire/
Basement/
Ornamental
Stair Tiles Skt
Care
Taket/Servent/G
uard/Others
Room Tiles Skt

Kit. Ver Tiles Skt

Care Taker Kit


Floor Skt.
Pavement Tiles
Skt
Roof Tiles Skt
Terrace Tiles
Skt
Planter/Garden
Tiles Skt
WALL TILE
WORK
Main Toilet Tiles
2nd & 3rd Toilet Tiles
2.Drivers toilet

3.Guard
Toilet
Main Kitchen
Wall
8 Caretaker
Kitchen Wall
Down wash Wall
Tiles
Reception wall Tiles
Lift Wall Tiles
Border for Toilets
Slate Stone /Cladding Tiles
Column protection Tiles(Height=3'-0")
Boundary Dado Tiles
Outside Wall Cladding(Tiles)
Swimming Pool & Water Body Wall Tiles
FLOOR MARBLE
Apartment(wait.Comu. etc.) -Marble
Gym/ Reception/Community Wooden Texture MARBLE
Main Stair ( Trade, Riser, Skirting, Landing)-MARBLE
Main Stair & Lift Lobby-MARBLE

2.Out
Side Level Up
Stair (Marble)

Kitchen Counter
Top
Toilet Counter
Top

Reception Table
Counter Top
Garden/Planter
Marble/Design
Marble
MARBLE
SKIRTING
Apt. Marble Skt
Main Stair
Marble Skt
Stair & Lift
Lobby marble
Skt

Basement/Level
Up/Ornamental
Stair Marble Skt

Graden/Planter
Marble Skt

WALL MARBLE
WORK

8 Reception wall Marble


Lift Wall Marble
Skirting Marble
Boundary Wall Cladding- Marble/Granite
Outside Wall Cladding( marble/ Granite)

ALUMINIUM
DOOR AND
WINDOW &
OTHER WORK

4" Single glazzing


4" Double glazzing
3" Fixed with Sliding
21 Fly proof Net
Fixed Glass
Glass Door
Curtain Wall
Curtain/Blind ( Community Space)
Aluminium Louver Work
ACP Work
Glass Canopy Work
GRILL WORK sft
a) Window Grill sft
b) Sliding Grill sft
c) Kitchen Verandah Safety G sft
22
d) Basement Ventilation Grill sft
e)Parking Grill sft
f)Safety Grill Over Boundary sft
g)Boundary Grill sft
RAILING WORK sft
a) Main Stair
sft
Railing
b) Fire Stair
sft
Railing
c)Basement
sft
Stair Railing
d)Ornamental
sft
Stair Railing
e)) Ramp
sft
Railing
f)Front
Verandah sft
Railing
g)Back
Verandah sft
Railing
h)Kitchen
Verandah sft
Railing
i)Voide & Punch
sft
Railing
j)Lift Lobby
sft
Railing

k)
Parapet/Terrace sft
/OHWT Railing

l)
Planter/Garden sft
Area Railing
m)Parking/
Boundary sft
Railing
WOOD WORK
(Door Frame)
a) Main Door Frame rft
b) Community/Bed Room Door rft
c) S.Bed Door Frame (2'-6"x7'-0")
d) Kit.Ver./Balcony Door Frame(2'-6"x7'-0")
e) Kitchen Door Frame (2'-11"x7'-0")
f) Stair door Frame(3'-4"x8'-0")
g)Toilet Door Frame (2'-6"x7'-0")
Servent Toilet Door Chowkath
CAT DOOR( 2'-
6" CX 2'-6")

25 PVC DOOR
(S.Toilet Door)
shutter

WOOD WORK
(Door Shutter)
a) Main Door Shutter sft
b) Community/Bed sft
c) S.Bed Door Shutter/Caretaker/Guard Bed
d) Kit.Ver./Balcony Door Shutter
e) Kitchen Door Shutter
f) Stair Door Shutter
g) Toilet Door Shutter
Servent Toilet Door Shutter
PLASTIC
PAINT
19 a) In Side of False Slab sft
b) In Side Wall 0 sft
c) Ceiling 0 sft
WEATHER
20 0 sft
COAT
ENAMEL PAINT sft
a) All Grill Surfac 0
23 b) On Plaster Surface sft
(c) On Wooden
sft
Surface
POLISH FOR
WOODEN sft
SURFACE
28
Polish for Design 0 sft
Polish for Interna 0 sft
Laquire Polish on Toilet Doo sft
Bituminus Felt sft
28 WATER
rft
STOPPER
TERMITE
29 sft
PROTECTION
MILD STEEL
30
MS Rod 60/72.5 Grade kg
Shore
31 Protection I- rft
Joist work
32 Bracing works rft
SUB TOTAL (Basement Level - 3) 0 0 0 0 0

Prepared by: Sabit

BASEMENT FLOOR- 02 (B-2)


Description of Ratio of Cement in bag/kg. Sand in cft Picket in
Quantity
Work Mixing Grey(bag) white(kg) Local Sylhet Nos.
EARTH
EXCAVATION

1
a) Footing /
Pile 205535 cft
1
Cap/Basement

b) U.G.W.R+Pile
1600 cft
Mud House

EARTH BACK
2 cft
FILLING
3 SAND FILLING 35500 cft
C.C WORK
(RMC/Manual)
a) Mat/ Pile
6 2250 cft 1:3:6 270 1013 21488
Cap / Footing
b) U.G.W.R cft 1:3:6 0 0 0
c) Other's Area cft 1:3:6 0 0 0
BRICK FLAT
sft
SOLING
a. Herring bone
sft 0
Bond work ….

5 b) UGWR,
Mat/Footing/Pile sft 0
Cap
c) Other's Area
(brick on edging sft 0
work)

PATENT
cft
STONE WORK

9 a) UGWR &
285 cft 1:11/2:3 63 117
Septic Tank
b) Parking Floor
170 cft 1:11/2:3 37 78
(Ramp)
Pea Gravel
Concrete at
Parking (Avg.2"
Thick)
R.B.C
( Reinforce Brick
Bond Concrete)

B.B.C ( Brick
Bond Concrete)

R.C.C WORK
(RMC/Manual)

PILE WORK
Shore Pile 16005 cft 1:11/2:3 3521 0 7362
Service Pile cft 1:11/2:3 0 0 0
King Post 550 cft 1:11/2:3 121 253
Tie beam cft
Pile Head Breaki 1180 cft
False Boring wo 75 cft
FOUNDATION cft 1:1.25:2.5 0 0 0
Shore Pile Gap
cft 1:11/2:3 0 0 0
Casting
Pile Cap/Main
cft 1:1.25:2.5 0 0 0
Footing
MAT 28850 cft 1:1.25:2.5 7299 0 11396
Boundary
cft 1:1.25:2.5 0 0 0
Footing
Column,Lift wall 1:1.25:2.
3095 cft 783 1223
& Shear Wall 5
Boundary
rft
Column
7
GB of main
cft
Foundation
GB of Boundary
cft
Wall
Retaining wall +
non structural 5690 cft 1:11/2:3
wall
Basement
Additional Floor cft 1:11/2:3
Above Mat
Stair, Ramp,
Basement-2
6646 cft 1:1.5:2.5 1449 2718
Roof,Beam up
to (-1800)
U.G.W.R
2035 cft 1:1.5:2.5
( Wall+Salb )
h)Lintel up to 5"
Rft 1:2:4 - - 0
Width
i)Lintel above 5"
25 cft 1:2:4 5 11 239
Width
j)False Slab up
0 sft 1:2:4 - - 0
to 4" Thick
SHUTTERING
sft
WORK
WOODEN
SHUTTER FOR sft
NORMAL RCC
ANCILARY
SHUTTERING
a)Lintel 30 sft
b)False Slab 0 sft

STEEL
SHUTTER FOR sft
NORMAL RCC

FOUNDATION sft
a) Pile Cap /
Main Footing 2076 sft
side

b)Mat Shutter
sft
inside of lift core

COLUMN,
SHEAR WALL
& OTHER
VERTICAL
MEMBER
13
d) Column &
Shear Wall+ Lift
5975 sft
wall + Non-
structural wall
e) Retaining
4576 sft
Wall
h) UGWR Wall 2700 sft
BEAM, SLAB,
STAIR, RAMP
GB of Main
Foundation
i)UGWR Slab 2100
o) Stair 205
p)Ramp 1900
q) Roof Beam
Shutter up to (- 2070
1800)
r) Basement
7250
Roof (-1800)
ANCILARY
SHUTTERING
u)Sunshed
v)Ornamental
Slab
10" BRICK
WORK
a) UGWR & Lift
30 cft 1:6 1.20 11
Core
14 b) Internal Wall
115 cft 1:6 4.60 40
(Pump room)
c) Other's (Mat,
Foundaion etc.) 4880 cft 1:6 195.20 1708
R-wall
5" BRICK
WORK
a) U.G.W.R sft 1:4 0.00 0
Mat Footing side
1850 sft 1:4 46.25 315
15 wall
c) Retaining
0 sft 1:4 0.00 0
WallI
15

d) Internal Wall 135 sft 1:4 3.38 23


e) Other's (Mat) sft 1:4 0.00 0

3/4" THICK
sft
PLASTER
a) Inside Wall Pla 2260 sft 1:6 27.12 226
11
b) Outside Wall Pl 967 sft 1:6 11.60 97
c) Rough Plaster for shore pi sft 1:6 0.00 0
Shore Pile Rough 4800 sft 1:6 57.60 480
1/2" THICK CEMENT PLASTER
a) U.G.W.R (Insid 3725 sft 1:4 55.88 279.38
10 b) Retaining Wall 3240 sft 1:4 48.60 243.00
Internal Column & SW,side sft 1:4 0.00 0.00
c) Ceiling,Ramp bot5854 sft 1:4 87.81 439.05

NEAT CEMENT
0.00 0
FINISHING
12
a) U.G.W.R 5500 sft 27.50 413
c) Retaining Wall out & Othe sft 0.00
FLOOR TILES
Main Stair -Tiles( 0 sft 1:3 0.00 0.00
Main Stair & Lift 160 sft 1:3 6.40 24.00
2.Basement-
Stair
192 sft 1:3 7.68 28.80

3.Out5.Side
Pump
7
Room
160 sft 1:3 6.40 24.00

Pavement
Tiles(12''x12'') & 4600 sft 1:3 184.00 690.00
(6''X6")
sft 1:3 0.00 0.00
sft 1:3 0.00 0.00
sft 1:3 0.00 0.00
SKIRTING
TILES
Stair Tiles- Skt 60 rft 1:3 0.50 1.98
Stair & Lift
40 rft 1:3 0.33 1.32
Lobby Tiles Skt
Fire/
Basement/
rft 1:3 0.00 0.00
Ornamental
Stair Tiles Skt
Pavement Tiles
350 rft 1:3 2.89 11.55
Skt
rft 1:3 0.00 0.00
rft 1:3 0.00 0.00
WALL TILE
WORK
8
Lift Wall Tiles 180 sft 1:3 4.50 18.00
Column protection 350 sft 1:3 8.75 35.00
FLOOR MARBLE sft
Main Stair ( Trade, Riser, sft
Main Stair & Lift Lobby-MA sft

2.Out
Side Level Up sft
Stair (Marble)

MARBLE
sft
SKIRTING
Main Stair
rft
Marble Skt
Stair & Lift
Lobby marble rft
Skt

Basement/Level
Up/Ornamental rft
Stair Marble Skt

8
WALL MARBLE
WORK

Lift Wall Marble sft


Skirting Marble sft

ALUMINIUM
DOOR AND
WINDOW &
21 OTHER WORK

4" Single glazzing sft


Aluminium Louver Work sft
GRILL WORK
22 d) Basement Ventilation Grill sft
e)Parking Grill sft
RAILING WORK sft
a) Main Stair
sft
Railing
b) Fire Stair
Railing (Two sft
side)
c)Basement
100 sft
Stair Railing
d)Ornamental
sft
Stair Railing
e)) Ramp
sft
Railing
i)Voide & Punch
sft
Railing
j) Lift Lobby
Railing (1'-0"
Low height sft
railing over 2'
brick wall)
PLASTIC
PAINT
19 a) In Side of lift c 250 sft
c) In Side Wall 2270 sft
d) Ceiling 5854 sft

WEATHER
20 3250 sft
COAT (R-Wall)

ENAMEL PAINT sft


a) All Grill Surfac 100
23 b) On Plaster Surface sft
(c) On Wooden
sft
Surface
Bituminus Felt
WATER
28 rft
STOPPER
TERMITE
29 sft
PROTECTION
Shore
31 Protection I- rft
Joist work
32 MS Rod 60/72.5 248,468 kg
33 Bracing works 0 rft
SUB TOTAL ( Basement Level - 2) 14336 0 6326 22952 21726
Prepared by: Sabit
BASEMENT FLOOR- 01 (B-1) & Foundation
EARTH
EXCAVATION

a) Footing / Pile
cft
Cap/Basement

b) Footing of
1 2000 cft
Boundary Wall

c) U.G.W.R+Pile
cft
Mud House

d) Septic Tank &


cft
Soak Well
EARTH BACK
2 2000 cft
FILLING
3 SAND FILLING cft
C.C WORK
(RMC/Manual)
a) Wall Footing sft 1:3:6 0 0 0
b) Pile Cap /
sft 1:3:6 0 0 0
Footing/mat
6 c) U.G.W.R, lift
sft 1:3:6 0 0 0
core
d) Footing of
sft 1:3:6 24 91 1939
Boundary Wall
e) Septic Tank &
Soak Well & sft 1:3:6 0 0 0
Inspection PIT
BRICK FLAT
sft
SOLING

a) Parking Floor sft 0

b)
UGWR,Footing/ sft 0
5 Pile Cap
c) Boundary
270 sft 14
Footing
d) Septic Tank &
Soak Well & sft 1:2:4 0
Inspection PIT

PATENT
cft
STONE WORK
9
a) U.G.W.R cft 1:11/2:3 0 0
b) Parking Floor
190 cft 1:11/2:3 42 87
(Ramp)
Pea Gravel
Concrete at
Parking (Avg.2" cft 1:2:4 0 0 0
Thick)
R.B.C
( Reinforce Brick
Bond Concrete) sft

B.B.C ( Brick
Bond Concrete) cft 1:2:4 0 0 0

R.C.C WORK
(RMC/Manual)

PILE WORK
Shore Pile cft 1:11/2:3 0 0 0
Service Pile
cft 1:1.25:2.5 0 0
precast
King Post cft 1:1.25:2.5 0 0 0
Tie beam for pile
600 cft 1:2:4 132 0 276
top
FOUNDATION
cft 1:11/2:3 0 0 0
Footing R.C.C
Shore Pile Gap
cft 1:1.25:2.5 0 0 0
Casting
Pile Cap/Main
cft 1:1.25:2.5 0 0 0
Footing
MAT+ Others
area total rmc cft 1:11/2:3 0 0 0
casting
Boundary
203 cft 1:2:4 35 45 45 1939
Footing
Column,Lift
1:1.25:2.
7 wall & Shear 1880 cft 476 743
5
wall
Boundary
100 cft 1:2:4 17 22 22 955
Column
GB of main
cft 1:1.25:2.5 0 0 0
Foundation
GB of Boundary
270 cft 1:2:4 49 59 59 2579
Wall
1:1.25:2.
b) Retaining wall 2900 cft 734 1145
5
Basement
Additional Floor rft
Above Mat

c) Stair, Ramp,
Basement-1
Roof+ G.F
Beam + beam 5950 cft 1:1.5:2.5 1298 2434
below ramp to
reach G.F from
basement-1

f) U.G.W.R
sft 1:1.5:2.5 0 0
( Wall+Salb)

Septic
sft 1:1.5:2.5 0 0
Tank(Wall+Slab)

Inspection Pit
20 sft 1:1.5:2.5 5 8
Top Slab
Drop wall.
railinq. Aic slab.
sunshade,
sft
Rib.Beam
(upto 4"
thickness)
h)Lintel up to 5"
Rft 1:2:4 - - 0
Width
i)Lintel above 5"
25 cft 1:2:4 5 11 239
Width
j)False Slab up
0 sft 1:2:4 - - 0
to 4" Thick
SHUTTERING
WORK

WOODEN
SHUTTER FOR sft
NORMAL RCC
14
ANCILARY
sft
SHUTTERING
a)Lintel 35 sft
b)False Slab sft
c)Counter Slab sft
d)Septic Tank
sft
Slab & wall
e)Inspection Pit
50 sft
Slab

STEEL
SHUTTER FOR sft
NORMAL RCC

FOUNDATION sft
a) Pile
Cap/MainFootin sft
g
b)Mat Shutter sft

c)Boundary Wall
1000 sft
Footing & GB

COLUMN,
SHEAR WALL
& OTHER sft
VERTICAL
MEMBER
d) Column,Lift
wall & Shear 3170 sft
Wall
e) Retaining
3500 sft
Wall

f)Boundary Wall-
Column/Shear sft
Wall

h) UGWR Wall sft


g)Boundary-
sft
RCC Wall
m)Water Body &
Swimming Pool sft
Wall
j)Septic Tank
sft
Wall
BEAM, SLAB,
sft
STAIR, RAMP
GB of Main
sft
Foundation
sft
i)UGWR top
sft
Slab
n)Water Body &
Swimming Pool sft
Slab
o) Stair 450 sft
p)Ramp 2050 sft
q) Roof Beam
2500 sft
Shutter
r)Basement
5500 sft
Roof
ANCILARY
sft
SHUTTERING
s) Drop Wall sft
t)Railing/
Parapet/ sft
Ornamental Wall
u)Sunshed sft
v)Ornamental
sft
Slab
10" BRICK
sft
WORK
a) UGWR cft 1:6 0.00 0
b) Septic Tank &
15 Soak Well& cft 1:6 0.00 0
Inspection Pit
c) Internal Wall 230 cft 1:6 9.20 81
d) Other's ( R-
2670 cft 1:6 106.80 934
wall out)
5" BRICK
WORK
a) U.G.W.R sft 1:4 0.00 0
b) Septic Tank &
Soak Well& sft 1:4 0.00 0
Inspection Pit
16
c) Inspection Pit 250 sft 1:4 6.25 43

d) Retaining
sft 1:4 0.00 0
WallI
e) Internal Wall 130 sft 1:4 3.25 22
f) Other's(mat ) sft 1:4 0.00 0
Ceramic/Facing
Bricks
3/4" THICK
sft
PLASTER
a) Inside Wall Pla 2450 sft 1:6 29.40 245
b) Outside Wall Plaster( Norm sft 1:6 0.00 0
11
c)Septic Tank (ins 250 sft 1:6 3.00 25
11

d) Rough Plaster(For Fair Fa sft 1:6 0.00 0


e) Fair Face Plaster(Reatining sft
Shore Pile Rough 4000 sft
1/2" THICK CEMENT PLASTER
a) U.G.W.R (Inside & outsid sft 1:4 0.00 0.00
b) Retaining wall
(In side & 4975 sft 1:4 74.63 373.13
outside)

10 c) Non
Structural wall
+Column+ 1:4 0.00 0.00
Shear
Wall+beam side

d) Ceiling & Ramp 5855 sft 1:4 87.83 439.13

NEAT CEMENT
FINISHING
12
a) U.G.W.R sft 0.00
b) Septic Tank+ I 250 sft 1.25
c) Retaining Wall & Other's sft 0.00
7 FLOOR TILES
Main Stair -Tiles( Trade, Ris sft 1:3 0.00 0.00
Stair & Lift -(Lob 150 sft 1:3 6.00 22.50

2.Basement-GF
Stair

192 sft 1:3 7.68 28.80

3.Out Side
Level Up Stair
( Tiles)
1. Driver Waiting

160 sft 1:3 6.40 24.00

2.
Pavement Block
(12"X12") & 6000 sft 1:3 240.00 900.00
(6"X6")

Water Body &


Swimming Pool sft 1:3 0.00 0.00
Floor Tiles
Water Body &
Swimming Pool sft 1:3 0.00 0.00
Deck Tiles
SKIRTING
TILES
Stair Tiles- Skt 150 rft 1:3 1.24 4.95
Stair & Lift
35 rft 1:3 0.29 1.16
Lobby Tiles Skt
Fire/
Basement/
rft 1:3 0.00 0.00
Ornamental
Stair Tiles Skt
Pavement Tiles
370 rft 1:3 3.05 12.21
Skt
WALL TILE
WORK
8 Lift Wall Tiles 140 sft 1:3 3.50 14.00
Column protection 345 sft 1:3 8.63 34.50
Boundary Dado Tiles sft 1:3 0.00 0.00
FLOOR MARBLE
Main Stair ( Trade, Riser, Skirting, L 1:3 0.00 0.00 0.00
Main Stair & Lift Lobby-MARBLE 1:3 0.00 0.00 0.00

2.Out
Side Level Up 1:3 0.00 0.00 0.00
Stair (Marble)

MARBLE
SKIRTING
Stair & Lift
Lobby marble 1:3 0.00 0.00 0.00
Skt

Basement/Level
Up/Ornamental 1:3 0.00 0.00 0.00
Stair Marble Skt

WALL MARBLE
WORK
8
Lift Wall Marble 1:3 0.00 0.00 0.00
Skirting Marble 1:3 0.00 0.00 0.00

ALUMINIUM
DOOR AND
sft
21 WINDOW &
OTHER WORK

3" Single glazzing sft


GRILL WORK sft
22
d) Basement Ventilation Grill sft
RAILING WORK sft
a) Main Stair
sft
Railing
b) Fire Stair
sft
Railing
c)Basement
300 sft
Stair Railing
d)Ornamental
sft
Stair Railing
e)) Ramp
sft
Railing
i)Voide & Punch
sft
Railing

j)Lift Lobby
Railing(1'-0" low
sft
height railing
over 2' wall)

PLASTIC
PAINT
20 a) In Side of Lift 250 sft
b) In Side Wall 2450 sft
c) Ceiling 5854 sft
WEATHER
21 3240 sft
COAT

ENAMEL PAINT
24
a) All Grill Surfa 300 sft
b) On Plaster Surface sft
Bituminus Felt sft
29 WATER
rft
STOPPER
TERMITE
30 sft
PROTECTION
Shore
Protection I-
31 rft
Joist work
(4"x8")
33 MS Rod 60/72.5 48,264 kg
33 Bracing works 1240 rft
SUB TOTAL ( Basement Level - 1) 3413 0 3534 4731 7650

Prepared by: Sabit

GROUND FLOOR
Description of Ratio of Cement in bag/kg. Sand in cft Picket in
c Quantity
Work Mixing Gray(bag) white(kg) Local Sylhet Nos.
R.C.C. WORK
1
(RMC/Manual)

a) Column &
Shear Wall
3075 cft 1:1.25:2.5 778 0 1215
(main Structure)
Lift wall
b)Boundary Wall
Column,G.Beam 1305 cft 1:2:4 223 281 281 12463
& Coping beam

c)Waterbody &
Swimming Pool,

d) Slab, Beam &


3674 cft 1:11/2:3 808 0 1506
Stair (main Slab)

e) Patent stone
cft 1:11/2:3 0 0 0
work at GF
C.Ancilary
Structure
Drop wall.
railinq. Aic slab.
sunshade, 27 cft 1:2:4 5 12 258
Rib.Beam (upto
4" thickness)
Drop Wall
Railing/Parapet
SunShed
RIB Beam
2)Lintel up to 5"
25 Rft 1:2:4 1 2 50
Width
3)Lintel above 5"
20 cft 1:2:4 4 9 191
Width
4)False Slab up
0 sft 1:2:4 - - 0
to 4" Thick
FAIR FACE
sft
RCC WORK
Column & Shear
sft
Wall
Slab, Beam &
sft
Stair
Drop Wall &
sft
Sunshed
Non Structural
sft
Wall up to 5"
Non structural
wall + entry sft
porch
SHUTTERING
2 WORK- sft
NORMAL RCC
WOODEN
sft
SHUTTER
ANCILARY
STRUCTURE sft
SHUTTERING
False Slab 0 sft
Lintel 110 sft
Counter Top
20 sft
Slab
STEEL
sft
SHUTTER
VERICAL
MEMBER sft
SHUTTER
a) Column, Lift
5110 sft
and Shear Wall
b)Water Body &
Swimming Pool sft
Wall
c) Boundary
Column ,GB & 3220 sft
R.C.C wall
SLAB &
sft
BEAM& STAIR
a) Slab,and Stair
5450 sft
Shutter

b) Beam Shutter 1900 sft

c) Water Body &


Swimming Pool sft
Slab
ANCILARY STRUCTURE S sft
s) Drop Wall sft
t)Railing/
Parapet/ sft
Ornamental Wall
u)Sunshed sft
v)Ornamental
sft
Slab

SHUTTERING
WORK- sft
FAIRFACE RCC

a) Column and
sft
Shear Wall
b) Slab, and
sft
Stair Shutter

c) Beam Shutter

d) Non
Structural RCC sft
Wall-5"-12"
e) Non
Structural
sft
Boundary Wall
entry porch
f) Drop Wall &
SunShade
Shutter
Sand Filling-
cft
Main Filling
Sand Filling-
Boundary Wall
CC WORK
Level
up/Gardening/D Sft
ecoration
4 BRICK WORK

10" Brick Work

a) 10" Brick
530 cft 1:6 21.20 186
Partition Wall
b) Brick Soaking
90 cft 1:6 3.60 31
House

c) Sand
90 cft 1:6 3.60 31
Washing House

d) 10" Brick
Work (Boundary 0 cft 1:6 0.00 0
Wall)

5" Brick Work

a)5" Brick
1950 sft 1:4 48.75 332
Partition Wall
b) Brick Soaking
sft 1:4 0.00 0
House

c) Sand
sft 1:4 0.00 0
Washing House

d) 5" Brick Work


2700 sft 1:4 67.50 459
(Boundary Wall)

Ceramic/Facing
sft 1:4 0.00 0
Bricks
PLASTER
5 WORK (3/4" 1:6 0.00 0
thick)
a) In Side Wall 3660 sft 1:6 43.92 366

b) Brick Soaking
& Sand Washing 120 sft 1:6 1.44 12
House

c) Out Side Wall


1050 sft 1:6 12.60 105
Plaster(Normal)
d) Boundary
Wall 5600 sft 1:6 67.20 560
Plaster(Normal)
e) Rough Plaster( 0 sft 1:6 0.00 0
f)Fair Face Plast 1805 sft
g) Fair Face Plaster- Bounda sft
PLASTER (1/2"
6 sft
thick)
Ceiling Plaster 1600 sft 1:4 24.00 120
False Slab
0 sft 1:4 0.00 0
Bottom Plaster
RCC Column &
SW Plaster + 1300 sft 1:4 19.50 98
Beam

NEAT CEMENT
FINISHING
(NCF)

a) Brick Soaking
& Sand Washing 120 sft 0.60
House

b) Above False
0 sft 0.00
Slab
c) Other Area 700 sft 3.50
7 FLOOR TILES 1:3 0.00 0.00
Apartment(wait.Co 1050 sft 1:3 42.00 157.50
Gym/ Reception/Community Wooden Tex 1:3 0.00 0.00
Main Stair -Tiles( 0 sft 1:3 0.00 0.00
Stair & Lift -(Lobby) sft 1:3 0.00 0.00

2.Basement-GF
Stair

560 sft 1:3 22.40 84.00

3.Out Side
Level Up Stair
( Tiles)
3.
Driver Waiting

85 sft 1:3 3.40 12.75

4. EMR
Room

Main Toilet Floor sft 1:3 0.00 0.00


2nd & 3rd Toilet F 34 sft 1:3 1.36 5.10
Main Kitchen Floor with Kit sft 1:3 0.00 0.00
Caretaker Kitchen Floor sft 1:3 0.00 0.00
2.Drivers toilet

sft 1:3 0.00 0.00

3.Guard
Toilet
Kitchen Counter
sft 1:3 0.00 0.00
Top
Toilet Counter
sft 1:3 0.00 0.00
Top

Reception Table
sft 1:3 0.00 0.00
Counter Top

Pavement Tiles
(6"X6") Drive 2450 sft 1:3 98.00 367.50
way
Garden/Planter
705 sft 1:3 28.20 105.75
Tiles
Water Body &
Swimming Pool 1:3 0.00 0.00
Floor Tiles
Water Body &
Swimming Pool 1:3 0.00 0.00
Deck Tiles
SKIRTING
TILES
Apt. Floor Tiles
200 rft 1:3 1.65 6.60
Skt

Gym/Com
Wooden Texture 1:3 0.00 0.00
Tiles Skt

Stair Tiles- Skt 50 1:3 0.41 1.65


Stair & Lift
34 1:3 0.28 1.12
Lobby Tiles Skt
Fire/
Basement/
50 1:3 0.41 1.65
Ornamental
Stair Tiles Skt
Care
Taket/Servent/G
25 1:3 0.21 0.83
uard/Others
Room Tiles Skt

Kit. Ver Tiles Skt 1:3 0.00 0.00

Care Taker Kit


1:3 0.00 0.00
Floor Skt.
Pavement Tiles
170 1:3 1.40 5.61
Skt
1:3 0.00 0.00
Terrace Tiles
1:3 0.00 0.00
Skt
Planter/Garden
150 1:3 1.24 4.95
Tiles Skt
WALL TILE
8
WORK
Main Toilet Tiles sft 1:3 0.00 0.00
2nd & 3rd Toilet T 150 1:3 3.75 15.00
2.Drivers toilet

1:3 0.00 0.00

3.Guard
Toilet
Main Kitchen
1:3 0.00 0.00
Wall
Caretaker
1:3 0.00 0.00
Kitchen Wall
Down wash Wall
1:3 0.00 0.00
Tiles
Reception wall Tiles sft 1:3 0.00 0.00
Lift Wall Tiles 1:3 0.00 0.00
Border for Toilets 45 rft 1:3 1.13 4.50
Slate Stone /Cladding Tiles 1:3 0.00 0.00
Column protection Tiles(Height=3'-0") 1:3 0.00 0.00
Boundary Dado Tiles sft 1:3 0.00 0.00
Outside Wall Cladding(Tiles) 1:3 0.00 0.00
Water Body Wall Tiles 1:3 0.00 0.00
FLOOR MARBLE
Marble including
entry stair & 470 sft 1:3 18.80 94.00 70.50
lobby
Gym/ Reception/Community Wooden 1:3 0.00 0.00 0.00
Main Stair ( Tra 270 1:3 10.80 54.00 40.50
Lift Lobby-MAR 225 1:3 9.00 45.00 33.75

2.Out
Side Level Up sft 1:3 0.00 0.00 0.00
Stair (Marble)

Kitchen Counter
1:3 0.00 0.00 0.00
Top
Toilet Counter
10 1:3 0.40 2.00 1.50
Top

Reception Table
30 1:3 1.20 6.00 4.50
Counter Top

Garden/Planter
Marble/Design 1:3 0.00 0.00 0.00
Marble
MARBLE
SKIRTING
Apt. Marble Skt 80 1:3 1.06 5.28 3.96
Main Stair
55 1:3 0.73 3.63 2.72
Marble Skt
Stair & Lift
Lobby marble 35 rft 1:3 0.46 2.31 1.73
Skt

Basement/Level
Up/Ornamental 1:3 0.00 0.00 0.00
Stair Marble Skt

Graden/Planter
1:3 0.00 0.00 0.00
Marble Skt

WALL MARBLE
8
WORK

Reception wall Marble 1:3 0.00 0.00 0.00


Lift Wall Marble 200 sft 1:3 8.00 40.00 30.00
Skirting Marble sft 1:3 0.00 0.00 0.00
Boundary Wall Cladding- Mar sft 1:3 0.00 0.00 0.00
Outside Wall Cladding( marbl sft 1:3 0.00 0.00 0.00

ALUMINIUM
DOOR AND
21
WINDOW &
OTHER WORK

4" Single glazzing sft


4" Double glazzing sft
3" Fixed with Sli 100 sft
Fly proof Net sft
Fixed Glass (Win 200 sft
Glass Door 100 sft
Curtain Wall 1316 sft
Curtain/Blind ( Community S sft
Aluminium Louver 30 sft
ACP Work 900 sft
Glass Canopy Work
22 GRILL WORK sft
a) Window Grill 140 sft
b) Sliding Grill sft
c) Sub-Station roo 120 sft
d) Basement Ventilation Grill sft
e)Parking Grill sft
f)Safety Grill Over Boundary sft
g)Boundary Grill sft
RAILING WORK sft
a) Main Stair
90 sft
Railing
b) Fire Stair
90 sft
Railing
c)Basement
sft
Stair Railing
d)Ornamental
Stair Railing sft
(back side)
e)) Ramp
sft
Railing
f)Front
Verandah sft
Railing
g)Back
Verandah sft
Railing
h)Kitchen
Verandah sft
Railing
i)Voide & Punch
147 sft
Railing
j) Lift Lobby
Railing (low
height 1'-0" sft
height ober 2'-0"
Brick wall)
sft
l)
Planter/Garden sft
Area Railing
m)Parking/
Boundary
sft
Railing (Boundry
railing glass)
RAILING
15
WORK
a) Verandah Railing sft
b) Kit.Ver.Railing (Eme & Ca sft
c) Main Stair Railing sft
d) Fire Stair Railing sft
e) Plant/Garden Railing (Lo rft
f) Lift Lobby Railing sft
g) Parking /Boundary Railing sft
WOOD WORK
17
(Door Frame)
a) Main Door Frame rft
b) Community/Bed Room Door rft
c) S.Bed Door Fra 17.5 rft
d) Kit.Ver./Balcony Door Frame(2'-6"x7'-0")
e) Caretaker room 0 rft
f) Stair door Frame(3'-4"x8'-0")
g)Toilet Door Fram 16.5 rft
Servent Toilet Door Chowkath
CAT DOOR( 2'-
1 nos
6" CX 2'-6")
PVC DOOR
(S.Toilet Door)
shutter

WOOD WORK
(Door Shutter)

a) Main Door Shutter


b) Community/Be 15.5 sft
c) S.Bed Door Sh 15.5 sft
d) Kit.Ver./Balcony Door Shutter
e) Caretaker roo 0 sft
f) Stair Door Shutter sft
g) Toilet Door Shu 0 sft
Servent Toilet Door Shutter
PLASTIC
11
PAINT
a) In Side of Lift 300 sft
b) In Side Wall 3670 sft
c) Ceiling 1965 sft
WEATHER
12 COAT 6650 sft
(In.R.wall)

16 ENAMEL PAINT

a) All Grill Paint 260 sft


b) Paint on kit + false slab sft
c) Paint on Wood 0 sft
POLISH FOR
28 WOODEN sft
SURFACE
Polish for Design 0 sft
Polish for Interna 125 sft
Laquire Polish on Toilet Doo sft
29 Water Body & Gerdening Tr sft
30 MAIN GATE 106 sft
FIBER SHEET
32 (over safety sft
grill)
33 MANHOLE COVER(U.G.W.R, Nos
34 MAIL BOX Nos
35 INSPECTION PIT Nos
36 CAR PARKING NUMBER No.
37 LOGO 1 No.
38 PROJECT ADDR 1 No.
39 APARTMENT NUMBER PL No.
40 WOODEN METER BOX sft
41 NOTICE BOARD 1 No.
42 KEY BOARD No.
43 MILD STEEL
44 MS Rod 60/72.5 42235 Kg.
SUB TOTAL (Ground Floor) 2393 252 3567 3002 12962

Prepared by: Sabit


1ST FLOOR / (2nd floor roof)
Cement in bag/kg. Sand in cft
Description of Ratio of Picket in
c Quantity
Work Mixing Gray(bag) white(kg) Local Sylhet Nos.

