500 KVA-TRANSFORMER - SPEC As Per Tender-Notice
500 KVA-TRANSFORMER - SPEC As Per Tender-Notice
NOTE: AS PER THE AMENDMENT NO:4 MARCH 2021 TO IS:1180(PART-I): 2014, THE
SAME DISTRIBUTION TRANSFORMERS WILL BE ACCEPTED AS ENERGY EFFICIENT
LEVEL-1 WITH THE SAME LOSSES ON OR AFTER 31.03.2022
6.0 TRANSFORMER CORE :
i. The core shall be stacked type:
The core shall be of high grade cold rolled grain oriented ( CRGO ) annealed steel of M4
grade or superior having low loss and good grain properties, with inter lamination
resistance and rust inhibiting property. The complete design of core must ensure
permanency of the core losses with continuous working of the transformers.
ii. The supporting frame work of the core shall be so designed so as to avoid the
presence of pocket which would prevent complete emptying of tank or cause trapping of
air during filling.
iii. The core shall conform to latest IS: 3024- Grain Oriented Electrical Sheet Steel and
Strip and IS 649 1983- Method of Testing of steel sheets and strips for magnetic
circuits.
iv. The grade of core lamination shall be superior than M4 grade or better. The
losses in Watt per Kg and the thickness of the core lamination to ascertain the quality of
core materials. The purchaser reserves the right to get sample of the core material
tested at any Government recognized laboratory.
v. The transformer core shall not be saturated for any value of V / f ratio to the extent of
112.5 % of the rated value of V / f (i.e 11000 V / 50 Hz) ( due to combined effect of
voltage and frequency ) up to 12.5 % voltage and 5% frequency variation without
injurious heating at full load condition and will not get saturated. The bidder shall furnish
necessary design data in support of this situation.
72
vi. FLUX DENSITY:
Flux density should not be more than 1.60 Tesla at the rated voltage and frequency
and core shall not get saturated up to 112.5% of rated voltage with 5% variation of
frequency. The value of the flux density allowed in the design shall be clearly stated in the
offer along with graph.
vii. The no load current at rated voltage shall not exceed the percentage given
in the table below.
iii. t / lug shall be clamped to LV bushing metal part by using nut, locknut
and washers.
12.0 TANK:
12.1 The transformers tank shall be made up of prime quality M.S. sheets of rectangular
shape. The transformers tank shall be of robust construction. Horizontal or vertical
joints in side walls of tank and bottom or top plate of tank will not be allowed.
Side wall thickness : 4 mm (Minimum)
Top and bottom plate thickness : 5 mm (Minimum)
12.2 All the joints of the tank and fittings should be oil tight and no bulging shall occur
during service. The tank design shall be such that the core and windings can be lifted
freely. The tank plates shall be of such strength that the complete transformer when filled
with oil may be lifted by means of the lifting lugs provided. Tank should be sand blasted
or cleaned by chemical process and then coated with paint conforming to IS : 5 of latest
issue. The inside of the tank shall be painted by oil resistant paint.
12.3 Top cover plate shall be slightly sloped approximately 5 to10 degree towards HV
bushing so as to avoid stagnation of water at top cover plate. The edge of the top cover
should project beyond the sides and shall be bent downwards all round the tank to a
depth of 10 mm so as avoid entry of water through the cover plate gasket.
12.4 Reinforced by welded MS Angle 50 x 50 x 6 mm on all the outside walls on the
edge of tank to form two equal compartments. The permanent deflection is not more
75
than 5mm for the length upto 750 mm length and 6.5 mm for the length upto 1250 mm
when the transformer tank without oil is subject to air pressure test and vacuum test as
per IS:1180(PART-I):2014.
12.5 All welding operations to be carried out by MIG process.
12.6 VERTICAL CLEARANCE :
The height of the tank shall be such that minimum vertical clearance upto the top
cover plate of 120 mm achieved from top most live point or top yoke of core.
12.7 LIFTING LUGS:
4 Nos. welded heavy duty lifting lugs of MS plate of 10 mm thickness suitably reinforced
by vertical supporting flat of same thickness as of lug welded edgewise below the lug on
the side wall, upto reinforcing angle. They shall be so extended that cutting of bending
plate is not required.
12.8 PULLING LUGS:
4 Nos. welded heavy duty pulling lugs of MS plate of 10 mm thickness shall be provided
to pull the transformer horizontally.
12.9 TOP COVER FIXING BOLTS:
a) 6 mm neoprene cork oil resistance gaskets of RC 70-A grade C-type conforming to
latest IS: 4253(PART-II):2008 of Nucork Brand or equivalent shall be placed between
tank and cover plate.
b) GI bolts and nuts shall be of size 12mm X 40 mm with one plain and one spring
washer suitably 100 mm apart to press the cover.
12.10. PROVISION FOR RESISTANCE TEMPERATURE DETECTOR- RTD ( PT100)
Provision for RTD (Type : PT100) sensor for analyzing the top oil temperature rise should
be made at the top cover of main tank.
The dimensions for PT100 provision shall be 10 mm Dia., 50 mm Depth with female
be suitable for fixing any reputed RTD with
type of PT100 sensors available in the market.
13.0 HEAT DISSIPATION:
a) Heat dissipation by tank walls excluding top and bottom should have maximum of 500
watts/ sq.m.
b) Thickness of radiator fins shall be minimum 1 mm thick for effective heat
dissipation .
c) Tenderer shall submit the calculation sheet along with number of radiators to be
provided and type of fixing radiators to the transformer tank.
d) The guaranteed temperature rise of oil and winding shall be found by conducting
temperature rise test in presence of the representative of the purchaser.
