Neelmangala — Tumkur including Tumkur bypass section of NH-48 (Old NH-4) in the
State of Karnataka on EPC mode under Bharatmala Pariyojna.
Revised
Old weightage Original Revised
Type of weightage in Stage for Revised Scope Unit Rate
in % to the Stage for Payment %Weightage %Weightage Unit Scope
Works % to the Payment Amount in Rs
Contract Price to Particular to Particular
Contract Price
A B C D E F G I = H/G
A - Phase-01
1. Earthwork up to top of the Sub-grade 0.00% Kms
2. Earthwork in Shoulders 0.00% Kms
3. Sub-base course 0.00% Kms
Road works including culverts, widening and repair of culverts
1. Earthwork up to top of the Sub-grade 3.77% 4.61% Kms 0.060 56,326,616 938,776,936
2. Earthwork in Shoulders 0 -
3. Sub-base course 1.28% 1.57% Kms 0.060 19,124,156 318,735,936
4. Non-Bituminous Base course 1.26% 1.54% Kms 0.060 18,825,341 313,755,687
5. Bituminous Base course 1.62% 1.98% Kms 0.060 24,204,010 403,400,169
18.79%
1. Earthwork up to top of the Sub-grade 8.91% 8.53% Kms 61.289 104,191,289 1,699,988
2. Earthwork in Shoulders -
3. Sub-base course 15.18% 14.43% Kms 60.914 176,292,168 2,894,096
4. Non-Bituminous Base course 19.12% 18.07% Kms 60.594 220,731,630 3,642,772
5. Bituminous Base course 16.12% 15.13% Kms 60.253 184,892,322 3,068,578
6. Wearing Course 10.68% 9.21% Kms 55.869 112,467,200 2,013,037
D. 1- Reconstruction and New culvert on existing road ,realignment ,bypass for service
40,399,475
road from chainage :-Km 29+435 to 74+168 of tumkur bypass
D (Phase-01)
A - Phase-01
A. 2.1-New minor Bridges (Length>6m & <60m forservice road from chainage km 29+435
157,347,446
to 74+168 including Tumkur bypass
1. Foundation 9.78% 12.94% Rmt 41.30 27,691,356 670,493
2. Sub-structure 20.37% 26.95% Rmt 41.30 57,676,168 1,396,517
3. Super Structure 12.97% 17.16% Rmt 41.30 36,723,608 889,191
4. Approaches 5.86% 7.93% Nos 10.00 16,976,335 1,697,634
3.292%
3.30% 6. Other Ancillary works 6.31% 8.54% Rmt 5.00 18,279,979 3,655,996
Minor Bridges/Underpasses/Overpasses
Revised
Old weightage Original Revised
Type of weightage in Stage for Revised Scope Unit Rate
in % to the Stage for Payment %Weightage %Weightage Unit Scope
Works % to the Payment Amount in Rs
Contract Price to Particular to Particular
Contract Price
3.292%
A B C D E F G I = H/G
3.30%
B.2- New underpasses / overpasses for main carriageway from chainage Km 61+520 to
34,274,857
74+168 of Tumkur bypass
1. Foundation 1.23% 0.52% Rmt 24.00 1,111,214 46,301
B - Phase-01
2. Sub-structure 4.41% 1.86% Rmt 24.00 3,984,108 166,005
3a. Casting of Girders 3.03% 0.00% Nos -
3b. Super Structure 8.85% 3.74% Rmt 24.00 7,995,319 333,138
4a. Casting of RE walls 0.83% 0.54% Sqm 2034.9 1,149,047 564.670
4b. RE wall 8.83% 5.74% Sqm 2034.9 12,291,305 6,040
5. Approaches and Other Ancillary works 8.34% 3.62% Nos 2.00 7,743,865 3,871,933
Amount for Minor Bridges/Underpasses/Overpasses @ 3.30% Rs. = 214,018,109