R.C.C. WORK
(RMC/Manual)
a) Column &
Shear Wall,Lift
1780 cft 1:1.25:2.5 450 0 703
wall (with stair
colum)
c)Waterbody &
Swimming Pool,
cft 1:2:4 0 0 0 0
OHWT Wall &
Slab

d) Slab, Beam &


4085 cft 1:11/2:3 899 0 1675
Stair (main Slab)

C.Ancilary
1:11/2:3 0 0 0
Structure
Drop wall.
railinq. Aic slab.
sunshade, sft
Rib.Beam (upto
4" thickness)
1
Drop Wall 1:2:4 - - 0

SunShed sft 1:2:4 - - 0


RIB Beam
2)Lintel up to 5"
25 Rft 1:2:4 1 2 50
Width
3)Lintel above 5"
20 cft 1:2:4 4 9 191
Width

4)False Slab up
to 4" Thick & sft 1:2:4 - - 0
Counter top slab

FAIR FACE
sft 1:2:4 - - 0
RCC WORK
Column & Shear
cft
Wall
Slab, Beam &
cft
Stair
Drop Wall &
Sunshed
Non Structural
Wall up to 5"
Non Structural
Wall Above 5"
SHUTTERING
WORK-
NORMAL RCC
WOODEN
sft
SHUTTER
ANCILARY
STRUCTURE
SHUTTERING
False Slab +
sft
Sunshade
Lintel 110 sft
Counter Top
20 sft
Slab
STEEL
SHUTTER
VERICAL
MEMBER
SHUTTER
a) Column and
2200 sft
Shear Wall
d) Boundary
Wall Column & sft
Copping Beam
SLAB &
sft
BEAM& STAIR
b) Slab,and Stair
4625 sft
Shutter

2 c) Beam Shutter 2330 sft

ANCILARY STRUCTURE S sft


s) Drop Wall sft
t)Railing/
Parapet/ sft
Ornamental Wall
u)Sunshed sft
v)Ornamental
sft
Slab

SHUTTERING
WORK- sft
FAIRFACE RCC

a) Column and
sft
Shear Wall
b) Slab, and
sft
Stair Shutter
c) Beam Shutter sft

d) Non
Structural RCC sft
Wall-5"-12"
e) Non
Structural sft
Boundary Wall
f) Drop Wall &
SunShade
Shutter
10" BRICK
cft 1:6 0.00 0
WORK
a) 10" Brick
690 cft 1:6 27.60 241
3 Partition Wall
b) Brick Soaking
85 cft 1:6 3.40 30
House
cft 1:6 0.00 0
5" BRICK
sft 1:4 0.00 0
WORK
a) 5" Brick
900 sft 1:4 22.50 153
Partition Wall
b) Brick Soaking
sft 1:4 0.00 0
House
4
c) Sand
sft 1:4 0.00 0
Washing House

Ceramic
Bricks/Facing 1:4 0.00 0
Bricks
3/4" Thick
sft 1:6 0.00 0
Plaster
a) In Side Wall 3500 sft 1:6 42.00 350

b) Brick Soaking
& Sand Washing sft 1:6 0.00 0
House

5 c) Out Side
Wall(Normal sft 1:6 0.00 0
Plaster)
d) Rough
Plaster For Fair 0 sft 1:6 0.00 0
Face Plaster
e) Fair Face
950 sft
Plaster
PLASTER (1/2"
sft 1:4 0.00 0
thick)
Ceiling Plaster 850 sft 1:4 12.75 64
6 False Slab
0 1:4 0.00 0
Bottom Plaster
RCC Column &
1:4 0.00 0
SW Plaster
NEAT CEMENT
FINISHING
(NCF)

a) Brick Soaking
& Sand Washing 138 sft 0.69
House

b) Above False
0 sft 0.00
Slab
c) Other Area 150 sft 0.75
7 FLOOR TILES
Apartment -Tiles 2660 sft 1:3 106.40 399.00
Gym/ Reception/Community sft 1:3 0.00 0.00
Main Stair -Tiles( 270 sft 1:3 10.80 40.50
Main Stair & Lift 220 sft 1:3 8.80 33.00

270 sft 1:3 10.80 40.50

sft 1:3 0.00 0.00

Main Toilet Floor sft 1:3 0.00 0.00


2nd & 3rd Toilet F 120 sft 1:3 4.80 18.00
Main Kitchen Floor with Kit sft 1:3 0.00 0.00
Caretaker Kitchen Floor sft 1:3 0.00 0.00

sft 1:3 0.00 0.00

Kitchen Counter
0 sft 1:3 0.00 0.00
Top
Toilet Counter
150 sft 1:3 6.00 22.50
Top

Reception Table
0 sft 1:3 0.00 0.00
Counter Top

Pavement Tiles 0 sft 1:3 0.00 0.00


Roof Tiles sft 1:3 0.00 0.00
Terrace Tiles sft 1:3 0.00 0.00
Garden/Planter
sft 1:3 0.00 0.00
Tiles
Water Body &
Swimming Pool 1:3 0.00 0.00
Floor Tiles
Water Body &
Swimming Pool 1:3 0.00 0.00
Deck Tiles
SKIRTING
TILES
Apt. Floor Tiles
400 1:3 3.30 13.20
Skt

Gym/Com
Wooden Texture 1:3 0.00 0.00
Tiles Skt

Stair Tiles- Skt 106 1:3 0.87 3.50


Stair & Lift
70 1:3 0.58 2.31
Lobby Tiles Skt
Fire /
Ornamental 106 1:3 0.87 3.50
Stair Tiles Skt
Care
Taker/Servent/G
1:3 0.00 0.00
uard/Others
Room Tiles Skt

Kit. Ver Tiles Skt 1:3 0.00 0.00

Care Taker Kit


1:3 0.00 0.00
Floor Skt.
1:3 0.00 0.00
Roof Tiles Skt 1:3 0.00 0.00
Terrace Tiles
1:3 0.00 0.00
Skt
Planter/Garden
1:3 0.00 0.00
Tiles Skt
WALL TILE
WORK
Main Toilet Tiles 1:3 0.00 0.00
2nd & 3rd Toilet T 600 1:3 15.00 60.00

1:3 0.00 0.00

Main Kitchen
1:3 0.00 0.00
Wall
Caretaker
8 1:3 0.00 0.00
Kitchen Wall
Down wash Wall
1:3 0.00 0.00
Tiles
Reception wall Tiles 1:3 0.00 0.00
Lift Wall Tiles 183 1:3 4.58 18.30
Border for Toilets 80 1:3 0.66 2.64
Slate Stone /Cladding Tiles 1:3 0.00 0.00
Column protection Tiles(Height=3'-0") 1:3 0.00 0.00
1:3 0.00 0.00
Outside Wall Cladding(Tiles) 1:3 0.00 0.00
Swimming Pool & Water Body Wall Tile 1:3 0.00 0.00
FLOOR MARBLE
Apartment(wait.Comu. etc.) -Marble 1:3 0.00 0.00 0.00
Gym/ Reception/ 0 1:3 0.00 0.00 0.00
Main Stair ( Trade, Riser, Skirting, L 1:3 0.00 0.00 0.00
Main Stair & Lift Lobby-MARBLE 1:3 0.00 0.00 0.00

2.Out
Side Level Up 1:3 0.00 0.00 0.00
Stair (Marble)

Kitchen Counter
1:3 0.00 0.00 0.00
Top
Toilet Counter
36 1:3 1.44 7.20 5.40
Top

Reception Table
1:3 0.00 0.00 0.00
Counter Top

Garden/Planter
Marble/Design 1:3 0.00 0.00 0.00
Marble
MARBLE
SKIRTING
Apt. Marble Skt 1:3 0.00 0.00 0.00
Main Stair
1:3 0.00 0.00 0.00
Marble Skt
Stair & Lift
Lobby marble 1:3 0.00 0.00 0.00
Skt

Basement/Level
Up/Ornamental 1:3 0.00 0.00 0.00
Stair Marble Skt

Graden/Planter
1:3 0.00 0.00 0.00
Marble Skt

WALL MARBLE
WORK

8 Reception wall Marble 1:3 0.00 0.00 0.00


Lift Wall Marble 0 1:3 0.00 0.00 0.00
Skirting Marble 1:3 0.00 0.00 0.00
Boundary Wall Cladding- Marble/Granit 1:3 0.00 0.00 0.00
Outside Wall Cladding( marble/ Granite 1:3 0.00 0.00 0.00

ALUMINIUM
DOOR AND
WINDOW &
OTHER WORK

4" Single glazzing sft


4" Double glazzing sft

21
3" Fixed with Sliding sft
21 Fly proof Net sft
Fixed Glass (Void 560 sft
Glass Door 120 sft
Curtain Wall 1900 sft
Curtain/Blind ( Community S sft
Aluminium Louver 570 sft
ACP Work 650 sft
Glass Canopy Work sft
GRILL WORK sft
a) Window Grill 135 sft
b) Sliding Grill sft
c) Kitchen Verandah Safety G sft
22
d) Veranda safety Grill sft
e)Parking Grill sft
f)Safety Grill Over Boundary sft
g)Boundary Grill sft
RAILING WORK sft
a) Main Stair
88 sft
Railing
b) Fire Stair
88 sft
Railing
f)Front
Verandah sft
Railing
g)Back
Verandah sft
Railing
h)Kitchen
Verandah sft
Railing
i)Voide & Punch
sft
Railing
j)Lift Lobby
railing(Coridoor sft
railing)

k)
Parapet/Terrace sft
/OHWT Railing

l)
Planter/Garden sft
Area Railing
m)Parking/
Boundary sft
Railing
WOOD WORK
(Door Frame)
a) Main Door Frame (3'-9"x7' rft
b) Community/Bed Room Door rft
c) S.Bed Door Frame (2'-6"x7 rft
16
16
d) Kit.Ver./Balcony Door Fra rft
e) Kitchen Door Frame & Com rft
f) Stair door Frame(3'-4"x7'-0 rft
g)Toilet Door Fram 66 rft
Servent Toilet Door Chowkath
CAT DOOR( 2'-
17 2 nos
0" CX 2'-0")
PVC DOOR
18 (S.Toilet Door) nos
shutter

WOOD WORK
(Door Shutter)

a) Main Door Shutter sft


b) Community/Bed 62 sft
19 c) S.Bed Door Shutter/Care sft
d) Kit.Ver./Balcony Door Shu sft
e) Kitchen Door & communit sft
f) Stair Door Shutter sft
g) Toilet Door Shutter(P.V.C) nos
Servent Toilet Door Shutter
PLASTIC
PAINT
11 a) In Side of Lift 300 sft
b) In Side Wall 3500 sft
c) Ceiling 850 sft
WHEATHER
12 0 sft
COAT
ENAMEL PAINT 0
a) All Grill Surfac 311 sft
b) On Plaster (Kit 0 sft
15 c) On Wooden
Surface(In of
sft
Toi+Out of Ver
Door)
POLISH FOR
WOODEN sft
SURFACE
28
Polish for Design Door Surf sft
Polish for Interna 194.02 sft
Laquire Polish on 97.01 sft
MILD STEEL
22
MS Rod 60/72.5 34172 Kg.
SUB TOTAL (1st. Floor) 1638 7 1512 2378 241

Prepared by: Sabit


2nd FLOOR / (3rd floor roof)
Cement in bag/kg. Sand in cft
Description of Ratio of Picket in
c Quantity
Work Mixing Nos.
Description of Ratio of Picket in
c Quantity
Work Mixing Gray(bag) white(kg) Nos.
Local Sylhet
R.C.C. WORK
(RMC/Manual)
a) Column &
Shear Wall,Lift
1780 1:1.25:2.5 450 0 703
wall(with Stair
colum)
c)Waterbody &
Swimming Pool,
0 1:11/2:3 0 0 0
OHWT Wall &
Slab

d) Slab, Beam &


4205 1:11/2:3 925 0 1724
Stair (main Slab)

C.Ancilary
Structure
Drop wall.
railinq. Aic slab.
sunshade, 0 sft 1:2:4 - - 0
Rib.Beam (upto
4" thickness)
Drop Wall sft 1:2:4 - - 0
Railing/Parapet sft 1:2:4 - - 0
1
SunShed 0 sft 1:2:4 - - 0
RIB Beam 1:2:4 - - 0
Lintel up to 5"
25 rft 1:2:4 1 2 50
Width
Lintel above 5"
20 cft 1:2:4 4 9 191
Width

False Slab up to
4" Thick & 0 sft 1:2:4 - - 0
Counter top slab

FAIR FACE
RCC WORK
Column & Shear
1:1.25:2.5 0 0 0
Wall
Slab, Beam &
1:1.25:2.5 0 0 0
Stair
Drop Wall &
1:1.25:2.5 0 0 0
Sunshed
Non Structural
1:1.25:2.5 0 0 0
Wall up to 5"
Non Structural
1:1.25:2.5 0 0 0
Wall Above 5"
SHUTTERING
WORK-
NORMAL RCC
WOODEN
sft
SHUTTER
ANCILARY
STRUCTURE
SHUTTERING
False
Slab,Counter 0 sft
top,Sunshade
Lintel 110 sft
Counter Top
20 sft
Slab
STEEL
0 sft
SHUTTER
VERICAL
MEMBER 0 sft
SHUTTER
a) Column and
2200 sft
Shear Wall
d) Boundary
Wall Column & 0 sft
Copping Beam
SLAB &
0 sft
BEAM& STAIR
b) Slab,and Stair
4725 sft
Shutter

2 c) Beam Shutter 2330 sft

ANCILARY STR 0 sft


s) Drop Wall 0 sft
t)Railing/
Parapet/ 0 sft
Ornamental Wall
u)Sunshed 0 sft
v)Ornamental
0 sft
Slab

SHUTTERING
WORK- 0 sft
FAIRFACE RCC

a) Column and
0 sft
Shear Wall
b) Slab, and
Stair 0 sft
Shutter,beam

c) Beam Shutter 0 sft

d) Non
Structural RCC 0 sft
Wall-5"-12"
e) Non
Structural 0 sft
Boundary Wall
f) Drop Wall &
SunShade 0 sft
Shutter
10" BRICK
0 cft 1:6 0.00 0
WORK
a) 10" Brick
690 cft 1:6 27.60 241
Partition Wall
3 b) Brick Soaking
cft 1:6 0.00 0
House

c) Sand
cft 1:6 0.00 0
Washing House

5" BRICK
sft 1:4 0.00 0
WORK
a) 5" Brick
1050 sft 1:4 26.25 179
Partition Wall
4 b) Brick Soaking
sft 1:4 0.00 0
House

c) Sand
sft 1:4 0.00 0
Washing House

Ceramic/Facing
bricks
3/4" Thick
sft
Plaster
a) In Side Wall 3300 sft 1:6 39.60 330

b) Brick Soaking
& Sand Washing sft 1:6 0.00 0
House( 2 nos)

5 c) Out Side
Wall(Normal sft 1:6 0.00 0
Plaster)
d) Rough
Plaster For Fair 0 sft 1:6 0.00 0
Face Plaster
e) Fair Face
950 sft
Plaster
PLASTER (1/2"
sft
thick)
Ceiling Plaster 850 sft 1:4 12.75 64
6 False Slab
0 sft 1:4 0.00 0
Bottom Plaster
RCC Column &
sft 1:4 0.00 0
SW Plaster

NEAT CEMENT
FINISHING sft
(NCF)
a) Brick Soaking
& Sand Washing 0 sft 0.00
House

b) Above False
0 sft 0.00
Slab
c) other Area 150 sft 0.75
FLOOR TILES
7 (1.5" thick
mortar)
Apartment(wait.Co 3335 sft 1:3 133.40 500.25
Gym/ Reception/Community sft 1:3 0.00 0.00
Main Stair -Tiles( 270 sft 1:3 10.80 40.50
Lift Bobby 220 sft 1:3 8.80 33.00
270 sft 1:3 10.80 40.50

0 sft 1:3 0.00 0.00

Main Toilet Floor 0 sft 1:3 0.00 0.00


2nd & 3rd Toilet F 120 sft 1:3 4.80 18.00
Main Kitchen Floor with Kit sft 1:3 0.00 0.00
Caretaker Kitchen Floor sft 1:3 0.00 0.00
sft 1:3 0.00 0.00
Kitchen Counter
0 sft 1:3 0.00 0.00
Top
Toilet Counter
150 sft 1:3 6.00 22.50
Top

Reception Table
0 sft 1:3 0.00 0.00
Counter Top

0 sft 1:3 0.00 0.00


0 sft 1:3 0.00 0.00
Terrace Tiles sft 1:3 0.00 0.00
Garden/Planter
sft 1:3 0.00 0.00
Tiles
Water Body &
Swimming Pool sft 1:3 0.00 0.00
Floor Tiles
Water Body &
Swimming Pool sft 1:3 0.00 0.00
Deck Tiles
SKIRTING
TILES(1" thick
mortar)
Apt. Floor Tiles
450 Rft 1:3 3.71 14.85
Skt

Gym/Com
Wooden Texture Rft 1:3 0.00 0.00
Tiles Skt

Stair Tiles- Skt 106 Rft 1:3 0.87 3.50


Stair & Lift
70 Rft 1:3 0.58 2.31
Lobby Tiles Skt
Fire/
Basement/
106 Rft 1:3 0.87 3.50
Ornamental
Stair Tiles Skt
Care
Taket/Servent/G
0 Rft 1:3 0.00 0.00
uard/Others
Room Tiles Skt

Kit. Ver Tiles Skt 0 Rft 1:3 0.00 0.00

Care Taker Kit


0 Rft 1:3 0.00 0.00
Floor Skt.
Pavement Tiles
0 Rft 1:3 0.00 0.00
Skt
Roof Tiles Skt 0 Rft 1:3 0.00 0.00
Terrace Tiles
0 Rft 1:3 0.00 0.00
Skt
Planter/Garden
0 Rft 1:3 0.00 0.00
Tiles Skt
WALL TILE
WORK(1" thick
mortar)
Main Toilet Tiles 0 sft 1:3 0.00 0.00
2nd & 3rd Toilet T 600 sft 1:3 15.00 60.00
0 sft 1:3 0.00 0.00
Main Kitchen
Wall with Border 0 sft 1:3 0.00 0.00
tiles
Caretaker
0 sft 1:3 0.00 0.00
8 Kitchen Wall
Down wash Wall
0 sft 1:3 0.00 0.00
Tiles
Reception wall Til 0 1:3 0.00 0.00
Lift Wall Tiles 183 1:3 4.58 18.30
Border for Toilets 80 1:3 0.66 2.64
Slate Stone /Clad 0 1:3 0.00 0.00
Column protection 0 1:3 0.00 0.00
Boundary Dado Ti 0 sft 1:3 0.00 0.00
Outside Wall Clad 0 sft 1:3 0.00 0.00
Swimming Pool & 0 sft 1:3 0.00 0.00
FLOOR MARBLE
Apartment(wait.Comu. etc.) sft 1:3 0.00 0.00 0.00
Gym/ Reception/ 0 sft 1:3 0.00 0.00 0.00
Main Stair ( Trad 0 sft 1:3 0.00 0.00 0.00
Main Stair & Lif 0 sft 1:3 0.00 0.00 0.00
0 sft 1:3 0.00 0.00 0.00
Kitchen Counter
Top (imported
polished 10-12 0 sft 1:3 0.00 0.00 0.00
mm thickness
12*24" size)

Toilet Counter
36 sft 1:3 1.44 7.20 5.40
Top

Reception Table
0 sft 1:3 0.00 0.00 0.00
Counter Top

Garden/Planter
Marble/Design 0 sft 1:3 0.00 0.00 0.00
Marble
MARBLE
SKIRTING
Apt. Marble Skt 0 Rft 1:3 0.00 0.00 0.00
Main Stair
0 Rft 1:3 0.00 0.00 0.00
Marble Skt
Stair & Lift
Lobby marble 0 Rft 1:3 0.00 0.00 0.00
Skt

Basement/Level
Up/Ornamental 0 Rft 1:3 0.00 0.00 0.00
Stair Marble Skt

Graden/Planter
0 Rft 1:3 0.00 0.00 0.00
Marble Skt

WALL MARBLE
WORK(1.5"
thick mortar)
8 Reception wall M 0 sft 1:3 0.00 0.00 0.00
Lift Wall Marble 0 sft 1:3 0.00 0.00 0.00
Skirting Marble 0 1:3 0.00 0.00 0.00
Boundary Wall Cl 0 sft 1:3 0.00 0.00 0.00
Outside Wall Clad 0 sft 1:3 0.00 0.00 0.00

ALUMINIUM
DOOR AND
0
WINDOW &
OTHER WORK

4" Single glazzing sft


4" Double glazzin 0 sft
3" Fixed with Slid 0 sft
21 Fly proof Net 0 sft
Fixed Glass ( wi 80 sft
Glass Door 120 sft
Curtain Wall 1390 sft
Curtain/Blind ( 0 sft
Aluminium Louver 400 sft
ACP Work sft
0 sft
GRILL WORK sft
a) Window Grill 135 sft
b) Sliding Grill 0 sft
c) Kitchen Verand 0 sft
22
d) Veranda safety 0 sft
e)Parking Grill 0 sft
f)Safety Grill Ov 0 sft
0 sft
Lift Lobby/Corridor 0
RAILING WORK sft
a) Main Stair
88 sft
Railing
b) Fire Stair
88 sft
Railing
f)Front
Verandah sft
Railing
g)Back
Verandah sft
Railing
h)Kitchen
Verandah sft
Railing
i)Voide & Punch
0 sft
Railing
j)Lift Lobby
0 sft
Railing

k)
Parapet/Terrace 0 sft
/OHWT Railing

l)
Planter/Garden 0 sft
Area Railing
m)Parking/
Boundary 0 sft
Railing
WOOD WORK
0
(Door Frame)
a) Main Door Fra 0 rft
b) Bed Room Doo 0 rft
c) S.Bed Door 0 rft
16
d) Kit.Ver./Balco 0 rft
e) Kitchen Door 0 rft
f) Stair door Fra 0 rft
g)Toilet Door Fr 66 rft
Servent Toilet D 0 rft
17 CAT DOOR 2 nos
18 PVC DOOR 0 nos

WOOD WORK
0
(Door Shutter)

a) Main Door Shut 0 sft


b) Community/Bed 62 sft
19 c) S.Bed Door Sh 0 sft
d) Kit.Ver./Balco 0 sft
e) Kitchen Door 0 sft
f) Stair Door Shut 0 sft
g) Toilet Door Shu 0 nos.
Servent Toilet Do 0 sft
PLASTIC
PAINT
11 a) In Side of Lift 300 sft
b) In Side Wall 3500 sft
c) Ceiling 850 sft
WHEATHER
12 0 sft
COAT
ENAMEL PAINT
a) All Grill Surfac 311 sft
b) On Plaster (Kit 0 sft
15 c) On Wooden
Surface(In
0 sft
ofToi+Out of Ver
Door)
POLISH FOR
WOODEN 0 sft
SURFACE
28
Polish for Design 0 sft
Polish for Interna 194.02 sft
Laquire Polish on 97.01 sft
MILD STEEL
22
MS Rod 60/72.5 34022 Kg.
SUB TOTAL (2nd Floor) 1689 7 1590 2427 241
Prepared by: Sabit
3RD FLOOR (4th floor roof)
Description of Ratio of Cement in bag/kg. Sand in cft Picket in
c Quantity
Work Mixing Gray(bag) white(kg) Local Sylhet Nos.
R.C.C. WORK
(RMC/Manual)

a) Column &
Shear Wall 1780 cft 1:1.25:2.5 450 0 703
(main Structure)

c)Waterbody &
Swimming Pool,
0 1:11/2:3 0 0 0
OHWT Wall &
Slab
d) Slab, Beam &
3770 1:11/2:3 829 0 1546
Stair (main Slab)

C.Ancilary
0
Structure
1)Drop wall.
railinq. Aic slab.
sunshade, 0 sft 1:2:4 - - 0
Rib.Beam (upto
4" thickness)
Drop Wall 1:2:4 - - 0
Railing/Parapet 1:2:4 - - 0
1
SunShed 0 sft 1:2:4 - - 0
RIB Beam 1:2:4 - - 0
2)Lintel up to 5"
25 rft 1:2:4 1 2 50
Width
3)Lintel above 5"
20 cft 1:2:4 4 9 191
Width

False Slab up to
4" Thick & 0 sft 1:2:4 - - 0
Counter top slab

FAIR FACE
RCC WORK
Column & Shear
1:1.25:2.5 0 0 0
Wall
Slab, Beam &
1:1.25:2.5 0 0 0
Stair
Drop Wall &
1:1.25:2.5 0 0 0
Sunshed
Non Structural
1:1.25:2.5 0 0 0
Wall up to 5"
Non Structural
1:1.25:2.5 0 0 0
Wall Above 5"
SHUTTERING
WORK-
NORMAL RCC
WOODEN
sft
SHUTTER
ANCILARY
STRUCTURE
SHUTTERING
False
Slab,Counter 0
top,Sunshade
Lintel 110
Counter Top
20
Slab
STEEL
SHUTTER
VERICAL
MEMBER
SHUTTER
a) Column and
2200
Shear Wall
d) Boundary
Wall Column & 0
Copping Beam
SLAB &
0
BEAM& STAIR
b) Slab,and Stair
4725 sft
Shutter
2
c) Beam Shutter 2330 sft

ANCILARY STR 0 sft


s) Drop Wall 0 sft
t)Railing/
Parapet/ 0 sft
Ornamental Wall
u)Sunshed 0 sft
v)Ornamental
0
Slab

SHUTTERING
WORK-
FAIRFACE RCC

a) Column and
Shear Wall
b) Slab, and
Stair Shutter

c) Beam Shutter

d) Non
Structural RCC
Wall-5"-12"
e) Non
Structural
Boundary Wall
f) Drop Wall &
SunShade
Shutter
10" BRICK
cft 1:6 0.00 0
WORK
a) 10" Brick
690 1:6 27.60 241
Partition Wall
3 b) Brick Soaking
0 1:6 0.00 0
House

c) Sand
0 1:6 0.00 0
Washing House

5" BRICK
0 sft 1:4 0.00 0
WORK

4
a) 5" Brick
1050 1:4 26.25 179
Partition Wall
4 b) Brick Soaking
0 1:4 0.00 0
House

c) Sand
1:4 0.00 0
Washing House

Ceramic/Facing
Bricks
3/4" Thick
0 sft
Plaster
a) In Side Wall 3250 1:6 39.00 325

b) Brick Soaking
& Sand Washing 0 1:6 0.00 0
House

5 c) Out Side
Wall(Normal 0 sft 1:6 0.00 0
Plaster)
d) Rough
Plaster For Fair 0 1:6 0.00 0
Face Plaster
e) Fair Face
880
Plaster
PLASTER (1/2"
0 sft
thick)
Ceiling Plaster 850 1:4 12.75 64
6 False Slab
0 1:4 0.00 0
Bottom Plaster
RCC Column &
0 1:4 0.00 0
SW Plaster

NEAT CEMENT
FINISHING 0 sft
(NCF)

a) Brick Soaking
& Sand Washing 0 0.00
House

b) Above False
0 0.00
Slab
c) Other Area
350 1.75
(Garden Area)
7 FLOOR TILES 0 0.00
Apartment(wait.Co 3250 sft 1:3 130.00 487.50
Gym/ Reception/ 0 sft 1:3 0.00 0.00
Main Stair -Tiles( 270 sft 1:3 10.80 40.50
Main Stair & Lift 220 sft 1:3 8.80 33.00
270 sft 1:3 10.80 40.50
0 sft 1:3 0.00 0.00
Main Toilet Floor 0 sft 1:3 0.00 0.00
2nd & 3rd Toilet F 120 sft 1:3 4.80 18.00
Main Kitchen Floo 0 sft 1:3 0.00 0.00
Caretaker Kitchen 0 sft 1:3 0.00 0.00
0 sft 1:3 0.00 0.00
Kitchen Counter
0 1:3 0.00 0.00
Top
Toilet Counter
150 sft 1:3 6.00 22.50
Top

Reception Table
0 1:3 0.00 0.00
Counter Top

0 1:3 0.00 0.00


Roof Tiles 0 1:3 0.00 0.00
Terrace Tiles 0 1:3 0.00 0.00
Garden/Planter
0 1:3 0.00 0.00
Tiles
Water Body &
Swimming Pool 0 1:3 0.00 0.00
Floor Tiles
Water Body &
Swimming Pool 1:3 0.00 0.00
Deck Tiles
SKIRTING
TILES
Apt. Floor Tiles
430 1:3 3.55 14.19
Skt

Gym/Com
Wooden Texture 1:3 0.00 0.00
Tiles Skt

Stair Tiles- Skt 106 1:3 0.87 3.50


Stair & Lift
70 1:3 0.58 2.31
Lobby Tiles Skt
Fire/
Basement/
106 1:3 0.87 3.50
Ornamental
Stair Tiles Skt
Care
Taket/Servent/G
0 1:3 0.00 0.00
uard/Others
Room Tiles Skt

Kit. Ver Tiles Skt 0 1:3 0.00 0.00

Care Taker Kit


0 1:3 0.00 0.00
Floor Skt.
Pavement Tiles
0 1:3 0.00 0.00
Skt
Roof Tiles Skt 0 1:3 0.00 0.00
Terrace Tiles
0 1:3 0.00 0.00
Skt
Planter/Garden
0 1:3 0.00 0.00
Tiles Skt
WALL TILE
WORK(1" thick
mortar)
Main Toilet Tiles 0 1:3 0.00 0.00
2nd & 3rd Toilet T 600 1:3 15.00 60.00

0 1:3 0.00 0.00

Main Kitchen
0 1:3 0.00 0.00
Wall
Caretaker
0 1:3 0.00 0.00
Kitchen Wall
8 Down wash Wall
0 1:3 0.00 0.00
Tiles
Reception wall Til 0 1:3 0.00 0.00
Lift Wall Tiles 183 1:3 4.58 18.30
Border for Toilets 80 rft 1:3 0.66 2.64
Slate Stone /Clad 0 1:3 0.00 0.00
Skirting Tiles 1:3 0.00 0.00
0 1:3 0.00 0.00
0 1:3 0.00 0.00
Outside Wall Clad 0 1:3 0.00 0.00
Swimming Pool & 0 1:3 0.00 0.00
FLOOR MARBLE
Apartment(wait.Co 0 1:3 0.00 0.00 0.00
Gym/ Reception/ 0 1:3 0.00 0.00 0.00
Main Stair ( Trad 0 1:3 0.00 0.00 0.00
Main Stair & Lif 0 1:3 0.00 0.00 0.00
Ornamental
0 1:3 0.00 0.00 0.00
Stair(Marble)
Kitchen Counter
0 1:3 0.00 0.00 0.00
Top
Toilet Counter
36 1:3 1.44 7.20 5.40
Top

Reception Table
0 1:3 0.00 0.00 0.00
Counter Top

Garden/Planter
Marble/Design 0 1:3 0.00 0.00 0.00
Marble
MARBLE
SKIRTING
Apt. Marble Skt 0 1:3 0.00 0.00 0.00
Main Stair
0 1:3 0.00 0.00 0.00
Marble Skt
Stair & Lift
Lobby marble 0 1:3 0.00 0.00 0.00
Skt
Basement/Level
Up/Ornamental 1:3 0.00 0.00 0.00
Stair Marble Skt

Graden/Planter
1:3 0.00 0.00 0.00
Marble Skt

WALL MARBLE
0 1:3 0.00 0.00 0.00
WORK

8 Reception wall M 0 1:3 0.00 0.00 0.00


Lift Wall Marble 0 1:3 0.00 0.00 0.00
Skirting Marble 0 1:3 0.00 0.00 0.00
Boundary Wall Cl 0 1:3 0.00 0.00 0.00
Outside Wall Clad 0 1:3 0.00 0.00 0.00

ALUMINIUM
DOOR AND
0
WINDOW &
OTHER WORK

4" Single glazzing 0


4" Double glazzin 0
3" Fixed with Slid 0
21 Fly proof Net
Fixed Glass
80
( window)
Glass Door 120
Curtain Wall 1370
Curtain/Blind ( 0
Aluminium Louver 365
ACP Work 0
Glass Canopy Wo 0
GRILL WORK 0 sft
a) Window Grill 135 sft
b) Sliding Grill 0 sft
c) Kitchen Verand 0 sft
22 d) Veranda
0 sft
safety Grill
e)Parking Grill 0 sft
f)Safety Grill Ov 0 sft
g)Boundary Grill 0 sft
Lift Lobby/Corridor 0
RAILING WORK 0 sft
a) Main Stair
88 sft
Railing
b) Fire Stair
88 sft
Railing
f)Front
Verandah 166 sft
Railing
g)Back
Verandah 0 sft
Railing
h)Kitchen
Verandah 0 sft
Railing
i)Voide & Punch
0 sft
Railing
j)Lift Lobby
0 sft
Railing

k)
Parapet/Terrace sft
/OHWT Railing

l)
Planter/Garden 0 sft
Area Railing
m)Parking/
Boundary 0 sft
Railing
WOOD WORK
0
(Door Frame)
a) Main Door Fram 0 rft
b) Bed Room Door 0 rft
c) S.Bed Door Fra 0 rft
16
d) Kit.Ver./Balco 0 rft
e) Kitchen Door F 0 rft
f) Stair door Fram 0 rft
g)Toilet Door Fram 66 rft
Servent Toilet D 0 rft
17 CAT DOOR 2 nos
PVC DOOR
18 0 nos
(S.Toilet Door)

WOOD WORK
0
(Door Shutter)

a) Main Door Shut 0 sft


b) Community/Bed 62 sft
19 c) S.Bed Door Sh 0 sft
d) Kit.Ver./Balco 0 sft
e) Kitchen Door 0 sft
f) Stair Door Shut 0 sft
g) Toilet Door Shu 0 nos.
Servent Toilet Do 0
PLASTIC
0
PAINT
11 a) In Side of Fals 300 sft
b) In Side Wall 3500 sft
c) Ceiling 850 sft
WHEATHER
12 0 sft
COAT
ENAMEL PAINT 0
a) All Grill Surfac 477 sft
b) On Plaster (Kit 0 sft
15 c) On Wooden
Surface(In of
0 sft
Toi+Out of Ver
Door)
POLISH FOR
WOODEN sft
SURFACE
28
Polish for Design 0 sft
Polish for Interna 194.02 sft
Laquire Polish on 97.01 sft
MILD STEEL
22
MS Rod 60/72.5 33332 Kg.
SUB TOTAL (3rd Floor) 1590 7 1572 2249 241
Prepared by: Sabit NOTE: CONCRETE MIXING RATIO MAY BE CHANGED WITH RESPECT T
4TH FLOOR
Description of Ratio of Cement in bag/kg. Sand in cft Picket in
c Quantity
Work Mixing Gray(bag) white(kg) Local Sylhet Nos.
R.C.C. WORK
(RMC/Manual)

a) Column &
Shear Wall 1780 cft 1:1.25:2.5 450 0 703
(main Structure)

c)Waterbody &
Swimming Pool,
0 1:11/2:3 0 0 0
OHWT Wall &
Slab

d) Slab, Beam &


3520 1:11/2:3 774 0 1443
Stair (main Slab)

C.Ancilary
0
Structure
Drop wall.
railinq. Aic slab.
sunshade, 0 sft 1:2:4 - - 0
Rib.Beam (upto
4" thickness)
Drop Wall 1:2:4 - - 0
Railing/Parapet 1:2:4 - - 0
1
SunShed 0 sft 1:2:4 - - 0
RIB Beam 1:2:4 - - 0
2)Lintel up to 5"
25 rft 1:2:4 1 2 50
Width
3)Lintel above 5"
20 cft 1:2:4 4 9 191
Width
False Slab up to
4" Thick & 0 sft 1:2:4 - - 0
Counter top slab

FAIR FACE
RCC WORK
Column & Shear
1:1.25:2.5 0 0 0
Wall
Slab, Beam &
1:1.25:2.5 0 0 0
Stair
Drop Wall &
1:1.25:2.5 0 0 0
Sunshed
Non Structural
1:1.25:2.5 0 0 0
Wall up to 5"
Non Structural
1:1.25:2.5 0 0 0
Wall Above 5"
SHUTTERING
WORK-
NORMAL RCC
WOODEN
sft
SHUTTER
ANCILARY
STRUCTURE
SHUTTERING
False
Slab,Counter 0 sft
top,Sunshade
Lintel 110 sft
Counter Top
20 sft
Slab
STEEL
SHUTTER
VERICAL
MEMBER
SHUTTER
a) Column and
2200 sft
Shear Wall
d) Boundary
Wall Column & 0 sft
Copping Beam
SLAB &
0 sft
BEAM& STAIR
b) Slab,and Stair
4475 sft
Shutter
2
c) Beam Shutter 2330 sft

ANCILARY STR 0 sft


s) Drop Wall 0 sft
t)Railing/
Parapet/ 0 sft
Ornamental Wall
u)Sunshed 0 sft
v)Ornamental
0 sft
Slab

SHUTTERING
WORK- 0 sft
FAIRFACE RCC

a) Column and
0 sft
Shear Wall
b) Slab, and
0 sft
Stair Shutter

c) Beam Shutter 0 sft

d) Non
Structural RCC 0 sft
Wall-5"-12"
e) Non
Structural 0 sft
Boundary Wall
f) Drop Wall &
SunShade 0 sft
Shutter
10" BRICK
0 cft 1:6 0.00 0
WORK
a) 10" Brick
690 cft 1:6 27.60 241
Partition Wall
3 b) Brick Soaking
0 cft 1:6 0.00 0
House

c) Sand
0 cft 1:6 0.00 0
Washing House

5" BRICK
0 sft 1:4 0.00 0
WORK
a) 5" Brick
1050 sft 1:4 26.25 179
Partition Wall
4 b) Brick Soaking
0 sft 1:4 0.00 0
House

c) Sand
0 sft 1:4 0.00 0
Washing House

Ceramic/Facing
sft
bricks
3/4" Thick
0 sft
Plaster
a) In Side Wall 3250 sft 1:6 39.00 325

b) Brick Soaking
& Sand Washing 0 sft 1:6 0.00 0
House

5 c) Out Side
Wall(Normal 0 sft 1:6 0.00 0
Plaster)
5

d) Rough
Plaster For Fair 0 sft 1:6 0.00 0
Face Plaster
e) Fair Face
880 sft
Plaster
PLASTER (1/2"
0 sft
thick)
Ceiling Plaster 850 sft 1:4 12.75 64
6 False Slab
0 sft 1:4 0.00 0
Bottom Plaster
RCC Column &
0 sft 1:4 0.00 0
SW Plaster