14.0 TOTAL MINIMUM OIL VOLUME:
14.1 Oil shall be filled under vacuum.
14.2 Minimum oil volume should be 670Litres /596 Kg after the oil being absorbed by core
and coil assembly.(Density of oil 0.89g/cm cube)
14.3 If the absorption of oil in the core and the windings is more than the permissible
value, the first filling oil volume should be increased accordingly and detailed calculation
of absorption shall be submitted.
15.0 CONSERVATOR:
15.1 The total volume of the conservator shall be such as to contain 10 % of total
quantity of oil. Normally 3% quantity of the total quantity of oil will be contained in the
conservator.
15.2 The oil gauge and the breather device shall be fixed to the conservator which shall
also be provided with a drain plug and a filling hole (1¼ quarter nominal size thread sec.
76
also as per latest IS: 8999 with cover). In addition the cover of the main tank shall be
provided with an air release plug to enable air trapped within to be released.
15.3 The prismatic oil level indicator shall be provided on the side which will be fully
covered with detachable flange with single neoprene gasket and tightened with M.S.
Bolt and nuts.
15.4 The inside diameter of the pipe connecting the conservator to the main tank shall
be within 30 to 50 mm and it should project into the conservator in such a way that its
end is approximately 20 mm above the bottom of the conservator so as to create a
sump for collection of impurities. The minimum oil level should be above sump level.
(50% of conservator tank capacity).
15.5 The pipe from conservator tank connecting to main tank shall be sloping so that
the oil falling from the pipe shall not fall directly on the active parts and shall fall on the
side walls only.
15.6 The conservator shall be provided with the drain plug and filling hole with cover. In
addition the cover of the main tank shall be provided with an air release plug.
16. 0 BREATHERS:
16.1 Breather joints shall be of bolted type. It shall have die cast aluminum
body/polypropylene and inside container for silica gel shall be suitable material.
16.2 The volume of breather shall be 1000 grams of silica gel breather shall be
provided for 500 KVA Distribution Transformer.
16.3 The breather shall have an inspection window to view the condition of the
silica gel breather.
i) shall be fabricated from high quality aluminium alloy (M-6) & powder coated for
corrosion resistance.
ii) special grade nitrile gasket to ensure water proof & air tight joints.
iii) glass / transparent UV stabilized polycarbonate for visualizing silica gel & oil level
should be fixed by using screws to the main body with gasket to prevent leakage of oil.
16.4 Silica gel shall be conforming to IS: 3401/1992 with its latest amendments.
16.5 The breather shall be provided along with each distribution transformer with good
quality to meet out the environmental/ climatic conditions and additional one number
breather with same specification should be supplied along with each distribution
transformer.
17.0 TRANSFORMER OIL:
The distribution transformers shall be supplied in complete shape with first filling of oil
and the same shall comply with the latest IS:335/ 2018(TYPE-II) standard (with latest
revisions) with aging characteristics specified. Test certificates shall be furnished.
SL.NO. PROPERTY LIMITS
A. FUNCTION
1 Viscosity at 40° c 15mm2/s, (Max)
2 Pour Point 10°C (Max)
3 Water Content 40 mg/kg (Max)
4 Break down voltage(Electric strength)with 2.5 mm gap
a) New unfiltered oil as in received 30 KV ( Min)
condition
b)After filteration 70 KV (Min)
5 Density at 20° c 0.895g/ml, (Max)
6 DDF (Dielectric Dissipation Factor) at 0.005( Max)
90° C
B. REFINING/STABILITY
77
7 Appearance Clear, free from sediment and
suspended matter
8 Acidity 0.01 mg KOH/g (Max)
9 Interfacial Tension 40 mN/m (Min)
10 Corrosive Sulphur Not Corrosive
11 Inhibitors Uninhibited Mineral oil: not detectable
(< 0.01%)
Trace inhibited oil: <0.08%
Inhibited oils: 0.08%-0.40%
12 2 Furfural and related compound Not detectable(<0.05 mg/kg) for each
content individual compound.
C. PERFORMANCE
13 Oxidation Stability
a. Total Acidity 1.2 mg KOH/g. ( Max)
b. Sludge 0.8% (Max)
c. DDF at 90° C 0.500 (Max)
D. HEALTH, SAFETY AND ENVIRONMENT (HSE)
14 Flash Point 135° C
15 PCA Content 3% Max
16 PCB Content Not detectable(< 2 mg/kg)
17.1 INSPECTION AND TESTING OF TRANSFORMER OIL:
The manufacturer shall make arrangements for testing of transformer oil to be used in
78
18.3. The adequate radiators must be provided. There should be a clear gap of
75 mm between the tank/stiffner if any and the radiators so that the belting angles
one on each longer side of the tank can be fixed. The radiators shall not hinder the
passage of belting angles.
19.0. BUSHING TERMINALS:
19.1. Brass rods with 12 mm diameter for HT and Copper rods with 30 mm for LT for
500 KVA Distribution Transformer.
19.2 The HV and LV winding conductor shall not be terminated to the bushing rod
directly.
19.3. HT/LT bimetallic connectors shall be provided to avoid bimetallic action
at the point of connections to the external aluminum cables/conductors.
19.4. HV winding shall be linked through a terminal lug and copper jumper lead of
larger size. The leads shall be enclosed in Kraft paper tube.
19.5. LV winding shall be terminated using inverted S type link with suitable size flat.
a) All the leads / links shall be immersed in oil.
b) All the leads/link shall be taken neatly strapped on an insulated Press Board / wooden
bus bar.
c) The metallic connector shall be L type for LT bushing.
