Assignment 2 Titles and List

The document outlines construction specifications organized by titles and section numbers to standardize data related to construction requirements, facilitating communication among stakeholders. It includes detailed sections on civil works, electrical works, and plumbing works, each specifying general scopes, methodologies, materials, and payment terms. The aim is to ensure that building projects meet owners' requirements, timelines, and budgets effectively.

Uploaded by

Hassan Mobin
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
4 views

Assignment 2 Titles and List

The document outlines construction specifications organized by titles and section numbers to standardize data related to construction requirements, facilitating communication among stakeholders. It includes detailed sections on civil works, electrical works, and plumbing works, each specifying general scopes, methodologies, materials, and payment terms. The aim is to ensure that building projects meet owners' requirements, timelines, and budgets effectively.

Uploaded by

Hassan Mobin
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 6

Submitted Construction Specifications Writing and

Specifications

Dated: 4th, January, 2021

The Document enlists titles and section numbers for organizing data for construction
requirements, products, and activities. By standardizing such information, it aims at facilitating
communication among architects, specifiers, contractors and suppliers, which helps them meet
building owners' requirements, timelines and budgets.

Level/Sublevel SPECIFICATIONS

01 00 00 CIVIL and FINISHING WORKS


01 01 00 Demolition Works
01 01 01 General scope of work
01 01 02 Methodology submittals
01 01 03 Screening for dust/water showering
01 01 04 Diversion of existing services
01 01 05 Selective demolition of period structures
01 01 06 Conservation of existing serviceable material
01 01 07 Damage made to existing period conditions
01 01 08 Assessment/Schedules for existing material
01 01 09 Disposal of surplus material
01 01 10 Measurements
01 01 11 Rate and payment
01 02 00 Stake-out-Survey
01 02 01 General scope of work
01 02 02 Surveying instruments, devices, aids and material
01 02 03 Execution
01 02 03.1 Site clearance and grubbing up vegetation
01 02 03.2 Acquisition of control points and benchmarks
01 02 03.3 Establishment and preservation of survey points and references
01 02 03.4 Documentation and record-keeping of stake-out survey works
01 02 04 Payments
01 03 00 Excavation Works
01 03 01 General scope of work
01 03 02 Site clearance and grubbing up vegetation
01 03 03 Methodology submittals
01 03 04 Excavation
01 02 04.1 Excavating machinery and equipment
01 02 04.2 Depth/Width of Excavation
01 02 04.3 Excavation Protection
01 02 04.4 Slopes Protection
01 02 04.5 Dewatering pumping, ditching and trenching
01 02 04.6 Stockpiling of excavated material
01 02 04.7 Disposal of surplus material
Submitted Construction Specifications Writing and
Specifications

Dated: 4th, January, 2021


01 03 05 Backfilling
01 02 05.1 Backfilling levels
01 02 05.2 Backfilling material
01 02 05.3 Compaction of backfilled material
01 02 05.4 On-field testing of compaction
01 02 05.5 Allowances
01 03 06 Payments
01 04 00 Plain and Reinforced Concrete
01 04 01 General scope of work
01 04 02 General
01 04 02.1 Installation/Placement of embedded items
01 04 02.2 Inspection for quality
01 04 02.3 Special finishes and methods
01 04 02.4 Submission of Bar Bending Schedules
01 04 03 Related Specifications and Standards
01 04 04 Materials
01 04 04.1 Aggregates
01 04 04.2 Cement
01 04 04.3 Water
01 04 04.4 Reinforcement
01 04 04.5 Reinforcement fixing
01 04 05 Concrete
01 04 05.1 General
01 04 05.2 Strength of concrete
01 04 05.3 Water Content
01 04 05.4 Slump
01 04 05.5 Admixtures
01 04 05.6 Methods of obtaining mix designs
01 04 05.7 Batching
01 04 05.8 Mixing
01 04 05.9 Transportation
01 04 05.11 Placing
01 04 05.12 Construction joints
01 04 05.13 Embedded items
01 04 05.14 Consolidation
01 04 05.15 Curing and Protection
01 04 05.16 Works in extreme weather conditions
01 04 06 Test of concrete quality
01 04 07 Finishing of formed concrete
01 04 08 Repair of surface defects
01 04 09 Concrete Construction Tolerances
01 04 10 Acceptance of structure
01 04 11 Methods of Measurements Concrete, formwork and reinforcement
01 05 00 Block Masonry
Submitted Construction Specifications Writing and
Specifications