NEAT CEMENT
FINISHING 0 sft
(NCF)

a) Brick Soaking
& Sand Washing 0 sft 0.00
House

b) Above False
0 sft 0.00
Slab
c) other Area 350 sft 1.75
7 FLOOR TILES sft
Apartment(wait.Co 3200 sft 1:3 128.00 480.00
Gym/ Reception/ 0 sft 1:3 0.00 0.00
Main Stair -Tiles( 270 sft 1:3 10.80 40.50
Main Stair & Lift 220 sft 1:3 8.80 33.00
270 sft 1:3 10.80 40.50
Room
0 sft 1:3 0.00 0.00

Main Toilet Floor 0 sft 1:3 0.00 0.00


2nd & 3rd Toilet F 120 sft 1:3 4.80 18.00
Main Kitchen Floo 0 sft 1:3 0.00 0.00
Caretaker Kitchen 0 sft 1:3 0.00 0.00
0 sft 1:3 0.00 0.00
Kitchen Counter
0 sft 1:3 0.00 0.00
Top
Toilet Counter
150 sft 1:3 6.00 22.50
Top

Reception Table
0 sft 1:3 0.00 0.00
Counter Top

Pavement Tiles 0 sft 1:3 0.00 0.00


Roof Tiles 0 sft 1:3 0.00 0.00
Terrace Tiles sft 1:3 0.00 0.00
Garden/Planter
0 sft 1:3 0.00 0.00
Tiles
Water Body &
Swimming Pool 0 sft 1:3 0.00 0.00
Floor Tiles
Water Body &
Swimming Pool sft 1:3 0.00 0.00
Deck Tiles
SKIRTING
sft
TILES
Apt. Floor Tiles
430 sft 1:3 3.55 14.19
Skt

Gym/Com
Wooden Texture 0 sft 1:3 0.00 0.00
Tiles Skt

Stair Tiles- Skt 106 sft 1:3 0.87 3.50


Stair & Lift
70 sft 1:3 0.58 2.31
Lobby Tiles Skt
Fire/
Basement/
106 sft 1:3 0.87 3.50
Ornamental
Stair Tiles Skt
Care
Taket/Servent/G
0 sft 1:3 0.00 0.00
uard/Others
Room Tiles Skt

Kit. Ver Tiles Skt 0 sft 1:3 0.00 0.00

Care Taker Kit


sft 1:3 0.00 0.00
Floor Skt.
Pavement Tiles
sft 1:3 0.00 0.00
Skt
Roof Tiles Skt sft 1:3 0.00 0.00
Terrace Tiles
sft 1:3 0.00 0.00
Skt
Planter/Garden
sft 1:3 0.00 0.00
Tiles Skt
WALL TILE
sft
WORK
Main Toilet Tiles 0 sft 1:3 0.00 0.00
2nd & 3rd Toilet T 600 sft 1:3 15.00 60.00
0 sft 1:3 0.00 0.00
Main Kitchen
0 sft 1:3 0.00 0.00
Wall
Caretaker
0 sft 1:3 0.00 0.00
Kitchen Wall
8 Down wash Wall
0 sft 1:3 0.00 0.00
Tiles
Reception wall Til 0 sft 1:3 0.00 0.00
Lift Wall Tiles 183 sft 1:3 4.58 18.30
Border for Toilets 80 sft 1:3 0.66 2.64
Slate Stone /Clad 0 sft 1:3 0.00 0.00
0 sft 1:3 0.00 0.00
0 sft 1:3 0.00 0.00
Outside Wall Clad 0 sft 1:3 0.00 0.00
Swimming Pool & 0 sft 1:3 0.00 0.00
FLOOR MARBLE sft
Apartment(wait.Co 0 sft 1:3 0.00 0.00 0.00
Gym/ Reception/ 0 sft 1:3 0.00 0.00 0.00
Main Stair ( Trad 0 sft 1:3 0.00 0.00 0.00
Main Stair & Lif 0 sft 1:3 0.00 0.00 0.00
Ornamental
0 sft 1:3 0.00 0.00 0.00
Stair(Marble)
Kitchen Counter
0 sft 1:3 0.00 0.00 0.00
Top
Toilet Counter
36 sft 1:3 1.44 7.20 5.40
Top

Reception Table
0 sft 1:3 0.00 0.00 0.00
Counter Top

Garden/Planter
Marble/Design 0 sft 1:3 0.00 0.00 0.00
Marble
MARBLE
sft
SKIRTING
Apt. Marble Skt 0 sft 1:3 0.00 0.00 0.00
Main Stair
0 sft 1:3 0.00 0.00 0.00
Marble Skt
Stair & Lift
Lobby marble 0 sft 1:3 0.00 0.00 0.00
Skt
sft 1:3 0.00 0.00 0.00
Graden/Planter
sft 1:3 0.00 0.00 0.00
Marble Skt

WALL MARBLE
sft
WORK

8 0 sft 1:3 0.00 0.00 0.00


Lift Wall Marble 0 sft 1:3 0.00 0.00 0.00
Skirting Marble 0 sft 1:3 0.00 0.00 0.00
0 sft 1:3 0.00 0.00 0.00
Outside Wall Clad 0 sft 1:3 0.00 0.00 0.00

ALUMINIUM
DOOR AND
sft
WINDOW &
OTHER WORK

4" Single glazzing 0 sft


4" Double glazzin 0 sft
3" Fixed with Slid 0 sft
21 Fly proof Net 0 sft
Fixed Glass (Win 80 sft
Glass Door 120 sft
21

Curtain Wall 1340 sft


Curtain/Blind ( 0 sft
Aluminium Louve 365 sft
ACP Work 0 sft
Glass Canopy Wo 0 sft
GRILL WORK 0 sft
a) Window Grill 135 sft
b) Sliding Grill 0 sft
c) Kitchen Verand 0 sft
22 d) Veranda
0 sft
safety Grill
e)Parking Grill 0 sft
f)Safety Grill Ov 0 sft
g)Boundary Grill 0 sft
Lift Lobby/Corridor 0
RAILING WORK 0 sft
a) Main Stair
88 sft
Railing
b) Fire Stair
88 sft
Railing
f)Front
Verandah 0 sft
Railing
g)Back
Verandah 0 sft
Railing
h)Kitchen
Verandah 0 sft
Railing
i)Voide & Punch
0 sft
Railing
j)Lift Lobby
0 sft
Railing

k)
Parapet/Terrace 0 sft
/OHWT Railing

l)
Planter/Garden 0 sft
Area Railing
m)Parking/
Boundary 0 sft
Railing
WOOD WORK
0
(Door Frame)

a) Main Door Fram 0 rft


b) Bed Room Door 0 rft
16 c) S.Bed Door Fra 0 rft
d) Kit.Ver./Balco 0 rft
e) Kitchen Door F 0 rft
16

f) Stair door Fram 0 rft


g)Toilet Door Fram 66 rft
Servent Toilet D 0 rft
17 CAT DOOR 2 nos
PVC DOOR
18 0 nos
(S.Toilet Door)

WOOD WORK
0
(Door Shutter)

a) Main Door Shut 0 sft


b) Community/Bed 62 sft
19 c) S.Bed Door Sh 0 sft
d) Kit.Ver./Balco 0 sft
e) Kitchen Door 0 sft
f) Stair Door Shut 0 sft
g) Toilet Door Shu 0 sft
Servent Toilet Door Shutter sft
PLASTIC
0 sft
PAINT
11 a) In Side of Fals 300 sft
b) In Side Wall 3500 sft
c) Ceiling 850 sft
WHEATHER
12 0 sft
COAT
ENAMEL PAINT 0
a) All Grill Surfac 311 sft
b) On Plaster (Kit 0 sft
15 (c) On Wooden
Surface(In of
0 sft
Toi+Out of Ver
Door)
POLISH FOR
WOODEN sft
SURFACE
28
Polish for Design 0 sft
Polish for Interna 194.02 sft
Laquire Polish on 97.01 sft
MILD STEEL
22
MS Rod 60/72.5 32072 Kg.
SUB TOTAL (4th Floor) 1533 7 1564 2146 241
Prepared by: Sabit
5TH FLOOR
Description of Ratio of Cement in bag/kg. Sand in cft Picket in
c Quantity
Work Mixing Gray(bag) white(kg) Local Sylhet Nos.
R.C.C. WORK
(RMC/Manual)
a) Column &
Shear Wall 1780 1:1.25:2.5 450 0 703
(main Structure)

c)Waterbody &
Swimming Pool,
0 1:11/2:3 0 0 0
OHWT Wall &
Slab

d) Slab, Beam &


3795 1:11/2:3 835 0 1556
Stair (main Slab)

C.Ancilary
Structure
1)Drop wall.
railinq. Aic slab.
sunshade, 0 sft 1:2:4 - - 0
Rib.Beam (upto
4" thickness)
Drop Wall 1:2:4 - - 0
Railing/Parapet 1:2:4 - - 0
1
SunShed 0 sft 1:2:4 - - 0
RIB Beam 1:2:4 - - 0
2)Lintel up to 5"
25 rft 1:2:4 1 2 50
Width
3)Lintel above 5"
20 cft 1:2:4 4 9 191
Width

False Slab up to
4" Thick & 0 sft 1:2:4 - - 0
Counter top slab

FAIR FACE
RCC WORK
Column & Shear
1:1.25:2.5 0 0 0
Wall
Slab, Beam &
1:1.25:2.5 0 0 0
Stair
Drop Wall &
1:1.25:2.5 0 0 0
Sunshed
Non Structural
1:1.25:2.5 0 0 0
Wall up to 5"
Non Structural
1:1.25:2.5 0 0 0
Wall Above 5"
SHUTTERING
WORK-
NORMAL RCC
WOODEN
sft
SHUTTER
ANCILARY
STRUCTURE
SHUTTERING
False
Slab,Counter 0 sft
top,Sunshade
Lintel 110 sft
Counter Top
20 sft
Slab
STEEL
SHUTTER
VERICAL
MEMBER
SHUTTER
a) Column and
2200 sft
Shear Wall
d) Boundary
Wall Column & 0 sft
Copping Beam
SLAB &
0 sft
BEAM& STAIR
b) Slab,and Stair
4675 sft
Shutter
2
c) Beam Shutter 2330 sft

ANCILARY STR 0 sft


s) Drop Wall sft
t)Railing/
Parapet/ sft
Ornamental Wall
u)Sunshed sft
v)Ornamental
sft
Slab

SHUTTERING
WORK- sft
FAIRFACE RCC

a) Column and
sft
Shear Wall
b) Slab, and
sft
Stair Shutter

c) Beam Shutter sft

d) Non
Structural RCC sft
Wall-5"-12"
e) Non
Structural sft
Boundary Wall
f) Drop Wall &
SunShade sft
Shutter
10" BRICK
0 cft 1:6 0.00 0
WORK

3
a) 10" Brick
690 cft 1:6 27.60 241
Partition Wall
3 b) Brick Soaking
0 cft 1:6 0.00 0
House

c) Sand
0 cft 1:6 0.00 0
Washing House

5" BRICK
WORK
a) 5" Brick
1050 sft 1:4 26.25 179
Partition Wall
4 b) Brick Soaking
0 sft 1:4 0.00 0
House

c) Sand
0 sft 1:4 0.00 0
Washing House

Ceramic/Facing
sft 1:4 0.00 0
Bricks
3/4" Thick
0 sft
Plaster
a) In Side Wall 3250 sft 1:6 39.00 325

b) Brick Soaking
& Sand Washing 0 sft 1:6 0.00 0
House

5 c) Out Side
Wall(Normal 0 sft 1:6 0.00 0
Plaster)
d) Rough
Plaster For Fair 0 sft 1:6 0.00 0
Face Plaster
e) Fair Face
880 sft
Plaster
PLASTER (1/2"
sft
thick)
Ceiling Plaster 850 sft 1:4 12.75 64
6 False Slab
0 sft 1:4 0.00 0
Bottom Plaster
RCC Column &
0 sft 1:4 0.00 0
SW Plaster

NEAT CEMENT
FINISHING sft
(NCF)

a) Brick Soaking
& Sand Washing 0 sft 0.00
House

b) Above False
0 sft 0.00
Slab
c) Other Area
350 sft 1.75
(Garden Area)
7 FLOOR TILES sft
Apartment(wait.Co 3350 sft 1:3 134.00 502.50
Gym/ Reception/ 0 sft 1:3 0.00 0.00
Main Stair -Tiles( 270 sft 1:3 10.80 40.50
Main Stair & Lift 220 sft 1:3 8.80 33.00
270 sft 1:3 10.80 40.50
0 sft 1:3 0.00 0.00
Main Toilet Floor 0 sft 1:3 0.00 0.00
2nd & 3rd Toilet F 120 sft 1:3 4.80 18.00
Main Kitchen Floo 0 sft 1:3 0.00 0.00
Caretaker Kitchen 0 sft 1:3 0.00 0.00
0 sft 1:3 0.00 0.00
Kitchen Counter
0 sft 1:3 0.00 0.00
Top
Toilet Counter
150 sft 1:3 6.00 22.50
Top
0 sft 1:3 0.00 0.00
0 sft 1:3 0.00 0.00
0 sft 1:3 0.00 0.00
Terrace Tiles 0 sft 1:3 0.00 0.00
Garden/Planter
0 sft 1:3 0.00 0.00
Tiles
Water Body &
Swimming Pool 0 sft 1:3 0.00 0.00
Floor Tiles
Water Body &
Swimming Pool sft 1:3 0.00 0.00
Deck Tiles
SKIRTING
TILES
Apt. Floor Tiles
430 rft 1:3 3.55 14.19
Skt

Gym/Com
Wooden Texture 0 rft 1:3 0.00 0.00
Tiles Skt

Stair Tiles- Skt 106 rft 1:3 0.87 3.50


Stair & Lift
70 rft 1:3 0.58 2.31
Lobby Tiles Skt
Fire/Ornamental
106 rft 1:3 0.87 3.50
Stair Tiles Skt
Servent/Others
0 rft 1:3 0.00 0.00
Room Tiles Skt

Kit. Ver Tiles Skt 0 rft 1:3 0.00 0.00

Care Taker Kit


rft 1:3 0.00 0.00
Floor Skt.
Pavement Tiles
rft 1:3 0.00 0.00
Skt
Roof Tiles Skt rft 1:3 0.00 0.00
Terrace Tiles
rft 1:3 0.00 0.00
Skt
Planter/Garden
rft 1:3 0.00 0.00
Tiles Skt
WALL TILE
rft
WORK
Main Toilet Tiles 0 1:3 0.00 0.00
2nd & 3rd Toilet T 600 1:3 15.00 60.00
0 1:3 0.00 0.00
Main Kitchen
0 1:3 0.00 0.00
Wall
Caretaker
0 1:3 0.00 0.00
Kitchen Wall
8 Down wash Wall
0 1:3 0.00 0.00
Tiles
Reception wall Til 0 1:3 0.00 0.00
Lift Wall Tiles 183 1:3 4.58 18.30
Border for Toilets 80 1:3 0.66 2.64
Slate Stone /Clad 0 1:3 0.00 0.00
Column protection 0 sft 1:3 0.00 0.00
Boundary Dado Ti 0 sft 1:3 0.00 0.00
Outside Wall Clad 0 sft 1:3 0.00 0.00
Swimming Pool & 0 sft 1:3 0.00 0.00
FLOOR MARBLE
Apartment(wait.Co 0 sft 1:3 0.00 0.00 0.00
Gym/ Reception/ 0 sft 1:3 0.00 0.00 0.00
Main Stair ( Trad 0 sft 1:3 0.00 0.00 0.00
Main Stair & Lif 0 sft 1:3 0.00 0.00 0.00
0 sft 1:3 0.00 0.00 0.00
Kitchen Counter
0 sft 1:3 0.00 0.00 0.00
Top
Toilet Counter
36 sft 1:3 1.44 7.20 5.40
Top

Reception Table
0 1:3 0.00 0.00 0.00
Counter Top

Garden/Planter
Marble/Design 0 1:3 0.00 0.00 0.00
Marble
MARBLE
SKIRTING
Apt. Marble Skt 0 1:3 0.00 0.00 0.00
Main Stair
0 1:3 0.00 0.00 0.00
Marble Skt
Stair & Lift
Lobby marble 0 1:3 0.00 0.00 0.00
Skt
Basement/Level
Up/Ornamental 1:3 0.00 0.00 0.00
Stair Marble Skt

Graden/Planter
1:3 0.00 0.00 0.00
Marble Skt

WALL MARBLE
0
WORK

8 Reception wall M 0 1:3 0.00 0.00 0.00


Lift Wall Marble 0 1:3 0.00 0.00 0.00
Skirting Marble 0 1:3 0.00 0.00 0.00
Boundary Wall Cl 0 1:3 0.00 0.00 0.00
Outside Wall Clad 0 1:3 0.00 0.00 0.00

ALUMINIUM
DOOR AND
WINDOW &
OTHER WORK

4" Single glazzing 0


4" Double glazzin 0
3" Fixed with Slid 0
21 Fly proof Net
Fixed Glass 80
Glass Door 120
Curtain Wall 1400
Curtain/Blind ( 0
Aluminium Louve 365
ACP Work 0
Glass Canopy Wo 0
GRILL WORK 0 sft
a) Window Grill 135 sft
b) Sliding Grill 0 sft
c) Kitchen Verand 0 sft
22 d) Veranda
0 sft
safety Grill
e)Parking Grill 0 sft
f)Safety Grill Ov 0 sft
g)Boundary Grill 0 sft
Lift Lobby/Corridor 0
RAILING WORK 0 sft
a) Main Stair
88 sft
Railing
b) Fire Stair
88 sft
Railing
f)Front
Verandah 166 sft
Railing
g)Back
Verandah 0 sft
Railing
h)Kitchen
Verandah 0 sft
Railing
i)Voide & Punch
0 sft
Railing
j)Lift Lobby
0 sft
Railing

k)
Parapet/Terrace 0 sft
/OHWT Railing

l)
Planter/Garden 0 sft
Area Railing
m)Parking/
Boundary 0 sft
Railing
WOOD WORK
0
(Door Frame)
a) Main Door Fram 0 rft
b) Bed Room Door 0 rft
c) S.Bed Door Fra 0 rft
16
d) Kit.Ver./Balco 0 rft
e) Kitchen Door F 0 rft
f) Stair Door Fram 0 rft
g)Toilet Door Fram 66 rft
Servent Toilet D 0 rft
17 CAT DOOR 2 nos
PVC DOOR
18 0 nos
(S.Toilet Door)

WOOD WORK
0
(Door Shutter)

a) Main Door Shut 0 sft


b) Community/Bed 62 sft
19 c) S.Bed Door Sh 0 sft
d) Kit.Ver./Balco 0 sft
e) Kitchen Door 0 sft
f) Stair Door Shut 0 sft
g) Toilet Door Shu 0 nos.
Servent Toilet Do 0
PLASTIC
0
PAINT
11 a) In Side of Fals 300 sft
b) In Side Wall 3500 sft
c) Ceiling 850 sft
WHEATHER
12 0 sft
COAT
ENAMEL PAINT 0
a) All Grill Surfac 477 sft
b) On Plaster (Kit 0 sft
15 c) On Wooden
Surface(In of
0 sft
Toi+Out of Ver
Door)
POLISH FOR
WOODEN sft
SURFACE
28
Polish for Design 0 sft
Polish for Interna 194.02 sft
Laquire Polish on 97.01 sft
MILD STEEL
22
MS Rod 60/72.5 32542 Kg.
SUB TOTAL (5th Floor) 1600 7 1587 2259 241
Prepared by: Sabit
6TH FLOOR
Description of Ratio of Cement in bag/kg. Sand in cft Picket in
c Quantity
Work Mixing Gray(bag) white(kg) Local Sylhet Nos.
R.C.C. WORK
(RMC/Manual)

a) Column &
Shear Wall 1780 cft 1:1.25:2.5 450 0 703
(main Structure)

c)Waterbody &
Swimming Pool,
1:11/2:3 0 0 0
OHWT Wall &
Slab

d) Slab, Beam &


3815 1:11/2:3 839 0 1564
Stair (main Slab)

C.Ancilary
Structure
1)Drop wall.
railinq. Aic slab.
sunshade, 0 sft 1:2:4 - - 0
Rib.Beam (upto
4" thickness)
Drop Wall 1:2:4 - - 0
Railing/Parapet 1:2:4 - - 0
1
SunShed 0 sft 1:2:4 - - 0
RIB Beam 1:2:4 - - 0
2)Lintel up to 5"
25 rft 1:2:4 1 2 50
Width
3)Lintel above
20 cft 1:2:4 4 9 191
5" Width
False Slab up to
4" Thick & 0 sft 1:2:4 - - 0
Counter top slab

FAIR FACE
RCC WORK
Column & Shear
1:1.25:2.5 0 0 0
Wall
Slab, Beam &
1:1.25:2.5 0 0 0
Stair
Drop Wall &
1:1.25:2.5 0 0 0
Sunshed
Non Structural
1:1.25:2.5 0 0 0
Wall up to 5"
Non Structural
1:1.25:2.5 0 0 0
Wall Above 5"
SHUTTERING
WORK-
NORMAL RCC
WOODEN
0 sft
SHUTTER
ANCILARY
STRUCTURE
SHUTTERING
False
Slab,Counter 0 sft
top,Sunshade
Lintel 110 sft
Counter Top
20 sft
Slab
STEEL
SHUTTER
VERICAL
MEMBER
SHUTTER
a) Column and
2200 sft
Shear Wall
d) Boundary
Wall Column & 0
Copping Beam
SLAB &
0
BEAM& STAIR
b) Slab,and Stair
4675 sft
Shutter
2
c) Beam Shutter 2330

ANCILARY STR 0
s) Drop Wall 0
t)Railing/
Parapet/ 0
Ornamental Wall
u)Sunshed 0
v)Ornamental
0
Slab

SHUTTERING
WORK- 0
FAIRFACE RCC

a) Column and
0
Shear Wall
b) Slab, and
0
Stair Shutter

c) Beam Shutter 0

d) Non
Structural RCC 0
Wall-5"-12"
e) Non
Structural 0
Boundary Wall
f) Drop Wall &
SunShade 0
Shutter
10" BRICK
WORK
a) 10" Brick
690 1:6 27.60 241
Partition Wall
3 b) Brick Soaking
0 1:6 0.00 0
House

c) Sand
0 1:6 0.00 0
Washing House

5" BRICK
0 sft 1:6 0.00 0
WORK
a) 5" Brick
1050 1:4 26.25 179
Partition Wall
4 b) Brick Soaking
0 1:4 0.00 0
House

c) Sand
0 1:4 0.00 0
Washing House

Ceramic/Facing
1:4 0.00 0
Bricks
3/4" Thick
0 sft
Plaster
a) In Side Wall 3250 1:6 39.00 325

b) Brick Soaking
& Sand Washing 0 1:6 0.00 0
House

5 c) Out Side
Wall(Normal 0 sft 1:6 0.00 0
Plaster)
5

d) Rough
Plaster For Fair 0 1:6 0.00 0
Face Plaster
e) Fair Face
880
Plaster
PLASTER (1/2"
sft
thick)
Ceiling Plaster 850 1:4 12.75 64
6 False Slab
0 1:4 0.00 0
Bottom Plaster
RCC Column &
0 1:4 0.00 0
SW Plaster

NEAT CEMENT
FINISHING sft 1:4 0.00 0
(NCF)

a) Brick Soaking
& Sand Washing 0 0.00
House

b) Above False
0 0.00
Slab
c) other Area
350 1.75
(Garden Area)
7 FLOOR TILES
Apartment(wait.Co 3100 sft 1:3 124.00 465.00
Gym/ Reception/ 0 1:3 0.00 0.00
Main Stair -Tiles( 270 1:3 10.80 40.50
Main Stair & Lift 220 1:3 8.80 33.00
270 1:3 10.80 40.50
0 1:3 0.00 0.00
Main Toilet Floor 0 1:3 0.00 0.00
2nd & 3rd Toilet F 120 1:3 4.80 18.00
Main Kitchen Floo 0 1:3 0.00 0.00
Caretaker Kitchen 0 1:3 0.00 0.00
0 1:3 0.00 0.00
Kitchen Counter
0 1:3 0.00 0.00
Top
Toilet Counter
150 1:3 6.00 22.50
Top

Reception Table
0 1:3 0.00 0.00
Counter Top

Pavement Tiles 0 1:3 0.00 0.00


Roof Tiles 0 1:3 0.00 0.00
Terrace Tiles 0 1:3 0.00 0.00
Garden/Planter
0 1:3 0.00 0.00
Tiles
Water Body &
Swimming Pool 0 1:3 0.00 0.00
Floor Tiles
Water Body &
Swimming Pool 1:3 0.00 0.00
Deck Tiles
SKIRTING
TILES
Apt. Floor Tiles
380 1:3 3.14 12.54
Skt

Gym/Com
Wooden Texture 0 1:3 0.00 0.00
Tiles Skt

Stair Tiles- Skt 106 1:3 0.87 3.50


Stair & Lift
70 1:3 0.58 2.31
Lobby Tiles Skt
Fire/
Basement/
106 1:3 0.87 3.50
Ornamental
Stair Tiles Skt
Care
Taket/Servent/G
0 1:3 0.00 0.00
uard/Others
Room Tiles Skt

Kit. Ver Tiles Skt 0 1:3 0.00 0.00

Care Taker Kit


1:3 0.00 0.00
Floor Skt.
Pavement Tiles
1:3 0.00 0.00
Skt
Roof Tiles Skt 1:3 0.00 0.00
Terrace Tiles
1:3 0.00 0.00
Skt
Planter/Garden
1:3 0.00 0.00
Tiles Skt
WALL TILE
WORK
Main Toilet Tiles 0 1:3 0.00 0.00
2nd & 3rd Toilet T 600 1:3 15.00 60.00
0 1:3 0.00 0.00
Main Kitchen
0 1:3 0.00 0.00
Wall
Caretaker
0 1:3 0.00 0.00
Kitchen Wall
8 Down wash Wall
0 1:3 0.00 0.00
Tiles
Reception wall Til 0 1:3 0.00 0.00
Lift Wall Tiles 183 1:3 4.58 18.30
Border for Toilets 80 1:3 0.66 2.64
Slate Stone /Clad 0 1:3 0.00 0.00
Column protection 0 1:3 0.00 0.00
Boundary Dado Ti 0 1:3 0.00 0.00
Outside Wall Clad 0 1:3 0.00 0.00
Swimming Pool & 0 1:3 0.00 0.00
FLOOR MARBLE
Apartment(wait.Co 0 1:3 0.00 0.00 0.00
Gym/ Reception/ 0 sft 1:3 0.00 0.00 0.00
Main Stair ( Trad 0 sft 1:3 0.00 0.00 0.00
Main Stair & Lif 0 sft 1:3 0.00 0.00 0.00
0 sft 1:3 0.00 0.00 0.00
Kitchen Counter
0 sft 1:3 0.00 0.00 0.00
Top
Toilet Counter
36 sft 1:3 1.44 7.20 5.40
Top

Reception Table
0 1:3 0.00 0.00 0.00
Counter Top

Garden/Planter
Marble/Design 0 1:3 0.00 0.00 0.00
Marble
MARBLE
SKIRTING
Apt. Marble Skt 0 1:3 0.00 0.00 0.00
Main Stair
0 1:3 0.00 0.00 0.00
Marble Skt
Stair & Lift
Lobby marble 0 1:3 0.00 0.00 0.00
Skt

Basement/Level
Up/Ornamental 1:3 0.00 0.00 0.00
Stair Marble Skt

Graden/Planter
1:3 0.00 0.00 0.00
Marble Skt

WALL MARBLE
0
WORK

8 Reception wall M 0 1:3 0.00 0.00 0.00


Lift Wall Marble 0 1:3 0.00 0.00 0.00
Skirting Marble 0 1:3 0.00 0.00 0.00
Boundary Wall Cl 0 1:3 0.00 0.00 0.00
Outside Wall Clad 0 1:3 0.00 0.00 0.00

ALUMINIUM
DOOR AND
0
WINDOW &
OTHER WORK

4" Single glazzing 0


4" Double glazzin 0
3" Fixed with Slid 0
21 Fly proof Net
21
Fixed Glass 80
Glass Door 120
Curtain Wall 1400
Curtain/Blind ( 0
Aluminium Louve 365
ACP Work 0
Glass Canopy Wo 0
GRILL WORK 0 sft
a) Window Grill 135 sft
b) Sliding Grill 0 sft
c) Kitchen Verand 0 sft
22 d) Veranda
0 sft
safety Grill
e)Parking Grill 0 sft
f)Safety Grill Ov 0 sft
g)Boundary Grill 0 sft
Lift Lobby/Corridor 0
RAILING WORK 0 sft
a) Main Stair
88 sft
Railing
b) Fire Stair
88 sft
Railing
f)Front
Verandah 357 sft
Railing
g)Back
Verandah 0 sft
Railing
h)Kitchen
Verandah 0 sft
Railing
i)Voide & Punch
0 sft
Railing
j)Lift Lobby
0 sft
Railing

k)
Parapet/Terrace 0 sft
/OHWT Railing

l)
Planter/Garden 0 sft
Area Railing
m)Parking/
Boundary 0 sft
Railing
WOOD WORK
0
(Door Frame)
a) Main Door Fram 0 rft
b) Bed Room Door 0 rft
c) S.Bed Door Fra 0 rft
16
d) Kit.Ver./Balco 0 rft
16

e) Kitchen Door F 0 rft


f) Stair door Fram 0 rft
g)Toilet Door Fram 66 rft
Servent Toilet D 0 rft
17 CAT DOOR 2 nos
PVC DOOR
18 nos
(S.Toilet Door)

WOOD WORK
0
(Door Shutter)

a) Main Door Shut 0 sft


b) Community/Bed 62 sft
19 c) S.Bed Door Sh 0 sft
d) Kit.Ver./Balco 0 sft
e) Kitchen Door 0 sft
f) Stair Door Shut 0 sft
g) Toilet Door Shu 0 nos.
Servent Toilet Do 0
PLASTIC
0
PAINT
11 a) In Side of Fals 300 sft
b) In Side Wall 3500 sft
c) Ceiling 850 sft
WHEATHER
12 0 sft
COAT
ENAMEL PAINT
a) All Grill Surfac 668 sft
b) On Plaster (Kit 0 sft
15 c) On Wooden
Surface(In of
0 sft
Toi+Out of Ver
Door)
POLISH FOR
WOODEN sft
SURFACE
28
Polish for Design 0 sft
Polish for Interna 194.02 sft
Laquire Polish on 97.01 sft
MILD STEEL
22
MS Rod 60/72.5 33192 Kg.
SUB TOTAL (6th Floor) 1594 7 1548 2267 241
Prepared by: Sabit NOTE: CONCRETE MIXING RATIO MAY BE CHANGED WITH RESPECT T
7TH FLOOR (Developer)
Description of Ratio of Cement in bag/kg. Sand in cft Picket in
c Quantity
Work Mixing Gray(bag) white(kg) Local Sylhet Nos.
R.C.C. WORK
(RMC/Manual)
a) Column &
Shear Wall 1780 cft 1:1.25:2.5 450 0 703
(main Structure)

c)Waterbody &
Swimming Pool,
1:11/2:3 0 0 0
OHWT Wall &
Slab

d) Slab, Beam &


3560 1:11/2:3 783 0 1460
Stair (main Slab)

C.Ancilary
Structure
1)Drop wall.
railinq. Aic slab.
sunshade, 0 sft 1:2:4 - - 0
Rib.Beam (upto
4" thickness)
Drop Wall 1:2:4 - - 0
Railing/Parapet 1:2:4 - - 0
1
SunShed 0 sft 1:2:4 - - 0
RIB Beam 1:2:4 - - 0
2)Lintel up to 5"
25 rft 1:2:4 1 2 50
Width
3)Lintel above 5"
20 cft 1:2:4 4 9 191
Width

False Slab up to
4" Thick & 0 sft 1:2:4 - - 0
Counter top slab

FAIR FACE
RCC WORK
Column & Shear
1:1.25:2.5 0 0 0
Wall
Slab, Beam &
1:1.25:2.5 0 0 0
Stair
Drop Wall &
1:1.25:2.5 0 0 0
Sunshed
Non Structural
1:1.25:2.5 0 0 0
Wall up to 5"
Non Structural
1:1.25:2.5 0 0 0
Wall Above 5"
SHUTTERING
WORK-
NORMAL RCC
WOODEN
sft
SHUTTER
ANCILARY
STRUCTURE
SHUTTERING
False
Slab,Counter 0 sft
top,Sunshade
Lintel 110 sft
Counter Top
20 sft
Slab
STEEL
SHUTTER
VERICAL
MEMBER
SHUTTER
a) Column and
2200 sft
Shear Wall
d) Boundary
Wall Column & 0
Copping Beam
SLAB &
0
BEAM& STAIR
b) Slab,and Stair
4675 sft
Shutter
2
c) Beam Shutter 2330 sft

ANCILARY STR 0
s) Drop Wall
t)Railing/
Parapet/
Ornamental Wall
u)Sunshed
v)Ornamental
Slab

SHUTTERING
WORK-
FAIRFACE RCC

a) Column and
Shear Wall
b) Slab, and
Stair Shutter

c) Beam Shutter

d) Non
Structural RCC
Wall-5"-12"
e) Non
Structural
Boundary Wall
f) Drop Wall &
SunShade
Shutter
10" BRICK
0 cft 1:6 0.00 0
WORK

3
a) 10" Brick
690 1:6 27.60 241
Partition Wall
3 b) Brick Soaking
0 1:6 0.00 0
House

c) Sand
0 1:6 0.00 0
Washing House

5" BRICK
0 sft 1:6 0.00 0
WORK
a) 5" Brick
1050 1:4 26.25 179
Partition Wall
4 b) Brick Soaking
0 1:4 0.00 0
House

c) Sand
0 1:4 0.00 0
Washing House

Ceramic/Facing
1:4 0.00 0
Bricks
3/4" Thick
0 sft
Plaster
a) In Side Wall 3250 1:6 39.00 325

b) Brick Soaking
& Sand Washing 0 1:6 0.00 0
House

5 c) Out Side
Wall(Normal 0 sft 1:6 0.00 0
Plaster)
d) Rough
Plaster For Fair 0 1:6 0.00 0
Face Plaster
e) Fair Face
880
Plaster
PLASTER (1/2"
0 sft
thick)
Ceiling Plaster 850 1:4 12.75 64
6 False Slab
0 1:4 0.00 0
Bottom Plaster
RCC Column &
0 1:4 0.00 0
SW Plaster

NEAT CEMENT
FINISHING 0 sft 1:4 0.00 0
(NCF)

a) Brick Soaking
& Sand Washing 0 0.00
House

b) Above False
0 0.00
Slab
c) other Area
300 1.50
(Garden Area)
7 FLOOR TILES 0 0.00
Apartment(wait.Co 3090 sft 1:3 123.60 463.50
Gym/ Reception/ 0 sft 1:3 0.00 0.00
Main Stair -Tiles( 270 1:3 10.80 40.50
Main Stair & Lift 220 1:3 8.80 33.00
270 1:3 10.80 40.50
room
0 1:3 0.00 0.00

Main Toilet Floor 0 1:3 0.00 0.00


2nd & 3rd Toilet F 120 1:3 4.80 18.00
Main Kitchen Floo 0 1:3 0.00 0.00
Caretaker Kitchen 0 1:3 0.00 0.00
0 1:3 0.00 0.00
Kitchen Counter
0 1:3 0.00 0.00
Top
Toilet Counter
150 1:3 6.00 22.50
Top

Reception Table
0 1:3 0.00 0.00
Counter Top

Pavement Tiles 0 1:3 0.00 0.00


Roof Tiles 0 1:3 0.00 0.00
Terrace Tiles 0 1:3 0.00 0.00
Garden/Planter
0 1:3 0.00 0.00
Tiles
0 1:3 0.00 0.00
1:3 0.00 0.00
SKIRTING
TILES
Apt. Floor Tiles
380 1:3 3.14 12.54
Skt
0 1:3 0.00 0.00
Main Stair Tiles-
106 1:3 0.87 3.50
Skt
Stair & Lift
70 1:3 0.58 2.31
Lobby Tiles Skt
Fire Stair Tiles
106 1:3 0.87 3.50
Skt
Care
Taket/Servent/G
0 1:3 0.00 0.00
uard/Others
Room Tiles Skt