19.6 The bimetallic connectors for HT/LT conforming to IS: 5561 shall be provided.
20.0. BUSHINGS:
20.1. For 11 KV, single piece type of rating 12 KV rating shall be used.
20.2. For LV, double piece type of rating 1.0 KV rating shall be used.
20.3. Bushings of the same voltage class shall be interchangeable.
20.4. Bushings with plain sheds as per IS:3347 shall be mounted on side of the tank
and shall have an inclination of more than 30 degrees from the vertical as per CBIP
manual and IS: 2099-1986.
20.5. Only sheet metal pocket with turret shall be provided for mounting HT bushing.
20.6. Creepage distance shall not be less than 25mm/KV as per IS: 2099-1986.
20.7. All jumpers from windings to bushing shall have a cross section larger than the
winding connectors. The minimum phase to phase and phase to earth external clearances
for HV & LV bushings shall be as follows:
MINIMUM CLEARANCES
PHASE TO PHASE (IN PHASE TO EARTH (IN MM)
MM)
11 KV- HV BUSHINGS 255 140
LV BUSHINGS 75 40
iii. Particular attention must be paid to full film thickness at the edges.
iv. The requirements for the Dry Film Thickness (DFT) of paint and the materials to be
used shall be as given below:
S.No Paint Type Area to No. of Total Dry Film
be Coats Thickness ,(Min )
painted (microns)
1. Thermo setting powder Inside 01 30
paint outside 01 60
80
2. Liquid paint
a) Epoxy (primer) Outside 01 30
b) Polyurethane paint Outside 02 25 each
(finish coat) Inside 01 35/10
c) Hot oil resistant paint /
varnish.
27.0 FITTINGS:
Rating and Terminal marking Plate : 1 No.
Earthing Terminals with earthing symbol ,lugs and markings :2 No.
Lifting Lugs for cover and main tank : 2 No. and 4No.
Oil filling hole with cap : 1 No.
Breathing device : 1 No.
Drain cum sampling valve of diameter 20 mm with steel plug : 1 No
Filtration valve of diameter 20 mm with steel plug : 1 No
Air Release Plug : 1 No
Pulling Lugs : 4 No.
Radiators : Adequate area.
HT and LT Bushing : 3 Nos. of HT Bushing and
: 5 Nos. of LT Bushing shall be provided.
: 3 for the phases; one for the service
neutral; one for the earth.
Each bushing should be provided with 3 Nos. of brass nuts and 2 plain brass washers.
Bi-metallic connectors HV Side Brass / Aluminium : 3 Nos.
LV Side Copper/ Aluminium : 5 Nos.
81
28.0. CURRENT TRANSFORMERS: NOT APPLICABLE
29.0 TESTS ON DISTRIBUTION TRANSFORMER:
Type tests, Special tests, routine tests and acceptance tests shall be conducted on
distribution transformers, of each capacity. All the equipments offered, shall be fully type
tested as per the relevant standards, In case the equipment of the type and design
offered has already been type tested in an independent NABL accredited Lab, the supplier
shall furnish (in four sets) the type test reports before offering the material for
inspection. These test must not have been conducted earlier than five years from the
date of tender opening.
29.1 TYPE TEST:
The following shall constitute the types as per IS:1180 (PART-I):2014 and IS:2026/CBIP
manual.
A. TYPE TESTS:
a) Lightning impulse test IS:2026 (PART-3)
b) Temperature rise test IS: 2026 (PART-2)
c) Pressure test IS:1180 (PART-I) 2014.(with Explosion vent)
B. SPECIAL TESTS:
a) Short circuit withstand test- IS:2026 (PART-5) if the rating is more than
200KVA.
b) No load current at 112.5 percent voltage.
NOTE:
All type and special tests shall be conducted once in five years and also for every change
in design at any independent NABL accredited Laboratory like CPRI, ERDA etc.
If necessary , random samples of materials supplied will be tested (both routine & type
tests and any other special tests ) departmentally or through approved Govt. Laboratory
-conformity to relevant IS and TANGEDCO specification ,
full supplies will be rejected. If initial payment had already been made , the balance
payment will be forfeited and any other losses or damages including testing charges will
also be claimed. Future supplies in such cases will be accepted and paid for only after
the results of the samples tested are satisfactory . In addition, the guarantee period will
also be extended for subsequent supplies at the discretion of the purchaser.
The transformer so selected at random vide item (B) shall also be subject to strip test
after all the type tests are conducted. After the strip test the distribution transformer shall
be subjected to physical inspection as per ISS. If the distribution transformer fails to meet
out the requirement of type tests & special tests, the quantity of transformers ordered on
them will be forthwith rejected.
If any subsequent tests to be conducted as per the TANGEDCO approval, it shall be at the
cost of the supplier.
29.2. TYPE TEST REPORTS:
29.2.1 The attested copy of the type tests and special test reports as mentioned in clause
29 of SECTION VI of this Specification should be submitted along with the tender
offer. The attestation should be obtained from the NABL Lab in which the above testing
was carried out. Otherwise the tender offer will summarily be rejected.
29.2.2 If the type tests and special test would have been conducted within five years as
on the date of tender opening, otherwise the reports will be considered as invalid.
29.2.3 Proof for taking out the distribution transformers from the factory to the NABL
accredited lab and bringing back to the company along with the clear xerox copy of
inward and outward gate pass entries of the lab for both the Short Circuit Lab and the
High Voltage Division Lab for conducting the tests should be enclosed.
29.2.4 Tests to be done on one single unit in the same Lab only.
82
29.2.5 Test piece should be available for verification if needed, till completion of
contract.
