0% found this document useful (0 votes)
5 views

Installation Manual

The document is an installation manual for the Roof Mounted PV Racking System by Empery Solar, detailing product introduction, installation tools, system composition, and step-by-step installation instructions. It emphasizes compliance with local building codes, safety regulations, and proper installation techniques to ensure structural integrity and safety. The manual also includes warranty information and cautions regarding the use of fasteners and installation dimensions.

Uploaded by

Ornela Drasa
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
5 views

Installation Manual

The document is an installation manual for the Roof Mounted PV Racking System by Empery Solar, detailing product introduction, installation tools, system composition, and step-by-step installation instructions. It emphasizes compliance with local building codes, safety regulations, and proper installation techniques to ensure structural integrity and safety. The manual also includes warranty information and cautions regarding the use of fasteners and installation dimensions.

Uploaded by

Ornela Drasa
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 24

Roof Mounted PV Racking System

(Hook Vertical Row)


Installation Manual Ver.1.0

Contents
1.Product introduction
2.Installation tools
3.System composition
4.installation in structions
5.Notes
6.Warranty
1.Product Introduction
Empery solar ( RoofHook ) solar racking system is an all aluminum alloy
solar racking based on RoofHook, which is suitable for large-scale
commercial roof installation and civil roof installation.
RoofHook has been developed into a racking system to adapt to various roof
solar panels. The pre installation features of RoofHook component save
users' installation time and cost.

Before install the RoofHook system, please read the whole manual carefully.
This manual provides the planning and installation instructions of the
RoofHook system.

Follow the installation instructions of solar racking system strictly, which will
meet the structural requirements of products and relevant standards. During
the installation, we must abide by the relevant safety regulations and pay
attention to the implementation of the relevant provisions of the region.
Please contact Empery solar or your local agent by email to check whether
the installation manual you are using is the latest version.

The installation personnel shall comply with the following specifications:

· Comply with all applicable local or national building codes including any that
may replace this manual;
· Ensure that the products such as Empery solar bracket are suitable for
specific installation and installation environment;
· Please use the accessories provided by Empery solar and the installation
tools you carry. (if other accessories are used to replace the construction of
Empery solar accessories, our company will not bear any responsibility for
this.);
· How to recycle: according to local regulations;
· How to remove: corresponding to the installation steps;
· Ensure no less than two professional battery installers;
· Ensure that professional electricians complete the installation of electrical
related equipment;
· Ensure PV array electrical components installation keep safety;

XIAMEN EMPERY SOLAR TECHNOLOGY CO., LTD


Add: Room 410, No.368, Quanyutong Business Center, Xianhou She, Huli District, Xiamen, China.
Tel: +86-592-5903050 Fax:+86-592-5903057 E-mail:[email protected]
2.Install Tools

Hex Wrench Socket Spanner Tape

Socket Electric Tool Marker

XIAMEN EMPERY SOLAR TECHNOLOGY CO., LTD


Add: Room 410, No.368, Quanyutong Business Center, Xianhou She, Huli District, Xiamen, China.
Tel: +86-592-5903050 Fax:+86-592-5903057 E-mail:[email protected]
3.System composition

6 7
8 4
2 1 3 5

XIAMEN EMPERY SOLAR TECHNOLOGY CO., LTD


Add: Room 410, No.368, Quanyutong Business Center, Xianhou She, Huli District, Xiamen, China.
Tel: +86-592-5903050 Fax:+86-592-5903057 E-mail:[email protected]
3.Component List

01 Tapping Screw 02 Roof Hook R19 Rail

R19 Rail Connector End Clamp Mid Clamp

Grounding Clip Grounding Lug

XIAMEN EMPERY SOLAR TECHNOLOGY CO., LTD


Add: Room 410, No.368, Quanyutong Business Center, Xianhou She, Huli District, Xiamen, China.
Tel: +86-592-5903050 Fax:+86-592-5903057 E-mail:[email protected]
4.Installation Instructions
■4.3 Roof Positioning Dimensions
◎Roof Hook Positioning