Kit. Ver Tiles Skt 0 1:3 0.00 0.00

1:3 0.00 0.00


1:3 0.00 0.00
1:3 0.00 0.00
Terrace Tiles
1:3 0.00 0.00
Skt
1:3 0.00 0.00
WALL TILE
WORK
Main Toilet Tiles 0 1:3 0.00 0.00
2nd & 3rd Toilet T 600 1:3 15.00 60.00
0 1:3 0.00 0.00
Main Kitchen
0 1:3 0.00 0.00
Wall
Caretaker
0 1:3 0.00 0.00
Kitchen Wall
8 Down wash Wall
0 1:3 0.00 0.00
Tiles
Reception wall Til 0 1:3 0.00 0.00
Lift Wall Tiles 183 1:3 4.58 18.30
Border for Toilets 80 1:3 0.66 2.64
Slate Stone /Clad 0 1:3 0.00 0.00
Column protection 0 1:3 0.00 0.00
Boundary Dado Ti 0 1:3 0.00 0.00
Outside Wall Clad 0 1:3 0.00 0.00
Swimming Pool & 0 1:3 0.00 0.00
FLOOR MARBL 0 1:3 0.00 0.00
Apartment(wait.Co 0 1:3 0.00 0.00 0.00
0 sft 1:3 0.00 0.00 0.00
Main Stair ( Trad 0 sft 1:3 0.00 0.00 0.00
Main Stair & Lif 0 sft 1:3 0.00 0.00 0.00
0 sft 1:3 0.00 0.00 0.00
Kitchen Counter
0 sft 1:3 0.00 0.00 0.00
Top
Toilet Counter
36 sft 1:3 1.44 7.20 5.40
Top
0 sft 1:3 0.00 0.00 0.00
0 sft 1:3 0.00 0.00 0.00
MARBLE
1:3 0.00 0.00 0.00
SKIRTING
Apt. Marble Skt 0 1:3 0.00 0.00 0.00
Main Stair
0 1:3 0.00 0.00 0.00
Marble Skt
Stair & Lift
Lobby marble 0 1:3 0.00 0.00 0.00
Skt
1:3 0.00 0.00 0.00
1:3 0.00 0.00 0.00

WALL MARBLE
0 sft 1:3 0.00 0.00 0.00
WORK

8 Reception wall M 0 1:3 0.00 0.00 0.00


Lift Wall Marble 0 sft 1:3 0.00 0.00 0.00
Skirting Marble 0 sft 1:3 0.00 0.00 0.00
Boundary Wall Cl 0 sft 1:3 0.00 0.00 0.00
Outside Wall Clad 0 sft 1:3 0.00 0.00 0.00

ALUMINIUM
DOOR AND
0
WINDOW &
OTHER WORK

4" Single glazzing 0


4" Double glazzin 0
3" Fixed with Slid 0
21 Fly proof Net
Fixed Glass 80
Glass Door 120
Curtain Wall 1345
Curtain/Blind ( 0
Aluminium Louve 365
ACP Work 0
Glass Canopy Wo 0
GRILL WORK 0 sft
a) Window Grill 135 sft
b) Sliding Grill 0 sft
c) Kitchen Verand 0 sft
22 d) Veranda
0 sft
safety Grill
e)Parking Grill 0 sft
f)Safety Grill Ov 0 sft
g)Boundary Grill 0 sft
Lift Lobby/Corridor 0
RAILING WORK 0 sft
a) Main Stair
88 sft
Railing
b) Fire Stair
88 sft
Railing
f)Front
Verandah 140 sft
Railing
g)Back
Verandah 0 sft
Railing
h)Kitchen
Verandah 0 sft
Railing
i)Voide & Punch
0 sft
Railing
j)Lift Lobby
0 sft
Railing

k)
Parapet/Terrace 0 sft
/OHWT Railing
l)
Planter/Garden 0 sft
Area Railing
m)Parking/
Boundary 0 sft
Railing
WOOD WORK
0
(Door Frame)
a) Main Door Fram 0 rft
b) Bed Room Door 0 rft
c) S.Bed Door Fra 0 rft
16
d) Kit.Ver./Balco 0 rft
e) Kitchen Door F 0 rft
f) Stair door Fram 0 rft
g)Toilet Door Fram 66 rft
Servent Toilet D 0 rft
17 CAT DOOR 2 nos
PVC DOOR
18 0 nos
(S.Toilet Door)

WOOD WORK
0
(Door Shutter)

a) Main Door Shut 0 sft


b) Community/Bed 62 sft
19
c) S.Bed Door Sh 0 sft
d) Kit.Ver./Balco 0 sft
e) Kitchen Door 0 sft
f) Stair Door Shut 0 sft
g) Toilet Door Shu 0 nos.
Servent Toilet Do 0
PLASTIC
0
PAINT
11 a) In Side of Fals 300 sft
b) In Side Wall 3500 sft
c) Ceiling 850 sft
WHEATHER
12 0 sft
COAT
ENAMEL PAINT
a) All Grill Surfac 451 sft
b) On Plaster (Kit 0 sft
15 (c) On Wooden
Surface(In of
0 sft
Toi+Out of Ver
Door)
POLISH FOR
WOODEN sft
SURFACE
28
Polish for Design 0 sft
Polish for Interna 194.02 sft
Laquire Polish on 97.01 sft
MILD STEEL
22
MS Rod 60/72.5 29632 Kg.
SUB TOTAL (7th Floor) 1537 7 1546 2163 241
Prepared by: Sabit
8TH FLOOR
Description of Ratio of Cement in bag/kg. Sand in cft Picket in
c Quantity
Work Mixing Gray(bag) white(kg) Local Sylhet Nos.
R.C.C. WORK
(RMC/Manual)

a) Column &
Shear Wall 1780 cft 1:1.25:2.5 450 0 703
(main Structure)

c)Waterbody &
Swimming Pool,
cft 1:11/2:3 0 0 0
OHWT Wall &
Slab

d) Slab, Beam &


3785 cft 1:11/2:3 833 0 1552
Stair (main Slab)

C.Ancilary
Structure
1)Drop wall.
railinq. Aic slab.
sunshade, sft 1:2:4 - - 0
Rib.Beam (upto
4" thickness)
Drop Wall sft 1:2:4 - - 0
Railing/Parapet sft 1:2:4 - - 0
1
SunShed 0 sft 1:2:4 - - 0
RIB Beam sft 1:2:4 - - 0
2)Lintel up to 5"
25 rft 1:2:4 1 2 50
Width
3)Lintel above 5"
20 cft 1:2:4 4 9 191
Width

False Slab up to
4" Thick & 0 sft 1:2:4 - - 0
Counter top slab

FAIR FACE
RCC WORK
Column & Shear
1:1.25:2.5 0 0 0
Wall
Slab, Beam &
1:1.25:2.5 0 0 0
Stair
Drop Wall &
1:1.25:2.5 0 0 0
Sunshed
Non Structural
1:1.25:2.5 0 0 0
Wall up to 5"
Non Structural
1:1.25:2.5 0 0 0
Wall Above 5"
SHUTTERING
WORK-
NORMAL RCC
WOODEN
sft
SHUTTER
ANCILARY
STRUCTURE sft
SHUTTERING
False
Slab,Counter 0 sft
top,Sunshade
Lintel 110 sft
Counter Top
20 sft
Slab
STEEL
0
SHUTTER
VERICAL
MEMBER 0
SHUTTER
a) Column and
2200 sft
Shear Wall
0 sft
SLAB &
0
BEAM& STAIR
b) Slab,and Stair
4875 sft
Shutter

c) Beam Shutter 2380 sft


2
ANCILARY STR 0 sft
s) Drop Wall 0 sft
t)Railing/
Parapet/ 0 sft
Ornamental Wall
u)Sunshed sft
v)Ornamental
sft
Slab

SHUTTERING
WORK- sft
FAIRFACE RCC

a) Column and
sft
Shear Wall
b) Slab, and
sft
Stair Shutter

c) Beam Shutter sft

d) Non
Structural RCC sft
Wall-5"-12"
e) Non
Structural sft
Boundary Wall
f) Drop Wall &
SunShade sft
Shutter
10" BRICK
0 cft 1:6 0.00 0
WORK
a) 10" Brick
690 1:6 27.60 241
Partition Wall
3 b) Brick Soaking
0 1:6 0.00 0
House

c) Sand
0 1:6 0.00 0
Washing House

5" BRICK
0 sft 1:6 0.00 0
WORK
a) 5" Brick
1050 1:4 26.25 179
Partition Wall
4 b) Brick Soaking
0 1:4 0.00 0
House

c) Sand
0 1:4 0.00 0
Washing House

Ceramic/Facing
1:4 0.00 0
Bricks
3/4" Thick
0 sft
Plaster
a) In Side Wall 3250 1:6 39.00 325

b) Brick Soaking
& Sand Washing 0 1:6 0.00 0
House

5 c) Out Side
Wall(Normal 0 sft 1:6 0.00 0
Plaster)
d) Rough
Plaster For Fair 0 1:6 0.00 0
Face Plaster
e) Fair Face
880
Plaster
PLASTER (1/2"
0 sft
thick)
Ceiling Plaster 850 1:4 12.75 64
6 False Slab
0 1:4 0.00 0
Bottom Plaster
RCC Column &
0 1:4 0.00 0
SW Plaster

NEAT CEMENT
FINISHING 0 sft 1:4 0.00 0
(NCF)
a) Brick Soaking
& Sand Washing 0 0.00
House

b) Above False
0 sft 0.00
Slab
c) other Area
270 1.35
(Garden Area)
7 FLOOR TILES 0 0.00
Apartment(wait.Co 3380 sft 1:3 135.20 507.00
0 sft 1:3 0.00 0.00
Main Stair -Tiles( 270 sft 1:3 10.80 40.50
Main Stair & Lift 220 sft 1:3 8.80 33.00
270 sft 1:3 10.80 40.50
0 sft 1:3 0.00 0.00
Main Toilet Floor 0 sft 1:3 0.00 0.00
2nd & 3rd Toilet F 120 sft 1:3 4.80 18.00
Main Kitchen Floo 0 sft 1:3 0.00 0.00
0 sft 1:3 0.00 0.00
0 sft 1:3 0.00 0.00
Kitchen Counter
0 sft 1:3 0.00 0.00
Top
Toilet Counter
150 sft 1:3 6.00 22.50
Top
0 sft 1:3 0.00 0.00
0 sft 1:3 0.00 0.00
0 sft 1:3 0.00 0.00
Terrace Tiles 0 sft 1:3 0.00 0.00
Garden/Planter
0 sft 1:3 0.00 0.00
Tiles
Water Body &
Swimming Pool 0 sft 1:3 0.00 0.00
Floor Tiles
Water Body &
Swimming Pool sft 1:3 0.00 0.00
Deck Tiles
SKIRTING
sft 1:3 0.00 0.00
TILES
Apt. Floor Tiles
430 sft 1:3 3.55 14.19
Skt

Gym/Com
Wooden Texture 0 sft 1:3 0.00 0.00
Tiles Skt

Main Stair Tiles-


106 sft 1:3 0.87 3.50
Skt
Stair & Lift
70 sft 1:3 0.58 2.31
Lobby Tiles Skt
Fire Stair Tiles
106 sft 1:3 0.87 3.50
Skt
Care
Taket/Servent/G
0 sft 1:3 0.00 0.00
uard/Others
Room Tiles Skt

Kit. Ver Tiles Skt 0 sft 1:3 0.00 0.00

Care Taker Kit


sft 1:3 0.00 0.00
Floor Skt.
Pavement Tiles
sft 1:3 0.00 0.00
Skt
Roof Tiles Skt sft 1:3 0.00 0.00
Terrace Tiles
sft 1:3 0.00 0.00
Skt
Planter/Garden
sft 1:3 0.00 0.00
Tiles Skt
WALL TILE
0 sft 1:3 0.00 0.00
WORK
Main Toilet Tiles 0 sft 1:3 0.00 0.00
2nd & 3rd Toilet T 600 sft 1:3 15.00 60.00
0 sft 1:3 0.00 0.00
Main Kitchen
0 sft 1:3 0.00 0.00
Wall
Caretaker
0 sft 1:3 0.00 0.00
Kitchen Wall
8 Down wash Wall
0 sft 1:3 0.00 0.00
Tiles
0 sft 1:3 0.00 0.00
Lift Wall Tiles 183 sft 1:3 4.58 6.04
Border for Toilets 80 sft 1:3 0.66 2.64
Slate Stone /Clad 0 sft 1:3 0.00 0.00
0 sft 1:3 0.00 0.00
0 sft 1:3 0.00 0.00
Outside Wall Clad 0 sft 1:3 0.00 0.00
Swimming Pool & 0 sft 1:3 0.00 0.00
FLOOR MARBL 0 sft 1:3 0.00 0.00
Apartment(wait.Co 0 sft 1:3 0.00 0.00 0.00
Gym/ Reception/ 0 sft 1:3 0.00 0.00 0.00
Main Stair ( Trad 0 sft 1:3 0.00 0.00 0.00
Main Stair & Lif 0 sft 1:3 0.00 0.00 0.00

2.Out
Side Level Up 0 sft 1:3 0.00 0.00 0.00
Stair (Marble)

Kitchen Counter
0 sft 1:3 0.00 0.00 0.00
Top
Toilet Counter
36 sft 1:3 1.44 7.20 5.40
Top
Reception Table
0 sft 1:3 0.00 0.00 0.00
Counter Top

Garden/Planter
Marble/Design 0 sft 1:3 0.00 0.00 0.00
Marble
MARBLE
sft 1:3 0.00 0.00 0.00
SKIRTING
Apt. Marble Skt 0 sft 1:3 0.00 0.00 0.00
Main Stair
0 sft 1:3 0.00 0.00 0.00
Marble Skt
Stair & Lift
Lobby marble 0 sft 1:3 0.00 0.00 0.00
Skt

Basement/Level
Up/Ornamental sft 1:3 0.00 0.00 0.00
Stair Marble Skt

Graden/Planter
sft 1:3 0.00 0.00 0.00
Marble Skt

WALL MARBLE
0 sft 1:3 0.00 0.00 0.00
WORK

8 Reception wall M 0 sft 1:3 0.00 0.00 0.00


Lift Wall Marble 0 sft 1:3 0.00 0.00 0.00
Skirting Marble 0 sft 1:3 0.00 0.00 0.00
Boundary Wall Cl 0 sft 1:3 0.00 0.00 0.00
Outside Wall Clad 0 sft 1:3 0.00 0.00 0.00

ALUMINIUM
DOOR AND
0 sft
WINDOW &
OTHER WORK

4" Single glazzing 0 sft


4" Double glazzin 0 sft
3" Fixed with Slid 0 sft
21 Fly proof Net 0 sft
Fixed Glass 80 sft
Glass Door 120 sft
Curtain Wall 1455 sft
Curtain/Blind ( 0 sft
Aluminium Louve 365 sft
ACP Work 0 sft
Glass Canopy Wo 0 sft
GRILL WORK 0 sft
a) Window Grill 135 sft
b) Sliding Grill 0 sft
c) Kitchen Verand 0 sft
22 d) Veranda
0 sft
safety Grill
22

e)Parking Grill 0 sft


f)Safety Grill Ov 0 sft
g)Boundary Grill 0 sft
Lift Lobby/Corridor 0
RAILING WORK 0 sft
a) Main Stair
88 sft
Railing
b) Fire Stair
88 sft
Railing
f)Front
Verandah 108.5 sft
Railing
g)Back
Verandah 0 sft
Railing
h)Kitchen
Verandah 0 sft
Railing
i)Voide & Punch
0 sft
Railing
j)Lift Lobby
0 sft
Railing

k)
Parapet/Terrace 0 sft
/OHWT Railing

l)
Planter/Garden 0 sft
Area Railing
m)Parking/
Boundary 0 sft
Railing
WOOD WORK
0
(Door Frame)
a) Main Door Fram 0 rft
b) Bed Room Door 0 rft
c) S.Bed Door Fra 0 rft
16
d) Kit.Ver./Balco 0 rft
e) Kitchen Door F 0 rft
f) Stair door Fram 0 rft
g)Toilet Door Fram 66 rft
Servent Toilet D 0 rft
17 CAT DOOR 2 nos
PVC DOOR
18 0 nos
(S.Toilet Door)

WOOD WORK
0
(Door Shutter)

a) Main Door Shut 0 sft


b) Community/Bed 62 sft
c) S.Bed Door Sh 0 sft
d) Kit.Ver./Balco 0 sft
e) Kitchen Door 0 sft
f) Stair Door Shut 0 sft
g) Toilet Door Shu 0 nos.
Servent Toilet Do 0
PLASTIC
PAINT
11 a) In Side of Fals 300 sft
b) In Side Wall 3500 sft
c) Ceiling 850 sft
WHEATHER
12 0 sft
COAT
ENAMEL PAINT 0
a) All Grill Surfac 419.5 sft
b) On Plaster (Kit 0 sft
15 (c) On Wooden
Surface(In
0 sft
ofToi+Out of Ver
Door)
POLISH FOR
WOODEN sft
SURFACE
28
Polish for Design 0 sft
Polish for Interna 194.02 sft
Laquire Polish on 97.01 sft
MILD STEEL
22
MS Rod 60/72.5 30614 Kg.
SUB TOTAL (8th Floor) 1598 7 1579 2255 241
Prepared by: Sabit
9TH FLOOR
Description of Ratio of Cement in bag/kg. Sand in cft Picket in
c Quantity
Work Mixing Gray(bag) white(kg) Local Sylhet Nos.
R.C.C. WORK
(RMC/Manual)

a) Column &
Shear Wall 1780 cft 1:1.25:2.5 450 0 703
(main Structure)

c)Waterbody &
Swimming Pool,
0 1:11/2:3 0 0 0
OHWT Wall &
Slab

d) Slab, Beam &


3785 1:11/2:3 833 0 1552
Stair (main Slab)

C.Ancilary
Structure

1
Drop wall.
railinq. Aic slab.
sunshade, 0 sft 1:2:4 - - 0
Rib.Beam (upto
4" thickness)
Drop Wall 0 1:2:4 - - 0
1
Railing/Parapet 0 1:2:4 - - 0
SunShed 0 sft 1:2:4 - - 0
RIB Beam 0 1:2:4 - - 0
2)Lintel up to 5"
25 rft 1:2:4 1 2 50
Width
3)Lintel above 5"
20 cft 1:2:4 4 9 191
Width
4)False Slab up
0 sft 1:2:4 - - 0
to 4" Thick
FAIR FACE
0
RCC WORK
Column & Shear
0 1:1.25:2.5 0 0 0
Wall
Slab, Beam &
0 1:1.25:2.5 0 0 0
Stair
Drop Wall &
0 1:1.25:2.5 0 0 0
Sunshed
Non Structural
0 1:1.25:2.5 0 0 0
Wall up to 5"
Non Structural
0 1:1.25:2.5 0 0 0
Wall Above 5"
SHUTTERING
WORK- 0
NORMAL RCC
WOODEN
0 sft
SHUTTER
ANCILARY
STRUCTURE 0
SHUTTERING
False Slab 0 sft
Lintel 110 sft
Counter Top
20 sft
Slab
STEEL
0
SHUTTER
VERICAL
MEMBER 0
SHUTTER
a) Column and
2200 sft
Shear Wall
e) O.H.W.T &
Machine room 0
wall+Slab
SLAB &
0
BEAM& STAIR

2
b) Slab,and Stair
4875 sft
Shutter

c) Beam Shutter 2380 sft


2
ANCILARY STR 0
s) Drop Wall 0
t)Railing/
Parapet/ 0
Ornamental Wall
u)Sunshed 0
v)Ornamental
0
Slab

SHUTTERING
WORK- 0
FAIRFACE RCC

a) Column and
0
Shear Wall
b) Slab, and
0
Stair Shutter

c) Beam Shutter 0

d) Non
Structural RCC 0
Wall-5"-12"
e) Non
Structural 0
Boundary Wall
f) Drop Wall &
SunShade 0
Shutter
10" BRICK
0
WORK
a) 10" Brick
690 1:6 27.60 241
Partition Wall
3 b) Brick Soaking
0 1:6 0.00 0
House

c) Sand
0 1:6 0.00 0
Washing House

5" BRICK
sft 1:6 0.00 0
WORK
a) 5" Brick
1050 1:4 26.25 179
Partition Wall
4 b) Brick Soaking
0 1:4 0.00 0
House

c) Sand
0 1:4 0.00 0
Washing House

Ceramic/Facing
0 1:4 0.00 0
Bricks
3/4" Thick
0 sft
Plaster
a) In Side Wall 3250 1:6 39.00 325

b) Brick Soaking
& Sand Washing 0 1:6 0.00 0
House

5 c) Out Side
Wall(Normal 0 sft 1:6 0.00 0
Plaster)
d) Rough
Plaster For Fair 0 1:6 0.00 0
Face Plaster
e) Fair Face
880
Plaster
PLASTER (1/2"
0 sft
thick)
Ceiling Plaster 850 1:4 12.75 64
6 False Slab
0 1:4 0.00 0
Bottom Plaster
RCC Column &
0 1:4 0.00 0
SW Plaster

NEAT CEMENT
FINISHING 0
(NCF)

a) Brick Soakin 0 0.00


b) Above False
0 0.00
Slab
c) other Area
250 1.25
(Garden Area)
7 FLOOR TILES 0
Apartment(wait.Co 3300 1:3 132.00 495.00
Gym/ Reception/ 0 1:3 0.00 0.00
Main Stair -Tiles( 270 1:3 10.80 40.50
Main Stair & Lift 220 1:3 8.80 33.00
270 1:3 10.80 40.50
0 1:3 0.00 0.00
Main Toilet Floor 0 1:3 0.00 0.00
2nd & 3rd Toilet F 120 1:3 4.80 18.00
Main Kitchen Floo 0 1:3 0.00 0.00
Caretaker Kitchen 0 1:3 0.00 0.00
0 1:3 0.00 0.00
Kitchen Counter
0 1:3 0.00 0.00
Top
Toilet Counter
150 1:3 6.00 22.50
Top

Reception Table
0 1:3 0.00 0.00
Counter Top
Pavement Tiles 0 1:3 0.00 0.00
Roof Tiles 0 1:3 0.00 0.00
Terrace Tiles 0 1:3 0.00 0.00
Garden/Planter
0 sft 1:3 0.00 0.00
Tiles
Water Body &
Swimming Pool 0 1:3 0.00 0.00
Floor Tiles
Water Body &
Swimming Pool 1:3 0.00 0.00
Deck Tiles
SKIRTING
TILES
Apt. Floor Tiles
430 1:3 3.55 14.19
Skt

Gym/Com
Wooden Texture 0 1:3 0.00 0.00
Tiles Skt

Main Stair Tiles-


106 1:3 0.87 3.50
Skt
Stair & Lift
70 1:3 0.58 2.31
Lobby Tiles Skt
Fire Stair Tiles
106 1:3 0.87 3.50
Skt
Care
Taket/Servent/G
0 1:3 0.00 0.00
uard/Others
Room Tiles Skt

Kit. Ver Tiles Skt 0 1:3 0.00 0.00

Care Taker Kit


0 1:3 0.00 0.00
Floor Skt.
Pavement Tiles
0 1:3 0.00 0.00
Skt
Roof Tiles Skt 0 1:3 0.00 0.00
Terrace Tiles
0 1:3 0.00 0.00
Skt
Planter/Garden
0 1:3 0.00 0.00
Tiles Skt
WALL TILE
WORK
Main Toilet Tiles 0 1:3 0.00 0.00
2nd & 3rd Toilet T 600 1:3 15.00 60.00
0 1:3 0.00 0.00
Main Kitchen
0 1:3 0.00 0.00
Wall
Caretaker
0 1:3 0.00 0.00
Kitchen Wall
8 Down wash Wall
0 1:3 0.00 0.00
Tiles
8

Reception wall Til 0 1:3 0.00 0.00


Lift Wall Tiles 183 1:3 4.58 18.30
Border for Toilets 80 1:3 0.66 2.64
Slate Stone /Clad 0 1:3 0.00 0.00
0 1:3 0.00 0.00
Boundary Dado Ti 0 1:3 0.00 0.00
Outside Wall Clad 0 1:3 0.00 0.00
Swimming Pool & 0 1:3 0.00 0.00
FLOOR MARBLE
Apartment(wait.Co 0 1:3 0.00 0.00 0.00
Gym/ Reception/ 0 1:3 0.00 0.00 0.00
Main Stair ( Trad 0 1:3 0.00 0.00 0.00
Main Stair & Lif 0 1:3 0.00 0.00 0.00
0 1:3 0.00 0.00 0.00
Kitchen Counter
0 sft 1:3 0.00 0.00 0.00
Top
Toilet Counter
36 sft 1:3 1.44 7.20 5.40
Top
1:3 0.00 0.00 0.00
Garden/Planter
Marble/Design 1:3 0.00 0.00 0.00
Marble
MARBLE
SKIRTING
Apt. Marble Skt 0 1:3 0.00 0.00 0.00
Main Stair
0 1:3 0.00 0.00 0.00
Marble Skt
Stair & Lift
Lobby marble 0 1:3 0.00 0.00 0.00
Skt

Basement/Level
Up/Ornamental 0 1:3 0.00 0.00 0.00
Stair Marble Skt

Graden/Planter
0 1:3 0.00 0.00 0.00
Marble Skt

WALL MARBLE
WORK

8 1:3 0.00 0.00 0.00


Lift Wall Marble 0 1:3 0.00 0.00 0.00
Skirting Marble 0 1:3 0.00 0.00 0.00
Boundary Wall Cl 0 1:3 0.00 0.00 0.00
Outside Wall Clad 0 1:3 0.00 0.00 0.00

ALUMINIUM
DOOR AND
WINDOW &
OTHER WORK

4" Single glazzing 0

21
4" Double glazzin 0
3" Fixed with Slid 0
21 Fly proof Net 0
Fixed Glass 80
Glass Door 120
Curtain Wall 1420
Curtain/Blind ( 0
Aluminium Louve 365
ACP Work 0
Glass Canopy Wo 0
GRILL WORK sft
a) Window Grill 135 sft
b) Sliding Grill 0 sft
c) Kitchen Verand 0 sft
22
d) Veranda safety 0 sft
e)Parking Grill 0 sft
f)Safety Grill Ov 0 sft
g)Boundary Grill 0 sft
Lift Lobby/Corridor 0
RAILING WORK sft
a) Main Stair
88 sft
Railing
b) Fire Stair
88 sft
Railing
f)Front
Verandah 168 sft
Railing
g)Back
Verandah 0 sft
Railing
h)Kitchen
Verandah 0 sft
Railing
i)Voide & Punch
0 sft
Railing
j)Lift Lobby
0 sft
Railing

k)
Parapet/Terrace 0 sft
/OHWT Railing

l)
Planter/Garden 0 sft
Area Railing
m)Parking/
Boundary 0 sft
Railing
WOOD WORK
(Door Frame)
a) Main Door Fram 0 rft
b) Entrance + Loc 0 rft

16
c) S.Bed Door Fra 0 rft
16
d) Kit.Ver./Balco 0 rft
e) Kitchen Door F 0 rft
f) Stair door Frame(3'-4"x7'-0 rft
g) Toilet Door Fra 66 rft
Servent Toilet D 0 rft
17 CAT DOOR 2 nos
PVC DOOR
18 0 nos
(S.Toilet Door)

WOOD WORK
(Door Shutter)

a) Main Door Shut 0 sft


b) Community/Bed 62 sft
19 c) S.Bed Door Sh 0 sft
d) Kit.Ver./Balco 0 sft
e) Kitchen Door 0 sft
f) Stair Door Shutter sft
g) Toilet Door Shu 0 sft
Servent Toilet Do 0 sft
PLASTIC
PAINT
11 a) In Side of Lift 300 sft
b) In Side Wall 3500 sft
c) Ceiling 850 sft
WHEATHER
12 0 sft
COAT
ENAMEL PAINT
a) All Grill Surfac 479 sft
b) On Plaster (Kit 0 sft
15 (c) On Wooden
Surface(In of
0 sft
Toi+Out of Ver
Door)
POLISH FOR
WOODEN sft
SURFACE
28
Polish for Design 0 sft
Polish for Interna 194.02 sft
Laquire Polish on 97.01 sft
MILD STEEL
22
MS Rod 60/72.5 30614 Kg.
SUB TOTAL (9th Floor) 1595 7 1579 2255 241
NOTE: CONCRETE MIXING RATIO MAY BE CHANGED WITH RESPECT T
10TH FLOOR
Description of Ratio of Cement in bag/kg. Sand in cft Picket in
c Quantity
Work Mixing Gray(bag) white(kg) Local Sylhet Nos.
R.C.C. WORK
(RMC/Manual)
a) Column &
Shear Wall 1780 cft 1:1.25:2.5 450 0 703
(main Structure)

c)Non-structural
wall &
Swimming Pool,
OHWT Wall & 0 1:11/2:3 0 0 0
Slab+Lift ,machi
ne room
wall+slab

d) (Roof top
Slab+ Beam) & 3795 1:11/2:3 835 0 1556
Stair (main Slab)

C.Ancilary
Structure
1)Drop wall.
railinq. Aic slab.
sunshade, 0 sft 1:2:4 - - 0
1 Rib.Beam (upto
4" thickness)
Drop Wall 1:2:4 - - 0
Railing/Parapet 1:2:4 - - 0
SunShed 0 sft 1:2:4 - - 0
RIB Beam 1:2:4 - - 0
2)Lintel up to 5"
25 rft 1:2:4 1 2 50
Width
3)Lintel above 5"
20 cft 1:2:4 4 9 191
Width
4)False Slab up
0 sft 1:2:4 - - 0
to 4" Thick
FAIR FACE
RCC WORK
Column & Shear
1:1.25:2.5 0 0 0
Wall
Slab, Beam &
1:1.25:2.5 0 0 0
Stair
Drop Wall &
1:1.25:2.5 0 0 0
Sunshed
Non Structural
1:1.25:2.5 0 0 0
Wall up to 5"
Non Structural
1:1.25:2.5 0 0 0
Wall Above 5"
SHUTTERING
WORK-
NORMAL RCC
WOODEN
sft
SHUTTER
ANCILARY
STRUCTURE
SHUTTERING
False Slab 0 sft
Lintel 110 sft
Counter Top
20 sft
Slab
STEEL
SHUTTER
VERICAL
MEMBER
SHUTTER
a) Column and
2200 sft
Shear Wall
d) Boundary
Wall Column & 0
Copping Beam
SLAB &
0
BEAM& STAIR

c)Non-structural
wall &
Swimming Pool,
OHWT Wall & 4975 sft
Slab+Lift ,machi
ne room
2 wall+slab

c) Beam Shutter 2480 sft

ANCILARY STRUCTURE S sft


s) Drop Wall 0 sft
t)Railing/
Parapet/ 0 sft
Ornamental Wall
u)Sunshed sft
v)Ornamental
sft
Slab

SHUTTERING
WORK- sft
FAIRFACE RCC

a) Column and
sft
Shear Wall
b) Slab, and
sft
Stair Shutter

c) Beam Shutter sft

d) Non
Structural RCC sft
Wall-5"-12"
e) Non
Structural sft
Boundary Wall
f) Drop Wall &
SunShade sft
Shutter
10" BRICK
1:6 0.00 0
WORK
a) 10" Brick
690 cft 1:6 27.60 241
Partition Wall
3 b) Brick Soaking
cft 1:6 0.00 0
House

c) Sand
cft 1:6 0.00 0
Washing House

5" BRICK
WORK
a) 5" Brick
1050 sft 1:4 26.25 179
Partition Wall
4 b) Brick Soaking
0 sft 1:4 0.00 0
House

c) Sand
0 sft 1:4 0.00 0
Washing House

Ceramic/Facing
Bricks
3/4" Thick
Plaster
a) In Side Wall 3250 sft 1:6 39.00 325

b) Brick Soaking
& Sand Washing 0 sft 1:6 0.00 0
House

5 c) Out Side
Wall(Normal 0 sft 1:6 0.00 0
Plaster)
d) Rough
Plaster For Fair 0 sft 1:6 0.00 0
Face Plaster
e) Fair Face
880 sft
Plaster
PLASTER (1/2"
sft
thick)
Ceiling Plaster 850 sft 1:4 12.75 64
6 False Slab
0 sft 1:4 0.00 0
Bottom Plaster
RCC Column &
0 sft 1:4 0.00 0
SW Plaster

NEAT CEMENT
FINISHING sft
(NCF)
a) Brick Soaking
& Sand Washing 0 sft 0.00
House

b) Above False
0 sft 0.00
Slab
c) other Area
475 sft 2.38
(Garden Area)
7 FLOOR TILES 0
Apartment(wait.Co 3200 sft 1:3 128.00 480.00
Gym/ Reception/ 0 sft 1:3 0.00 0.00
Main Stair -Tiles( 270 sft 1:3 10.80 40.50
Main Stair & Lift 220 sft 1:3 8.80 33.00
270 sft 1:3 10.80 40.50
0 sft 1:3 0.00 0.00
Main Toilet Floor 0 ss 1:3 0.00 0.00
2nd & 3rd Toilet F 120 sft 1:3 4.80 18.00
Main Kitchen Floo 0 sft 1:3 0.00 0.00
Caretaker Kitchen 0 sft 1:3 0.00 0.00
0 sft 1:3 0.00 0.00
Kitchen Counter
0 sft 1:3 0.00 0.00
Top
Toilet Counter
150 sft 1:3 6.00 22.50
Top

Reception Table
0 sft 1:3 0.00 0.00
Counter Top

Pavement Tiles 0 sft 1:3 0.00 0.00


Roof Tiles 0 sft 1:3 0.00 0.00
Terrace Tiles 0 sft 1:3 0.00 0.00
Garden/Planter
0 sft 1:3 0.00 0.00
Tiles
Water Body &
Swimming Pool 1:3 0.00 0.00
Floor Tiles
Water Body &
Swimming Pool 1:3 0.00 0.00
Deck Tiles
SKIRTING
TILES
Apt. Floor Tiles
430 rft 1:3 3.55 14.19
Skt

Gym/Com
Wooden Texture 0 rft 1:3 0.00 0.00
Tiles Skt

Stair Tiles- Skt 106 rft 1:3 0.87 3.50


Stair & Lift
70 rft 1:3 0.58 2.31
Lobby Tiles Skt
Fire/
Basement/
106 rft 1:3 0.87 3.50
Ornamental
Stair Tiles Skt
Care
Taket/Servent/G
0 rft 1:3 0.00 0.00
uard/Others
Room Tiles Skt

Kit. Ver Tiles Skt 0 rft 1:3 0.00 0.00

Care Taker Kit


0 rft 1:3 0.00 0.00
Floor Skt.
Pavement Tiles
0 rft 1:3 0.00 0.00
skt
Roof Tiles Skt 0 rft 1:3 0.00 0.00
Terrace Tiles
0 rft 1:3 0.00 0.00
Skt
Planter/Garden
0 rft 1:3 0.00 0.00
Tiles Skt
WALL TILE
WORK
Main Toilet Tiles 0 sft 1:3 0.00 0.00
2nd & 3rd Toilet T 600 sft 1:3 15.00 60.00
0 sft 1:3 0.00 0.00
Main Kitchen
0 sft 1:3 0.00 0.00
Wall
Caretaker
0 sft 1:3 0.00 0.00
Kitchen Wall
8 Down wash Wall
0 sft 1:3 0.00 0.00
Tiles
Reception wall Til 0 sft 1:3 0.00 0.00
Lift Wall Tiles 183 sft 1:3 4.58 18.30
Border for Toilets 80 sft 1:3 0.66 2.64
Slate Stone /Clad 0 sft 1:3 0.00 0.00
0 sft 1:3 0.00 0.00
Boundary Dado Ti 0 sft 1:3 0.00 0.00
Outside Wall Clad 0 sft 1:3 0.00 0.00
Swimming Pool & 0 sft 1:3 0.00 0.00
FLOOR MARBLE sft
Apartment(wait.Comu. etc.) sft 1:3 0.00 0.00 0.00
Gym/ Reception/Community sft 1:3 0.00 0.00 0.00
Main Stair ( Trade, Riser, sft 1:3 0.00 0.00 0.00
Main Stair & Lif 0 sft 1:3 0.00 0.00 0.00
0 sft 1:3 0.00 0.00 0.00
Kitchen Counter
0 sft 1:3 0.00 0.00 0.00
Top
Toilet Counter
36 sft 1:3 1.44 7.20 5.40
Top

Reception Table
0 sft 1:3 0.00 0.00 0.00
Counter Top
Garden/Planter
Marble/Design 0 sft 1:3 0.00 0.00 0.00
Marble
MARBLE
0 rft
SKIRTING
Apt. Marble Skt 0 rft 1:3 0.00 0.00 0.00
Main Stair
0 rft 1:3 0.00 0.00 0.00
Marble Skt
Stair & Lift
Lobby marble 0 rft 1:3 0.00 0.00 0.00
Skt

Basement/Level
Up/Ornamental 0 rft 1:3 0.00 0.00 0.00
Stair Marble Skt

Graden/Planter
0 rft 1:3 0.00 0.00 0.00
Marble Skt

WALL MARBLE
0
WORK

8 Reception wall M 0 sft 1:3 0.00 0.00 0.00


Lift Wall Marble 0 sft 1:3 0.00 0.00 0.00
Skirting Marble 0 sft 1:3 0.00 0.00 0.00
Boundary Wall Cl 0 sft 1:3 0.00 0.00 0.00
Outside Wall Clad 0 sft 1:3 0.00 0.00 0.00