Dated: 4th, January, 2021


01 05 01 General scope of work
01 05 02 Codes and Standards
01 05 03 Methodology and material Submittals
01 05 04 Tolerances
01 05 05 Inspection and Testing
01 05 06 Delivery and Storage
01 05 07 Mortar
01 05 08 Scaffolding
01 05 09 Execution
01 04 09.1 Placement/Type of joint
01 04 09.2 Curing
01 04 09.3 Finishing
01 04 09.4 Cement-Mortar Coating
01 04 09.5 Pointing
01 05 10 Repairing Brick Work
01 05 11 Vertical/Horizontal Damp proof course
01 05 12 Measurement and payments
01 06 00 Marble Works
01 06 01 General scope of work
01 06 02 Action and Material Submittals and Approvals
01 06 03 Quality Assurance
01 06 04 Pre-Construction Testing and Mockups
01 06 05 Delivery, Storage and Handling
01 06 06 Materials
01 06 07 Installation and Fixation
01 06 07.1 Mortar mixes
01 06 07.2 Grout mixes
01 06 07.3 Dividers, Edging and transitions
01 06 08 Grouting and Filling
01 06 09 Protection
01 07 00 Ceramic Tiles
01 07 01 General scope of work
01 07 02 Action and Material Submittals and Approvals
01 07 03 Quality Assurance
01 07 04 Pre-Construction Testing and Mockups
01 07 05 Delivery, Storage and Handling
01 07 06 Materials, type and pattern
01 07 07 Installation and Fixation
01 07 07.1 Mortar mixes
01 07 07.2 Grout mixes
01 07 07.3 Dividers, spacers. Edging and transitions
01 07 08 Grouting and Filling
01 07 09 Protection
01 08 00 Plaster and Pointer
Submitted Construction Specifications Writing and
Specifications

Dated: 4th, January, 2021


01 08 01 Scope of work
01 08 02 Applicable standards
01 08 03 General
01 08 04 Materials
01 08 05 Proportioning and Mixing
01 08 06 Preparation od surface to be plastered
01 08 07 Beds and Profiles
01 08 08 Cleaning and Protection
01 08 09 Tolerances
01 08 10 Pointing Works
01 08 11 Measurement and payments
01 09 00 Painting Works(Interior and Exterior)
01 09 01 General Scope of work
01 09 02 Product
01 09 03 Execution
01 10 00 Carpentry and Joinery
01 10 01 General Scope of work
01 10 02 Submittals
01 10 02 Applicable standards
01 10 03 Tolerances
01 10 04 Delivery and Storage
01 10 05 Products
01 10 05.1 Timber
01 10 05.2 Plywood and Veneer
01 10 05.3 Adhesives
01 10 05.4 Hardware
01 10 06 Execution
01 10 06.1 Fabrication
01 10 06.2 Priming
01 10 06.3 Door Frames
01 10 06.4 Installing door shutters
01 10 07 Measurement and payments
01 11 00 Gypsum Partitions and Suspended Ceiling
01 11 01 ……….
01 11 02 ……….
01 12 00 Roof Waterproofing System
01 12 01 General Scope of work
01 12 02 Sample
01 12 03 Protection
01 12 04 Measurement
01 12 05 Rate and payment
01 13 00 Aluminum Windows
01 13 01 ………
Submitted Construction Specifications Writing and
Specifications

Dated: 4th, January, 2021


01 13 02 ……….
01 14 00 MS Steel Works
01 14 01 General Scope of work
01 14 02 Submittals
01 14 02.1 Shop drawings
01 14 02.2 Samples
01 14 02.3 Methodology
01 14 03 Applicable standards
01 14 04 Quality Assurance
01 14 03 Materials
01 14 03.1 General requirements
01 14 03.2 Sheet steel
01 14 03.3 Welding Rods
01 14 03.4 Nuts, Bolts and Washers
01 14 03.5 Steel gratings
01 14 03.6 Safety Treads
01 14 03.7 Chain and Buckles
01 14 03.8 Turn Buckles
01 14 03.9 Wire Rope
01 14 03.11 Metal pipe, tubing and fittings
01 14 03.12 Anchors
01 14 04 Execution
01 14 03.1 Fabrication
01 14 03.2 Welding
01 14 03.3 Riveting
01 14 03.4 Bolted Connections
01 14 03.5 Painting and Galvanizing
01 14 03.6 Installation and Fixation
01 14 05 Delivery and Storage
01 14 06 Measurement and payments
01 15 00 Termite Control
01 15 01 ………
01 15 02 ……….
01 16 00 Car Park Curbs and Walkways
01 16 01 ………
01 16 02 ……….
01 17 00 ………
01 17 01 ………
01 17 02 ……….
02 00 00 ELECTRICAL WORKS
02 01 00 Technical Provisions
02 02 00 PVC Conduits and Accessories
02 03 00 Wire, Cable and Cords
Submitted Construction Specifications Writing and
Specifications

Dated: 4th, January, 2021


02 04 00 Wiring Accessories
02 05 00 Point Wiring, Circuit Wiring and Socket Outline Wiring
02 06 00 Light Fixtures
02 07 00 Power Cables
02 08 00 Main L.T Switch Board
02 09 00 Distribution Boards
02 10 00 Telephone Structured Cabling
02 11 00 Data Structured Cabling
02 12 00 Cable Tray System
02 13 00 Earthing
02 14 00 CCTV System
02 15 00 Testing and Commissioning

03 00 00 PLUMBING WORKS
03 01 00 Scope of Work
03 02 00 Underground and Draining System
03 03 00 Internal Sanitary System
03 04 00 Installation of Sanitary Appliances
03 05 00 Cold and Hot Water Supply
03 06 00 Pipe Work and Fitting
03 07 00 Pipe Work and Fitting for firefighting system
03 08 00 Plumbing Equipment and Controls