◎Tile removal

XIAMEN EMPERY SOLAR TECHNOLOGY CO., LTD


Add: Room 410, No.368, Quanyutong Business Center, Xianhou She, Huli District, Xiamen, China.
Tel: +86-592-5903050 Fax:+86-592-5903057 E-mail:[email protected]
4.Installation Instructions
■4.3 Hook Assembly Installation
◎Installing the Hook Assembly

XIAMEN EMPERY SOLAR TECHNOLOGY CO., LTD


Add: Room 410, No.368, Quanyutong Business Center, Xianhou She, Huli District, Xiamen, China.
Tel: +86-592-5903050 Fax:+86-592-5903057 E-mail:[email protected]
4.Installation Instructions
■4.3 Installation Instructions
◎Tile Installation

XIAMEN EMPERY SOLAR TECHNOLOGY CO., LTD


Add: Room 410, No.368, Quanyutong Business Center, Xianhou She, Huli District, Xiamen, China.
Tel: +86-592-5903050 Fax:+86-592-5903057 E-mail:[email protected]
4.Installation Instructions
■4.4 Rail Installation

XIAMEN EMPERY SOLAR TECHNOLOGY CO., LTD


Add: Room 410, No.368, Quanyutong Business Center, Xianhou She, Huli District, Xiamen, China.
Tel: +86-592-5903050 Fax:+86-592-5903057 E-mail:[email protected]
4.Installation Instructions
■4.4 Rail Installation
◎Connection Rail
Before installing the rail,check the length.If the length is not enough,it
is connected with a guide rail conector.

Insert the rail connector into one rail,adjust the position and then use
two hexagonal bolts M8*20(one for each of the two layers of the
W-rail)to flx and lock it.The same way to connect the other rail
hexagonal bolt M8*20。

Rail

hexagonal bolts M8*20


two in total

Rail Connector

XIAMEN EMPERY SOLAR TECHNOLOGY CO., LTD


Add: Room 410, No.368, Quanyutong Business Center, Xianhou She, Huli District, Xiamen, China.
Tel: +86-592-5903050 Fax:+86-592-5903057 E-mail:[email protected]
4.Installation Instructions
■4.4 Rail Installation

XIAMEN EMPERY SOLAR TECHNOLOGY CO., LTD


Add: Room 410, No.368, Quanyutong Business Center, Xianhou She, Huli District, Xiamen, China.
Tel: +86-592-5903050 Fax:+86-592-5903057 E-mail:[email protected]
4.Installation Instructions
■4.5 Installing the solar panels
◎Installing the first panel
When installing the first panel of the array (first column/topmost), refer to
the design drawings to adjust the panel fixing position and use the mid
clamps and end clamps in the panel to fix the panel to the rail.

◎In the same way, fix the remaining panels in the first row with the mid
clamps and end clamps. When installing the second row of solar panels, leave
a gap of 17mm between the panels and repeat the above steps to install the
batteries.

XIAMEN EMPERY SOLAR TECHNOLOGY CO., LTD


Add: Room 410, No.368, Quanyutong Business Center, Xianhou She, Huli District, Xiamen, China.
Tel: +86-592-5903050 Fax:+86-592-5903057 E-mail:[email protected]
4.Installation Instructions
■4.5 Installing the solar panels
◎Continue the above steps to install the entire row of remaining panels.

※Note: Recommended panel installation sequence: from top to bottom,


from left to right
◎After the panel is installed, check all the bolts for locking one last time.

XIAMEN EMPERY SOLAR TECHNOLOGY CO., LTD


Add: Room 410, No.368, Quanyutong Business Center, Xianhou She, Huli District, Xiamen, China.
Tel: +86-592-5903050 Fax:+86-592-5903057 E-mail:[email protected]
4.Installation Instructions
■4.6 Install Grounding System
◎Grounding Clip
When install grounding clip, let the hex bolt pass through the mid clamp and
D nut holes, fix tight and then fix onto the rail, and put the panel to lock tight with
bolt and clamp.

◎Grounding Lug
Once the panel fix finish, as like right chart shown, fix the grounding lug on
the end of rail, add the copper wire to connect the grounding lug, bury the
end of the copper wire into ground finally.

