Daily Pumpcrete Checklist

The document is a daily inspection checklist for the concrete pump at the 220 MLD Kaysakat Water Treatment Plant. It includes items to be checked such as certification, safety measures, equipment condition, and operator qualifications. The checklist must be submitted to the CWE-CCIEE & HSE team weekly and requires signatures from various personnel.

Uploaded by

bexcsla
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
42 views2 pages

Daily Pumpcrete Checklist

The document is a daily inspection checklist for the concrete pump at the 220 MLD Kaysakat Water Treatment Plant. It includes items to be checked such as certification, safety measures, equipment condition, and operator qualifications. The checklist must be submitted to the CWE-CCIEE & HSE team weekly and requires signatures from various personnel.

Uploaded by

bexcsla
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

DAILY PUMPCRETE INSPECTION CHECKLIST

PROJECT NAME : 220 MLD KAYSAKAT WATER TREATMENT PLANT SUPERVISOR :


UNIT / MODEL : OPERATOR :
LOCATION : MONTH OF :
DAY MON TUE WED THU FRI SAT SUN
SN ITEMS TO BE CHECKED
DATE
DESCRIPTION
1 Concrete Pump 3rd Party Certificate & Registration.
2 Sonographic test of all pipes.
3 Calibration of all the pressure gauges.
4 Operator's Competency Certificate and Driver's License.
5 Safe distance from the edge of the excavation.
6 Outrigger pads are free from damage.
7 Outriggers are level.
8 Reverse alarm and beacon light are operational.
9 Whip arrester on the pipes and pump.
10 Safe access for concrete mixer to the area (In & Out).
11 Area properly barricaded and signage posted.
12 Hydraulic Oil / Diesel Leakage.
13 Extension Pipeline - Free from damage.
14 Extension Pipeline - Lockin pin in every connection.
15 Extension Pipeline - Adequately supported and secured.
16 Spillage control measure in place.
17 Other accessories (e.g. spider pacing boom 3rd party certificate).
18 Static pumps positioned properly.
19 Static pumps - concrete pipes fixed on structrure as per design.
20 Concrete pipes coupler pins provided.
21 Concrete pipes on floor - away from scaffolds/formworks.
22 Competent banks man and supervision provided.
23 Others (Specify)

Signature:

REMARKS: ( √ ) GOOD / YES, ( X ) NO GOOD / NO. If no, please indicate in the comments column.
COMMENTS:

DATE COMMENTS NEED SERVICE OUT OF DESIGNATION SIGNATURE


SERVICE

Note:
1. Only authorized person can operate the specified tools or equipment.
2. Authorized person must check the tools or equipment to be used before start of work.

Note: This checklist will be submitted to CWE-CCIEE & HSE team at the end of the week.

SUBMITTED BY: CHECKED & VERIFIED BY: NOTED BY:

_____________________________ ____________________
Safety Officer
_____________________________
Safety Officer
Site Engineer Construction Manager