29.3 ROUTINE TESTS:
All distribution transformers manufactured shall be subjected to the following
routine test, at the manufacturer's works in accordance with IS:1180 (PART- I ):2014.
a) Measurement of winding resistance- IS: 2026 (PART-I).
b) Measurement of voltage ratio and check of phase displacement - IS:2026 (PART-I)
c) Measurement of short- circuit impedance (Principal tapping when applicable) and
load
loss at 50% and 100% load -IS:2026 (PART-I)
d) Measurement of no-load loss and current - IS:2026 (PART-I)
e) Measurement of insulation resistance- IS:2026 (PART-I)
f) Induced over voltage withstand test- IS:2026 (PART-III)
g) Separate source voltage withstand test - IS:2026 (PART-III)
h) Air pressure test as per IS:1180 (PART-I):2014
i) Oil leakage test as per IS:1180 (PART-I):2014
The test certificates shall include a statement of efficiency of the distribution transformers
of various loads at unity and 0.8 power factor lag.
29.3 .1 UNBALANCE /NEUTRAL CURRENT TEST:
The value of zero sequence current in the star winding shall not be more than 2% of
the full load current.
29.3. 2 PRESSURE AND VACUUM TEST:
The tank shall be fixed with a dummy cover with all fittings including bushing in
position and be subjected to following pressure/vacuum created inside the tank
i) 80 kPa above atmospheric pressure for 30 minutes.
ii) a vacuum corresponding to 500 mm of mercury.
Permanent deflection of flat plate after pressure has been released shall not exceed the
values given below:
LENGTH OF PLATE DEFLECTION
Upto 750mm 5 mm
751-1250mm 6.5 mm
1251-1750mm 8 mm
Supplier should ensure that each fabricated tank is subjected to pressure and vacuum test
at his works and confirmation to this effect is submitted in the test certificate along with
routine test certificate while offering the material for final inspection .
29.3 .3 VECTOR GROUP TEST:
All the distribution transformers must be complied with requirements to confirm the
vector group of Dyn11.
1. All the type, special and routine tests as stipulated in the relevant standards shall be
carried out by the supplier in the presence of TANGEDCO representative.
2. Immediately after finalization of tile programme of type/ special/acceptance/ routine
tests, the supplier shall give fifteen days advance intimation to the TANGEDCO to enable
to depute its representative for witnessing the tests. The cost for the inspection of
TANGEDCO representative shall be borne entirely by the supplier. The routine test
certificate shall be submitted along with the inspection offer.
83
i) all the routine tests as mentioned in the clause 29.3 above shall be performed on
minimum 10% quantity of offered lot.
ii) heat run test- on one unit of total ordered quantity.
iii) verification of active parts on one unit of each rating of offered quantity.
iv) weighment of the complete unit.
v) Power Frequency Test shall be conducted at 28 KV for 1 minute.
29.5 STRIP TEST:
29.5.1. One Unit will be subjected to strip tests at supplier's premises during the course
of stage inspection by the TANGEDCO. The transformers are liable to be rejected if
purchase order requirement are not met in respect of the minimum / maximum values
specified in the P.O. or GTP. The BDV, Water Content and Resistivity should be tested
from the randomly selected DT during the stage inspection for the first lot of DTs offered
for inspection in all the Purchase orders. The cost for the oil tests shall be borne by the
supplier.
29.5.2. TANGEDCO is at liberty to conduct strip test for 2% of the ordered quantity
subject to a minimum of one number will be subjected to strip test at TANGEDCO stores
in the presence of suppliers representative within 15 days from the date of receipt of
intimation by the Superintending Engineer/MM II. If it is found that the distribution
transformer is not meeting the specification requirements and is not meeting the specified
values and values specified in P.O. or GTP, then all the distribution transformers in that
particular consignment are liable to be rejected.
29.5.3. Dismantling and reassembling charges will be borne by the supplier. However
minor facilities such as transport (store to special maintenance) drying, oven, cranes etc
needed for conducting the strip test and subsequent reassembly by the supplier shall be
provided by the consignee Superintending Engineers at free of cost.
30.0. TOLERANCES:
Unless otherwise specified herein, the values of different parameters of the transformers
supplied shall be within the tolerance permitted in the IS:1180(PART-1):2014 on the
guaranteed values. Positive tolerance is not applicable for losses and negative tolerance
not applicable for cross sections of winding specified.
GUARANTEED TECHNICAL PARTICULARS:
The guaranteed technical particulars as per SCHEDULE - B to be filled-in except
the guaranteed values and submitted by the Tenderer. The distribution transformers to be
supplied against this order shall have the value as per technical specifications. If any
deviation in GTP mentioned, should be furnished in deviation schedule separately. The
GTP should be furnished as per SCHEDULE- B. Supplies received with variation/
deviation from the guaranteed values will be liable for rejection.
32.0 DOCUMENTARY EVIDENCE:
The successful bidder shall have to furnish the routine test certificates along with the
central excise gate pass and the purchase invoices for the purchase of CRGO sheet, core
material, oil and aluminum wire, bushings, steel (required for fabrication of the
transformer tank) etc., at the time of routine testing of the fully assembled transformer.
33.0 REJECTION :
Apart from rejection due to failure of distribution transformers to meet the specified
test requirements the transformer shall be liable for rejection on any one of the following
reasons:
1. No load total losses at 50% and 100 % loading exceeds the specified values mentioned
in clause 5.0 above.
2. Impedance voltage value exceeds the guarantee value as mentioned in clause 4.0
above.
84
3. Type test and special test are not carried out as per the clause no. 29.1 of the
specification.