A.2- New Major Bridges - service roads from chainage km 29+435 to 74+168 of Tumkur
495,522,195
bypass
1. Foundation 9.86% 9.86% Rmt 1900.00 77,319,968 40,695
2. Sub-structure 7.01% 7.01% Rmt 1900.00 54,970,895 28,932
A - Phase-01
A B C D E F G I = H/G
Phase-01
3.02%
Utility
C
A - Widening and Strengthening of existing Roadfrom chainage km 61+520 to km 74+168 of
-
Tumkur bypass
A - Phase-02
1. Earthwork up to top of the Sub-grade 0.00% Kms 0.000 - -
Road works including culverts, widening and repair of culverts
D. 1- Reconstruction and New culvert on existing road ,realignment ,bypass for service road
33,150,840
from chainage :-Km 29+435 to 74+168 of tumkur bypass
02
A. 2.1-New minor Bridges (Length>6m & <60m forservice road from chainage km 29+435 to
17,024,988
74+168 including Tumkur bypass
1. Foundation 0.05% Rmt 20.10 330,489 16,442
2. Sub-structure 0.75% Rmt 20.10 4,681,932 232,932
3. Super Structure 1.45% Rmt 20.10 9,033,375 449,422
10.34%
9.61%
6.37%
1.39%
Stage for Payment
Old Revised
weightage in weightage in Original Revised
Type of Total Amount Unit Rate
% to the % to the Stage for Payment %Weightage %Weightage Unit Scope
Works in Rs in Rs
Contract Contract to Particular to Particular
Price Price
A - Phase-02
5. Miscellaneous items like hand rails,crash
0.00% Rmt 0.00 -
MJB/ROB/RUB/Flyover
1.39%
(wearing coat, expansion joints, hand rails,
0.00% Rmt 0.00 -
crash barriers, road signs & markings, stone
pitching, protection works etc.)
C.2- New Elevated Section /Flyovers/Grade Sepearators from chaiange km 61+520 to km
90,408,553
74+168 of Tumkur bypass
B - Phase-02 1. Foundation 5.83% Rmt 40.00 5,269,441 131,736
2. Sub-structure 8.18% Rmt 40.00 7,393,348 184,834
3. Super Structure 18.17% Rmt 40.00 16,426,676 410,667
4. Wearing coat including expesion joint 2.14% Rmt 40.00 1,935,713 48,393
5. Miscellaneous items 0.57% Rmt 40.00 510,813 12,770
7. Retaining / Reinforced earth walls 34.94% Rmt 9000.00 31,584,385 3,509
8. Approaches and Other Ancillary works 30.18% Rmt 2.00 27,288,177 13,644,089
Amount for MJB/ROB/RUB/Flyover @ 6.37% Rs. = 90,408,553
I. Toll Plaza 29.27% Nos 1.00 272,421,815 272,421,815
III. Road signs,safety devices, Road
0.23% Kms 41.89 2,157,203 51,503
Furnitures etc
IV. Road marking & Studs 1.27% Kms 41.89 11,829,825 282,433
V. Crash Barrier 7.52% Kms 17.42 69,971,653 4,016,281
Other work
Phase -02
14.31%
0.00%
Utility
Say 305.94
Name of Project: 6-Laning with access control from km 29.435 to km 74.168 of Neelmangala — Tumkur including Tumkur bypass
section of NH-48 (Old NH-4) in the State of Karnataka on EPC mode under Bharatmala Pariyojna.
Total LHS + RHS 3 lane Qty ### 2 lane Qty ### 29.65 ### 30.61 4.54 4.54
Name of Project: 6-Laning with access control from km 29.435 to km 74.168 of Neelmanga
— Tumkur including Tumkur bypass section of NH-48 (Old NH-4) in the State of Karnataka
on EPC mode under Bharatmala Pariyojna.