ALUMINIUM
DOOR AND
0
WINDOW &
OTHER WORK

4" Single glazzing 0 sft


4" Double glazzin 0 sft
3" Fixed with Slid 0 sft
21 Fly proof Net 0 sft
Fixed Glass 80 sft
Glass Door 120 sft
Curtain Wall 1390 sft
Curtain/Blind ( 0 sft
Aluminium Louve 365 sft
ACP Work 0 sft
Glass Canopy Wo 0 sft
GRILL WORK sft
a) Window Grill 135 sft
b) Sliding Grill 0 sft
c) Kitchen Verand 0 sft
22
d) Veranda safety 0 sft
e)Parking Grill 0 sft
f)Safety Grill Ov 0 sft
g)Boundary Grill 0 sft
Lift Lobby/Corridor 0
RAILING WORK sft
a) Main Stair
88 sft
Railing
b) Fire Stair
88 sft
Railing
f)Front
Verandah 297.5 sft
Railing
g)Back
Verandah sft
Railing
h)Kitchen
Verandah 0 sft
Railing
i)Voide & Punch
sft
Railing
j)Lift Lobby
0 sft
Railing
k)
Parapet/Terrace
sft
/OHWT
Railing(Glass)
l)
Planter/Garden sft
Area Railing
m)Parking/
Boundary sft
Railing
WOOD WORK
(Door Frame)
a) Main Door Fram 0 rft
b) Bed Room Door 0 rft
16 c) S.Bed Door Fra 0 rft
d) Kit.Ver./Balco 0 rft
e) Kitchen Door F 0 rft
f) Stair door Frame(3'-4"x7'-0 rft
g)Toilet Door Fram 66 rft
17 CAT 2 nos
PVC DOOR
18 0 nos
(S.Toilet Door)

WOOD WORK
0
(Door Shutter)

a) Main Door Shut 0 sft


b) Community/Bed 62 sft
19 c) S.Bed Door Sh 0 sft
d) Kit.Ver./Balco 0 sft
e) Kitchen Door 0 sft
f) Stair Door Shut 0 sft
g) Toilet Door Shu 0 nos.
Servent Toilet Do 0 nos.
PLASTIC
PAINT
20 a) In Side of Fals 300 sft
b) In Side Wall 3500 sft
c) Ceiling 850 sft
WHEATHER
21 0 sft
COAT
ENAMEL PAINT
a) All Grill Surfac 608.5 sft
b) On Plaster (Kit 0 sft
22 c) On Wooden
Surface(In of
0 sft
Toi+Out of Ver
Door)
POLISH FOR
WOODEN sft
SURFACE
23
Polish for Design 0 sft
Polish for Interna 194.02 sft
Laquire Polish on 97.01 sft
MILD STEEL 0
24
MS Rod 60/72.5 29777 Kg.
SUB TOTAL (10th Floor) 1595 7 1564 2259 241
Prepared by: Sabit NOTE: CONCRETE MIXING RATIO MAY BE CHANGED WITH RESPECT T
11TH FLOOR
Description of Ratio of Cement in bag/kg. Sand in cft Picket in
c Quantity
Work Mixing Gray(bag) white(kg) Local Sylhet Nos.
R.C.C. WORK
(RMC/Manual)

a) Column &
Shear Wall 1780 cft 1:1.25:2.5 450 0 703
(main Structure)

c)Waterbody &
Swimming Pool,
1:11/2:3 0 0 0
OHWT Wall &
Slab

d) Slab, Beam &


3795 1:11/2:3 835 0 1556
Stair (main Slab)

C.Ancilary
Structure
1)Drop wall.
railinq. Aic slab.
sunshade, 0 sft 1:2:4 - - 0
Rib.Beam (upto
4" thickness)
Drop Wall 1:2:4 - - 0
1
Railing/Parapet 1:2:4 - - 0
1

SunShed 0 sft 1:2:4 - - 0


RIB Beam 1:2:4 - - 0
2)Lintel up to 5"
25 rft 1:2:4 1 2 50
Width
3)Lintel above 5"
20 cft 1:2:4 4 9 191
Width
4)False Slab up
0 sft 1:2:4 - - 0
to 4" Thick
FAIR FACE
RCC WORK
Column & Shear
1:1.25:2.5 0 0 0
Wall
Slab, Beam &
1:1.25:2.5 0 0 0
Stair
Drop Wall &
1:1.25:2.5 0 0 0
Sunshed
Non Structural
1:1.25:2.5 0 0 0
Wall up to 5"
Non Structural
1:1.25:2.5 0 0 0
Wall Above 5"
SHUTTERING
WORK- 0
NORMAL RCC
WOODEN
0 sft
SHUTTER
ANCILARY
STRUCTURE
SHUTTERING
False Slab 0 sft
Lintel 110 sft
Counter Top
20 sft
Slab
STEEL
SHUTTER
VERICAL
MEMBER
SHUTTER
a) Column and
2200 sft
Shear Wall
d) Boundary
Wall Column & 0
Copping Beam
SLAB &
BEAM& STAIR
b) Slab,and Stair
4500 sft
Shutter

c) Beam Shutter 2300 sft


2
ANCILARY STRUCTURE SHUTTERING
s) Drop Wall
2

t)Railing/
Parapet/
Ornamental Wall
u)Sunshed
v)Ornamental
Slab

SHUTTERING
WORK-
FAIRFACE RCC

a) Column and
Shear Wall
b) Slab, and
Stair Shutter

c) Beam Shutter

d) Non
Structural RCC
Wall-5"-12"
e) Non
Structural
Boundary Wall
f) Drop Wall &
SunShade
Shutter
10" BRICK
cft 1:6 0.00 0
WORK
a) 10" Brick
690 cft 1:6 27.60 241
Partition Wall
3 b) Brick Soaking
cft 1:6 0.00 0
House

c) Sand
cft 1:6 0.00 0
Washing House

5" BRICK
WORK
a) 5" Brick
1050 1:4 26.25 179
Partition Wall
4 b) Brick Soaking
0 1:4 0.00 0
House

c) Sand
0 1:4 0.00 0
Washing House

Ceramic/Facing
Bricks
3/4" Thick
sft
Plaster
a) In Side Wall 3250 sft 1:6 39.00 325

b) Brick Soaking
& Sand Washing 0 sft 1:6 0.00 0
House

5
5 c) Out Side
Wall(Normal 0 sft 1:6 0.00 0
Plaster)
d) Rough
Plaster For Fair 0 sft 1:6 0.00 0
Face Plaster
e) Fair Face
880 sft
Plaster
PLASTER (1/2"
sft
thick)
Ceiling Plaster 850 1:4 12.75 64
6 False Slab
0 1:4 0.00 0
Bottom Plaster
RCC Column &
0 1:4 0.00 0
SW Plaster

NEAT CEMENT
FINISHING sft
(NCF)

a) Brick Soaking
& Sand Washing 0 sft 0.00
House

b) Above False
0 sft 0.00
Slab
c) other Area
450 sft 2.25
(Garden Area)
7 FLOOR TILES
Apartment(wait.Co 3050 sft 1:3 122.00 457.50
Gym/ Reception/ 0 sft 1:3 0.00 0.00
Main Stair -Tiles( 270 sft 1:3 10.80 40.50
Main Stair & Lift 220 sft 1:3 8.80 33.00
270 sft 1:3 10.80 40.50
0 sft 1:3 0.00 0.00
Main Toilet Floor 0 sft 1:3 0.00 0.00
2nd & 3rd Toilet F 120 sft 1:3 4.80 18.00
Main Kitchen Floo 0 sft 1:3 0.00 0.00
Caretaker Kitchen 0 sft 1:3 0.00 0.00
0 sft 1:3 0.00 0.00
Kitchen Counter
0 sft 1:3 0.00 0.00
Top
Toilet Counter
150 sft 1:3 6.00 22.50
Top

Reception Table
0 sft 1:3 0.00 0.00
Counter Top

Pavement Tiles 0 sft 1:3 0.00 0.00


Roof Tiles 0 sft 1:3 0.00 0.00
Terrace Tiles 0 sft 1:3 0.00 0.00
Garden/Planter
0 sft 1:3 0.00 0.00
Tiles
Water Body &
Swimming Pool 0 sft 1:3 0.00 0.00
Floor Tiles
Water Body &
Swimming Pool 0 sft 1:3 0.00 0.00
Deck Tiles
SKIRTING
TILES
Apt. Floor Tiles
430 rft 1:3 3.55 14.19
Skt

Gym/Com
Wooden Texture 0 1:3 0.00 0.00
Tiles Skt

Stair Tiles- Skt 106 1:3 0.87 3.50


Stair & Lift
70 1:3 0.58 2.31
Lobby Tiles Skt
Fire/
Basement/
106 1:3 0.87 3.50
Ornamental
Stair Tiles Skt
Care
Taket/Servent/G
0 1:3 0.00 0.00
uard/Others
Room Tiles Skt

Kit. Ver Tiles Skt 0 1:3 0.00 0.00

Care Taker Kit


0 1:3 0.00 0.00
Floor Skt.
Pavement Tiles
0 1:3 0.00 0.00
skt
Roof Tiles Skt 0 1:3 0.00 0.00
Terrace Tiles
0 1:3 0.00 0.00
Skt
Planter/Garden
0 1:3 0.00 0.00
Tiles Skt
WALL TILE
WORK
Main Toilet Tiles 0 sft 1:3 0.00 0.00
2nd & 3rd Toilet T 600 sft 1:3 15.00 60.00
0 sft 1:3 0.00 0.00
Main Kitchen
0 sft 1:3 0.00 0.00
Wall
Caretaker
0 sft 1:3 0.00 0.00
Kitchen Wall
8 Down wash Wall
0 sft 1:3 0.00 0.00
Tiles
Reception wall Til 0 sft 1:3 0.00 0.00
Lift Wall Tiles 183 sft 1:3 4.58 18.30
Border for Toilets 80 sft 1:3 0.66 2.64
Slate Stone /Clad 0 sft 1:3 0.00 0.00
0 sft 1:3 0.00 0.00
0 sft 1:3 0.00 0.00
Outside Wall Clad 0 sft 1:3 0.00 0.00
Swimming Pool & 0 1:3 0.00 0.00
FLOOR MARBLE sft
Apartment(wait.Co 0 sft 1:3 0.00 0.00 0.00
Gym/ Reception/Community sft 1:3 0.00 0.00 0.00
Main Stair ( Trade, Riser, sft 1:3 0.00 0.00 0.00
Main Stair & Lif 0 sft 1:3 0.00 0.00 0.00
sft 1:3 0.00 0.00 0.00
Kitchen Counter
0 sft 1:3 0.00 0.00 0.00
Top
Toilet Counter
36 sft 1:3 1.44 7.20 5.40
Top
1:3 0.00 0.00 0.00
sft 1:3 0.00 0.00 0.00
MARBLE
SKIRTING
Apt. Marble Skt 1:3 0.00 0.00 0.00
Main Stair
1:3 0.00 0.00 0.00
Marble Skt
Stair & Lift
Lobby marble 0 1:3 0.00 0.00 0.00
Skt

Basement/Level
Up/Ornamental 1:3 0.00 0.00 0.00
Stair Marble Skt

Graden/Planter
1:3 0.00 0.00 0.00
Marble Skt

WALL MARBLE
sft
WORK

8 Reception wall Marble sft 1:3 0.00 0.00 0.00


Lift Wall Marble sft 1:3 0.00 0.00 0.00
Skirting Marble sft 1:3 0.00 0.00 0.00
Boundary Wall Cladding- Mar sft 1:3 0.00 0.00 0.00
Outside Wall Cladding( marbl rft 1:3 0.00 0.00 0.00

ALUMINIUM
DOOR AND
WINDOW &
OTHER WORK

4" Single glazzing 0


4" Double glazzin 0
3" Fixed with Slid 0 sft
21 Fly proof Net
Fixed Glass 80
Glass Door 120
21

Curtain Wall 1340


Curtain/Blind ( 0
Aluminium Louve 365
ACP Work 0
Glass Canopy Wo 0
GRILL WORK 0 sft
a) Window Grill 135 sft
b) Sliding Grill 0 sft
c) Kitchen Verand 0 sft
22
d) Veranda safety 0 sft
e)Parking Grill 0 sft
f)Safety Grill Ov 0 sft
g)Boundary Grill 0 sft
Lift Lobby/Corridor 0
RAILING WORK 0 sft
a) Main Stair
88 sft
Railing
b) Fire Stair
88 sft
Railing
f)Front
Verandah 190.75 sft
Railing
g)Back
Verandah 0 sft
Railing
h)Kitchen
Verandah 0 sft
Railing
i)Voide & Punch
0 sft
Railing
j)Lift Lobby
0 sft
Railing

k)
Parapet/Terrace 0 sft
/OHWT Railing

l)
Planter/Garden 0 sft
Area Railing
m)Parking/
Boundary 0 sft
Railing
WOOD WORK
(Door Frame)

a) Main Door Fram 0 rft


b) Bed Room Door 0 rft
16
c) S.Bed Door Fra 0 rft
d) Kit.Ver./Balco 0 rft
e) Kitchen Door F 0 rft
f) Stair door Frame(3'-4"x7'-0 rft
16

g)Toilet Door Fram 66 rft


17 CAT DOOR 2 nos
PVC DOOR
18 0 nos
(S.Toilet Door)

WOOD WORK
(Door Shutter)

a) Main Door Shut 0 sft


b) Community/Bed 62 sft
19 c) S.Bed Door Sh 0 sft
d) Kit.Ver./Balco 0 sft
e) Kitchen Door 0 sft
f) Stair Door Shut 0 sft
g) Toilet Door Shu 0 sft
Servent Toilet Do 0 sft
PLASTIC
PAINT
11 a) In Side of Lift 300 sft
b) In Side Wall 3500 sft
c) Ceiling 850 sft
WHEATHER
12 0 sft
COAT
ENAMEL PAINT
a) All Grill Surfac 501.75 sft
b) On Plaster (Kit 0 sft
15 (c) On Wooden
Surface(In
0 sft
ofToi+Out of Ver
Door)
POLISH FOR
WOODEN sft
SURFACE
28
Polish for Design 0 sft
Polish for Interna 194.02 sft
Laquire Polish on 97.01 sft
MILD STEEL
22
MS Rod 60/72.5 28812 Kg.
SUB TOTAL (11th Floor) 1588 7 1542 2259 241
Prepared by: Sabit NOTE: CONCRETE MIXING RATIO MAY BE CHANGED WITH RESPECT T
12TH FLOOR
Description of Ratio of Cement in bag/kg. Sand in cft Picket in
c Quantity
Work Mixing Gray(bag) white(kg) Local Sylhet Nos.
R.C.C. WORK
(RMC/Manual)

a) Column &
Shear Wall 1780 cft 1:1.25:2.5 450 0 703
(main Structure)
c) OHWT Wall &
Slab, Machine cft 1:11/2:3 0 0 0
room slab

d) Slab, Beam &


3790 cft 1:11/2:3 834 0 1554
Stair (main Slab)

C.Ancilary
Structure
Drop wall.
railinq. Aic slab.
sunshade, 0 sft 1:2:4 - - 0
Rib.Beam (upto
4" thickness)
Drop Wall 1:2:4 - - 0
1
Railing/Parapet cft 1:2:4 - - 0
SunShed 0 sft 1:2:4 - - 0
RIB Beam 1:2:4 - - 0
2)Lintel up to 5"
25 rft 1:2:4 1 2 50
Width
3)Lintel above 5"
20 cft 1:2:4 4 9 191
Width
4)False Slab up
0 sft 1:2:4 - - 0
to 4" Thick
FAIR FACE
0
RCC WORK
Column & Shear
0 1:1.25:2.5 0 0 0
Wall
Slab, Beam &
0 1:1.25:2.5 0 0 0
Stair
Drop Wall &
0 1:1.25:2.5 0 0 0
Sunshed
Non Structural
0 1:1.25:2.5 0 0 0
Wall up to 5"
Non Structural
0 1:1.25:2.5 0 0 0
Wall Above 5"
SHUTTERING
WORK- 0
NORMAL RCC
WOODEN
0 sft
SHUTTER
ANCILARY
STRUCTURE 0
SHUTTERING
False Slab 0 sft
Lintel 110 sft
Counter Top
20 sft
Slab
STEEL
0
SHUTTER
VERICAL
MEMBER 0
SHUTTER
a) Column and
2200 sft
Shear Wall
d) Boundary
Wall Column & 0 sft
Copping Beam
SLAB &
0 sft
BEAM& STAIR
b) Slab,and Stair
4650 sft
Shutter

c) Beam Shutter 2320 sft


2
ANCILARY STR 0 sft
s) Drop Wall 0 sft
t)Railing/
Parapet/ 0 sft
Ornamental Wall
u)Sunshed 0 sft
v)Ornamental
0 sft
Slab

SHUTTERING
WORK- 0 sft
FAIRFACE RCC

a) Column and
0 sft
Shear Wall
b) Slab, and
0 sft
Stair Shutter

c) Beam Shutter 0 sft

d) Non
Structural RCC 0 sft
Wall-5"-12"
e) Non
Structural 0 sft
Boundary Wall
f) Drop Wall &
SunShade 0 sft
Shutter
10" BRICK
0 cft 1:6 0.00 0
WORK
a) 10" Brick
690 cft 1:6 27.60 241
Partition Wall
3 b) Brick Soaking
0 1:6 0.00 0
House

c) Sand
0 1:6 0.00 0
Washing House

5" BRICK
0 sft
WORK

4
a) 5" Brick
1050 sft 1:4 26.25 179
Partition Wall
4 b) Brick Soaking
0 sft 1:4 0.00 0
House

c) Sand
0 sft 1:4 0.00 0
Washing House

Ceramic/Facing
0
Bricks
3/4" Thick
sft
Plaster
a) In Side Wall 3250 sft 1:6 39.00 325

b) Brick Soaking
& Sand Washing 0 1:6 0.00 0
House

5 c) Out Side
Wall(Normal 0 sft 1:6 0.00 0
Plaster)
d) Rough
Plaster For Fair 0 1:6 0.00 0
Face Plaster
e) Fair Face
880
Plaster
PLASTER (1/2"
0 sft
thick)
Ceiling Plaster 850 sft 1:4 12.75 64
6 Plaster false
0 1:4 0.00 0
ceiling
RCC Column &
0 1:4 0.00 0
SW Plaster

NEAT CEMENT
FINISHING sft
(NCF)

a) Brick Soaking
& Sand Washing 0 sft 0.00
House

b)False ceiling
0 sft 0.00
top
c) other Area
450 2.25
(Garden Area)
7 FLOOR TILES
Apartment(wait.Co 3345 sft 1:3 133.80 501.75
Gym/ Reception/ 0 sft 1:3 0.00 0.00
Main Stair -Tiles( 270 sft 1:3 10.80 40.50
Main Stair & Lift 220 sft 1:3 8.80 33.00
270 sft 1:3 10.80 40.50

0 sft 1:3 0.00 0.00


Main Toilet Floor 0 sft 1:3 0.00 0.00
2nd & 3rd Toilet F 120 sft 1:3 4.80 18.00
Main Kitchen Floo 0 sft 1:3 0.00 0.00
Caretaker Kitchen 0 sft 1:3 0.00 0.00
0 sft 1:3 0.00 0.00
Kitchen Counter
0 sft 1:3 0.00 0.00
Top
Toilet Counter
150 sft 1:3 6.00 22.50
Top
0 sft 1:3 0.00 0.00
0 sft 1:3 0.00 0.00
Roof Tiles 0 sft 1:3 0.00 0.00
Terrace Tiles 0 sft 1:3 0.00 0.00
Garden/Planter
0 sft 1:3 0.00 0.00
Tiles
Water Body &
Swimming Pool 0 1:3 0.00 0.00
Floor Tiles
Water Body &
Swimming Pool 0 1:3 0.00 0.00
Deck Tiles
SKIRTING
0
TILES
Apt. Floor Tiles
445 sft 1:3 3.67 14.69
Skt

Gym/Com
Wooden Texture sft 1:3 0.00 0.00
Tiles Skt

Stair Tiles- Skt 106 sft 1:3 0.87 3.50


Stair & Lift
70 sft 1:3 0.58 2.31
Lobby Tiles Skt
Fire/
Basement/
106 sft 1:3 0.87 3.50
Ornamental
Stair Tiles Skt
Care
Taket/Servent/G
0 sft 1:3 0.00 0.00
uard/Others
Room Tiles Skt

Kit. Ver Tiles Skt 0 sft 1:3 0.00 0.00

Care Taker Kit


0 1:3 0.00 0.00
Floor Skt.
Pavement Tiles
0 1:3 0.00 0.00
skt
Roof Tiles Skt 0 1:3 0.00 0.00
Terrace Tiles
0 1:3 0.00 0.00
Skt
Planter/Garden
0 1:3 0.00 0.00
Tiles Skt
WALL TILE
0
WORK
Main Toilet Tiles 0 sft 1:3 0.00 0.00
2nd & 3rd Toilet T 600 sft 1:3 15.00 60.00
0 sft 1:3 0.00 0.00
Main Kitchen
0 sft 1:3 0.00 0.00
Wall
Caretaker
sft 1:3 0.00 0.00
Kitchen Wall
8 Down wash Wall
0 sft 1:3 0.00 0.00
Tiles
Reception wall Tiles sft 1:3 0.00 0.00
Lift Wall Tiles 183 sft 1:3 4.58 18.30
Border for Toilets 80 sft 1:3 0.66 2.64
Slate Stone /Cladding Tiles sft 1:3 0.00 0.00
sft 1:3 0.00 0.00
sft 1:3 0.00 0.00
Outside Wall Cladding(Tiles) sft 1:3 0.00 0.00
Swimming Pool & Water Body sft 1:3 0.00 0.00
FLOOR MARBLE sft
Apartment(wait.Comu. etc.) sft 1:3 0.00 0.00 0.00
Gym/ Reception/ 0 sft 1:3 0.00 0.00 0.00
Main Stair ( Trade, Riser, sft 1:3 0.00 0.00 0.00
Main Stair & Lift Lobby-MA sft 1:3 0.00 0.00 0.00
1:3 0.00 0.00 0.00
Kitchen Counter
0 sft 1:3 0.00 0.00 0.00
Top
Toilet Counter
36 sft 1:3 1.44 7.20 5.40
Top

Reception Table
sft 1:3 0.00 0.00 0.00
Counter Top

Garden/Planter
Marble/Design sft 1:3 0.00 0.00 0.00
Marble

WALL MARBLE
0 sft
WORK

8 Reception wall M 0 sft 1:3 0.00 0.00 0.00


Lift Wall Marble 0 rft 1:3 0.00 0.00 0.00
Skirting Marble rft 1:3 0.00 0.00 0.00
Boundary Wall Cladding- Mar sft 1:3 0.00 0.00 0.00
Outside Wall Cladding( marbl sft 1:3 0.00 0.00 0.00

ALUMINIUM
DOOR AND
WINDOW &
OTHER WORK

4" Single glazzing 0 sft


4" Double glazzin 0 sft

21
3" Fixed with Slid 0 sft
21 Fly proof Net 0 sft
Fixed Glass 80 sft
Glass Door 120 sft
Curtain Wall 1420 sft
Curtain/Blind ( 0 sft
Aluminium Louve 365 sft
ACP Work 0 sft
Glass Canopy Wo 0 sft
GRILL WORK sft
a) Window Grill 135 sft
b) Sliding Grill 0 sft
c) Kitchen Verand 0 sft
22
d) Veranda safety 0 sft
e)Parking Grill sft
f)Safety Grill Over Boundary sft
g)Boundary Grill sft
Lift Lobby/Corridor 0
RAILING WORK sft
a) Main Stair
88 sft
Railing
b) Fire Stair
88 sft
Railing
f)Front
Verandah 0 sft
Railing
g)Back
Verandah sft
Railing
h)Kitchen
Verandah 0 sft
Railing
i)Voide & Punch
sft
Railing
j)Lift Lobby
0 sft
Railing

k)
Parapet/Terrace sft
/OHWT Railing

l)
Planter/Garden sft
Area Railing
m)Parking/
Boundary sft
Railing
WOOD WORK
(Door Frame)
a) Main Door Fram 0 rft
b) Bed Room Door 0 rft
16 c) S.Bed Door Frame (2'-6"x7 rft
16
d) Kit.Ver./Balco 0 rft
e) Kitchen Door F 0 rft
f) Stair door Fram 0 rft
g)Toilet Door Fram 66 rft
17 CAT DOOR 2 nos
PVC DOOR
18 0 nos
(S.Toilet Door)

WOOD WORK
0
(Door Shutter)

a) Main Door Shut 0 sft


b) Community/Bed 62 sft
19 c) S.Bed Door Sh 0 sft
d) Kit.Ver./Balco 0 sft
e) Kitchen Door 0 sft
f) Stair Door Shut 0 sft
g) Toilet Door Shu 0
Servent Toilet Do 0 nos.
PLASTIC
PAINT
11 a) In Side of Fals 300 sft
b) In Side Wall 3500 sft
c) Ceiling 850 sft
WHEATHER
12 0 sft
COAT
ENAMEL PAINT
a) All Grill Surfac 311 sft
b) On Plaster (Kit 0 sft
15 (c) On Wooden
Surface(In
0 sft
ofToi+Out of Ver
Door)
POLISH FOR
WOODEN sft
SURFACE
28
Polish for Design 0 sft
Polish for Interna 194.02 sft
Laquire Polish on 97.01 sft
MILD STEEL
22
MS Rod 60/72.5 29092 Kg.
SUB TOTAL (12th Floor) 1599 7 1587 2257 241
Prepared by: Sabit NOTE: CONCRETE MIXING RATIO MAY BE CHANGED WITH RESPECT T
13TH FLOOR
Description of Ratio of Cement in bag/kg. Sand in cft Picket in
c Quantity
Work Mixing Gray(bag) white(kg) Local Sylhet Nos.
R.C.C. WORK
(RMC/Manual)
a) Column &
Shear Wall 1780 cft
(main Structure)

c)Waterbody &
Swimming Pool,
OHWT Wall &
Slab

d) Slab, Beam &


3820 cft
Stair (main Slab)

C.Ancilary
Structure
Drop wall.
railinq. Aic slab.
sunshade, 0 sft 1:2:4 - - 0
Rib.Beam (upto
4" thickness)
Drop Wall 1:2:4 - - 0
1
Railing/Parapet 1:2:4 - - 0
SunShed 0 sft 1:2:4 - - 0
RIB Beam 1:2:4 - - 0
2)Lintel up to 5"
25 rft 1:2:4 1 2 50
Width
3)Lintel above 5"
20 cft 1:2:4 4 9 191
Width
4)False Slab up
0 sft 1:2:4 - - 0
to 4" Thick
FAIR FACE
RCC WORK
Column & Shear
Wall
Slab, Beam &
Stair
Drop Wall &
Sunshed
Non Structural
Wall up to 5"
Non Structural
Wall Above 5"
SHUTTERING
WORK- 0
NORMAL RCC
WOODEN
0 sft
SHUTTER
ANCILARY
STRUCTURE
SHUTTERING
False Slab 0 sft
Lintel 110 sft
Counter Top
20 sft
Slab
STEEL
SHUTTER
VERICAL
MEMBER
SHUTTER
a) Column and
2200 sft
Shear Wall
d) Boundary
Wall Column & 0 sft
Copping Beam
SLAB &
0 sft
BEAM& STAIR
b) Slab,and Stair
4700 sft
Shutter

c) Beam Shutter 2350 sft


2
ANCILARY STR 0 sft
s) Drop Wall sft
t)Railing/
Parapet/ sft
Ornamental Wall
u)Sunshed sft
v)Ornamental
sft
Slab

SHUTTERING
WORK- sft
FAIRFACE RCC

a) Column and
sft
Shear Wall
b) Slab, and
sft
Stair Shutter

c) Beam Shutter sft

d) Non
Structural RCC sft
Wall-5"-12"
e) Non
Structural sft
Boundary Wall
f) Drop Wall &
SunShade sft
Shutter
10" BRICK
cft 1:6 0.00 0
WORK
a) 10" Brick
690 cft 1:6 27.60 241
Partition Wall
3 b) Brick Soaking
cft 1:6 0.00 0
House
3

c) Sand
cft 1:6 0.00 0
Washing House

5" BRICK
sft
WORK
a) 5" Brick
1050 sft 1:4 26.25 179
Partition Wall
4 b) Brick Soaking
0 sft 1:4 0.00 0
House

c) Sand
sft 1:4 0.00 0
Washing House

Ceramic/Facing
sft 1:4 0.00 0
Bricks
3/4" Thick
sft
Plaster
a) In Side Wall 3250 sft 1:6 39.00 325

b) Brick Soaking
& Sand Washing 0 sft 1:6 0.00 0
House

5 c) Out Side
Wall(Normal 0 sft 1:6 0.00 0
Plaster)
d) Rough
Plaster For Fair 0 sft 1:6 0.00 0
Face Plaster
e) Fair Face
880 sft 1:6 10.56 88
Plaster
PLASTER (1/2"
sft
thick)
Ceiling Plaster 850 sft 1:4 12.75 64
6 False Slab
0 sft 1:4 0.00 0
Bottom Plaster
RCC Column &
0 sft 1:4 0.00 0
SW Plaster

NEAT CEMENT
FINISHING
(NCF)

a) Brick Soaking
& Sand Washing 0 sft 0.00
House

b) Above False
0 sft 0.00
Slab
c) other Area
1025 sft 5.13
(Garden Area)
7 FLOOR TILES
Apartment(wait.Co 3350 sft 1:3 134.00 33.50 502.50
Gym/ Reception/ 0 sft 1:3 0.00 0.00 0.00
Main Stair -Tiles( 270 sft 1:3 10.80 2.70 40.50
Main Stair & Lift 220 sft 1:3 8.80 2.20 33.00
270 sft 1:3 10.80 2.70 40.50
sft
Main Toilet Floor 0 sft 1:3 0.00 0.00 0.00
2nd & 3rd Toilet F 120 sft 1:3 4.80 1.20 18.00
Main Kitchen Floo 0 sft 1:3 0.00 0.00 0.00
Caretaker Kitchen 0 sft 1:3 0.00 0.00 0.00
0 sft 1:3 0.00 0.00 0.00
Kitchen Counter
0 sft 1:3 0.00 0.00 0.00
Top
Toilet Counter
150 sft 1:3 6.00 1.50 22.50
Top

Reception Table
0 sft 1:3 0.00 0.00 0.00
Counter Top

0 sft 1:3 0.00 0.00 0.00


Roof Tiles 0 sft 1:3 0.00 0.00 0.00
Terrace Tiles sft 1:3 0.00 0.00 0.00
Garden/Planter
0 sft 1:3 0.00 0.00 0.00
Tiles
Water Body &
Swimming Pool sft 1:3 0.00 0.00 0.00
Floor Tiles
Water Body &
Swimming Pool sft 1:3 0.00 0.00 0.00
Deck Tiles
SKIRTING
TILES
Apt. Floor Tiles
445 sft 1:3 3.67 14.69
Skt

Gym/Com
Wooden Texture sft 1:3 0.00 0.00
Tiles Skt

Stair Tiles- Skt 106 sft 1:3 0.87 3.50


Stair & Lift
70 sft 1:3 0.58 2.31
Lobby Tiles Skt
Fire/
Basement/
sft 1:3 0.00 0.00
Ornamental
Stair Tiles Skt
Care
Taket/Servent/G
sft 1:3 0.00 0.00
uard/Others
Room Tiles Skt

Kit. Ver Tiles Skt 0 sft 1:3 0.00 0.00

Care Taker Kit


sft 1:3 0.00 0.00
Floor Skt.
Pavement Tiles
sft 1:3 0.00 0.00
skt
Roof Tiles Skt sft 1:3 0.00 0.00
Terrace Tiles
sft 1:3 0.00 0.00
Skt
Planter/Garden
sft 1:3 0.00 0.00
Tiles Skt
WALL TILE
sft 1:3 0.00 0.00
WORK
Main Toilet Tiles 0 sft 1:3 0.00 0.00
2nd & 3rd Toilet T 600 sft 1:3 15.00 60.00
0 sft 1:3 0.00 0.00
Main Kitchen
0 sft 1:3 0.00 0.00
Wall
Caretaker
sft 1:3 0.00 0.00
Kitchen Wall
8 Down wash Wall
0 sft 1:3 0.00 0.00
Tiles
Reception wall Tiles sft 1:3 0.00 0.00
Lift Wall Tiles 183 sft 1:3 4.58 18.30
Border for Toilets 80 sft 1:3 2.00 8.00
Slate Stone /Cladding Tiles sft 1:3 0.00 0.00
sft 1:3 0.00 0.00
sft 1:3 0.00 0.00
Outside Wall Cladding(Tiles) sft 1:3 0.00 0.00
Swimming Pool & Water Body sft 1:3 0.00 0.00
FLOOR MARBLE
Apartment(wait.Comu. etc.) sft 1:3 0.00 0.00 0.00
Gym/ Reception/Community sft 1:3 0.00 0.00 0.00
Main Stair ( Trade, Riser, sft 1:3 0.00 0.00 0.00
Main Stair & Lift Lobby-MA sft 1:3 0.00 0.00 0.00
sft 1:3 0.00 0.00 0.00
Kitchen Counter
0 sft 1:3 0.00 0.00 0.00
Top
Toilet Counter
36 sft 1:3 1.44 7.20 5.40
Top

Reception Table
sft 1:3 0.00 0.00 0.00
Counter Top

Garden/Planter
Marble/Design sft 1:3 0.00 0.00 0.00
Marble
MARBLE
SKIRTING
Apt. Marble Skt
Main Stair
Marble Skt
Stair & Lift
Lobby marble
Skt
Basement/Level
Up/Ornamental
Stair Marble Skt

Graden/Planter
Marble Skt

WALL MARBLE
WORK

8 Reception wall Marble


Lift Wall Marble
Skirting Marble sft 1:3 0.00 0.00 0.00
Boundary Wall Cladding- Mar sft 1:3 0.00 0.00 0.00
Outside Wall Cladding( marbl sft 1:3 0.00 0.00 0.00

ALUMINIUM
DOOR AND
WINDOW &
OTHER WORK

4" Single glazzing 0 sft


4" Double glazzing sft
3" Fixed with Slid 0 sft
21 Fly proof Net 0 sft
Fixed Glass 80 sft
Glass Door 120 sft
Curtain Wall 1380 sft
Curtain/Blind ( 0 sft
Aluminium Louve 365 sft
ACP Work 0 sft
Glass Canopy Wo 0 sft
GRILL WORK sft
a) Window Grill 135 sft
b) Sliding Grill 0 sft
c) Kitchen Verand 0 sft
22
d) Veranda safety 0 sft
e)Parking Grill sft
f)Safety Grill Over Boundary sft
g)Boundary Grill sft
Lift Lobby/Corridor 0
RAILING WORK sft
a) Main Stair
88 sft
Railing
b) Fire Stair
88 sft
Railing
f)Front
Verandah 185.5 sft
Railing
g)Back
Verandah sft
Railing
h)Kitchen
Verandah 0 sft
Railing
i)Voide & Punch
sft
Railing
j)Lift Lobby
0 sft
Railing

k)
Parapet/Terrace sft
/OHWT Railing

l)
Planter/Garden sft
Area Railing
m)Parking/
Boundary sft
Railing
WOOD WORK
(Door Frame)
a) Main Door Fram 0 rft
b) Bed Room Door 0 rft
16 c) S.Bed Door Frame (2'-6"x7 rft
d) Kit.Ver./Balco 0 rft
e) Kitchen Door F 0 rft
f) Stair door Frame(3'-4"x7'-0 rft
g)Toilet Door Fram 66 rft
17 CAT DOOR 2 nos
PVC DOOR
18 0 nos
(S.Toilet Door)

WOOD WORK
(Door Shutter)

a) Main Door Shut 0 sft


b) Community/Bed 62 sft
19 c) S.Bed Door Sh 0 sft
d) Kit.Ver./Balco 0 sft
e) Kitchen Door 0 sft
f) Stair Door Shut 0 sft
g) Toilet Door Shu 0
Servent Toilet Do 0 nos.
PLASTIC
PAINT
11 a) In Side of Fals 300 sft
b) In Side Wall 3500 sft
c) Ceiling 850 sft
WHEATHER
12 0 sft
COAT
ENAMEL PAINT

15
a) All Grill Surfac 496.5 sft
b) On Plaster (Kit 0 sft
15 c) On Wooden
Surface(In of
0 sft
Toi+Out of Ver
Door)
POLISH FOR
WOODEN sft
SURFACE
28
Polish for Design 0 sft
Polish for Interna 194.02 sft
Laquire Polish on 97.01 sft
MILD STEEL
22
MS Rod 60/72.5 29817 Kg.
SUB TOTAL (13th Floor) 329 51 1677 0 241
NOTE: CONCRETE MIXING RATIO MAY BE CHANGED WITH RESPECT T
14TH FLOOR
Description of Ratio of Cement in bag/kg. Sand in cft Picket in
c Quantity
Work Mixing Gray(bag) white(kg) Local Sylhet Nos.
R.C.C. WORK
(RMC/Manual)

a) Column &
Shear Wall
(main Structure)

c)Waterbody &
Swimming Pool,
OHWT Wall &
Slab

d) Slab, Beam &


Stair (main Slab)