4. Drawings are not submitted as per the clause No. 38 of the specification.
5. GTP not submitted as per the clause No. 31 of the specification.
6. Maximum temperature rise exceeds the specified values mentioned in clause 4.0
above.
34.0 TESTING FACILITY:
The supplier shall have adequate testing facility to conduct the routine and acceptance
tests.
35.0 TESTING OF NO LOAD AND FULL LOAD LOSSES :
After inspection of the new distribution transformers at factory for acceptance of
the lot, all the distribution transformers will be tested for no load and full load losses at all
stores. Supplier has the liberty to be present at the time of testing . the distribution
transformers having losses exceeding from the GTP SCHEDULE-B, will be rejected.
36.0 QUALITY ASSURANCE PLAN:
In respect of raw materials such as core stamping, winding, conductor, insulating paper
and oil, the manufacturer shall use these materials manufactured/supplied by the
standard manufacturers and furnish the manufacturers test certificates as well as the
proof of purchase from these manufacturers (excise gate pass) for information of
TANGEDCO.
The bidder shall invariably furnish the following information along with his offer,
failing which his offer, shall be liable for rejection.
Statement giving list of important raw materials including but not limited to:
Core material.
Winding material.
Insulation paper and press boards.
Transformer oil.
Bushings.
Tanks, conservator and radiators.
Names of sub supplier for the raw materials, List of standards according to which the raw
materials are tested, list of tests normally carried out on raw materials in presence of
Bidder's representatives, copies of test certificates.
1.Information and copies of test certificates in respect of bought out accessories.
2.List of areas in manufacturing process where stage inspections are normally carried out
for quality control and details of such tests and inspections.
3.Special features provided in the equipment to make it maintenance free.
4.List of testing equipment available with the bidder for final testing of transformers vis-à-
vis, the type, special, acceptance and routine tests specified in the relevant standards.
The limitations shall be very clearly brought out in the relevant schedule i.e., schedule of
deviations from specified test requirements.
The supplier shall within 30 days of placement of order, submit following
information to the purchaser.
List of raw materials as well as brought out accessories and the names of sub suppliers
selected from those furnished along with offer.
Type test certificates of the raw material and bought out accessories.
Quality Assurance Plan (QAP) with hold points for purchaser's inspection. The quality
assurance plans and hold points shall be as per ANNEXURE-C.
The supplier shall submit the routine test certificate of bought out items and raw material,
at the time of routine tests of the fully assembled distribution transformer.
37.0 INSPECTION:
85
The supplier shall give 15 days advance intimation to the purchaser to organize stage
inspection of the distribution transformer in which the assembly of core and the winding
could be inspected. The TANGEDCO may at its option, open a distribution transformer
supplied to the stores, in the presence of the supplier at site or at TANGEDCO stores. If
any of the technical particulars are seen to be at variance with the GTP the whole lot of
transformers will be rejected and risk purchase resorted to.
38.0 DOCUMENTATION:
38.1 All drawings shall conform to international standards organization (ISO) 'A' Series
of drawing sheet- A3 Size. All drawings shall be in ink and suitable for micro filming. All
dimensions and data shall be in SI Units.
38.2 List of Drawings and Documents to be enclosed:
DT1 General drawing showing the dimensions, clearances and active parts for tendered
rating of Distribution Transformer.
DT2 Dimensional sketch showing the internal dimensions and clearance for tendered
rating of Distribution Transformer.
38.3 The suppliers are to manufacture and supply the transformers strictly as per the
specifications and as detailed in the above drawings only, and no deviations are
permitted.
The supplier shall furnish all the details of constructional feature showing the details of all
the items in the plan, sectional elevation and the side elevation and indicate these
details/dimensions
38.4 The supplier shall furnish the magnetization characteristic curve for the core
material of the transformer.
38.5 Two sets of the type test reports, duly approved by the TANGEDCO shall be
submitted by the supplier for distribution before commencement of supply.
The manufacture of the equipments shall be strictly in accordance with the approved
drawings and no deviation shall be permitted without written approval of the TANGEDCO.
All manufacturing and fabrication work in connection with the equipment prior to the
approval of tile drawing shall be at tile suppliers risk.
38.7 Approval of drawings / work by TANGEDCO shall not relieve the supplier of his
responsibility and liability for ensuring correctness and correct interpretation of the
drawings for meeting the requirement of the latest revision of applicable standards, rules
and codes of practices. The equipments shall conform in all respects to high standards of
engineering design workmanship and latest revisions of relevant standards at the time of
supply and the TANGEDCO shall have the power to reject any work or materials which in
his judgment is not in full accordance there with.
PACKING AND FORWARDING:
should be ensured that the packing is such that, the material would not get damaged
during transit by Rail/ Road/ Sea. The marking on each package shall be as per the
relevant IS.
HISTORY BOOKS :
The tenderer (as per the enclosed ANNEXURE-III(a) to(e) ) shall be supplied for all
the individual distribution transformers along with the History Book in A4 Size.
41.0 PUNCH MARKING OF TRANSFORMER SERIAL NUMBER.
The serial number of the distribution transformer shall be punch marked on the
transformers tank and also on the top cover in addition to that indicated on the name
plate as per relevant clause.
PERFORMANCE GUARANTEE OF DISTRIBUTION TRANSFORMERS:
86
If during the course of 60 months subsequent to the date of despatch of consignment,
any of the goods found to be defective in materials or workmanship or develops defects
during service, they will have to be replaced/ repaired by the supplier at free of all
charges. All necessary arrangements on this account will be made by the suppliers.
The distribution transformers if required to be repaired /replaced shall be collected by the
supplier / firm from stores at their own cost and at their own responsibility. The same will
like-wise be returned duly repaired / replaced and tested subsequently by the supplier to
the destination at their cost in a reasonable time of 30 days from the date of receipt of
intimation by stores.