DBM BC
Total
Convers Overlay Overlay
Item Ch. From Ch. To Side Length Scope Structu
ion ing ing
Length re Gap
Factor Length Length
1 2 3 4 5 = 3-2 6 7 = 5*6 8 9 10
1
Total
74.168 of Neelmangala
the State of Karnataka
Length
Reconst Reconst
ruction ruction
/ /
Realing Realing
ment ment
DBM BC
Length Length
11 12
0.06 0.06
Total 0.06
1 Service Road Scope LHS 28,683 -
10 5
List of VUP/LVUP's - New Construction
S:No From To Length Type of TCS Total Qty 22.392 Total Qty 15.730
S:No From To Length Type of TCS Total Qty 22.392 Total Qty 15.730
S:No From To Length Type of TCS Total Qty 22.392 Total Qty 15.730
S:No From To Length Type of TCS Total Qty 22.392 Total Qty 15.730
Utility Works
Extra High Tension Lines (EHT Lines)
Utility Works
Extra High Tension Lines (EHT Lines)
Total
Conversion
Item Ch. From Ch. To Side Length Scope Scope
Factor
Length
1 2 3 4 5 = 3-2 6 7 = 5*6 8
Reconstruction 29435.00 30420.00 LHS 985.00 1.50 1,477.50 1,477.50
VUP approach 30420.00 30591.70 LHS 171.70 1.50 257.55 257.55
At grade 30591.70 30608.30 LHS 16.60 1.50 24.90 24.90
VUP approach 30608.30 30990.00 LHS 381.70 1.50 572.55 572.55
Reconstruction 30990.00 31820.00 LHS 830.00 1.50 1,245.00 1,245.00
VUP approach 31820.00 32091.70 LHS 271.70 1.50 407.55
VUP 32091.70 32108.30 LHS 16.60 1.50 24.90
VUP approach 32108.30 32400.00 LHS 291.70 1.50 437.55
Reconstruction 32400.00 33020.00 LHS 620.00 1.50 930.00 930.00
VOP 33020.00 33840.00 LHS 820.00 1.50 1,230.00 1,230.00
Retained 33840.00 34600.00 LHS 760.00 0.50 380.00
34600.00 34685.80 LHS 85.80 1.50 128.70 128.70
MNB approach 34685.80 34691.80 LHS 6.00 1.50 9.00
MNB 34691.80 34712.20 LHS 20.40 1.50 30.60
MNB approach 34712.20 34718.20 LHS 6.00 1.50 9.00
Reconstruction 34718.20 38970.00 LHS 4,251.80 1.50 6,377.70 6,377.70
LVUP approach 38970.00 39194.00 LHS 224.00 1.50 336.00
LVUP 39194.00 39206.00 LHS 12.00 1.50 18.00
LVUP approach 39206.00 39400.00 LHS 194.00 1.50 291.00
Reconstruction 39400.00 39964.60 LHS 564.60 1.50 846.90 846.90
MNB approach 39964.60 39971.50 LHS 6.90 1.50 10.35
MNB 39971.50 39988.50 LHS 17.00 1.50 25.50
MNB approach 39988.50 39995.40 LHS 6.90 1.50 10.35
Reconstruction 39995.40 40250.00 LHS 254.60 1.50 381.90 381.90
LVUP approach 40250.00 40749.00 LHS 499.00 1.50 748.50
LVUP 40749.00 40761.00 LHS 12.00 1.50 18.00
LVUP approach 40761.00 41140.00 LHS 379.00 1.50 568.50
Reconstruction 41140.00 42830.00 LHS 1,690.00 1.50 2,535.00 2,535.00
VUP approach 42830.00 43047.50 LHS 217.50 1.50 326.25
VUP 43047.50 43062.50 LHS 15.00 1.50 22.50
VUP approach 43062.50 43457.30 LHS 394.80 1.50 592.20
LVUP 43457.30 43470.70 LHS 13.40 1.50 20.10
LVUP approach 43470.70 43610.00 LHS 139.30 1.50 208.95
Reconstruction 43610.00 44000.00 LHS 390.00 1.50 585.00 585.00
Retained 44000.00 44600.00 LHS 600.00 0.50 300.00
44600.00 45530.00 LHS 930.00 1.50 1,395.00 1,395.00
LVUP approach 45530.00 45743.30 LHS 213.30 1.50 319.95
LVUP 45743.30 45756.70 LHS 13.40 1.50 20.10
LVUP approach 45756.70 45930.00 LHS 173.30 1.50 259.95
Reconstruction 45930.00 46530.00 LHS 600.00 1.50 900.00 900.00