C.Ancilary
Structure
1)DroD wall.
railinq. Aic slab.
sunshade,
Rib.Beam (upto
4" thickness)
Drop Wall
1
Railing/Parapet
SunShed
RIB Beam
2)Lintel up to 5"
Width
3)Lintel above 5"
Width
4)False Slab up
to 4" Thick
FAIR FACE
RCC WORK
Column & Shear
Wall
Slab, Beam &
Stair
Drop Wall &
Sunshed
Non Structural
Wall up to 5"
Non Structural
Wall Above 5"
SHUTTERING
WORK-
NORMAL RCC
WOODEN
sft
SHUTTER
ANCILARY
STRUCTURE
SHUTTERING
False Slab
Lintel
Counter Top
Slab
STEEL
SHUTTER
VERICAL
MEMBER
SHUTTER
a) Column and
Shear Wall
d) Boundary
Wall Column &
Copping Beam
SLAB &
BEAM& STAIR
b) Slab,and Stair
Shutter

c) Beam Shutter
2
ANCILARY STRUCTURE SHUTTERING
s) Drop Wall
t)Railing/
Parapet/
Ornamental Wall
u)Sunshed
v)Ornamental
Slab
SHUTTERING
WORK-
FAIRFACE RCC

a) Column and
Shear Wall
b) Slab, and
Stair Shutter

c) Beam Shutter

d) Non
Structural RCC
Wall-5"-12"
e) Non
Structural
Boundary Wall
f) Drop Wall &
SunShade
Shutter
10" BRICK
cft 1:6 0.00 0
WORK
a) 10" Brick
Partition Wall
3 b) Brick Soaking
House

c) Sand
Washing House

5" BRICK
sft
WORK
a) 5" Brick
Partition Wall
4 b) Brick Soaking
1:4 0.00 0
House

c) Sand
Washing House

Ceramic/Facing
Bricks
3/4" Thick
sft
Plaster
a) In Side Wall

b) Brick Soaking
& Sand Washing
House

5 c) Out Side
Wall(Normal sft
Plaster)
d) Rough
Plaster For Fair
Face Plaster
e) Fair Face
Plaster
PLASTER (1/2"
sft 1:6 0.00 0
thick)
Ceiling Plaster
6 False Slab
Bottom Plaster
RCC Column &
1:6 0.00 0
SW Plaster

NEAT CEMENT
FINISHING sft
(NCF)

a) Brick Soaking
& Sand Washing
House

b) Above False
Slab
c) other Area

1/2" Thick
6 sft 1:4 0.00 0
Plaster(Ceiling)

7 FLOOR TILES
Apartment(wait.Comu. etc.) - sft 1:3 0.00 0.00 0.00
Gym/ Reception/Community sft 1:3 0.00 0.00 0.00
Main Stair -Tiles( Trade, Riser, Skirting, Landing)
Main Stair & Lift -Tiles(Lobby)

2.Basement-GF
Stair

3.Out Side
Level Up Stair
( Tiles)
3.
Driver Waiting

4. EMR
Room

Main Toilet Floor


2nd & 3rd Toilet Floor
Main Kitchen Floor with Kitchen Verandah
Caretaker Kitchen Floor
2.Drivers toilet

3.Guard
Toilet
Kitchen Counter
Top
Toilet Counter
Top

Reception Table
Counter Top

Pavement Tiles
Roof Tiles
Terrace Tiles
Garden/Planter
Tiles
Water Body &
Swimming Pool
Floor Tiles
Water Body &
Swimming Pool
Deck Tiles
SKIRTING
TILES
Apt. Floor Tiles
Skt

Gym/Com
Wooden Texture
Tiles Skt

Stair Tiles- Skt


Stair & Lift
Lobby Tiles Skt
Fire/
Basement/
Ornamental
Stair Tiles Skt
Care
Taket/Servent/G
uard/Others
Room Tiles Skt

Kit. Ver Tiles Skt

Care Taker Kit


Floor Skt.
Pavement Tiles
skt
Roof Tiles Skt
Terrace Tiles
Skt
Planter/Garden
Tiles Skt
WALL TILE
WORK
Main Toilet Tiles
2nd & 3rd Toilet Tiles
2.Drivers toilet

3.Guard
Toilet
Main Kitchen
Wall
8 Caretaker
Kitchen Wall
Down wash Wall
Tiles
Reception wall Tiles
Lift Wall Tiles
Border for Toilets
Slate Stone /Cladding Tiles
Column protection Tiles(Height=3'-0")
Boundary Dado Tiles
Outside Wall Cladding(Tiles)
Swimming Pool & Water Body Wall Tiles
FLOOR MARBLE
Apartment(wait.Comu. etc.) -Marble
Gym/ Reception/Community Wooden Texture MARBLE
Main Stair ( Trade, Riser, Skirting, Landing)-MARBLE
Main Stair & Lift Lobby-MARBLE

2.Out
Side Level Up
Stair (Marble)

Kitchen Counter
Top
Toilet Counter
sft 1:3 0.00 0.00 0.00
Top

Reception Table
sft 1:3 0.00 0.00 0.00
Counter Top

Garden/Planter
Marble/Design sft 1:3 0.00 0.00 0.00
Marble
MARBLE
SKIRTING
Apt. Marble Skt
Main Stair
Marble Skt
Stair & Lift
Lobby marble
Skt

Basement/Level
Up/Ornamental
Stair Marble Skt

Graden/Planter
Marble Skt

WALL MARBLE
sft 1:3 0.00 0.00 0.00
WORK

8 Reception wall Marble sft 1:3 0.00 0.00 0.00


Lift Wall Marble sft 1:3 0.00 0.00 0.00
Skirting Marble sft 1:3 0.00 0.00 0.00
Boundary Wall Cladding- Mar sft 1:3 0.00 0.00 0.00
Outside Wall Cladding( marble/ Granite)

ALUMINIUM
DOOR AND
WINDOW &
OTHER WORK

4" Single glazzing


4" Double glazzing
3" Fixed with Sliding
21 Fly proof Net
Fixed Glass
Glass Door
Curtain Wall
Curtain/Blind ( Community Space)
Aluminium Louver Work
ACP Work
Glass Canopy Work
GRILL WORK sft
a) Window Grill sft
b) Sliding Grill sft
c) Kitchen Verandah Safety G sft
22
d) Basement Ventilation Grill sft
e)Parking Grill sft
f)Safety Grill Over Boundary sft
g)Boundary Grill sft
RAILING WORK sft
a) Main Stair
sft
Railing
b) Fire Stair
sft
Railing
c)Basement
sft
Stair Railing
d)Ornamental
sft
Stair Railing
e)) Ramp
sft
Railing
f)Front
Verandah sft
Railing
g)Back
Verandah sft
Railing
h)Kitchen
Verandah sft
Railing
i)Voide & Punch
sft
Railing
j)Lift Lobby
sft
Railing

k)
Parapet/Terrace sft
/OHWT Railing

l)
Planter/Garden sft
Area Railing
m)Parking/
Boundary sft
Railing
WOOD WORK
(Door Frame)
a) Main Door Frame (3'-4"x7' rft
b) Bed Room Door Frame (3'- rft
16 c) S.Bed Door Frame (2'-6"x7 rft
d) Kit.Ver./Balcony Door Fra rft
e) Kitchen Door Frame (2'-11 rft
f) Stair door Frame(3'-4"x7'-0 rft
g)Toilet Door Frame (2'-6"x7' rft
17 CAT DOOR nos
PVC DOOR
18 nos
(S.Toilet Door)

WOOD WORK
(Door Shutter)

a) Main Door Shutter sft


b) Bed Room Door Shutter sft
19
c) S.Bed Door Shutter sft
d) Kit.Ver./Balcony Door Shu sft
e) Kitchen Door Shutter sft
f) Stair Door Shutter sft
g) Toilet Door Shutter sft
PLASTIC
PAINT
11 a) In Side of False Slab sft
b) In Side Wall sft
c) Ceiling sft
WHEATHER
12 sft
COAT
ENAMEL PAINT
a) All Grill Surface sft
b) On Plaster (Kit+Toi Ceilin sft
15 c) On Wooden
Surface(In
sft
ofToi+Out of Ver
Door)
POLISH FOR
WOODEN sft
SURFACE
28
Polish for Design Door Surf sft
Polish for Internal Door Surf sft
Laquire Polish on Toilet Doo sft
MILD STEEL
22
MS Rod 60/72.5 0 Kg.
SUB TOTAL (14th Floor) 0 0 0 0 0
NOTE: CONCRETE MIXING RATIO MAY BE CHANGED WITH RESPECT T
15TH FLOOR
Description of Ratio of Cement in bag/kg. Sand in cft Picket in
c Quantity
Work Mixing Gray(bag) white(kg) Local Sylhet Nos.
R.C.C. WORK
(RMC/Manual)

a) Column &
Shear Wall
(main Structure)

c)Waterbody &
Swimming Pool,
OHWT Wall &
Slab

d) Slab, Beam &


Stair (main Slab)

C.Ancilary
Structure
1)DroD wall.
railinq. Aic slab.
sunshade,
Rib.Beam (upto
4" thickness)
Drop Wall
1
Railing/Parapet
SunShed
1

RIB Beam
2)Lintel up to 5"
Width
3)Lintel above 5"
Width
4)False Slab up
to 4" Thick
FAIR FACE
RCC WORK
Column & Shear
Wall
Slab, Beam &
Stair
Drop Wall &
Sunshed
Non Structural
Wall up to 5"
Non Structural
Wall Above 5"
SHUTTERING
WORK-
NORMAL RCC
WOODEN
sft
SHUTTER
ANCILARY
STRUCTURE
SHUTTERING
False Slab
Lintel
Counter Top
Slab
STEEL
SHUTTER
VERICAL
MEMBER
SHUTTER
a) Column and
Shear Wall
d) Boundary
Wall Column &
Copping Beam
SLAB &
BEAM& STAIR
b) Slab,and Stair
Shutter

c) Beam Shutter
2
ANCILARY STRUCTURE SHUTTERING
s) Drop Wall
2

t)Railing/
Parapet/
Ornamental Wall
u)Sunshed
v)Ornamental
Slab

SHUTTERING
WORK-
FAIRFACE RCC

a) Column and
Shear Wall
b) Slab, and
Stair Shutter

c) Beam Shutter

d) Non
Structural RCC
Wall-5"-12"
e) Non
Structural
Boundary Wall
f) Drop Wall &
SunShade
Shutter
10" BRICK
cft 1:6 0.00 0
WORK
a) 10" Brick
Partition Wall
3 b) Brick Soaking
House

c) Sand
Washing House

5" BRICK
sft
WORK
a) 5" Brick
1:4 0.00 0
Partition Wall
4 b) Brick Soaking
House

c) Sand
Washing House

Ceramic/Facing
Bricks
3/4" Thick
sft
Plaster
a) In Side Wall

b) Brick Soaking
& Sand Washing
House

5
5 c) Out Side
Wall(Normal sft 1:6 0.00 0
Plaster)
d) Rough
Plaster For Fair
Face Plaster
e) Fair Face
Plaster
PLASTER (1/2"
sft
thick)
Ceiling Plaster
6 False Slab
Bottom Plaster
RCC Column &
SW Plaster

NEAT CEMENT
FINISHING sft 1:6 0.00 0
(NCF)

a) Brick Soaking
& Sand Washing 1:4 0.00 0
House

b) Above False
Slab
c) other Area
7 FLOOR TILES
Apartment(wait.Comu. etc.) - sft 1:3 0.00 0.00 0.00
Gym/ Reception/Community sft 1:3 0.00 0.00 0.00
Main Stair -Tiles( Trade, Ris sft 1:3 0.00 0.00 0.00
Main Stair & Lift -Tiles(Lobb sft 1:3 0.00 0.00 0.00

2.Basement-GF
Stair

sft 1:3 0.00 0.00 0.00

3.Out Side
Level Up Stair
( Tiles)
3.
Driver Waiting

4. EMR
Room

Main Toilet Floor


2nd & 3rd Toilet Floor
Main Kitchen Floor with Kitchen Verandah
Caretaker Kitchen Floor
2.Drivers toilet

3.Guard
Toilet
Kitchen Counter
Top
Toilet Counter
Top

Reception Table
Counter Top

Pavement Tiles
Roof Tiles
Terrace Tiles
Garden/Planter
Tiles
Water Body &
Swimming Pool
Floor Tiles
Water Body &
Swimming Pool
Deck Tiles
SKIRTING
TILES
Apt. Floor Tiles
Skt

Gym/Com
Wooden Texture
Tiles Skt

Stair Tiles- Skt


Stair & Lift
Lobby Tiles Skt
Fire/
Basement/
Ornamental
Stair Tiles Skt
Care
Taket/Servent/G
uard/Others
Room Tiles Skt

Kit. Ver Tiles Skt

Care Taker Kit


Floor Skt.
Pavement Tiles
skt
Roof Tiles Skt
Terrace Tiles
Skt
Planter/Garden
Tiles Skt
WALL TILE
WORK
Main Toilet Tiles
2nd & 3rd Toilet Tiles
2.Drivers toilet

3.Guard
Toilet
Main Kitchen
Wall
8 Caretaker
Kitchen Wall
Down wash Wall
Tiles
Reception wall Tiles
Lift Wall Tiles
Border for Toilets
Slate Stone /Cladding Tiles
Column protection Tiles(Height=3'-0")
Boundary Dado Tiles
Outside Wall Cladding(Tiles)
Swimming Pool & Water Body Wall Tiles
FLOOR MARBLE
Apartment(wait.Comu. etc.) -Marble
Gym/ Reception/Community Wooden Texture MARBLE
Main Stair ( Trade, Riser, Skirting, Landing)-MARBLE
Main Stair & Lift Lobby-MARBLE

2.Out
Side Level Up
Stair (Marble)

Kitchen Counter
Top
Toilet Counter
sft 1:3 0.00 0.00 0.00
Top

Reception Table
sft 1:3 0.00 0.00 0.00
Counter Top

Garden/Planter
Marble/Design sft 1:3 0.00 0.00 0.00
Marble
MARBLE
SKIRTING
Apt. Marble Skt
Main Stair
Marble Skt
Stair & Lift
Lobby marble
Skt

Basement/Level
Up/Ornamental
Stair Marble Skt

Graden/Planter
Marble Skt

WALL MARBLE
sft 1:3 0.00 0.00 0.00
WORK

8 Reception wall Marble sft 1:3 0.00 0.00 0.00


Lift Wall Marble
Skirting Marble sft 1:3 0.00 0.00 0.00
Boundary Wall Cladding- Mar sft 1:3 0.00 0.00 0.00
Outside Wall Cladding( marbl sft 1:3 0.00 0.00 0.00

ALUMINIUM
DOOR AND
WINDOW &
OTHER WORK

4" Single glazzing


4" Double glazzing
3" Fixed with Sliding
21 Fly proof Net
Fixed Glass
Glass Door
Curtain Wall
Curtain/Blind ( Community Space)
Aluminium Louver Work
ACP Work
Glass Canopy Work
GRILL WORK sft
a) Window Grill sft
b) Sliding Grill sft
c) Kitchen Verandah Safety G sft
22
d) Basement Ventilation Grill sft
e)Parking Grill sft
f)Safety Grill Over Boundary sft
g)Boundary Grill sft
RAILING WORK sft
a) Main Stair
sft
Railing
b) Fire Stair
sft
Railing
c)Basement
sft
Stair Railing
d)Ornamental
sft
Stair Railing
e)) Ramp
sft
Railing
f)Front
Verandah sft
Railing
g)Back
Verandah sft
Railing
h)Kitchen
Verandah sft
Railing
i)Voide & Punch
sft
Railing
j)Lift Lobby
sft
Railing

k)
Parapet/Terrace sft
/OHWT Railing

l)
Planter/Garden sft
Area Railing
m)Parking/
Boundary sft
Railing
WOOD WORK
(Door Frame)
a) Main Door Frame (3'-4"x7' rft
b) Bed Room Door Frame (3'- rft
16 c) S.Bed Door Frame (2'-6"x7 rft
d) Kit.Ver./Balcony Door Fra rft
e) Kitchen Door Frame (2'-11 rft
f) Stair door Frame(3'-4"x7'-0 rft
g)Toilet Door Frame (2'-6"x7' rft
17 CAT DOOR nos
PVC DOOR
18 nos
(S.Toilet Door)

WOOD WORK
(Door Shutter)

a) Main Door Shutter sft


b) Bed Room Door Shutter sft
19
c) S.Bed Door Shutter sft
d) Kit.Ver./Balcony Door Shu sft
e) Kitchen Door Shutter sft
f) Stair Door Shutter sft
19

g) Toilet Door Shutter sft


PLASTIC
PAINT
11 a) In Side of False Slab sft
b) In Side Wall sft
c) Ceiling sft
WHEATHER
12 sft
COAT
ENAMEL PAINT
a) All Grill Surface sft
b) On Plaster (Kit+Toi Ceilin sft
15 c) On Wooden
Surface(In of
sft
Toi+Out of Ver
Door)
POLISH FOR
WOODEN sft
SURFACE
28
Polish for Design Door Surf sft
Polish for Internal Door Surf sft
Laquire Polish on Toilet Doo sft
MILD STEEL
22
MS Rod 60/72.5 0 Kg.
SUB TOTAL (15th Floor) 0 0 0 0 0
NOTE: CONCRETE MIXING RATIO MAY BE CHANGED WITH RESPECT T
16TH FLOOR
Description of Ratio of Cement in bag/kg. Sand in cft Picket in
c Quantity
Work Mixing Gray(bag) white(kg) Local Sylhet Nos.
R.C.C. WORK
(RMC/Manual)

a) Column &
Shear Wall
(main Structure)

c)Waterbody &
Swimming Pool,
OHWT Wall &
Slab

d) Slab, Beam &


Stair (main Slab)

C.Ancilary
Structure
1)DroD wall.
railinq. Aic slab.
sunshade,
Rib.Beam (upto
4" thickness)
Drop Wall
1
Railing/Parapet
1

SunShed
RIB Beam
2)Lintel up to 5"
Width
3)Lintel above 5"
Width
4)False Slab up
to 4" Thick
FAIR FACE
RCC WORK
Column & Shear
Wall
Slab, Beam &
Stair
Drop Wall &
Sunshed
Non Structural
Wall up to 5"
Non Structural
Wall Above 5"
SHUTTERING
WORK-
NORMAL RCC
WOODEN
sft
SHUTTER
ANCILARY
STRUCTURE
SHUTTERING
False Slab
Lintel
Counter Top
Slab
STEEL
SHUTTER
VERICAL
MEMBER
SHUTTER
a) Column and
Shear Wall
d) Boundary
Wall Column &
Copping Beam
SLAB &
BEAM& STAIR
b) Slab,and Stair
Shutter

c) Beam Shutter
2
ANCILARY STRUCTURE SHUTTERING
s) Drop Wall
2

t)Railing/
Parapet/
Ornamental Wall
u)Sunshed
v)Ornamental
Slab

SHUTTERING
WORK-
FAIRFACE RCC

a) Column and
Shear Wall
b) Slab, and
Stair Shutter

c) Beam Shutter

d) Non
Structural RCC
Wall-5"-12"
e) Non
Structural
Boundary Wall
f) Drop Wall &
SunShade
Shutter
10" BRICK
cft 1:6 0.00 0
WORK
a) 10" Brick
Partition Wall
3 b) Brick Soaking
House

c) Sand
Washing House

5" BRICK
sft
WORK
a) 5" Brick
1:4 0.00 0
Partition Wall
4 b) Brick Soaking
House

c) Sand
Washing House

Ceramic/Facing
Bricks
3/4" Thick
sft
Plaster
a) In Side Wall

b) Brick Soaking
& Sand Washing
House

5
5 c) Out Side
Wall(Normal sft
Plaster)
d) Rough
Plaster For Fair 1:6 0.00 0
Face Plaster
e) Fair Face
Plaster
PLASTER (1/2"
sft
thick)
Ceiling Plaster
6 False Slab
Bottom Plaster
RCC Column &
SW Plaster

NEAT CEMENT
FINISHING sft
(NCF)

a) Brick Soaking
& Sand Washing 1:6 0.00 0
House

b) Above False
1:4 0.00 0
Slab
c) other Area
7 FLOOR TILES
Apartment(wait.Comu. etc.) -Tiles
Gym/ Reception/Community Wooden Texture Tiles
Main Stair -Tiles( Trade, Riser, Skirting, Landing)
Main Stair & Lift -Tiles(Lobby)

2.Basement-GF
Stair

3.Out Side
Level Up Stair
( Tiles)
3.
Driver Waiting

4. EMR
Room

Main Toilet Floor


2nd & 3rd Toilet Floor
Main Kitchen Floor with Kitchen Verandah
Caretaker Kitchen Floor
2.Drivers toilet

3.Guard
Toilet
Kitchen Counter
Top
Toilet Counter
Top

Reception Table
Counter Top

Pavement Tiles
Roof Tiles
Terrace Tiles
Garden/Planter
Tiles
Water Body &
Swimming Pool
Floor Tiles
Water Body &
Swimming Pool
Deck Tiles
SKIRTING
TILES
Apt. Floor Tiles
Skt

Gym/Com
Wooden Texture
Tiles Skt

Stair Tiles- Skt


Stair & Lift
Lobby Tiles Skt
Fire/
Basement/
Ornamental
Stair Tiles Skt
Care
Taket/Servent/G
uard/Others
Room Tiles Skt

Kit. Ver Tiles Skt

Care Taker Kit


Floor Skt.
Pavement Tiles
skt
Roof Tiles Skt
Terrace Tiles
Skt
Planter/Garden
Tiles Skt
WALL TILE
WORK
Main Toilet Tiles
2nd & 3rd Toilet Tiles
2.Drivers toilet

3.Guard
Toilet
Main Kitchen
Wall
8 Caretaker
Kitchen Wall
Down wash Wall
Tiles
Reception wall Tiles
Lift Wall Tiles
Border for Toilets
Slate Stone /Cladding Tiles
Column protection Tiles(Height=3'-0")
Boundary Dado Tiles
Outside Wall Cladding(Tiles)
Swimming Pool & Water Body Wall Tiles
FLOOR MARBLE
Apartment(wait.Comu. etc.) -Marble
Gym/ Reception/Community Wooden Texture MARBLE
Main Stair ( Trade, Riser, Skirting, Landing)-MARBLE
Main Stair & Lift Lobby-MARBLE

2.Out
Side Level Up
Stair (Marble)

Kitchen Counter
Top
Toilet Counter
Top

Reception Table
Counter Top

Garden/Planter
Marble/Design
Marble
MARBLE
SKIRTING
Apt. Marble Skt
Main Stair
Marble Skt
Stair & Lift
Lobby marble
Skt

Basement/Level
Up/Ornamental
Stair Marble Skt

Graden/Planter
Marble Skt

WALL MARBLE
WORK

8 Reception wall Marble sft 1:3 0.00 0.00 0.00


Lift Wall Marble sft 1:3 0.00 0.00 0.00
Skirting Marble sft 1:3 0.00 0.00 0.00
Boundary Wall Cladding- Mar sft 1:3 0.00 0.00 0.00
Outside Wall Cladding( marbl sft 1:3 0.00 0.00 0.00

ALUMINIUM
DOOR AND
WINDOW &
OTHER WORK

4" Single glazzing


4" Double glazzing
3" Fixed with Sliding
21 Fly proof Net
Fixed Glass
Glass Door
Curtain Wall
Curtain/Blind ( Community Space)
Aluminium Louver Work
ACP Work
Glass Canopy Work
GRILL WORK sft
a) Window Grill sft
b) Sliding Grill sft
c) Kitchen Verandah Safety G sft
22
d) Basement Ventilation Grill sft
e)Parking Grill sft
f)Safety Grill Over Boundary sft
g)Boundary Grill sft
RAILING WORK sft
a) Main Stair
sft
Railing
b) Fire Stair
sft
Railing
c)Basement
sft
Stair Railing
d)Ornamental
sft
Stair Railing
e)) Ramp
sft
Railing
f)Front
Verandah sft
Railing
g)Back
Verandah sft
Railing
h)Kitchen
Verandah sft
Railing
i)Voide & Punch
sft
Railing
j)Lift Lobby
sft
Railing

k)
Parapet/Terrace sft
/OHWT Railing

l)
Planter/Garden sft
Area Railing
m)Parking/
Boundary sft
Railing
WOOD WORK
(Door Frame)
a) Main Door Frame (3'-4"x7' rft
b) Bed Room Door Frame (3'- rft
16 c) S.Bed Door Frame (2'-6"x7 rft
d) Kit.Ver./Balcony Door Fra rft
e) Kitchen Door Frame (2'-11 rft
f) Stair door Frame(3'-4"x7'-0 rft
g)Toilet Door Frame (2'-6"x7' rft
17 CAT DOOR nos
PVC DOOR
18 nos
(S.Toilet Door)

WOOD WORK
(Door Shutter)

a) Main Door Shutter sft


b) Bed Room Door Shutter sft
19
c) S.Bed Door Shutter sft
d) Kit.Ver./Balcony Door Shu sft
e) Kitchen Door Shutter sft
f) Stair Door Shutter sft
19

g) Toilet Door Shutter sft


PLASTIC
PAINT
11 a) In Side of False Slab sft
b) In Side Wall sft
c) Ceiling sft
WHEATHER
12 sft
COAT
ENAMEL PAINT
a) All Grill Surface sft
b) On Plaster (Kit+Toi Ceilin sft
15 c) On Wooden
Surface(In of
sft
Toi+Out of Ver
Door)
POLISH FOR
WOODEN sft
SURFACE
28
Polish for Design Door Surf sft
Polish for Internal Door Surf sft
Laquire Polish on Toilet Doo sft
MILD STEEL
22
MS Rod 60/72.5 0 kg
SUB TOTAL (16th Floor) 0 0 0 0 0
NOTE: CONCRETE MIXING RATIO MAY BE CHANGED WITH RESPECT T

17TH FLOOR
Description of Ratio of Cement in bag/kg. Sand in cft Picket in
c Quantity
Work Mixing Gray(bag) white(kg) Local Sylhet Nos.
R.C.C. WORK
(RMC/Manual)

a) Column &
Shear Wall
(main Structure)

c)Waterbody &
Swimming Pool,
OHWT Wall &
Slab

d) Slab, Beam &


Stair (main Slab)

C.Ancilary
Structure
1)DroD wall.
railinq. Aic slab.
sunshade,
Rib.Beam (upto
4" thickness)

1
Drop Wall
1
Railing/Parapet
SunShed
RIB Beam
2)Lintel up to 5"
Width
3)Lintel above 5"
Width
4)False Slab up
to 4" Thick
FAIR FACE
RCC WORK
Column & Shear
Wall
Slab, Beam &
Stair
Drop Wall &
Sunshed
Non Structural
Wall up to 5"
Non Structural
Wall Above 5"
SHUTTERING
WORK-
NORMAL RCC
WOODEN
sft
SHUTTER
ANCILARY
STRUCTURE
SHUTTERING
False Slab
Lintel
Counter Top
Slab
STEEL
SHUTTER
VERICAL
MEMBER
SHUTTER
a) Column and
Shear Wall
d) Boundary
Wall Column &
Copping Beam
SLAB &
BEAM& STAIR
b) Slab,and Stair
Shutter

c) Beam Shutter
2
ANCILARY STRUCTURE SHUTTERING
2

s) Drop Wall
t)Railing/
Parapet/
Ornamental Wall
u)Sunshed
v)Ornamental
Slab

SHUTTERING
WORK-
FAIRFACE RCC

a) Column and
Shear Wall
b) Slab, and
Stair Shutter

c) Beam Shutter

d) Non
Structural RCC
Wall-5"-12"
e) Non
Structural
Boundary Wall
f) Drop Wall &
SunShade
Shutter
10" BRICK
cft 1:6 0.00 0
WORK
a) 10" Brick
Partition Wall
3 b) Brick Soaking
House

c) Sand
Washing House

5" BRICK
sft
WORK
a) 5" Brick
Partition Wall
4 b) Brick Soaking
1:4 0.00 0
House

c) Sand
Washing House

Ceramic/Facing
Bricks
3/4" Thick
sft
Plaster
a) In Side Wall

5
b) Brick Soaking
& Sand Washing
House

5 c) Out Side
Wall(Normal sft
Plaster)
d) Rough
Plaster For Fair 1:6 0.00 0
Face Plaster
e) Fair Face
Plaster
PLASTER (1/2"
sft
thick)
Ceiling Plaster
6 False Slab
Bottom Plaster
RCC Column &
SW Plaster

NEAT CEMENT
FINISHING sft
(NCF)

a) Brick Soaking
& Sand Washing 1:6 0.00 0
House

b) Above False
1:4 0.00 0
Slab
c) other Area
7 FLOOR TILES
Apartment(wait.Comu. etc.) - sft 1:3 0.00 0.00 0.00
Gym/ Reception/Community sft 1:3 0.00 0.00 0.00
Main Stair -Tiles( Trade, Riser, Skirting, Landing)
Main Stair & Lift -Tiles(Lobby)

2.Basement-GF
Stair

3.Out Side
Level Up Stair
( Tiles)
3.
Driver Waiting

4. EMR
Room

Main Toilet Floor


2nd & 3rd Toilet Floor
Main Kitchen Floor with Kitchen Verandah
Caretaker Kitchen Floor
2.Drivers toilet

3.Guard
Toilet
Kitchen Counter
Top
Toilet Counter
Top

Reception Table
Counter Top

Pavement Tiles
Roof Tiles
Terrace Tiles
Garden/Planter
Tiles
Water Body &
Swimming Pool
Floor Tiles
Water Body &
Swimming Pool
Deck Tiles
SKIRTING
TILES
Apt. Floor Tiles
Skt

Gym/Com
Wooden Texture
Tiles Skt

Stair Tiles- Skt


Stair & Lift
Lobby Tiles Skt
Fire/
Basement/
Ornamental
Stair Tiles Skt
Care
Taket/Servent/G
uard/Others
Room Tiles Skt

Kit. Ver Tiles Skt

Care Taker Kit


Floor Skt.
Pavement Tiles
skt
Roof Tiles Skt
Terrace Tiles
Skt
Planter/Garden
Tiles Skt
WALL TILE
WORK
Main Toilet Tiles
2nd & 3rd Toilet Tiles
2.Drivers toilet

3.Guard
Toilet
Main Kitchen
Wall
8 Caretaker
Kitchen Wall
Down wash Wall
Tiles
Reception wall Tiles
Lift Wall Tiles
Border for Toilets
Slate Stone /Cladding Tiles
Column protection Tiles(Height=3'-0")
Boundary Dado Tiles
Outside Wall Cladding(Tiles)
Swimming Pool & Water Body Wall Tiles
FLOOR MARBLE
Apartment(wait.Comu. etc.) -Marble
Gym/ Reception/Community Wooden Texture MARBLE
Main Stair ( Trade, Riser, Skirting, Landing)-MARBLE
Main Stair & Lift Lobby-MARBLE
2.Out
Side Level Up
Stair (Marble)

Kitchen Counter
sft 1:3 0.00 0.00 0.00
Top
Toilet Counter
sft 1:3 0.00 0.00 0.00
Top

Reception Table
sft 1:3 0.00 0.00 0.00
Counter Top

Garden/Planter
Marble/Design sft 1:3 0.00 0.00 0.00
Marble
MARBLE
SKIRTING
Apt. Marble Skt
Main Stair
Marble Skt
Stair & Lift
Lobby marble
Skt

Basement/Level
Up/Ornamental
Stair Marble Skt

Graden/Planter
Marble Skt

WALL MARBLE
sft 1:3 0.00 0.00 0.00
WORK

8 Reception wall Marble sft 1:3 0.00 0.00 0.00


Lift Wall Marble sft 1:3 0.00 0.00 0.00
Skirting Marble sft 1:3 0.00 0.00 0.00
Boundary Wall Cladding- Marble/Granite
Outside Wall Cladding( marbl sft 1:3 0.00 0.00 0.00

ALUMINIUM
DOOR AND
WINDOW &
OTHER WORK

4" Single glazzing


4" Double glazzing
3" Fixed with Sliding
21 Fly proof Net
Fixed Glass
Glass Door
Curtain Wall
21

Curtain/Blind ( Community Space)


Aluminium Louver Work
ACP Work
Glass Canopy Work
GRILL WORK sft
a) Window Grill sft
b) Sliding Grill sft
c) Kitchen Verandah Safety G sft
22
d) Basement Ventilation Grill sft
e)Parking Grill sft
f)Safety Grill Over Boundary sft
g)Boundary Grill sft
RAILING WORK sft
a) Main Stair
sft
Railing
b) Fire Stair
sft
Railing
c)Basement
sft
Stair Railing
d)Ornamental
sft
Stair Railing
e)) Ramp
sft
Railing
f)Front
Verandah sft
Railing
g)Back
Verandah sft
Railing
h)Kitchen
Verandah sft
Railing
i)Voide & Punch
sft
Railing
j)Lift Lobby
sft
Railing

k)
Parapet/Terrace sft
/OHWT Railing

l)
Planter/Garden sft
Area Railing
m)Parking/
Boundary sft
Railing
WOOD WORK
(Door Frame)
a) Main Door Frame (3'-4"x7' rft
b) Bed Room Door Frame (3'- rft
16 c) S.Bed Door Frame (2'-6"x7 rft
16
d) Kit.Ver./Balcony Door Fra rft
e) Kitchen Door Frame (2'-11 rft
f) Stair door Frame(3'-4"x7'-0 rft
g)Toilet Door Frame (2'-6"x7' rft
17 CAT DOOR nos
PVC DOOR
18 nos
(S.Toilet Door)

WOOD WORK
(Door Shutter)

a) Main Door Shutter sft


b) Bed Room Door Shutter sft
19
c) S.Bed Door Shutter sft
d) Kit.Ver./Balcony Door Shu sft
e) Kitchen Door Shutter sft
f) Stair Door Shutter sft
g) Toilet Door Shutter sft
PLASTIC
PAINT
11 a) In Side of False Slab sft
b) In Side Wall sft
c) Ceiling sft
WHEATHER
12 sft
COAT
ENAMEL PAINT
a) All Grill Surface sft
b) On Plaster (Kit+Toi Ceilin sft
15 c) On Wooden
Surface(In of
sft
Toi+Out of Ver
Door)
POLISH FOR
WOODEN sft
SURFACE
28
Polish for Design Door Surf sft
Polish for Internal Door Surf sft
Laquire Polish on Toilet Doo sft
MILD STEEL
22
MS Rod 60/72.5 0 Kg.
SUB TOTAL (17th Floor) 0 0 0 0 0
NOTE: CONCRETE MIXING RATIO MAY BE CHANGED WITH RESPECT T
18TH FLOOR
Description of Ratio of Cement in bag/kg. Sand in cft Picket in
c Quantity
Work Mixing Gray(bag) white(kg) Local Sylhet Nos.
R.C.C. WORK
(RMC/Manual)
a) Column &
Shear Wall
(main Structure)

c)Waterbody &
Swimming Pool,
OHWT Wall &
Slab

d) Slab, Beam &


Stair (main Slab)

C.Ancilary
Structure
1)DroD wall.
railinq. Aic slab.
sunshade,
Rib.Beam (upto
4" thickness)
Drop Wall
1
Railing/Parapet
SunShed
RIB Beam
2)Lintel up to 5"
Width
3)Lintel above 5"
Width
4)False Slab up
to 4" Thick
FAIR FACE
RCC WORK
Column & Shear
Wall
Slab, Beam &
Stair
Drop Wall &
Sunshed
Non Structural
Wall up to 5"
Non Structural
Wall Above 5"
SHUTTERING
WORK-
NORMAL RCC
WOODEN
SHUTTER
ANCILARY
STRUCTURE
SHUTTERING
False Slab
Lintel
Counter Top
Slab
STEEL
SHUTTER
VERICAL
MEMBER
SHUTTER
a) Column and
Shear Wall
d) Boundary
Wall Column &
Copping Beam
SLAB &
BEAM& STAIR
b) Slab,and Stair
Shutter

c) Beam Shutter
2
ANCILARY STRUCTURE SHUTTERING
s) Drop Wall
t)Railing/
Parapet/
Ornamental Wall
u)Sunshed
v)Ornamental
Slab