XIAMEN EMPERY SOLAR TECHNOLOGY CO., LTD


Add: Room 410, No.368, Quanyutong Business Center, Xianhou She, Huli District, Xiamen, China.
Tel: +86-592-5903050 Fax:+86-592-5903057 E-mail:[email protected]
4.Installation Instructions
■4.6 Install Grounding System

◎Grounding Clip Install Position Schematic Diagram

■4.7 D Nut Correct Install Method


◎Blow chart is the D nut install method, rail clamp, mid and end clamp
both use this method to install.

XIAMEN EMPERY SOLAR TECHNOLOGY CO., LTD


Add: Room 410, No.368, Quanyutong Business Center, Xianhou She, Huli District, Xiamen, China.
Tel: +86-592-5903050 Fax:+86-592-5903057 E-mail:[email protected]
5.Cautions
■5.1 Fasteners Install Note
Because of its good ductility, stainless steel is essentially different from carbon
steel; improper use will result in bolts and nuts can't be turned off. Prevention
of this situation is mainly in the following aspects:

a. Reduction of friction coefficient:


①Make sure the thread surface is clean, no ash, dirt, etc.
②It is recommended to use wax or lubricant, such as butter and 40# engine
oil, on the surface of bolts when installing.

b. Correct operation:
①When screwing, it must be perpendicular to the axis of the thread. Do not
tilt.
②In the tightening process, the force must be uniform, and the tightening
torque should not exceed the specified safety torque value.
③Use torque wrench or socket wrench as far as possible, avoid using
movable wrench or electric wrench. If you need to use electric wrench, you
should try to reduce the speed.
④Avoid high-temperature use, do not use fast rotation, avoid rapid
temperature rise and lead to lock.

c. Safety torque:
Refer to this install manual to finish safe torque operation of each fastener.
When the fasteners are stainless steel material, should be paid special
attention to the above install cautions.
In case of biting during installation, other tools can be used to forcibly
loosen or cut off the bolts, but it needs to pay attention to protect the solar
racking system and do not damage the oxide layer on the surface of the
aluminum alloy.

■5.2 Project Install Dimension Notes


All dimensions of project installation are subject to the drawings. This install
manual only for this product installation use.

XIAMEN EMPERY SOLAR TECHNOLOGY CO., LTD


Add: Room 410, No.368, Quanyutong Business Center, Xianhou She, Huli District, Xiamen, China.
Tel: +86-592-5903050 Fax:+86-592-5903057 E-mail:[email protected]
15 Years Warranty , 25 Years Duration
If the user/company, the local general agent/agent in the region, the wholesaler
purchase the racking system originally made by XiaMen Empery Solar Technology
Co.,LTD . The surface of the bracket is oxidized, the company promises that the
oxide layer on the surface will not fall off or crack within 5 years from the date of
purchase.And the Empery solar racking system, Empery solar will provide you
with a 15-year quality guarantee from the date of delivery goods.

The installation environment with artificial damage and corrosion to the racking is
not included in the after-sales service of Empery solar.Please refer to the
cleaning, maintenance and installation practice of building aluminum profiles
carefully when you purchase Empery solar products- AAMA 609 & 610-02,please
check to www.aamanet.org.We solemnly promise you in the transportation,
storage, installation process of non-human damage, we will provide you with
service guarantee.

If the operation steps in the manual are not followed during the construction, the
appearance of the support is changed, reworked and repaired without
authorization of Emeper solar, or the support is damaged during the installation
process due to the design error of the customer. Emeper solar is not responsible
for this.

For PV, rail shields and other related products involved in the construction
process, please ask your supplier to issue a warranty statement. Our company is
only responsible for the support system.