Unit once failed within guarantee period and returned to stores duly repaired at free of
charges, shall be guaranteed for a minimum of 12 months or un-expired guarantee period
left as on the date of failure of the unit, whichever is latter.
The outage period i.e. period from the date of failure till unit is repaired, shall not be
counted for arriving at the guarantee of 60 months. The period of failure and repairs,
thus, shall be excluded from the guaranteed service of 60 months.
Further, it is clarified that all the charges towards carrying out repairs including packing /
forwarding, loading /unloading shall be borne by the supplier. The amount deposited or
the BG furnished under security deposit cum performance guarantee clause shall also
cover the performance guarantee of repaired / replaced units.
The actual cost of dismantling and replacement of the equipments with new one may be
The transportation cost towards to and fro for such failed equipments shall be borne by
the supplier.
action will be taken against them which may inter-alia include black listing of the firm for
future business with the company for a certain period.
DEFECTIVE SUPPLIES :
The intimation of failure of distribution transformer shall be given by the any
TANGEDCO field offices from TANGEDCO stores. The failed distribution transformers is to
be replaced/repaired by supplier at free of all charges at the earliest but in any case
within 30 days from the date of receipt of intimation by the consignee. In case
defective / failed distribution transformers are not replaced / repaired and returned to the
area stores within the prescribed period of five months. TANGEDCO has right to recover
the cost of the distribution transformer or to withhold payment till distribution transformer
is repaired.
43.0. TRAINING OF TANGEDCO'S PERSONNEL AT MANUFACTURERS' WORKS:
The supplier shall arrange to train personnel deputed by TANGEDCO, one
AE/Foreman and one Winder for every 50 Nos. of transformers ordered, at their factory,
at free of cost. The training shall cover all aspects of manufacture of distribution
transformers like windings, assembly etc.
44.0. DRAWINGS:
The General Arrangement drawing showing all the details of active parts externally
and the Internal Arrangement drawing. showing all the internal dimensional details in A3
Sheets only, without omitting the guaranteed technical values in line with the type tested
drawings shall be furnished for approval.
GUARANTEED TECHNICAL PARTICULARS AND PARAMETERS GTP
FOR 500 KVA/11KV/ 433V ENERGY EFFICIENCY LEVEL-2
S.No PARTICULARS PARAMETERS
A.
Works
87
B. i. Phone No:
ii. Fax. No:
iii. E-mail Id:
C. BRAND NAME
1. System Voltage- Max. * 12KV
2. Rated HV Voltage * 11KV
3. Rated LV Voltage * 433V
4. Frequency in Hz or CPS with Tolerance +/- 5% * 50 Hz
5. Number of phases * THREE
6. Connection of HV * DELTA
7. Connection of LV * STAR
8. Neutral Earthing * Neutral point of the
secondary winding shall be
brought out in a separate
insulated terminal to be solidly
earthed.
9. a. Maximum Continuous Rating in KVA *500 KVA
b. Type of Cooling *ON AN
10. Normal Voltage Ratio of Transformation *11000/433V
11. Method of Connection/Vector Group *Dyn11
12. i. Maximum Hot Spot Temperature (Ambient Air
98 C
temperature shall be taken as 50 C)
ii. Maximum top oil temperature rise from the
ambient temperature(measured by *35 C
thermometer).
iii. Maximum winding temperature rise from the
ambient temperature(measured by resistance *40 C
method).
13. Flux Density at rated voltage and frequency in
Tesla
( Calculation sheet is to be enclosed along with *1.60 (Max)
core
area and flux density)
14. Type of Distribution Transformer *CORE TYPE
15. CORE:
a. Core material and Grade *CRGO & SUPERIOR THAN M4
b. Number of core steps in Nos. (* Minimum 7
Steps)
c. Dimension of core steps in mm x mm
d. Diameter of Core in mm *203
e. Leg centre in mm *410
f. Window Height in mm *515
e. Gross Core Area in square cm (Minimum) *302
f. Effective Core Area in square cm (Minimum) *293
g. Core Height including Base Channel with
Insulation in mm.
h. Insulation between bottom of core and base
channel in mm
88
i. Numbers and Dimensions of MS channel used *4Nos. and 125 x 65 mm
for clamping of core
j. Size of support channel for base of the Core Coil *2Nos. and 100 x 50 mm
Assembly (cut channels are not acceptable)
k. Size and Number of Key Studs/ core bolts *16 mm and 8 Nos.
l. Size and Number of Tie rods *16 mm and 8 Nos.
m. Insulation of Key Studs- core bolts *Kraft Paper/Fibre Tube
n. Insulation of Tie rods *Kraft Paper/Fibre Tube
o. Painting of core channel, key studs and tie rods.
p. Whether top yoke is cut or holes are made for
LV connections. If yes whether reinforcement is
done.
q. Weight of core alone in Kg. *807
r. Whether top yoke construction is in one piece
s. Whether bottom yoke construction is in one
piece
t. Whether the serial number of the transformer *To be punched
has been punched on the core yoke frame.
u. Neutral current measured by Ammeter *2% of Full Load Current
v. No load magnetizing current and no-load losses
(% of rated/full load current).
i. at 100% voltage *Less than 2% of Full Load
Current FLC
ii. at 112.5% voltage *Less than 5 % of FLC
w. Power factor of magnetizing current (Maximum) *0.2
in Lagging.
x. Audible Sound level at rated voltage and *56
frequency in dB(Decibels) as per NEMA
Standards.