FO Approach 46530.00 46980.00 LHS 450.00 1.50 675.00
FO 46980.00 47020.00 LHS 40.00 1.50 60.00
FO Approach 47020.00 47230.00 LHS 210.00 1.50 315.00
Reconstruction 47230.00 48600.00 LHS 1,370.00 1.50 2,055.00 2,055.00
3 lane Qty ### 2 lane Qty ### ###
Total
Conversion
Item Ch. From Ch. To Side Length Scope Scope
Factor
Length
1 2 3 4 5 = 3-2 6 7 = 5*6 8
Reconstruction 29435.00 30420.00 RHS 985.00 1.50 1,477.50 1,477.50
VUP approach 30420.00 30591.70 RHS 171.70 1.50 257.55 257.55
VUP 30591.70 30608.30 RHS 16.60 1.50 24.90 24.90
VUP approach 30608.30 30990.00 RHS 381.70 1.50 572.55 572.55
Reconstruction 30990.00 31820.00 RHS 830.00 1.50 1,245.00 1,245.00
VUP approach 31820.00 32091.70 RHS 271.70 1.50 407.55
VUP 32091.70 32108.30 RHS 16.60 1.50 24.90
VUP approach 32108.30 32400.00 RHS 291.70 1.50 437.55
Reconstruction 32400.00 33020.00 RHS 620.00 1.50 930.00 930.00
VOP 33020.00 33840.00 RHS 820.00 1.50 1,230.00 1,230.00
33840.00 34600.00 RHS 760.00 0.50 380.00
34600.00 34685.80 RHS 85.80 1.50 128.70 128.70
MNB approach 34685.80 34691.80 RHS 6.00 1.50 9.00
MNB 34691.80 34712.20 RHS 20.40 1.50 30.60
MNB approach 34712.20 34718.20 RHS 6.00 1.50 9.00
Reconstruction 34718.20 38970.00 RHS 4,251.80 1.50 6,377.70 6,377.70
LVUP approach 38970.00 39194.00 RHS 224.00 1.50 336.00
LVUP 39194.00 39206.00 RHS 12.00 1.50 18.00
LVUP approach 39206.00 39400.00 RHS 194.00 1.50 291.00
Reconstruction 39400.00 39964.60 RHS 564.60 1.50 846.90 846.90
MNB approach 39964.60 39971.50 RHS 6.90 1.50 10.35
MNB 39971.50 39988.50 RHS 17.00 1.50 25.50
MNB approach 39988.50 39995.40 RHS 6.90 1.50 10.35
Reconstruction 39995.40 40250.00 RHS 254.60 1.50 381.90 381.90
LVUP approach 40250.00 40749.00 RHS 499.00 1.50 748.50
LVUP 40749.00 40761.00 RHS 12.00 1.50 18.00
LVUP approach 40761.00 41140.00 RHS 379.00 1.50 568.50
Reconstruction 41140.00 42830.00 RHS 1,690.00 1.50 2,535.00 2,535.00
VUP approach 42830.00 43047.50 RHS 217.50 1.50 326.25
VUP 43047.50 43062.50 RHS 15.00 1.50 22.50
VUP approach 43062.50 43457.30 RHS 394.80 1.50 592.20
LVUP 43457.30 43470.70 RHS 13.40 1.50 20.10
LVUP approach 43470.70 43610.00 RHS 139.30 1.50 208.95
Reconstruction 43610.00 44000.00 RHS 390.00 1.50 585.00 585.00
Retained 44000.00 44600.00 RHS 600.00 0.50 300.00
44600.00 45530.00 RHS 930.00 1.50 1,395.00 1,395.00
LVUP approach 45530.00 45743.30 RHS 213.30 1.50 319.95
LVUP 45743.30 45756.70 RHS 13.40 1.50 20.10
LVUP approach 45756.70 45930.00 RHS 173.30 1.50 259.95
Reconstruction 45930.00 46530.00 RHS 600.00 1.50 900.00 900.00
FO Approach 46530.00 46980.00 RHS 450.00 1.50 675.00
FO 46980.00 47020.00 RHS 40.00 1.50 60.00
FO Approach 47020.00 47230.00 RHS 210.00 1.50 315.00
Reconstruction 47230.00 48600.00 RHS 1,370.00 1.50 2,055.00 2,055.00
3 lane Qty ### 2 lane Qty ### ###
Total LHS + RHS 3 lane Qty ### 2 lane Qty ### ###
List of Culverts - Reconstruction and New culvert on existing road ,realignment ,bypass for service
road from chainage :-Km 29+435 to 74+168 of tumkur bypass
Type of Type of
S:No Chainage Size LMCW RMCW Total Remarks
Structure Const.