XIAMEN EMPERY SOLAR TECHNOLOGY CO., LTD


Add: Room 410, No.368, Quanyutong Business Center, Xianhou She, Huli District, Xiamen, China.
Tel: +86-592-5903050 Fax:+86-592-5903057 E-mail:[email protected]
Rooftop Equipment Wiring Diagram

9Pcs

PV WIFI BAT BMS AC input AC Output Smart


output

9Pcs

IN IN

AC on-off DC on-off

OUT OUT

Combiner Box

LOAD
AC Cable
DC Cable Positive
DC Cable Negative
R485 Cable
Inverter Installation Diagram

Description:
This inverter is wall-mounted, i.e. the mounting method
is hanging on the wall, and there are two round holes
for fixed mounting on the top of the product for
installation. According to the site conditions, it can be
mounted in the following three ways:

Expansion screws:
440 If the inverter is installed on the wall is concrete,
please use expansion screws to fix it, use the
380 expansion screws with specification M8, the length of
the screws is not less than 80mm
9

Wood screws:
If the inverter is installed on the wall is a wooden
structure, please use wood screws to fix it, use the
expansion screws with specification M8, the length of
the screws is not less than 100mm

Screws with machine teeth:


PV WIFI BAT BMS AC input AC Output Smart If the inverter is mounted on a metal bracket, please
output
use machine screws for fixing, and drill corresponding
holes on the bracket, use the screws with specification
M8, and at the same time with one spring pad, two
flat pads and one nut, screw length depends on the
structure of the bracket.

Canopy
Height above ground not less than 500mm

Attention:
1、If the inverter is installed outdoors, it needs
to increase the canopy, which can be
composed of bracket and metal plate;
2、All cables must not leak out, and must be
wrapped with PVC wire pipe; PVC wire pipe
3、Inverter installation height, not less than
500mm from the ground.
Energy storage batteries

Description:
This product adopts wheeled rack structure, can be
pushed, easy to move, choose and inverter closer to
the place to place, reduce the length of the use of
cables, easy to unify management
Distribution Box Installation Diagram
400

Description:
This distribution box is wall-mounted, i.e. the installation is
hung on the wall, and there are four round holes for fixed
installation on the back plate of the product for installation.
According to the site conditions, the following three ways of
installation are available:

Front side
Expansion screws:
500

If the inverter is installed on the wall is concrete,


please use expansion screws to fix it, use the
expansion screws with specification M6, the length of
the screws is not less than 50mm

Wood screws:
If the inverter is installed on the wall is a wooden
structure, please use wood screws to fix it, use the
expansion screws with specification M6, the length of
the screws is not less than 50mm

350

Body mounting holes

Screws with machine teeth:


If the inverter is mounted on a metal bracket, please
use machine screws for fixing, and drill corresponding
holes on the bracket, use the screws with specification
M6, and at the same time with one spring pad, two
flat pads and one nut, screw length depends on the
Reverse side structure of the bracket.
450

Canopy
Height above ground not less than 500mm

Attention:
1、If the inverter is installed outdoors, it needs to increase
the canopy, which can be composed of bracket and
metal plate;
2、All cables must not leak out, and must be wrapped
with PVC wire pipe; PVC wire pipe
3、Inverter installation height, not less than 500mm from
the ground.
Inverter Wiring Diagram

1、CT port (Optional)


Switch:
After all installations are complete, 2、Current sharing port
switch on the startup shape 3、PAR.CANA
4、PAR.CANB
5、PV2 positive connector
DC Cables 6、PV2 negative connector
7、PV1 positive connector
8、PV2 negative connector
BAT+ BAT- 9、COMM port
10、BMS port
AC Cables
Connecting load 11、Generator dry contact
12、Battery terminals
13、Power on/off switch
14、AC input terminal
15、AC output terminal
16、Smart output
17、Battery positive
18、Battery negative

String 1+
String 1-
String 2+
String 2- R485 Cable
Connecting
Battery
Energy Storage Battery Wiring Diagram

Connecting Inverter-
DC Cables
Connecting Inverter+
The display and adjustment
keys are operated according
to the instructions

R485 Cable
Connecting
Battery
Combiner Box Wiring Diagram

Combiner Box

IN IN

AC on-off DC on-off

OUT OUT

Connecting Inverter+
Connecting Inverter-
BAT- BAT+

Connecting Connecting
Inverter Load

Attention:
When wiring, please pay attention to the state of the
switch, it should be in the closed new state, and then
close the switch after all the installation is completed.

You might also like