16. CURRENT DENSITY :
a. HV Winding in Amps/ square mm (Specify the
design value)
b. LV Winding in Amps/ square mm (Specify the
design value)
17. WINDINGS :
a. Material of HV Windings *Copper
b. Material of LV Winding *Copper
c. Size of wires for HV Winding (BARE) in mm *2.72 (Dia)
d. Size of Strip for LV Winding (BARE) in mm x *11.3 x 3.2
mm
e. Arrangements of HV conductors/Windings *1X2 in parallel
f. Arrangements of LV conductors/ Windings *3x4 in parallel
g. Total cross sectional Area of HV conductors in *11.616
sq.mm
h. Total cross sectional Area of LV conductors in *427.32
sq.mm
i. Resistance/Phase of HV Winding at 75 C
j. Resistance/Phase of LV Winding at 75 C
89
k. Type of insulation and thickness of HV Winding *Super Enamel Covered and
0.1 mm
l. Type of insulation and thickness of LV Winding *Triple Paper Covered and
0.5 mm
m. Internal and External Diameter of HV Coil in mm *302/398
n. Internal and External Diameter of LV Coil in mm *212/278
o. Number of Coils/Phase for HV side *4 Nos.
p. Number of Coils/Phase for LV side *1 No.
q. Number of Turns /Phase for HV side *1108 at+5% tap.
r. Number of Turns /Phase for LV side *24
s. Height / Axial Length of HV Coils in mm 464
t. Height / Axial Length of LV Coils in mm 477
18. METHODS OF CONNECTION OF WINDING ENDS
TO BUSHING TERMINALS:
a. For HV - The one end of HV winding brazed with
suitable size of wire and suitable material and
other end of wire bolted with HV stud by
forming eye loop and using washer of proper
size.
b. For LV- Other end of LV winding crimped with
suitable size of lugs with suitable material and
then bolted with LV stud terminals with proper
size of washers.
19. METHOD OF FORMING STAR CONNECTION ON
LV SIDE:
All the three ends of LV Windings crimped with
proper size of lugs with material and then bolted
with suitable size of flat with suitable thickness
and wrapping over it with cotton tape .
20. FORMATION OF DELTA CONNECTION ON HV
SIDE:
a. Material of the conductor *Copper
b. Diameter of the conductor in mm
21. GUARANTEED LOSSES:
a. No load loss at normal ratio at 75 C in Watts.
b. Total load loss at 50% loading at normal ratio at *1510 Watts
75 C in Watts-Maximum
c. Total load loss at 100% loading at normal ratio *4300 Watts
at 75 C in Watts- Maximum
d. Tolerance on total load losses at normal ratio at *No positive tolerance
75 C (Maximum)
22. i. Impedance Voltage between HV and LV *4.5%
Windings at normal ratio at 75 C
ii. Tolerance in Percentage +/- 10 (%)
23. Lightning Impulse voltage level of HV and LV *AS PER IS 1180(PART-
Windings at 1.2/50 micro second wave. I):2014
24. INSULATION MATERIALS USED &THICKNESS:
a. Between Core and LV Windings in mm *PCPB & 4.5 mm
b. Interlayer thickness of LV in mm PCPB & 3 mm
90
c. Between HV and LV Windings in mm *PCPB & 12 mm
d. Between Phase-Phase/Inter phase in mm PCPB+OIL & 12 mm
e. End Insulation in mm *PCPB & 25 mm
f. Insulation between HV plain Coils and HV Tap PCPB &10 mm &
coils if applicable in mm & mm. PCPB & 15 mm
g. Base Flat Insulation in mm PCPB & 10 mm
h. Thickness of Wedges and Width in mm and PCPB & 10 mm & 15-18 mm
mm
i. Number of Spacers between HV coil/circle in PCPB & 10
Nos.
j. Frame Channel insulation in mm PCPB & 1.5 mm
25. CLEARANCES:
a. Core to LV Winding (Radial) in mm *4.5
b. Between HV and LV (Radial ) in mm *12
c. Between Phase to Phase (In between HV *12
Conductor with provision of minimum of 2 x 1
mm PCPB to cover the tie rods/Phase Barrier).
91
TANK:
a. Material must be the best quality and oil *Cork sheet RC 70-A grade,
resistant C type
b. Thickness in mm 6 mm
c. Whether the gasket is joint less and one piece.
28. PULLING LUGS:
a. Total numbers 4 Nos.
b. Thickness in mm 10 mm
c. Position of Fixing Side
29. LIFTING LUGS:
a. Numbers for tank cover and for main tank in *2 Nos. and 4 Nos.
Nos.
b. Thickness for tank cover and for main tank in *10 mm and 10 mm
mm
c. Reinforcement of main tank sides by providing
MS Angle with 50 x 50 x 6 mm at one/two
places.
d. Whether all the transformers tanks which are to
be supplied, will be complied with the pressure
and vacuum test as per technical specifications.
e. Whether the top cover of the main tank is
having the following provision.
i. Air Release Plug. * 1No.
ii. Thermometer pocket *1No.
iii. Lifting Lugs *2No.
iv. RTD- PT100 *1No.
v. Explosion vent *1No.