1 29+495 Box Recon 2.0 x 2.0 1 1 2
2 29+778 Box Recon 3.0 x 2.0 1 1 2
3 30+180 Box Recon 2.0 x 2.0 1 1 2
4 30+549 Box Recon 6.0 x 2.0 1 1 2
5 31+496 Box Recon 3.0 x 2.0 1 1 2
6 32+309 Box Recon 2.0 x 2.0 1 1 2
7 32+400 Box New 4.0 x 2.0 1 1 2
8 34+378 Box Widening 1.5 x 2.0 0 0 0
9 34+955 Box Recon 2.0 x 2.0 1 1 2
10 35+086 Box Recon 2.0 x 2.0 1 1 2
11 35+150 Box Recon 3.0 x 2.0 1 1 2
12 36+560 Box New 2.0 x 2.0 1 1 2
13 38+137 Box Recon 4.0 x 2.0 1 1 2
14 39+206 Box Recon 3.0 x 2.0 1 1 2
15 41+878 Box Recon 2.0 x 2.0 1 1 2
16 43+201 Box Recon 2.0 x 2.0 1 1 2
17 43+341 Box Recon 2.0 x 2.0 1 1 2
18 44+254 HPC Widening 1 1 2
19 45+748 Box Recon 6.0 x 2.0 1 1 2
20 46+740 Box Recon 4.0 x 2.0 1 1 2
21 47+511 Box Recon 2.0 x 2.0 1 1 2
22 47+620 Box New 2.0 x 2.0 1 1 2
Total 21 21 42 0
6-Laning with access control from km 29.435 to km 74.168 of Neelmangala — Tumkur including Tumkur bypass section of
NH-48 (Old NH-4) in the State of Karnataka on EPC mode under Bharatmala Pariyojna
List of Minor Bridges - Widening
Remarks
6-Laning with access control from km 29.435 to km 74.168 of Neelmangala — Tumkur including Tumkur bypass
section of NH-48 (Old NH-4) in the State of Karnataka on EPC mode under Bharatmala Pariyojna
List of VUP/LVUP's - New Construction
Remarks
6-Laning with access control from km 29.435 to km 74.168 of Neelmangala — Tumkur including Tumkur bypass
section of NH-48 (Old NH-4) in the State of Karnataka on EPC mode under Bharatmala Pariyojna
Remarks
6-Laning with access control from km 29.435 to km 74.168 of Neelmangala — Tumkur including Tumkur bypass
section of NH-48 (Old NH-4) in the State of Karnataka on EPC mode under Bharatmala Pariyojna
Remarks
6-Laning with access control from km 29.435 to km 74.168 of Neelmangala — Tumkur including Tumkur byp
section of NH-48 (Old NH-4) in the State of Karnataka on EPC mode under Bharatmala Pariyojna
Crash Barrier
Length of Length of Total
S:No From To Length Nos Nos
LHS RHS Length
1 29+435 30+420 0.985 1 0.985 1 0.985 1.970
Page 53 of 59
5 to km 74.168 of Neelmangala — Tumkur including Tumkur bypass
tate of Karnataka on EPC mode under Bharatmala Pariyojna
Remarks
Figure 2.7A
Descope
Figure 2.7H
Figure 2.7A
Figure 2.5A
Figure 2.7A
Figure 2.7A
Figure 2.7C
Figure 2.7E
Figure 2.7E
Figure 2.7A
Figure 2.7C
Figure 2.7A
Figure 2.7F
Figure 2.7F
Figure 2.7F
Figure 2.7A
Figure 2.7A
Figure 2.7A & 2.7G
Figure 2.7C
Figure 2.7A
Figure 2.7C
Page 54 of 59
6-Laning with access control from km 29.435 to km 74.168 of Neelmangala — Tumkur including Tumkur bypass s