SHUTTERING
WORK-
FAIRFACE RCC

a) Column and
Shear Wall
b) Slab, and
Stair Shutter

c) Beam Shutter

d) Non
Structural RCC
Wall-5"-12"
e) Non
Structural
Boundary Wall
f) Drop Wall &
SunShade
Shutter
10" BRICK
cft 1:6 0.00 0
WORK
a) 10" Brick
Partition Wall
3 b) Brick Soaking
House
3

c) Sand
Washing House

5" BRICK
sft
WORK
a) 5" Brick
1:4 0.00 0
Partition Wall
4 b) Brick Soaking
House

c) Sand
Washing House

Ceramic/Facing
Bricks
3/4" Thick
sft
Plaster
a) In Side Wall

b) Brick Soaking
& Sand Washing
House

5 c) Out Side
Wall(Normal sft 1:6 0.00 0
Plaster)
d) Rough
Plaster For Fair
Face Plaster
e) Fair Face
Plaster
PLASTER (1/2"
sft
thick)
Ceiling Plaster
6 False Slab
Bottom Plaster
RCC Column &
SW Plaster

NEAT CEMENT
FINISHING sft 1:6 0.00 0
(NCF)

a) Brick Soaking
& Sand Washing 1:4 0.00 0
House

b) Above False
Slab
c) other Area
7 FLOOR TILES
Apartment(wait.Comu. etc.) - sft 1:3 0.00 0.00 0.00
Gym/ Reception/Community Wooden Texture Tiles
Main Stair -Tiles( Trade, Riser, Skirting, Landing)
Main Stair & Lift -Tiles(Lobby)

2.Basement-GF
Stair

3.Out Side
Level Up Stair
( Tiles)
3.
Driver Waiting

4. EMR
Room

Main Toilet Floor


2nd & 3rd Toilet Floor
Main Kitchen Floor with Kitchen Verandah
Caretaker Kitchen Floor
2.Drivers toilet

3.Guard
Toilet
Kitchen Counter
Top
Toilet Counter
Top

Reception Table
Counter Top

Pavement Tiles
Roof Tiles
Terrace Tiles
Garden/Planter
Tiles
Water Body &
Swimming Pool sft 1:3 0.00 0.00 0.00
Floor Tiles
Water Body &
Swimming Pool
Deck Tiles
SKIRTING
TILES
Apt. Floor Tiles
Skt
Gym/Com
Wooden Texture
Tiles Skt

Stair Tiles- Skt


Stair & Lift
Lobby Tiles Skt
Fire/
Basement/
Ornamental
Stair Tiles Skt
Care
Taket/Servent/G
uard/Others
Room Tiles Skt

Kit. Ver Tiles Skt

Care Taker Kit


Floor Skt.
Pavement Tiles
skt
Roof Tiles Skt
Terrace Tiles
Skt
Planter/Garden
Tiles Skt
WALL TILE
WORK
Main Toilet Tiles
2nd & 3rd Toilet Tiles
2.Drivers toilet

3.Guard
Toilet
Main Kitchen
Wall
8 Caretaker
Kitchen Wall
Down wash Wall
Tiles
Reception wall Tiles
Lift Wall Tiles
Border for Toilets
Slate Stone /Cladding Tiles
Column protection Tiles(Height=3'-0")
Boundary Dado Tiles
Outside Wall Cladding(Tiles)
Swimming Pool & Water Body sft 1:3 0.00 0.00 0.00
FLOOR MARBLE sft 1:3 0.00 0.00 0.00
Apartment(wait.Comu. etc.) sft 1:3 0.00 0.00 0.00
Gym/ Reception/Community sft 1:3 0.00 0.00 0.00
Main Stair ( Trade, Riser, sft 1:3 0.00 0.00 0.00
Main Stair & Lift Lobby-MA sft 1:3 0.00 0.00 0.00

2.Out
Side Level Up sft 1:3 0.00 0.00 0.00
Stair (Marble)

Kitchen Counter
sft 1:3 0.00 0.00 0.00
Top
Toilet Counter
Top

Reception Table
sft 1:3 0.00 0.00 0.00
Counter Top

Garden/Planter
Marble/Design sft 1:3 0.00 0.00 0.00
Marble
MARBLE
SKIRTING
Apt. Marble Skt
Main Stair
Marble Skt
Stair & Lift
Lobby marble
Skt

Basement/Level
Up/Ornamental
Stair Marble Skt

Graden/Planter
Marble Skt

WALL MARBLE
sft 1:3 0.00 0.00 0.00
WORK

8 Reception wall Marble sft 1:3 0.00 0.00 0.00


Lift Wall Marble sft 1:3 0.00 0.00 0.00
Skirting Marble sft 1:3 0.00 0.00 0.00
Boundary Wall Cladding- Mar rft 1:3 0.00 0.00 0.00
Outside Wall Cladding( marbl rft 1:3 0.00 0.00 0.00

ALUMINIUM
DOOR AND
WINDOW &
OTHER WORK

4" Single glazzing


4" Double glazzing
3" Fixed with Sliding
21
21 Fly proof Net
Fixed Glass
Glass Door
Curtain Wall
Curtain/Blind ( Community Space)
Aluminium Louver Work
ACP Work
Glass Canopy Work
GRILL WORK sft
a) Window Grill sft
b) Sliding Grill sft
c) Kitchen Verandah Safety G sft
22
d) Basement Ventilation Grill sft
e)Parking Grill sft
f)Safety Grill Over Boundary sft
g)Boundary Grill sft
RAILING WORK sft
a) Main Stair
sft
Railing
b) Fire Stair
sft
Railing
c)Basement
sft
Stair Railing
d)Ornamental
sft
Stair Railing
e)) Ramp
sft
Railing
f)Front
Verandah sft
Railing
g)Back
Verandah sft
Railing
h)Kitchen
Verandah sft
Railing
i)Voide & Punch
sft
Railing
j)Lift Lobby
sft
Railing

k)
Parapet/Terrace sft
/OHWT Railing

l)
Planter/Garden sft
Area Railing
m)Parking/
Boundary sft
Railing
WOOD WORK
(Door Frame)
a) Main Door Fram 0 rft
b) Bed Room Door 0 rft
16 c) S.Bed Door Fra 0 rft
d) Kit.Ver./Balco 0 rft
e) Kitchen Door F 0 rft
f) Stair door Fram 0 rft
g)Toilet Door Fram 0 rft
17 CAT DOOR nos
PVC DOOR
18 nos
(S.Toilet Door)

WOOD WORK
(Door Shutter)

a) Main Door Shut 0 sft


b) Bed Room Door 0 sft
19
c) S.Bed Door Shu 0 sft
d) Kit.Ver./Balco 0 sft
e) Kitchen Door S 0 sft
f) Stair Door Shut 0 sft
g) Toilet Door Shu 0 sft
PLASTIC
0
PAINT
11 a) In Side of Fals 0 sft
b) In Side Wall sft
c) Ceiling 0 sft
WHEATHER
12 sft
COAT 0
ENAMEL PAINT
a) All Grill Surfac 0 sft
b) On Plaster (Kit 0 sft
15 c) On Wooden
Surface(In of
0 sft
Toi+Out of Ver
Door)
POLISH FOR
WOODEN sft
SURFACE
28
Polish for Design Door Surf sft
Polish for Internal Door Surf sft
Laquire Polish on Toilet Doo sft
MILD STEEL
22
MS Rod 60/72.5 0 Kg.
SUB TOTAL (18th Floor) 0 0 0 0 0
NOTE: CONCRETE MIXING RATIO MAY BE CHANGED WITH RESPECT T

19TH FLOOR
Description of Ratio of Cement in bag/kg. Sand in cft Picket in
c Quantity
Work Mixing Gray(bag) white(kg) Local Sylhet Nos.
R.C.C. WORK
(RMC/Manual)

a) Column &
Shear Wall
(main Structure)

c)Waterbody &
Swimming Pool,
OHWT Wall &
Slab

d) Slab, Beam &


Stair (main Slab)

C.Ancilary
Structure
1)DroD wall.
railinq. Aic slab.
sunshade,
Rib.Beam (upto
4" thickness)
Drop Wall
1
Railing/Parapet
SunShed
RIB Beam
2)Lintel up to 5"
Width
3)Lintel above 5"
Width
4)False Slab up
to 4" Thick
FAIR FACE
RCC WORK
Column & Shear
Wall
Slab, Beam &
Stair
Drop Wall &
Sunshed
Non Structural
Wall up to 5"
Non Structural
Wall Above 5"
SHUTTERING
WORK-
NORMAL RCC
WOODEN
sft
SHUTTER
ANCILARY
STRUCTURE
SHUTTERING
False Slab
Lintel
Counter Top
Slab
STEEL
SHUTTER
VERICAL
MEMBER
SHUTTER
a) Column and
Shear Wall
d) Boundary
Wall Column &
Copping Beam
SLAB &
BEAM& STAIR
b) Slab,and Stair
Shutter

c) Beam Shutter
2
ANCILARY STRUCTURE SHUTTERING
s) Drop Wall
t)Railing/
Parapet/
Ornamental Wall
u)Sunshed
v)Ornamental
Slab

SHUTTERING
WORK-
FAIRFACE RCC

a) Column and
Shear Wall
b) Slab, and
Stair Shutter

c) Beam Shutter

d) Non
Structural RCC
Wall-5"-12"
e) Non
Structural
Boundary Wall
f) Drop Wall &
SunShade
Shutter
10" BRICK
cft 1:6 0.00 0
WORK
a) 10" Brick
Partition Wall
3 b) Brick Soaking
House

c) Sand
Washing House

5" BRICK
sft
WORK
a) 5" Brick
Partition Wall
4 b) Brick Soaking
1:4 0.00 0
House

c) Sand
Washing House

Ceramic/Facing
bricks
3/4" Thick
sft
Plaster
a) In Side Wall

b) Brick Soaking
& Sand Washing
House

5 c) Out Side
Wall(Normal sft
Plaster)
d) Rough
Plaster For Fair 1:6 0.00 0
Face Plaster
e) Fair Face
Plaster
PLASTER (1/2"
sft
thick)
Ceiling Plaster
6 False Slab
Bottom Plaster
RCC Column &
SW Plaster

NEAT CEMENT
FINISHING sft
(NCF)

a) Brick Soaking
& Sand Washing
House

b) Above False
1:6 0.00 0
Slab
c) other Area 1:4 0.00 0
7 FLOOR TILES
Apartment(wait.Co 0 sft 1:3 0.00 0.00 0.00
Gym/ Reception/ 0 sft 1:3 0.00 0.00 0.00
Main Stair -Tiles( Trade, Riser, Skirting, Landing)
Main Stair & Lift -Tiles(Lobby)

2.Basement-GF
Stair

3.Out Side
Level Up Stair
( Tiles)
3.
Driver Waiting

4. EMR
Room

Main Toilet Floor


2nd & 3rd Toilet Floor
Main Kitchen Floor with Kitchen Verandah
Caretaker Kitchen Floor
2.Drivers toilet

3.Guard
Toilet
Kitchen Counter
Top
Toilet Counter
Top

Reception Table
Counter Top

Pavement Tiles
Roof Tiles
Terrace Tiles
Garden/Planter
Tiles
Water Body &
Swimming Pool
Floor Tiles
Water Body &
Swimming Pool
Deck Tiles
SKIRTING
TILES
Apt. Floor Tiles
Skt

Gym/Com
Wooden Texture
Tiles Skt

Stair Tiles- Skt


Stair & Lift
Lobby Tiles Skt
Fire/
Basement/
Ornamental
Stair Tiles Skt
Care
Taket/Servent/G
uard/Others
Room Tiles Skt

Kit. Ver Tiles Skt

Care Taker Kit


Floor Skt.
pavement Tiles
skt
Roof Tiles Skt
Terrace Tiles
Skt
Planter/Garden
Tiles Skt
WALL TILE
WORK
Main Toilet Tiles
2nd & 3rd Toilet Tiles
2.Drivers toilet

3.Guard
Toilet
Main Kitchen
Wall
8 Caretaker
Kitchen Wall
Down wash Wall
Tiles
Reception wall Tiles
Lift Wall Tiles
Border for Toilets
Slate Stone /Cladding Tiles
Column protection Tiles(Height=3'-0")
Boundary Dado Tiles
Outside Wall Cladding(Tiles)
Swimming Pool & Water Body Wall Tiles
FLOOR MARBLE
Apartment(wait.Comu. etc.) -Marble
Gym/ Reception/Community Wooden Texture MARBLE
Main Stair ( Trade, Riser, Skirting, Landing)-MARBLE
Main Stair & Lift Lobby-MARBLE

2.Out
Side Level Up
Stair (Marble)

Kitchen Counter
Top
Toilet Counter
Top

Reception Table
Counter Top

Garden/Planter
Marble/Design
Marble
MARBLE
SKIRTING
Apt. Marble Skt
Main Stair
Marble Skt
Stair & Lift
Lobby marble
Skt

Basement/Level
Up/Ornamental
Stair Marble Skt

Graden/Planter
Marble Skt

WALL MARBLE
0 sft 1:3 0.00 0.00 0.00
WORK

8 Reception wall M 0 sft 1:3 0.00 0.00 0.00


Lift Wall Marble 0 sft 1:3 0.00 0.00 0.00
Skirting Marble 0 sft 1:3 0.00 0.00 0.00
Boundary Wall Cl 0 sft 1:3 0.00 0.00 0.00
Outside Wall Clad 0 sft 1:3 0.00 0.00 0.00
ALUMINIUM
DOOR AND
WINDOW &
OTHER WORK

4" Single glazzing


4" Double glazzing
3" Fixed with Sliding
21 Fly proof Net
Fixed Glass
Glass Door
Curtain Wall
Curtain/Blind ( Community Space)
Aluminium Louver Work
ACP Work
Glass Canopy Work
GRILL WORK sft
a) Window Grill sft
b) Sliding Grill sft
c) Kitchen Verandah Safety G sft
22
d) Basement Ventilation Grill sft
e)Parking Grill sft
f)Safety Grill Over Boundary sft
g)Boundary Grill sft
RAILING WORK sft
a) Main Stair
sft
Railing
b) Fire Stair
sft
Railing
c)Basement
sft
Stair Railing
d)Ornamental
sft
Stair Railing
e)) Ramp
sft
Railing
f)Front
Verandah sft
Railing
g)Back
Verandah sft
Railing
h)Kitchen
Verandah sft
Railing
i)Voide & Punch
sft
Railing
j)Lift Lobby
sft
Railing
k)
Parapet/Terrace sft
/OHWT Railing

l)
Planter/Garden sft
Area Railing
m)Parking/
Boundary sft
Railing
WOOD WORK
(Door Frame)
a) Main Door Fram 0 rft
b) Bed Room Door 0 rft
16 c) S.Bed Door Fra 0 rft
d) Kit.Ver./Balco 0 rft
e) Kitchen Door F 0 rft
f) Stair door Fram 0 rft
g)Toilet Door Fram 0 rft
17 CAT DOOR 0 nos
PVC DOOR
18 0 nos
(S.Toilet Door)

WOOD WORK
(Door Shutter)

a) Main Door Shut 0 sft


b) Bed Room Door 0 sft
19
c) S.Bed Door Shu 0 sft
d) Kit.Ver./Balco 0 sft
e) Kitchen Door S 0 sft
f) Stair Door Shu 0 sft
g) Toilet Door Shu 0 sft
PLASTIC
0
PAINT
11 a) In Side of Fals 0 sft
b) In Side Wall sft
c) Ceiling 0 sft
WHEATHER
12 sft
COAT 0
ENAMEL PAINT
a) All Grill Surfac 0 sft
b) On Plaster (Kit 0 sft
15 c) On Wooden
Surface(In of
0 sft
Toi+Out of Ver
Door)
POLISH FOR
WOODEN sft
SURFACE
28
Polish for Design Door Surf sft
Polish for Internal Door Surf sft
28

Laquire Polish on Toilet Doo sft


MILD STEEL
22
MS Rod 60/72.5 0 Kg.
SUB TOTAL (19th Floor) 0 0 0 0 0
NOTE: CONCRETE MIXING RATIO MAY BE CHANGED WITH RESPECT T
ROOF TOP FLOOR
Description of Ratio of Cement in bag/kg. Sand in cft Picket in
c Quantity
Work Mixing Gray(bag) white(kg) Local Sylhet Nos.
R.C.C. WORK
(RMC/Manual)
a) Column &
Shear Wall , Lift
3800 Cft
wall (main
Structure)
c)
M.room,OHWT 1800 Cft
Wall & Slab
d) Rib tie Beam
380 Cft
(Rib Slab)
C.Ancilary
Structure
1)Drop wall.
railinq. Aic slab.
sunshade, sft 1:2:4 - - 0
Rib.Beam (upto
4" thickness)
Drop Wall sft 1:2:4 - - 0
Parapet, sitting
slab, duct, sft 1:2:4 - - 0
1 Planter
SunShed sft 1:2:4 - - 0
RIB Beam 1000 sft 1:2:4
2)Lintel up to 5"
15 rft 1:2:4 1 1 30
Width
3)Lintel above 5"
18 cft
Width
4)False Slab up
to 4" Thick
FAIR FACE
RCC WORK
Column & Shear
Wall
Slab, Beam &
Stair
Drop Wall &
Sunshed
Non Structural
Wall up to 5"
Non Structural
Wall Above 5"
SHUTTERING
WORK-
NORMAL RCC
WOODEN
SHUTTER
ANCILARY
STRUCTURE
SHUTTERING
False Slab sft
Lintel 89 sft
Perapet
wall,plasnter, & sft
Sitting
RiB Beam 1200 sft
STEEL
SHUTTER
VERICAL
MEMBER
SHUTTER
a) Column and
Shear Wall,Lift 4100 sft
wall
b) Boundary
Wall Column &
Copping Beam
SLAB &
BEAM& STAIR
c)
M.room,OHWT 5636 sft
2 Wall & Slab

d) Beam Shutter 1250 sft

ANCILARY STRUCTURE SHUTTERING


s) Drop Wall
t)Railing/
Parapet/
Ornamental Wall
u)Sunshed
v)Ornamental
Slab

SHUTTERING
WORK-
FAIRFACE RCC

a) Column and
Shear Wall
b) Slab, and
Stair Shutter

c) Beam Shutter
d) Non
Structural RCC
Wall-5"-12"
e) Non
Structural
Boundary Wall
f) Drop Wall &
SunShade
Shutter
PATENT
3 STONE OF cft 1:11/2:3 - -
O.H.W.T
10" BRICK
cft 1:6 - -
WORK
a) 10" Brick Stair
775 cft 1:6 31 271
Wall
3 b) Brick Soaking
cft 1:6 - -
House

c) Sand
cft 1:6 - -
Washing House

5" BRICK
sft
WORK
a) 5" Brick
1020 sft 1:4 26 173
Partition Wall
4 b) Brick Soaking
sft 1:4 - -
House

c) Sand
Washing House

Ceramic/Facing
Bricks
3/4" Thick
sft
Plaster
a) In Side Wall 4500 sft 1:6 54.00 450

b) Brick Soaking
& Sand Washing sft 1:6 0.00 0
House

5 c) Out Side
Wall(Normal 6000 sft 1:6 72.00 600
Plaster)
d) Rough
Plaster For Fair 0 sft 1:6 0.00 0
Face Plaster
e) Fair Face
1900 sft 1:6 22.80 190
Plaster
PLASTER (1/2"
thick)

6
Ceiling Plaster
(Stair,O.H.W.T,
990 sft 1:4 14.85 74
& Machin room
bottom)
False Slab
6 sft 1:4 0.00 0
Bottom Plaster
RCC Column &
sft 1:4 0.00 0
SW Plaster
b) O.H.W.T in
1600 sft 1:4 24.00 120
side
c) Parapet
3600 sft 1:4 54.00 270
Wall /Rib bim

NEAT CEMENT
FINISHING sft
(NCF)

a) Brick Soaking
& Sand Washing
House

b) Above False
Slab
c) other Area

a) OHWT in side 1600 sft 8

b) On Lime Concr 4305 sft 22


c) In False Slab/Mach.room sft -

CC Work Below
Community Hall-
sft -
Over Lime
Terracing

7 FLOOR TILES
Apartment(wait.Comu. etc.) - sft 1:3 - - -
Gym/ Reception/Community sft 1:3 - - -
Main Stair -Tiles( Trade, Ris sft 1:3 - - -
Lift -Tiles(Lobby 230 sft 1:3 9 46 35
Main Toilet Floor sft 1:3 - - -
2nd & 3rd Toilet Floor sft 1:3 - - -
Toilet Counter
sft 1:3 - - -
Top
Pavement Tiles sft 1:3 - - -
Roof Tiles 3500 sft 1:3 140 700 525
Terrace Tiles sft 1:3 - - -
Garden/Planter
400 sft 1:3 16 80 60
Tiles
Water Body &
Swimming Pool sft 1:3 - - -
Floor Tiles
Water Body &
Swimming Pool sft 1:3 - - -
Deck Tiles
SKIRTING
TILES
Apt. Floor Tiles
sft 1:3 0.00 0.00
Skt

Gym/Com
Wooden Texture sft 1:3 0.00 0.00
Tiles Skt

Stair Tiles- Skt sft 1:3 0.00 0.00


Lift Lobby Tiles
100 sft 1:3 0.83 3.30
Skt
Fire/
Basement/
sft 1:3 0.00 0.00
Ornamental
Stair Tiles Skt
Care
Taket/Servent/G
sft 1:3 0.00 0.00
uard/Others
Room Tiles Skt
Roof Tiles Skt 300 sft 1:3 2.48 9.90
Terrace Tiles
sft 1:3 0.00 0.00
Skt
Planter/Garden
sft 1:3 0.00 0.00
Tiles Skt
WALL TILE
WORK
8 Main Toilet Tiles sft 1:3 0.00 0.00
Outside Wall Cladding(Tiles) sft 1:3 0.00 0.00
Swimming Pool & Water Body sft 1:3 0.00 0.00
FLOOR MARBLE
Apartment(wait.Comu. etc.) sft 1:3 0.00 0.00 0.00
Gym/ Reception/Community sft 1:3 0.00 0.00 0.00
Main Stair ( Trade, Riser, sft 1:3 - - -
Main Stair & Lift Lobby-MA sft 1:3 - - -
sft 1:3 - - -
Kitchen Counter
sft 1:3 - - -
Top
Toilet Counter
Top

Reception Table
Counter Top

Garden/Planter
Marble/Design sft 1:3 - - -
Marble
MARBLE
SKIRTING
Apt. Marble Skt
Main Stair
Marble Skt
Stair & Lift
Lobby marble
Skt

Basement/Level
Up/Ornamental
Stair Marble Skt

Graden/Planter
Marble Skt

WALL MARBLE
sft 1:3 - - -
WORK
8
Lift Wall Marble rft 1:3 - - -
Skirting Marble
Outside Wall Cladding( marble/ Granite)
LIME
11 4600 cft 7:02:02
TERRACING

Roof Treatment
2.5" C/C (Below 0 sft
Deck)

ROOF
12 TREATMENT 350 sft
(planter area)
Bituminus felt sft

ALUMINIUM
DOOR AND
sft
WINDOW &
OTHER WORK

4" Single glazzing sft


4" Double glazzing sft
3" Fixed with Sli 110 sft
21 Fly proof Net sft
Fixed Glass sft
Glass Door sft
Curtain Wall sft
Curtain/Blind ( Community S sft
Aluminium Louver Work sft
ACP Work sft
Glass Canopy Work sft
GRILL WORK sft
22 a) Window Grill 70 sft
b) Sliding Grill sft
RAILING WORK sft
a) Main Stair
sft
Railing
b) Fire Stair
sft
Railing
c)Basement
sft
Stair Railing
d)Ornamental
sft
Stair Railing
e)) Ramp
sft
Railing
f)Front
Verandah sft
Railing
g)Back
Verandah sft
Railing
h)Kitchen
Verandah sft
Railing
i)Voide & Punch
sft
Railing
j)Lift Lobby
sft
Railing

k)
Parapet/Terrace 730 sft
/OHWT Railing

WOOD WORK
19
(Door Frame)
a) Stair Door Frame rft
Roof Entrance/ -Same As Main Door
b) Kit /VerDoor Frame rft
c) Toilet Door Frame rft

WOOD WORK
(Door Shutter)

20 a) Stair Door Shut 0 sft


Roof Entrance/ -Same As Main Door
b) Kit/Ver Door Shutter sft
c) Toilet Door Shutter sft
21 CAT DOOR nos
PVC DOOR
22 nos
(Toilet Door)
PLASTIC
sft
PAINT
14 a) In Side of Lift core sft
b) In Side Wall 4500 sft
c) Ceiling 990 sft
WHEATHER
15 9600 sft
COAT
ENAMEL PAINT

a) All Grill Surfac 800 sft

18
b) On Plaster (Kit+Toi Ceilin sft
18
c) On Wooden
Surface(In
sft
ofToi+Out of Ver
Door)
POLISH FOR
WOODEN sft
SURFACE
28
Polish for Design Door Surf sft
Polish for Internal Door Surf sft
Laquire Polish on Toilet Doo sft
25 O.H.W.T COVER 0 No.
26 CLOTH DRYING STAND Set
27 ROOF LADDER 30 rft
MILD STEEL
28
MS Rod 60/72.5 23110 Kg.
SUB TOTAL (Roof Top) 497 826 2,783 - 30
GRAND TOTAL #REF! 1,216 #REF! 57,859 45,502
Prepared by: Sabit
Over all Project Variable Item Work List
Description of Ratio of Cement in bag/kg. Sand in cft Picket in
c Quantity
Work Mixing Gray(bag) white(kg) Local Sylhet Nos.
R.C.C.
WORK(RMC/Ma
nual)
a) Water Body cft 1:11/2:3 0 - -
b) Swimming
Pool- Slab- cft 1:11/2:3 0 0 0
Normal RCC

1 b) Swimming
Pool- Wall-
Normal RCC
c) Others
(sitting)+ cft 1:11/2:3 0 - -
Counter
b) Swimming
Pool Fair Facel
RCC-Wall

SHUTTERING
WORK
a) Water Body sft
b) Swimming
sft
2 Pool
c) Others sft
b) Swimming
Pool-Fair Face
Wall
Brick WORK
5" BW
sft
( Miscellaneous)
10" BW
cft
( Miscellaneous)
PLASTER
WORK
a) Water Body sft 1:4 0 0
b) Swimming
3 Pool (Blance
sft 1:4 0 0
tank, pump
room etc.)
c) Others sft 1:4 0 0
NCF( others)
TILES WORK
(Floor Tiles)
a) Water Body
sft 1:3 0 0 0
Floor
b) Water Body
sft 1:3 0 0 0
Top area
c) Swimming
sft 1:3 0 0 0
Pool Floor
4
d) Swimming
sft 1:3 0 0 0
Pool Top area
e)
Change/Shower/ sft 1:3 0 0 0
Toilet Floor
f) Swimming
sft 1:3 0 0 0
Pool Deck area
g) Sitting area Tiles sft 1:3 - 0 -
TILES WORK
(Wall Tiles)
a Swimming
sft 1:3 0 0 0
pool Wall

5 b) Swimming
sft 1:3 0 0 0
Pool Drain Tiles

c)
Change/Shower/ sft 1:3 0 0 0
Toilet Wall
MARBLE/
GRANITE
6 WORK
a) Water Body & Swimming sft
b) Water Body & Swimming sft
ALUMINIUM WORK
Canopy Glass Work sft
ACP Work sft
Outside
alluminium sft
design work
7
7
Swim.Pool
(area/deck) Stair sft
Railing

Other's Location
rft
Railing

8 WOOD & BOARD WORK


Stair Hand Rail
i) Rft
Work
ii) Stair King Post Each
Stair Curved
iii) nos
Edge Hand Rail
Wooden door
for duct
iv) sft
covring(3 no
duct)

FALSE
CEILING WORK

a) Decorative
False Ceiling -
sft
Reception, GF
Lobby

iv) a) Decorative
False Ceiling - 0 sft
Lift Lobby
b) PVC False
Ceiling for duct 805 sft
area (G.floor)
c) Other's area
False ceiling 1572 sft
( toilet)

OUT SIDE
DESIGN WORK

a) Fair-Face
Plaster / sft 1:3 - -
Grinding
b) Out side Slate
Stone/ Clading sft 1:3 - - -
9 Tiles
c) Out side
sft 1:3 - - -
Faching Bricks
d) Rustic Tiles
(Column GF & sft 1:3 - - -
Bas)
e) Parking &
Other's Rustic sft 1:3 - - -
Tiles
Louver Work
Aluminium
louver work for
duct covering
( Mechanical 1680 sft
duct,Fire duct &
communication
duct.)

3"*1.5"
Aluminium A/C
Out door unit 0 sft
Louver @ 3" c/c
& window
b). MS. Louver
( Generator sft
Shade- 2 Side)
b). MS. Louver
(Plumbing Duct
Covering)

b). MS. Louver


(over change
sft
room slab)(2"
X2" Box Louver)

c). Wooden
sft
Louver

FIBER SHEET
FITTING WORK

a) Swimming
sft
Pool Roof
10
Generator Shed

b) Other's
Location
sft
(Community
Roof)
TRUSS /
METAL
FRAME/SHED

a) Swimming
Pool Roof/ sft
11 Community Roof

b) Others
Location( Gener sft
ator Room)

12 BASEMENT VEN 70 sft


SLIDING GRILL DOOR
a) Electro Mechinical Room sft
b) Generator Roo 0 sft
c) Transformer Room sft
d) Substation Room sft
e) Machine Room sft
sft
13 g) Fire control
sft
room

h) Rain water
pump room+Fire
pump room + 35 sft
Domestic pump
room

14 MS WORK
i) Electro Mechinical Room sft
ii) Generator Ro 35 sft
iii) Substation/ 62 sft
vi) Stair Case Doo 21 sft
Lift Machine Roo 24 sft
Fire Hydrent louve 0 sft
Lift Machine Room 70 sft
A. Fire control
room

Rain water
pump room+Fire
pump room + sft
Domestic pump
room

B. Fire Stair Door 474 sft


E. MS Box (Roof Rib beam) rft
F. ELECTRICAL CABLE TRA sft
G. COLUMN GUARRD Sft
D. MS Gratings for Gu 2 nos
I. Fire Bucket Stand nos
J. Gas Riser Grill sft
K. Catchment/SCUPPER DRA sft
15 ENAMEL PAINT
Grill &
MS.Surface sft
area
GARDENING / Green AREA- sft
Water Body+Gravel Side & sft
16 Swimming Pool( Bottom + sft
OHWT-Water Pro 1600 sft
UGER- Water Pro 2500 sft
Out Side
17 Design/Other's sft
work
18 Fair Face Area Treatment sft
Swimming Pool
19 nos
Ladder

Machine Room
sft
Entry MS Stair

Swimming Pool
20 sft
Drain Cover

21
Sub- Total Over all Item - - - - -
Prepared by: Sabit
FOUNDATION LEVEL

Stone MILD STEEL 60/72.5 Grade in kg


Shingle in Pie Chips Brick in
Chips in
cft. in cft. Nos. 10 mm 12 mm 16 mm 20 mm 25 mm 32 mm
cft.

5750

1725
0

#REF!

0
0
0

0
0
0
0

0
0
0 0 #REF! 0 0 0 0 0 0 0

Stone MILD STEEL 60/72.5 Grade in kg


Shingle in Pie Chips Brick in
Chips in
cft. in cft. Nos. 10mm 12mm 16mm 20mm 25 mm 32 mm
cft.

0
0
0

0
0

0
0

0
0
0
0
0

0
0

0
0

-
0 0 0 0 0 0 0 0 0 0

Stone MILD STEEL 60/72.5 Grade in kg


Shingle in Pie Chips Brick in
Chips in
cft. in cft. Nos. 10mm 12mm 16mm 20mm 25 mm 32 mm
cft.
0

234

145 `

0 13444 13,520 1,000 55,072


0 0
0 473 160 1400
0

0 0 0

22763 888 8,800 48,597 13,244

2442 2448 2900 1430 3055 16225

24,520 9,877

5436 14478 11930 390 4945 1725

3105 7205 12 375 1107

35 25

0 0
345

1323

56120

9250

0
675
0
30641 13917 378 67713 33746 47443 21534 113444 32301 0
0

810

162

516 960 1120


0

350

1483 1460 1811 759 1600 8810

320 650

400 600

2290 120 7950

4867 6481 10428 265 3206 884

16 30

25 35

0
0

2645

30705

1250

650
0
9172 0 162 36060 9796 20539 3429 4806 9694 0

Stone MILD STEEL 60/72.5 Grade in kg


Shingle in Pie Chips Brick in
Chips in
cft. in cft. Nos. 10 mm 12 mm 16 mm 20 mm 25 mm 32 mm
cft.

2428 1890 2675 1190 3680 10540


1105 360 1780

3013 5125 3285 5950 3120 1320

30 20

30 50

25 60

-
6095

1035

1035

9750

13500

0
5440 0 0 31415 8205 6390 8980 6800 11860 0

Stone MILD STEEL 60/72.5 Grade in kg


Shingle in Pie Chips Brick in
Chips in
cft. in cft. Nos. 10 mm 12 mm 16 mm 20 mm 25 mm 32 mm
cft.

1405 1375 1960 745 1825 6905

3350 6575 7300 1055 3980 2275

20 80

17 60

- - -
0

7935

978

4500

0
4755 0 0 13413 7987 9260 1940 5805 9180 0

Stone MILD STEEL 60/72.5 Grade in kg


Shingle in Pie Chips
Chips in Brick in Nos.
cft. in cft.
cft.
Stone
Shingle in Pie Chips
Chips in Brick in Nos.
cft. in cft. 10 mm 12 mm 16 mm 20 mm 25 mm 32 mm
cft.

1405 1,535 1,685 1,000 2,050 6,000

3448 7150 7215 510 3970 2730

20 80

17 60

0
0

7935

5250

0
4853 0 0 13185 8722 8900 1650 6020 8730 0

Stone MILD STEEL 60/72.5 Grade in kg


Shingle in Pie Chips
Chips in Brick in Nos.
cft. in cft. 10 mm 12 mm 16 mm 20 mm 25 mm 32 mm
cft.

1405 1,500 1,630 1,000 2,050 5,400

0
3091 7150 7215 510 3970 2730

0 0 0

20 0 80

17 0 60

0 0 0

0 -

0 -

0 -
0

7935

0
5250

0
4497 0 0 13185 8687 8845 1650 6020 8130 0
GED WITH RESPECT TO CYLINDER TEST RESULT

Stone MILD STEEL 60/72.5 Grade in kg


Shingle in Pie Chips
Chips in Brick in Nos.
cft. in cft. 10 mm 12 mm 16 mm 20 mm 25 mm 32 mm
cft.

1405 1,485 1,625 1,000 2,050 5,400

2886 6,670 6,575 510 3,900 2,680

0 0 0

20 0 80

17 0 60
0 0 0

0
0

7935

5250

0
4292 0 0 13185 8192 8200 1650 5950 8080 0

Stone MILD STEEL 60/72.5 Grade in kg


Shingle in Pie Chips
Chips in Brick in Nos.
cft. in cft. 10 mm 12 mm 16 mm 20 mm 25 mm 32 mm
cft.
1405 1,485 1,625 1,000 2,050 4,670

3112 7150 7175 510 3970 2730

0 0 0

20 0 80

17 0 60

0 0 0

0
0
7935

5250

0
4517 0 0 13185 8672 8800 1650 6020 7400 0

Stone MILD STEEL 60/72.5 Grade in kg


Shingle in Pie Chips
Chips in Brick in Nos.
cft. in cft. 10 mm 12 mm 16 mm 20 mm 25 mm 32 mm
cft.

1405 1,485 1,625 1,000 2,700 4,670

3128 7150 7175 510 3970 2730

0 0 0

20 0 80

17 0 60
0 0 0

0
7935

5250

0
4534 0 0 13185 8672 8800 1650 6670 7400 0
GED WITH RESPECT TO CYLINDER TEST RESULT

Stone MILD STEEL 60/72.5 Grade in kg


Shingle in Pie Chips
Chips in Brick in Nos.
cft. in cft. 10 mm 12 mm 16 mm 20 mm 25 mm 32 mm
cft.
1405 2,400 510 1,000 2,700 2,520

2919 6,670 6,575 500 3,900 2,680

0 0 0

20 0 80

17 0 60

0 0 0

0
0
7935

5250

0
4325 0 0 13185 9107 7085 1640 6600 5200 0

Stone MILD STEEL 60/72.5 Grade in kg


Shingle in Pie Chips
Chips in Brick in Nos.
cft. in cft. 10 mm 12 mm 16 mm 20 mm 25 mm 32 mm
cft.

1405 2,400 517 1,000 2,250 2,520

3104 7,200 7,155 560 3,750 3,085

0 0 0 0

20 0 80

17 0 60

0 0 0

0
0

7935

5250

0
4509 0 0 13185 9637 7672 1700 6000 5605 0

Stone MILD STEEL 60/72.5 Grade in kg


Shingle in Pie Chips Brick in
Chips in
cft. in cft. Nos. 10 mm 12 mm 16 mm 20 mm 25 mm 32 mm
cft.