30. BUSHINGS:
A. CHARACTERISTICS:
a. i. Dry withstand Voltage-HV 28kV rms
ii. Dry withstand Voltage-LV Not Applicable
b. i. Wet withstand Voltage-HV 28kV rms
ii. Wet withstand Voltage-LV Not Applicable
c. i. Impulse withstand Voltage-HV 75kVp(Peak)
ii. Impulse withstand Voltage-LV Not Applicable
B. MATERIAL OF THE COMPLETE BUSHING
STUDS:
a. Bushing rods- HV & LV *Brass & Copper
b. Number of Bushing Rods on HV side *3 Nos.
c. Number of Bushing Rods on LV side *5 Nos.
d. Caps, Nuts, Chuck nuts and Washers- HV & LV
e. Size of bushing rods- HV & LV in mm *12 mm & 30 mm
f. Mounting of bushing on side walls/ top cover *Side walls
g. External clearance of bushing terminals after
providing HT and LT Bimetallic connectors on
the bushing rods.
i. Phase to Phase on 11KV - HV side(Minimum) in *255 mm
mm
92
ii. Phase to Phase on 1.1KV- LV side(Minimum) in *75 mm
mm
iii. Phase to Earth on 11KV-HV side(Minimum) in *140 mm
mm
iv. Phase to Earth on 1.1KV- LV side(Minimum) in *40 mm
mm
h. Arrangements of studs provided for fixing of HV
Bushings should be in diamond shape so that
arcing horns are positioned vertically.
31. BIMETALLIC CONNECTORS:
a. Normal current rating of connectors for HV
b. Normal current rating of connectors for LV
c. Short time current rating of connectors for HV
d. Short time current rating of connectors for LV
e. Tensile strength for HV connectors
f. Tensile strength for LV connectors
g. Whether HT and LT Bimetallic connectors are
provided as per specification.
32. BREATHER:
a. Whether breathers are provided as per
specification.
b. Make
c. Capacity *1000grams
d. Material of the Body *Die cast aluminium /
Polypropylene
33. CONSERVATOR:
a. Dimension of Diameter and Length in mm
b. Volume in Litres (10% of total volume of main
tank)
c. Internal Diameter of pipe used for connecting
conservator and main tank.
d. Please confirm whether pipe projected into the *To be provided
conservator 20 mm above the bottom of the
conservator
e. Whether the arrangements made so that oil
does not fall on the active parts.
34. RADIATORS:
(Heat dissipation calculation is to be enclosed)
a. Total Number of Radiators To be specified
b. Total Number of fins/radiators To be specified
c. Size of each fin in mm x mm To be specified
d. Number of radiators fixing on HV side To be specified
e. Number of radiators fixing on LV side To be specified
f. Thickness of the Radiator Fins *1 mm
35. EXPLOSION VENT:
a. Diameter of the Pipe *70 mm
b. Material of Diaphragm *Hylem
c. Thickness (Maximum) *0.3 mm
93
d. Distance between wire mesh and Diaphragm * 12 mm
(Max)
36. OIL TO BE FILLED-IN :
a. Minimum quantity of Oil for filling after *670 Litres
absorption by core and winding ( specific
gravity=0.89 gm/cubic cm) in Litres
b. Grade and Characteristics of oil. *AS PER IS: 335
c. Volume of Oil in Main Tank in Liters
d. Weight of Oil in Main Tank in Kgs.
e. Volume of oil in Conservator in Litres
f. Weight of Oil in Conservator in Kgs.
g. Volume of Total oil filled-in the transformers in
Litres
h. Weight of Total oil filled-in the transformers in
Kgs.
37. OVERALL DIMENSIONS OF TRANSFORMER:
a. Length in mm
b. Breadth in mm
c. Height in mm
38. DETAILS OF RATING PLATE: *AS PER 1180(PART-I):2014
a. Whether all entries are provided.
b. Whether rating plate with riveted of minimum 8
SWG aluminium anodized material sheet.
c. Whether the entries in the rating plate are made
by etching or engraving.
d. TERMINAL MARKINGS: *AS PER 1180(PART-I):2014
39. WEIGHT OF WINDINGS AND DT:
a. Weight of HV Windings (Dry/without oil soaking) *380 Kg.
in Kgs.
b. Weight of LV Windings (Dry/without oil soaking) *225 Kg.
in Kgs.
c. Weight of core assembly with core channels,
core bolts, tie rods, insulation materials etc., in
Kgs.
d. Un tanking Weight of Core Assembly with
Windings including oil absorption in Kgs.
e. Weight of Tank and Fittings including radiators,
conservators, Explosion vent etc., in Kgs.
f. Total Weight of complete transformer with oil
including all fittings and oil absorption in Kgs.
(i.e) 36(h)+39(d)+39(e)
40. DRY FILM THICKNESS OF PAINTING OF *AS PER IS 1180 (PART-
COMPLETE TRANSFORMER: I):2014
a. Colour of Main Tank and Radiators. *Dark Admiralty Grey-ISC
No:632
b. Colour of Conservator . *Dark Admiralty Grey-ISC
No:632
41. DETAILS OF TYPE TEST AND SPECIAL TEST
REPORTS:
94
a. Lightning Impulse Test:
Serial No. of the Transformer:
Report No. and Date :
Name of the NABL LAB:
b. Short Circuit Withstand Test:
Serial No. of the Transformer:
Report No. and Date :
Name of the NABL LAB:
c. Temperature Rise Test:
Serial No. of the Transformer:
Report No. and Date :
Name of the NABL LAB:
d. Pressure Test with Explosion vent:
Serial No. of the Transformer:
Report No. and Date :
Name of the NABL LAB:
e. No- load current at 112.5 percent Voltage.
Serial No. of the Transformer:
Report No. and Date :
Name of the NABL LAB:
42. CURENT TRANSFORMERS: NOT APPLICABLE
43. HISTORY CARD AND OTHERS AS PER
SPECIFICATION:
Whether the leaflet of history card, test results, *To be provided.
flow chart, repairs and major repairs at site of
distribution transformers as per ANNEXURE-III
(a to e) is provided along with each DT. at the
time of supplying of DT.
95