4) in the State of Karnataka on EPC mode under Bharatmala Pariyojna
Street Lighting as per TCS - 2.7C, 2.7D and 2.8A
Length of
S:No From To Length Nos Nos
LHS
1 39+440 39+800 0.360 1 0.360 1
2 41+300 41+600 0.300 1 0.300 1
3 47+240 47+500 0.260 1 0.260 1
4 49+814 50+000 0.186 1 0.186 1
5 55+380 55+500 0.120 1 0.120 1
6 58+060 58+400 0.340 1 0.340 1
7 59+720 60+320 0.600 1 0.600 1
The length shoulb be considered in linear mtr 2.166
Descope
Revised Scope
IRC-SP-87 2019
12.5.3 Locations where lighting is to be provided
Unless specified otherwise in Schedule ‘C’ of the Concession Agreement and elsewhere in
this Manual, the Concessionaire shall provide lighting at the following locations of the Project
Highway:
i) Toll Plaza Area: The lighting in and around Toll Plaza, toll booths, office building,
on the approach road, etc. shall be as per Section 10 of this Manual.
Page 55 of 59
6-Laning with access control from km 29.435 to km 74.168 of Neelmangala — Tumkur including Tumkur bypass s
4) in the State of Karnataka on EPC mode under Bharatmala Pariyojna
Street Lighting as per TCS - 2.7C, 2.7D and 2.8A
Length of
S:No From To Length Nos Nos
LHS
ii) Rest Areas as given in Para 12.9
iii) Truck Lay-Bye: Lighting at the truck lay-bye shall be as per Para 12.6
iv) Bus Bay & Bus Shelter Locations: Lighting shall be provided as per Para 12.7
v) Grade Separated Structures, Interchanges, Flyovers, Underpasses
(vehicular/pedestrian) and Overpasses: Lighting shall be provided as per
Para 3.4.6 of this Manual.
vi) Built-up sections on the Project Highway both in the median of main carriageway
and on the service roads on either side.
3.4.6 Lighting
Lighting requirement shall be as per Section 12 of this Manual. The top and underside of the
grade separated structures and interchange area at the ground level upto 50 m beyond the point
from centre on all legs of interchange/crossing both at top and bottom shall be provided with
lighting.
Page 56 of 59
Neelmangala — Tumkur including Tumkur bypass section of NH-48 (Old NH-
on EPC mode under Bharatmala Pariyojna
Length of Total
Remarks
RHS Length
0.360 0.720
0.300 0.600
0.260 0.520
0.186 0.372 Descope
0.120 0.240 Descope
0.340 0.680
0.600 1.200
2.166 4.332
Descope 0.612
3.720
-SP-87 2019
Page 57 of 59
6-Laning with access control from km 29.435 to km 74.168 of Neelmangala — Tumkur including
Tumkur bypass section of NH-48 (Old NH-4) in the State of Karnataka on EPC mode under
Bharatmala Pariyojna
List of Minor Bridges - Widening