1405 2,400 517 1,000 2,250 2,520

3104 7,200 7,155 560 3,750 3,085


0 0 0

20 0 80

17 0 60

0 0 0

0
7935

5250

0
4509 0 0 13185 9637 7672 1700 6000 5605 0
GED WITH RESPECT TO CYLINDER TEST RESULT

Stone MILD STEEL 60/72.5 Grade in kg


Shingle in Pie Chips
Chips in Brick in Nos.
cft. in cft. 10 mm 12 mm 16 mm 20 mm 25 mm 32 mm
cft.
1405 2,600 540 710 1,980 1,970

3112 7,200 7,155 580 3,765 3,100

0 0 0

20 0 80

17 0 60

0 0 0

0
0

7935

5250

0
4517 0 0 13185 9837 7695 1430 5745 5070 0
GED WITH RESPECT TO CYLINDER TEST RESULT

Stone MILD STEEL 60/72.5 Grade in kg


Shingle in Pie Chips
Chips in Brick in Nos.
cft. in cft. 10 mm 12 mm 16 mm 20 mm 25 mm 32 mm
cft.

1405 2,600 540 710 1,980 1,970

3112 6850 6750 535 3950 2750

0 0 0
20 0 80

17 0 60

0 0 0

0
0

7935

5250

0
4517 0 0 13185 9487 7290 1385 5930 4720 0
GED WITH RESPECT TO CYLINDER TEST RESULT

Stone MILD STEEL 60/72.5 Grade in kg


Shingle in Pie Chips Brick in
Chips in
cft. in cft. Nos. 10 mm 12 mm 16 mm 20 mm 25 mm 32 mm
cft.

1405 2600 540 710 2610 920


0

3108 7150 7175 510 3970 2730

0 0 0

20 0 80

17 0 60

0 0 0

0
0

7935

0
5250

0
4513 0 0 13185 9787 7715 1360 6580 3650 0
GED WITH RESPECT TO CYLINDER TEST RESULT

Stone MILD STEEL 60/72.5 Grade in kg


Shingle in Pie Chips
Chips in Brick in Nos.
cft. in cft. 10 mm 12 mm 16 mm 20 mm 25 mm 32 mm
cft.
2600 540 710 2610 920

7800 7250 510 3970 2730

0 0 0

20 0 80

17 0 60

0 0 0
0

7935

0
0

5250

0
0 0 0 13185 10437 7790 1360 6580 3650 0
GED WITH RESPECT TO CYLINDER TEST RESULT

Stone MILD STEEL 60/72.5 Grade in kg


Shingle in Pie Chips
Chips in Brick in Nos.
cft. in cft. 10 mm 12 mm 16 mm 20 mm 25 mm 32 mm
cft.
0

0
0 0 0 0 0 0 0 0 0 0
GED WITH RESPECT TO CYLINDER TEST RESULT

Stone MILD STEEL 60/72.5 Grade in kg


Shingle in Pie Chips
Chips in Brick in Nos.
cft. in cft. 10 mm 12 mm 16 mm 20 mm 25 mm 32 mm
cft.
0

0
0 0 0 0 0 0 0 0 0 0
GED WITH RESPECT TO CYLINDER TEST RESULT

Stone MILD STEEL 60/72.5 Grade in kg


Shingle in Pie Chips
Chips in Brick in Nos.
cft. in cft. 10 mm 12 mm 16 mm 20 mm 25 mm 32 mm
cft.
0

0
0 0 0 0 0 0 0 0 0 0
GED WITH RESPECT TO CYLINDER TEST RESULT

Stone MILD STEEL 60/72.5 Grade in kg


Shingle in Pie Chips
Chips in Brick in Nos.
cft. in cft. 10 mm 12 mm 16 mm 20 mm 25 mm 32 mm
cft.
0

0
0 0 0 0 0 0 0 0 0
GED WITH RESPECT TO CYLINDER TEST RESULT

Stone MILD STEEL 60/72.5 Grade in kg


Shingle in Pie Chips
Chips in Brick in Nos.
cft. in cft. 10 mm 12 mm 16 mm 20 mm 25 mm 32 mm
cft.
0
0
0 0 0 0 0 0 0 0 0 0
GED WITH RESPECT TO CYLINDER TEST RESULT
Stone MILD STEEL 60/72.5 Grade in kg
Shingle in Pie Chips
Chips in Brick in Nos.
cft. in cft. 10 mm 12 mm 16 mm 20 mm 25 mm 32 mm
cft.
0

0
0 0 0 0 0 0 0 0 0 0
GED WITH RESPECT TO CYLINDER TEST RESULT

Stone MILD STEEL 60/72.5 Grade in kg


Shingle in Pie Chips Brick in
Chips in
cft. in cft. Nos. 10 mm 12 mm 16 mm 20 mm 25 mm 32 mm
cft.

5,000 1,020 1,300 4,500 1,560

1,970 3,060 430 540 -

600 - 700 1,110 -

610 320 390

25 10

35 20
-

8,913

5,100

-
43,930
- - - 57,943 8,240 4,410 2,840 6,150 1,560 -
99,591 13,917 #REF! 364,763 178,848 184,506 57,548 211,120 137,835 -

Stone MILD STEEL 60/72.5 Grade in kg


Shingle in Pie Chips Brick in
Chips in
cft. in cft. Nos. 10 mm 12 mm 16 mm 20 mm 25 mm 32 mm
cft.

-
- - - - - - - - -
Total

0
0

0
0

0
0
0
0
0
0

0
0

0
0
0

0
0
0

0
0
0

0
0

0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0

0
0
0
0

0
0
0

0
0

0
0

0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0

0
0
0

0
0
0

0
0
0

0
0

0
0

Total

0
0
0

0
0

0
0
0
0
0
0

0
0

0
0
0

0
0

0
0

0
0
0

0
0

0
0

0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0

0
0
0

0
0

0
0

0
0
0
0
0
0
0
0
0
0
0
0
0

0
0

0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0

0
0
0

0
0
0

0
0
0
0

0
0

0
0

Total
0

0
0

0
69592
0
1560
0
0

71529

26058

34397

33468

11804

60

0
0

0
0

0
0
0

0
0
0

0
0
0
0
0
0
0
0
0

0
0
0
0
0

0
0
0

0
0
0

0
0
0
0
0

0
0

0
0
0
0
0
0

0
0

0
0
0

0
0
0

0
248,468 248468

0
0

0
0

2080
0

350

14440

970

1000

8070

21264

30

60

0
0

0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0
0

0
0
0
0
0
0

0
0

0
0
0
0
0
0

0
0

0
0
0
0

0
0

0
0
0

0
0
0

0
48264 48264

Total

19975
3245

18800

50

0
0
0
0

80

85

0
0
0

0
0

0
0

0
0

0
0
0

0
0
0
0
0
0

0
0
0
0

0
0

0
0

0
0
0
0
0
0
0
0
0

0
0
0

0
0

0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0

0
0
0

0
0
0

0
0
0
0
0

0
0
0
0
0
0
0
0
0
0

42235 42235

Total

12810

21185

0
0
0
0

100

77

0
0

0
34172 34172
Total

12270

21575

0
0
0
0

100

77

0
34022

Total

11580

0
21575

0
0
0
0

100

77

0
33332

Total

11560

20335

0
0
0
0

100

77
0

0
0
32072 32072

Total
10830

21535

0
0
0
0

100

77

0
0

0
32542

Total

11480

21535

0
0
0
0

100

77
0

0
33192

Total
9130

20325

0
0
0
0

100

77

0
29632 29632

Total

8687

21750

0
0
0
0

100

77

0
0
30614 30614

Total

8687

21750

0
0

0
0
0
0

100

77

0
0

0
0

0
0

0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0

0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0

0
0
0

0
0
0

0
0
0
0
0
30614

Total
7800

21800

0
0
0
0

100

77

0
0

0
0

0
0

0
0

0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

0
0

0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0

0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0

0
0
0

0
0
0

0
0
0
0
0
29777

Total

7800

20835

0
0
0
0

100

77

0
0

0
0
0

0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0

0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0

0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0

0
0
0
0
0
0

0
0
0

0
0
0

0
0
0
0
0
28812

Total

7380
0

21535

0
0
0
0

100

77

0
0

0
0

0
0

0
0

0
0
0
0
0
0

0
0
0
0
0
0

0
0
0
0

0
0

0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0

0
0
0
0
0
0

0
0
0

0
0
0

0
0
0
0
0
29092

Total
2600

22260

0
0
0
0

100

77

0
29817

Total
0

Total
0

Total
0

Total
0

Total
0
Total
0

Total

13,380

6,000

2,410

1,320
-
23,110
769,767

Total

-
-
Mixing Mobilizatio
Sl. No. Items Unit n&
Ratio Bas.-4 Bas.-3 Bas.-2 Bas.-1
Temporary
Work

PILE WORK
0 0 16005 0
1 Shore Pile cft
0 0 0 0
2 Service Pile cft

3 King Post cft 0 0 550 0

4 Tie beam cft 0 0 0 600

RCC & CC WORK

SUB STRUCTURE
3"C.C. Work sft - - 2,250 -
1
Brick Flat Soling sft - - - 270
2
1.5" Patent Stone cft - - 455 190
3

Pea Gravel cft - - - -


Concrete at Parking
(Avg.2" Thick)
4

R.B.C ( Reinforce cft - - - -


Brick Bond
Concrete)
5

B.B.C ( Brick Bond cft - - - -


Concrete)
6

MANNUAL CASTING
cft - - - -

Shore Pile Gap


1 Casting(Non
Schedule)

600
2 Tie beam for pile top

cft - - - -
Pile Cap/Main
3
Footing

cft - - - 203
3 Boundary Footing
cft - - 3,095 1,880
Column & Shear
4
Wall

cft - - - 100
Boundary Column &
5
Shear Wall

cft - - - -
GB of main
6
Foundation

cft - - - 270
GB of Boundary
7
Wall

cft - - 5,690 2,900


8 b) Retaining wall

cft - - - -

Basement Additional
9
Floor Above Mat

cft - - 2,035 -

f) U.G.W.R
10
( Wall+Salb)

cft - - -
Septic
11
Tank(Wall+Slab)

cft - - 20
Inspection Pit Top
12
Slab

READY MIX CONCRETE


1 MAT cft - - 28,850 -
cft - - 6,646 5,950
c) Stair, Ramp,
2
Basement-Roof

ANCILARY STRUCTURE
sft - - -

g)Drop wall. railinq.


Aic slab. sunshade,
1
Rib.Beam (upto 4"
thickness)

rft - - - -
h)Lintel up to 5"
2
Width

cft - - 25 25
i)Lintel above 5"
3
Width

sft - - - -
j)False Slab up to 4"
4
Thick

BRICK WORK
10" Brick Work cft 1:6 - - 4,880 2,670
1
5" Brick Work sft 1:4 - - - 250
2

SUPER STRUCTURE RCC WORK


R.C.C. WORK (MANNUAL)
cft

a) Column & Shear


Wall (main
Structure)

cft

b)Boundary Wall
Column/ Shear
Wall/Coping beam

1
cft

1
c)Waterbody &
Swimming Pool ,
OHWT Wall & Slab

d) Patent stone work


at GF( up to 2.5")

R.C.C. WORK (RMC)


Cft

d) Slab, Beam &


Stair (main Slab)

C.Ancilary Structure
sft

1)Drop wall. railinq.


Aic slab. sunshade,
Rib.Beam (upto 4"
thickness)

2
rft
2)Lintel up to 5"
Width

cft
3)Lintel above 5"
Width

sft
4)False Slab up to
4" Thick

CC.Work
FAIR FACE RCC WORK
cft 1:2:4
Column & Shear
Wall

cft
Slab, Beam & Stair

Cft
Drop Wall &
3 Sunshed
3
cft
Non Structural Wall
up to 5"

cft 1:2:4
Non Structural Wall
Above 5"

SHUTTERING WORK

SUB STRUCTURE SHUTTERING

WOODEN SHUTTERING

ANCILARY WORK
1 0 0 30 85
SHUTTERING

2 Slab Beam & Stair 0

STEEL SHUTTER FOR


NORMAL RCC
0 0 2076 1000
1 Foundation
0 0 13251 6670

Column, Shear Wall


2 & Other Vertical
member

0 0 13525 10500
Beam, Slab, Stair,
3
Ramp

0 0 0 0
Aancilary Structure
4
Shuttering

SUPER STRUCTURE SHUTTERING


WOODEN SHUTTER
Sft
Ancilary Structure
1
Shuttering

2 Slab Beam & Stair

STEEL SHUTTER
Sft
Vertical Member
1
Shuttering

Sft
2 Slab, Beam, Stair

3 Ancilary Structure Shu Sft


Sft
4 Fair-Face Shuttering

BRICK WORK
10" Brick Work cft 1:6 - - 5,025 2,900 650
1
5" Brick Work sft 1:4 - - 1,985 380 2,600
2
Ceramic/Faciing sft 1:4 - - - -
3 Bricks

PLASTER WORK
3/4" Thick Plaster sft 1:6

a) Inside Wall Plaster - - 2,260 2,700 1,414


- - 967 -

b) Outside Wall
Plaster(Normal
Plaster)

c) Rough Plaster(For Fair Face Plaster) - - -


d) Fair Face Plaster -
sft 1:6 - - 4,800 4,000

Shore Pile Rough


Plaster Including
Wire Mesh Fitting
sft 1:4 - - 12,819 10,830

1/2" Thick Plaster


(Ceiling & RCC
Surface)( Inside
Plaster)

N.C.F sft - - 5,500 250 1,014

ROOF TREATMENT
Lime Terracing cft 7:2:2
1

Roof Treatmernt-
2.5" C/C
2

SAND FILLING
Sand Filling cft 0 0 35500 0
1 FM( 0.5)

Sand Filling cft 0


2 FM( 2.5)

GRILL & RAILING WORK


GRILL WORK sft
a) Window Grill - -
b) Sliding Grill - -
c) Kitchen Verandah Safety Grill - -
46 d) Veranda Safety Grill - - - -
e)Parking Grill - - -
f)Safety Grill Over Boundary - -
g)Boundary Grill - -
h)Lift Lobby/Corridor safety Grill - - - -
RAILING WORK - - - -
- - - -
a) Main Stair Railing

- - - -
b) Fire Stair Railing

- - 100.00 300.00
c)Basement Stair
Railing
- - - -
d)Ornamental Stair
Railing

- - - -
e)) Ramp Railing
- -
f)Front Verandah
Railing

- -
g)Back Verandah
Railing

- -
h)Kitchen Verandah
Railing

- - - -
i)Voide & Punch
Railing

- - - -
j)Lift Lobby
railing(Coridoor
railing)

- -
k)
Parapet/Terrace/OH
WT Railing

- -

l) Planter/Garden
Area Railing

- -
m)Parking/Boundary
Railing

ALUMINIUM WORK
1 4" Single glazzing sft - - - -
2 4" Double glazzing sft - -
3 3" Fixed with Sliding sft - -
Fly proof Net sft - -
4

5 Fixed Glass sft - -


6 Glass Door sft - -
7 Curtain Wall sft - -
8 Curtain/Blind ( Comm sft - -
9 Aluminium Louver Wo sft - - -
10 ACP Work sft - -
11 Glass Canopy Work sft - -
PAINT & POLISH WORK
Plastic Paint
Plastic Paint in side sft 0 0 250 250
lift core
1

In Side Wall Paint sft 0 0 2270 2450


2

Ceiling Paint sft 0 0 5854 5854


3
Weather Coat 0 0 3250 3240
Outside paint
4

Enamel Paint 0 0 0 0
Enamel Paint Grill sft 0 0 100 300
5 Surface

Enamel Plaster sft 0 0 0 0


6 Surface

Enamel Wooden sft 0 0 0


7 Surface

Polish Work 0 0
Polish for Design Door Surface 0 0
Polish for Internal Door Surface 0 0
Laquire Polish on Toilet Door Shutter 0 0

TILES, MARBLE & GRANITE WORK


sft

FLOOR TILES

Apartment(wait.Comu.sft - -
sft 1:3 - -

Gym/
Reception/Communi
ty Wooden Texture
Tiles

Main Stair -Tiles( Tra sft 1:3 - - - -


Main Stair & Lift -Til sft 1:3 - - 160.00 150.00
1.Fire Stair
sft 1:3 - - 192.00 192.00

2.Basement-GF
Stair

3.Out Side Level Up


Stair ( Tiles)

4.
Ornamental Stair sft - - 160.00 160.00
2. Guard Room

3. Driver Waiting

4. EMR Room

5. Pump
Room
7

Main Toilet Floor - -


2nd & 3rd Toilet Floorsft 1:3 - -
sft 1:3 - -
Main Kitchen Floor
with Kitchen
Verandah

Caretaker Kitchen Flosft 1:3 - -


sft 1:3 - -

2.Drivers toilet

3.Guard
Toilet

sft 1:3 - -
Kitchen Counter
Top(Tiles)
sft 1:3 - -
Toilet Counter
Top( Tiles)

rft 1:3 - -
Reception Table
Counter Top

rft 1:3 - - 4,600.00 6,000.00


Pavement Tiles
sft 1:3
Roof Tiles
sft 1:3
Terrace Tiles
sft 1:3
Garden/Planter Tiles

sft 1:3 - - -

Water Body &


Swimming Pool
Floor Tiles

- - -

Water Body &


Swimming Pool
Deck Tiles

- - -
SKIRTING TILES
- -
Apt. Floor Tiles Skt
- -

Gym/Com Wooden
Texture Tiles Skt

- - 60.00 150.00
Stair Tiles- Skt
- - 40.00 35.00
Stair & Lift Lobby
Tiles Skt

- - - -
Fire/Basement/
Ornamental Stair
Tiles Skt
- -
Care
Taket/Servent/Guar
d/Others Room Tiles
Skt

- -
Kit. Ver Tiles Skt
- -
Care Taker Kit Floor
Skt.

- - 350.00 370.00
Pavement Tiles skt
- - -
Roof Tiles Skt
- - -
Terrace Tiles Skt
- -
Planter/Garden Tiles
Skt

- - - -
WALL TILE WORK

Main Toilet Tiles - -


2nd & 3rd Toilet Tiles - -

2.Drivers toilet

- -
3.Guard
Toilet

- -
8 Main Kitchen Wall

- -
Caretaker Kitchen
Wall

- -
Down wash Wall
Tiles

Reception wall Tiles - -


Lift Wall Tiles sft 1:3 - - 180.00 140.00
Border for Toilets sft 1:3 - -
Slate Stone /Claddingsft 1:3 - -
Column protection Tilsft 1:3 - - 350.00 345.00
Boundary Dado Tiles sft 1:3 - - -
Outside Wall Cladding(Tiles) - -
Swimming Pool & Wate sft 1:3 - -
FLOOR MARBLE - - - -
Apartment(wait.Comu. sft 1:3 - -
- -

Gym/
Reception/Communi
ty Wooden Texture
MARBLE

- - - -

Main Stair ( Trade,


Riser, Skirting,
Landing)-MARBLE

Main Stair & Lift Lo sft 1:3 - - - -


- - - -
1.Basement-GF
Stair(Marble)

2.Out Side
Level Up Stair
(Marble)

3.
Ornamental
Stair(Marble)

- -
Kitchen Counter Top

- -
Toilet Counter Top

- -
Reception Table
Counter Top

- -
Garden/Planter
Marble/Design
Marble

- - - -
MARBLE
SKIRTING
- -
Apt. Marble Skt

- - -
Main Stair Marble
Skt

- - - -

Stair & Lift Lobby


marble Skt

- - - -

Basement/Level
Up/Ornamental Stair
Marble Skt

- -
Graden/Planter
Marble Skt

- - - -
WALL MARBLE
WORK

Reception wall Marble - -


Lift Wall Marble - - - -
Skirting Marble - - - -
- -
8 Boundary Wall
Cladding-
Marble/Granite

- -
Outside Wall
Cladding( marble/
Granite)

DOOR FRAME & SHUTTER


DOOR FRAME
Main Door Frame rft 0 0
1

Community/Bed rft 0 0
Room Door(3'-4"*7')
2
Care taker + utility+ rft 0 0
Guard room (2'-
6"x7'-0") &(3.33'*7)

Kit.Ver./Balcony rft 0 0
Door Frame(2'-6"x7'-
4 0")

Kitchen Door Frame rft 0 0


(2'-11"x7'-0")
5

Stair door Frame(3'- rft 0 0


4"x8'-0")
6

Toilet Door Frame rft 0 0


(2'-6"x7'-0")
7

Servent Toilet Door rft 0 0


Frame
8

CAT DOOR( 2'-6" Nos 0 0


CX 2'-6")
9

PVC DOOR Nos 0 0


(S.Toilet Door)
10 shutter

DOOR SHUTTER 0 0
Main Door Shutter sft 0 0
11

Community/Bed sft 0 0
Door Shutter
12
S.Bed Door sft 0 0
Shutter/Caretaker/G
uard Bed Door
Shutter
13

Kit.Ver./Balcony sft 0 0
Door Shutter
14

Kitchen Door sft 0 0


15 Shutter

Stair Door Shutter pcs 0 0


16

Toilet Door Shutter 0 0


pvc
17

Servent Toilet Door 0 0


Shutter
18

RE BAR WORK
Re- Bar Febrication 0.00 0.00 177.32 46.18 0
1

Plantation
TOTAL WORK VOLUME

Quantity

GF 1st 2nd 3rd 4th 5th 6th 7th 8th


3,075 1,780 1,780 1,780 1,780 1,780 1780 1780 1780

1,305
- - - - - - - - -

3,674 4,085 4,205 3,770 3,520 3,795 3,815 3,560 3,785

27 - - - - - - - -

25 25 25 25 25 25 25 25 25

20 20 20 20 20 20 20 20 20

- - - - - - - - -

- - - - - - - - -

- - - - - - - - -

- - - - - - - - -
- - - - - - - - -

- - - - - - - - -

130 130 130 130 130 130 130 130 130

0 0 0 0 0 0 0 0 0
8330 2200 2200 2200 2200 2200 2200 2200 2200

7350 6955 7055 7055 6805 7005 7005 7005 7255

0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0

710 775 690 690 690 690 690 690 690

4,650 900 1,050 1,050 1,050 1,050 1,050 1,050 1,050

- - - - - - - - -

3,780 3,500 3,300 3,250 3,250 3,250 3,250 3,250 3,250


6,650 - - - - - - - -

- - - - - - - - -
1,805 950 950 880 880 880 880 880 880
2,900 850 850 850 850 850 850 850 850

820 288 150 350 350 350 350 300 270

140 135 135 135 135 135 135 135 135


- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
90 88 88 88 88 88 88 88 88

90 88 88 88 88 88 88 88 88

-
-

- - - 166 - 166 357 140 109

- - - - - - - - -

- - - - - - - - -

147 - - - - - - - -

- - - - - - - - -

- - - - - - - - -

- - - - - - - - -

- - - - - - - - -

- - - - - - - - -
- - - - - - - - -
100.00 - - - - - - - -
- - - - - - - - -

200.00 560.00 80.00 80.00 80.00 80.00 80.00 80.00 80


100.00 120.00 120.00 120.00 120.00 120.00 120.00 120.00 120
1,316.00 1,900.00 1,390.00 1,370.00 1,340.00 1,400.00 1,400.00 1,345.00 1,455
- - - - - - - - -
30.00 570.00 400.00 365.00 365.00 365.00 365.00 365.00 365
900.00 650.00 - - - - - - -
- - - - - - - - -
300 300 300 300 300 300 300 300 300

3670 3500 3500 3500 3500 3500 3500 3500 3500

1965 850 850 850 850 850 850 850 850

6650 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0
260 311 311 477 311 477 668 451 419.5

0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
125.00 194.02 194.02 194.02 194.02 194.02 194.02 194.02 194.02
0.00 97.01 97.01 97.01 97.01 97.01 97.01 97.01 97.01

1,050.00 2,660.00 3,335.00 3,250.00 3,200.00 3,350.00 3,100.00 3,090.00 3,380.00


- - - - - - - - -

- 270.00 270.00 270.00 270.00 270.00 270.00 270.00 270.00


- 220.00 220.00 220.00 220.00 220.00 220.00 220.00 220.00
560.00 270.00 270.00 270.00 270.00 270.00 270.00 270.00 270.00

85.00 - - - - - - - -

- - - - - - - - -
34.00 120.00 120.00 120.00 120.00 120.00 120.00 120.00 120.00
- - - - - - - - -

- - - - - - - - -
- - - - - - - - -

- - - - - - - - -
- 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00

- - - - - - - - -

2,450.00 - - - - - - - -

- - - - - - - -

- - - - - - - -

705.00 - - - - - - - -

- - - - - - - - -

- - - - - - - - -

- - - - - - - - -

200.00 400.00 450.00 430.00 430.00 430.00 380.00 380.00 430.00

- - - - - - - - -

50.00 106.00 106.00 106.00 106.00 106.00 106.00 106.00 106.00

34.00 70.00 70.00 70.00 70.00 70.00 70.00 70.00 70.00

- 106.00 106.00 106.00 106.00 106.00 106.00 106.00 106.00


25.00 - - - - - - - -

- - - - - - - - -

- - - - - - - - -

170.00 - - - - - - - -

- - - - - - - - -

- - - - - - - - -

150.00 - - - - - - - -

- - - - - - - - -

- - - - - - - - -
150.00 600.00 600.00 600.00 600.00 600.00 600.00 600.00 600.00

- - - - - - - - -

- - - - - - - - -

- - - - - - - - -

- - - - - - - - -

- - - - - - - - -
- 183.00 183.00 183.00 183.00 183.00 183.00 183.00 183.00
45.00 80.00 80.00 80.00 80.00 80.00 80.00 80.00 80.00
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
470.00 - - - - - - - -
- - - - - - - - -

270.00 - - - - - - - -

225.00 - - - - - - - -
- - - - - - - - -

- - - - - - - - -

36.00 36.00 36.00 36.00 36.00 36.00 36.00 36.00

30.00 - - - - - - - -

- - - - - - - - -

- - - - - - - - -
80.00 - - - - - - - -

55.00 - - - - - - - -

35.00 - - - - - - - -

- - - - - - - - -

- - - - - - - - -

- - - - - - - - -

- - - - - - - - -
200.00 - - - - - - - -
- - - - - - - - -
- - - - - - - - -

- - - - - - - - -

- 0 0 0 0 0 - - -

- 0 0 0 0 0 - - -
17.50 0 0 0 0 0 - - -

- 0 0 0 0 0 - - -

- 0 0 0 0 0 - - -

- 0 0 0 0 0 - - -

16.50 66 66 66 66 66 66.00 66.00 66.00

- 0 0 0 0 0 - - -

1.00 2 2 2 2 2 2.00 2.00 2.00

- 0 0 0 0 0 - - -

- 0 0 0 0 0 - -
- 0 0 0 0 0 - - -

15.50 62 62 62 62 62 62.00 62.00 62.00


15.50 0 0 0 0 0 - - -

- 0 0 0 0 0 - - -

- 0 0 0 0 0 - - -

- 0 0 0 0 0 - - -

- 0 0 0 0 0 - - -

- 0 0 0 0 0 - - -

42.24 34.17 34.02 33.33 32.07 32.54 33.19 29.63 30.61


Quantity

9th 10th 11th 12th 13th 14th 15th 16th 17th 18th
1780 1780 1780 1780 1780 0 0 0 0 0
- - - - - - - - - -

3,785 3,795 3,795 3,790 3,820 - - - - -

- - - - - - - - - -

25 25 25 25 25 - - - - -

20 20 20 20 20 - - - - -

- - - - - - - - - -

- - - - - - - - - -

- - - - - - - - - -

- - - - - - - - - -
- - - - - - - - - -

- - - - - - - - - -

130 130 130 130 130 0 0 0 0 0

0 0 0 0 0
2200 2200 2200 2200 2200 0 0 0 0 0

7255 7455 6800 6970 7050 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0

690 690 690 690 690 - - - - -

1,050 1,050 1,050 1,050 1,050 - - - - -

- - - - - - - - - -

3,250 3,250 3,250 3,250 3,250 - - - - -


- - - - - - - - - -

- - - - - - - - - -
880 880 880 880 880 - - - - -
850 850 850 850 850 - - - - -

250 475 450 450 1,025 - - - - -

135 135 135 135 135 - - - - -


- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
88 88 88 88 88 - - - - -

88 88 88 88 88 - - - - -

- - - - -
- - - - -

- - - - -

168 298 191 - 186 - - - - -

- - - - - - - - - -

- - - - - - - - - -

- - - - - - - - - -

- - - - - - - - - -

- - - - - - - - - -

- - - - - - - - - -

- - - - - - - - - -

- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -

80 80 80 80 80 - - - - -
120 120 120 120 120 - - - - -
1,420 1,390 1,340 1,420 1,380 - - - - -
- - - - - - - - - -
365 365 365 365 365 - - - - -
- - - - - - - - - -
- - - - - - - - - -
300 300 300 300 300 0 0 0 0 0

3500 3500 3500 3500 3500 0 0 0 0 0

850 850 850 850 850 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0
479 608.5 501.75 311 496.5 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
194.02 194.02 194.02 194.02 194.02 0 0 0 0 0
97.01 97.01 97.01 97.01 97.01 0 0 0 0 0

3,300.00 3,200.00 3,050.00 3,345.00 3,350.00 - - - - -


- - - - - - - - - -

270.00 270.00 270.00 270.00 270.00 - - - - -


220.00 220.00 220.00 220.00 220.00 - - - - -
270.00 270.00 270.00 270.00 270.00 - - - - -

- - - - - - - - - -

- - - - - - - - - -
120.00 120.00 120.00 120.00 120.00 - - - - -
- - - - - - - - - -

- - - - - - - - - -
- - - - - - - - - -

- - - - - - - - - -
150.00 150.00 150.00 150.00 150.00 - - - - -

- - - - - - - - - -

- - - - - - - - - -

- - - - - - - - - -

- - - - - - - - - -

- - - - - - - - - -

- - - - - - - - - -

- - - - - - - - - -

- - - - - - - - - -

430.00 430.00 430.00 445.00 445.00 - - - - -

- - - - - - - - - -

106.00 106.00 106.00 106.00 106.00 - - - - -

70.00 70.00 70.00 70.00 70.00 - - - - -

106.00 106.00 106.00 106.00 - - - - - -


- - - - - - - - - -

- - - - - - - - - -

- - - - - - - - - -

- - - - - - - - - -

- - - - - - - - - -

- - - - - - - - - -

- - - - - - - - - -

- - - - - - - - - -

- - - - - - - - - -
600.00 600.00 600.00 600.00 600.00 - - - - -

- - - - - - - - - -

- - - - - - - - - -

- - - - - - - - - -

- - - - - - - - - -

- - - - - - - - - -
183.00 183.00 183.00 183.00 183.00 - - - - -
80.00 80.00 80.00 80.00 80.00 - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -

- - - - - - - - - -

- - - - - - - - - -
- - - - - - - - - -

- - - - - - - - - -

36.00 36.00 36.00 36.00 36.00 - - - - -

- - - - - - - - - -

- - - - - - - - - -

- - - - - - - - - -
- - - - - - - - - -

- - - - - - - - - -

- - - - - - - - - -

- - - - - - - - - -

- - - - - - - - - -

- - - - - - - - - -

- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -

- - - - - - - - - -

- - - - - - - - - -

- - - - - - - - - -
- - - - - - - - - -

- - - - - - - - - -

- - - - - - - - - -

- - - - - - - - - -

66.00 66.00 66.00 66.00 66.00 - - - - -

- - - - - -

2.00 2.00 2.00 2.00 2.00 - - - - -

- - - - - - - - - -

- - - - - -
- - - - - - - - - -

62.00 62.00 62.00 62.00 62.00 - - - - -


- - - - - - - -

- - - - - - - - - -

- - - - - - - - - -

- - - - - -

- - - - - - - - - -

- - - - - -

30.61 29.78 28.81 29.09 29.82 0 0 0 0 0


20th/ Total Qty.
19th Others
Roof

16,005

550

600

0 2,250 6,818.18

270

0 645

-
-

600

203

4,975

100

270

8,590

2,035

20

28,850
12,596

50

7,550

250

0 - 3800 30015

1305
- 1800 1800

- 380 53574

- 1000 1,027 338.91

- 15 365 76.65

- 18 298 298.00

- 0 - 0.00

0.00

- 0 0

- 0 0

- 0 0
- 0 0

- 0 0

115

3076

19921

24025

0 1289
3109

0
0 4100
41030

0 6886
105906

0 0 0
0 0
0

- - 775 19,115

- - 1020 24,135

- 0 -

- 4500 57,204
- 6000 13,617

- 0 -
- 1900 15,285
8,800
- 6190 43,789

- 5905 18,547

4600 4600

0 0

35500

-
- 70.00 1,965.0
- - -
- -
- -
- -
- -
- -
- - -
- - -
- - 1,234.0

- - 1,234.0

- - 400.0
- - -

- - -

- - 1,779.3

- - -

- - -

- - 147.0

- - -

- 730.00 730.0

- - -

- - -

- - -
- - -
- 110 210.0
- - -

- - 1,720.0
- - 1,660.0
- - 19,866.0
- - -
- - 5,015.0
- - 1,550.0
- - -
0 0 4700

0 4500 58390

0 990 25713

0 9600 22740

0 0
0 800 7282.25

0 0 0 Marble 1,085

0 0 0

0 0
0 0 0
0 0 2647.26 2647.26
0 0 1261.13

0 note: all
Apartment
floor tiles
quantity are
in/c with
skirting

- - 42660
- - 0

- - 3510
- 230 3400
- - 4454

- 405

- - 0
- - 1594
- - 0

- 0
- 0

- - 0
- - 1950

- 0

- - 13050

- 3,500 3500

- - 0

- 400 1105

- - 0

- - 0

- - 0

- - 5710

- - 0

- - 1638

- 100 1119

- - 1272
- - 25

- 0

- 0

- 890

- 300 300

- - 0

- - 150

- - 0

- - 0
- 7950

- 0

- 0

- 0

- 0

- 0
- 2699
- 1085
- 0
- 695
- 0
- - 0
- - 0
- - 0
- - 470
- - 0

- - 270

- - 225 Marbel
- - 0

- - 0

- - 468

- - 30

- - 0

- - 0
- - 80

- - 55

- - 35

- - 0

- - 0

- - 0

- 0
- - 200
- - 0
- 0

- - 0

- - 0 0.00

- - 0 0.00
- - 17.5 1.00

- - 0 0.00

- - 0 0.00

- - 0 #DIV/0!

- - 874.5 53.00

- - 0

- - 27

- - 0

- - 0
- - 0 #DIV/0!

- - 821.50 53.00
- 15.5 #DIV/0!

- - 0 #DIV/0!

- - 0 0.00

- - 0 #DIV/0!

- - 0 390.00

- - 0

0 23 696.535

0
PILING WORK

Service Piling (precast) Work- Shore Pile-(12*12") rft 53.00


Service Piling(precast) Work- Shore Pile-(12*12") 3 rft 100.00
Piling Work 7,339.00 rft 212.00
Piling Work 300.00 rft 210.00
Pile Head - cft 100.00
False Bori 75.00 rft 110.00
King Post - cft
Concrete Br - cft
Sheet Thickness 12 mm,Flange-12",Web-12" rft 1,149.00
Sheet Thickness 10 mm,Flange-10",Web-10" rft 936.00
I-Joist Cutting pcs 46.00
Welding Charge Joint 46.00
Fitting Fi 900.00 Rft 334.00
Fitting Fi 400.00 Rft 303.00

Driving & Cutting Rft 240.00


I- Joist Be
- Rft 90.00

I joist Car - Rft 23.00


Driving, Lifting, Cutting-King Post( Additional)
Rft 120.00
Labor Charge for Loading of I-Joist Bracing, Carry Rft 12.00
Labor Charge for Cutting to Size of MS Plate from cu pcs 85.00
Painting Work-MS I-Joist new Surface Area sft 4.00
Shall Bullah in/c (Material &Labour cost) Nos 650.00
Stone chip 3.50 cft 13,545.30
Sand carry 3.30 cft 6,774.31
Rod carryi 240.00 ton 73.23

TOTAL LABOR COST FOR PILE, JOIST & BRACING


-
-
1,555,868.00
63,000.00
-
8,250.00
-
-
-
-
- `
-
300,600.00 Qty M.Rate
Joist - 875.00 359 314125
121,200.00 (12"x12")
Joist - 391 0
- (12"x15")
Joist - 345.00 345 119025
- (10"x10")
Joist - 247 0
- (6"x12")
Joist - 247 0
- (6"x4")
- Total rft 1220.00 433150
-
-
-
47,408.55
22,355.21
17,575.68
-
2,136,257.44
355.04 av.rate
SAFETY WORK

Sch. Rate
Description Unit
It. (Tk.)

a) Hessian Cloth / Net Hanging & maintenance: Hessian cloth / Net


fixing around the Building (excluding out side scaffolding) during
construction period including stretching with edge to etc. complete sft 1.00
21.0 as per direction of the Engineer-in-Charge. Any floor level (This
project safety net & hesian cloth considered same qty)

b) Hessian Cloth / Net opening with proper stacking as per direction


sft 0.40
of the Engineer-in-Charge. Any floor
TOTAL SAFETY LABOR COST
Quantit
Amount
y

127400 127400

127400 50960
178,360.00